-
1
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
A. Gungor, S.M Gupta, "Issues in environmentally conscious manufacturing and product recovery: a survey, " Computers Industrial Engineering, vol. 36, pp. 811-853, 1999.
-
(1999)
Computers Industrial Engineering
, vol.36
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
2
-
-
0035837942
-
A solution approach to the disassembly line problem in the presence of task failures
-
A. Gungor, S.M. Gupta, "A solution approach to the disassembly line problem in the presence of task failures, " International Journal of Production Research, vol. 39, pp. 1427-1467, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
S.M. McGovern, S.M.Gupta, "A balancing method and genetic algorithm for disassembly line balancing, " European Journal of Operational Research, vol. 179, pp. 692-708, 2007.
-
(2007)
European Journal of Operational Research
, vol.179
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
4
-
-
0038351785
-
Dynamic scheduling and line balancing methods, and software tolls for lean and reconfigurable disassembly cells and lines
-
Boston USA
-
RJ. Ranky, M. Subramanyam, RJ. Caudill, K. Limaye. and N. Alli, "Dynamic scheduling and line balancing methods, and software tolls for lean and reconfigurable disassembly cells and lines, " Proceedings of the IEEE International symposium on Electronics and Environment, Boston USA, 234-239, 2003.
-
(2003)
Proceedings of the IEEE International Symposium on Electronics and Environment
, pp. 234-239
-
-
Ranky, R.J.1
Subramanyam, M.2
Caudill, R.J.3
Limaye., K.4
Alli, N.5
-
5
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
F.T. Altekin, L.Kandiller and N.E Ozdemirel, "Profit-oriented disassembly-line balancing, " International Journal of Production Research, vol. 46, pp. 2675-2693, 2008.
-
(2008)
International Journal of Production Research
, vol.46
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
6
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
S. Agrawal, M.K. Tiwari, "A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem, " International Journal of Production Research, vol. 46, pp. 1405-1429, 2008.
-
(2008)
International Journal of Production Research
, vol.46
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
7
-
-
33748559516
-
Ant colony optimization for disassembly sequencing with multiple objectives
-
S.M McGovern, S.M.Gupta, "Ant colony optimization for disassembly sequencing with multiple objectives, " International Journal of Advanced Manufacturing Technology, vol. 30, pp. 481-496, 2006.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
|