메뉴 건너뛰기




Volumn 183, Issue 2, 2007, Pages 674-693

A classification of assembly line balancing problems

Author keywords

Assembly line balancing; Classification; Configuration of assembly lines

Indexed keywords

CLASSIFICATION (OF INFORMATION); OPERATIONS RESEARCH; PRODUCT DEVELOPMENT; PRODUCTION ENGINEERING;

EID: 34249995941     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.10.010     Document Type: Article
Times cited : (744)

References (188)
  • 2
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labor productivity: An experimental study
    • Aase G.R., Olson J.R., and Schniederjans M.J. U-shaped assembly line layouts and their impact on labor productivity: An experimental study. European Journal of Operational Research 156 (2004) 698-711
    • (2004) European Journal of Operational Research , vol.156 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Schniederjans, M.J.3
  • 5
    • 0031673732 scopus 로고    scopus 로고
    • Ajenblit, D.A., Wainwright, R.L., 1998. Applying genetic algorithms to the U-shaped assembly line balancing problem. In: Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, Anchorage, AK, pp. 96-101.
  • 6
    • 0020816054 scopus 로고
    • A method for assembly line balancing with more than one worker in each station
    • Akagi F., Osaki H., and Kikuchi S. A method for assembly line balancing with more than one worker in each station. International Journal of Production Research 21 (1983) 755-770
    • (1983) International Journal of Production Research , vol.21 , pp. 755-770
    • Akagi, F.1    Osaki, H.2    Kikuchi, S.3
  • 7
    • 0006030850 scopus 로고    scopus 로고
    • Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung
    • Zimmermann U., et al. (Ed), Springer, Berlin
    • Amen M. Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung. In: Zimmermann U., et al. (Ed). Operations Research Proceedings 1996 (1997), Springer, Berlin 224-229
    • (1997) Operations Research Proceedings 1996 , pp. 224-229
    • Amen, M.1
  • 8
    • 0033881924 scopus 로고    scopus 로고
    • An exact method for cost-oriented assembly line balancing
    • Amen M. An exact method for cost-oriented assembly line balancing. International Journal of Production Economics 64 (2000) 187-195
    • (2000) International Journal of Production Economics , vol.64 , pp. 187-195
    • Amen, M.1
  • 9
    • 0034294050 scopus 로고    scopus 로고
    • Heuristic methods for cost-oriented assembly line balancing: A survey
    • Amen M. Heuristic methods for cost-oriented assembly line balancing: A survey. International Journal of Production Economics 68 (2000) 1-14
    • (2000) International Journal of Production Economics , vol.68 , pp. 1-14
    • Amen, M.1
  • 10
    • 0035852818 scopus 로고    scopus 로고
    • Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time
    • Amen M. Heuristic methods for cost-oriented assembly line balancing: A comparison on solution quality and computing time. International Journal of Production Economics 69 (2001) 255-264
    • (2001) International Journal of Production Economics , vol.69 , pp. 255-264
    • Amen, M.1
  • 11
    • 25144463245 scopus 로고    scopus 로고
    • Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds
    • Amen M. Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds. European Journal of Operational Research 168 (2006) 747-770
    • (2006) European Journal of Operational Research , vol.168 , pp. 747-770
    • Amen, M.1
  • 12
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus A.L. COMSOAL: A computer method of sequencing operations for assembly lines. International Journal of Production Research 4 (1966) 259-277
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 13
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • Askin R.G., and Zhou M. A parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research 35 (1997) 3095-3105
    • (1997) International Journal of Production Research , vol.35 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 15
    • 0024673749 scopus 로고
    • Assembly line balancing with parallel workstations and dead time
    • Bard J.F. Assembly line balancing with parallel workstations and dead time. International Journal of Production Research 27 (1989) 1005-1018
    • (1989) International Journal of Production Research , vol.27 , pp. 1005-1018
    • Bard, J.F.1
  • 18
    • 33751255097 scopus 로고    scopus 로고
    • Ant algorithms for a time and space constrained assembly line balancing problem
    • Bautista J., and Pereira J. Ant algorithms for a time and space constrained assembly line balancing problem. European Journal of Operational Research 177 (2006) 2016-2032
    • (2006) European Journal of Operational Research , vol.177 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 19
    • 0033707420 scopus 로고    scopus 로고
    • Bautista, J., Suarez, R., Mateo, M., Companys, R., 2000. Local search heuristics for the assembly line balancing problem with incompatibilities between tasks. In: Proceedings of the 2000 IEEE International Conference on Robotics and Automation, San Francisco, CA, pp. 2404-2409.
  • 20
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 (1986) 909-932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 22
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168 (2006) 694-715
    • (2006) European Journal of Operational Research , vol.168 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 23
  • 26
    • 34250026282 scopus 로고    scopus 로고
    • Boysen, N., Fliedner, M., 2006. A versatile algorithm for assembly line balancing. European Journal of Operational Research, to appear.
  • 28
  • 29
    • 11844274635 scopus 로고    scopus 로고
    • A space allocation algorithm for assembly line components
    • Bukchin Y., and Meller R.D. A space allocation algorithm for assembly line components. IIE Transactions 37 (2005) 51-61
    • (2005) IIE Transactions , vol.37 , pp. 51-61
    • Bukchin, Y.1    Meller, R.D.2
  • 30
    • 33845260328 scopus 로고    scopus 로고
    • A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
    • Bukchin Y., and Rabinowitch I. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. European Journal of Operational Research 174 (2005) 492-508
    • (2005) European Journal of Operational Research , vol.174 , pp. 492-508
    • Bukchin, Y.1    Rabinowitch, I.2
  • 31
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin J., and Rubinovitz J. A weighted approach for assembly line design with station paralleling and equipment selection. IIE Transactions 35 (2003) 73-85
    • (2003) IIE Transactions , vol.35 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 32
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • Bukchin J., and Tzur M. Design of flexible assembly line to minimize equipment cost. IIE Transactions 32 (2000) 585-598
    • (2000) IIE Transactions , vol.32 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 36
    • 0016027179 scopus 로고
    • Assembly line balancing with multiple stations
    • Buxey G.M. Assembly line balancing with multiple stations. Management Science 20 (1974) 1010-1021
    • (1974) Management Science , vol.20 , pp. 1010-1021
    • Buxey, G.M.1
  • 37
    • 0015603944 scopus 로고
    • Production flow line system design - A review
    • Buxey G.M., Slack N.D., and Wild R. Production flow line system design - A review. AIIE Transactions 5 (1973) 37-48
    • (1973) AIIE Transactions , vol.5 , pp. 37-48
    • Buxey, G.M.1    Slack, N.D.2    Wild, R.3
  • 38
    • 34250003561 scopus 로고    scopus 로고
    • Capacho, L., Pastor, R., 2004. ASALBP: The alternative subgraphs assembly line balancing problem, Working Paper, Universitat Politecnica de Catalunya, Spain.
  • 39
    • 0035480374 scopus 로고    scopus 로고
    • Incorporating physical demand criteria into assembly line balancing
    • Carnahan B.J., Norman B.A., and Redfern M.S. Incorporating physical demand criteria into assembly line balancing. IIE Transactions 33 (2001) 875-887
    • (2001) IIE Transactions , vol.33 , pp. 875-887
    • Carnahan, B.J.1    Norman, B.A.2    Redfern, M.S.3
  • 40
    • 0013054874 scopus 로고
    • A dynamic programming approach to stochastic assembly line balancing
    • Carraway R.L. A dynamic programming approach to stochastic assembly line balancing. Management Science 35 (1989) 459-471
    • (1989) Management Science , vol.35 , pp. 459-471
    • Carraway, R.L.1
  • 41
    • 48749137178 scopus 로고
    • A cost-effective approach to stochastic line balancing with off-line repairs
    • Carter J.C., and Silverman F.N. A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management 4 (1984) 145-157
    • (1984) Journal of Operations Management , vol.4 , pp. 145-157
    • Carter, J.C.1    Silverman, F.N.2
  • 42
    • 0024033958 scopus 로고
    • Line balancing with task learning effects
    • Chakravarty A.K. Line balancing with task learning effects. IIE Transactions 20 (1988) 186-193
    • (1988) IIE Transactions , vol.20 , pp. 186-193
    • Chakravarty, A.K.1
  • 43
    • 0022129886 scopus 로고
    • Balancing mixed model lines with in-process inventories
    • Chakravarty A.K., and Shtub A. Balancing mixed model lines with in-process inventories. Management Science 31 (1985) 1161-1174
    • (1985) Management Science , vol.31 , pp. 1161-1174
    • Chakravarty, A.K.1    Shtub, A.2
  • 44
    • 0022440844 scopus 로고
    • A cost minimization procedure for mixed model production lines with normally distributed task times
    • Chakravarty A.K., and Shtub A. A cost minimization procedure for mixed model production lines with normally distributed task times. European Journal of Operational Research 23 (1986) 25-36
    • (1986) European Journal of Operational Research , vol.23 , pp. 25-36
    • Chakravarty, A.K.1    Shtub, A.2
  • 45
    • 0016028490 scopus 로고
    • Survey of paced assembly lines
    • Chase R.B. Survey of paced assembly lines. Industrial Engineering 6 2 (1974) 14-18
    • (1974) Industrial Engineering , vol.6 , Issue.2 , pp. 14-18
    • Chase, R.B.1
  • 46
    • 34249982707 scopus 로고    scopus 로고
    • Chiang, W.-C., Urban, T.L., 2002. A hybrid heuristic for the stochastic U-line balancing problem, Working Paper, University of Tulsa, Oklahoma, USA.
  • 47
    • 34249834508 scopus 로고
    • Manufacturing flow line systems: A review of models and analytical results
    • Dallery Y., and Gershwin S.B. Manufacturing flow line systems: A review of models and analytical results. Queueing Systems Theory and Applications 12 (1992) 3-94
    • (1992) Queueing Systems Theory and Applications , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 49
    • 0024683477 scopus 로고
    • Balancing cycle time and workstations
    • Deckro R.F. Balancing cycle time and workstations. IIE Transactions 21 (1989) 106-111
    • (1989) IIE Transactions , vol.21 , pp. 106-111
    • Deckro, R.F.1
  • 50
    • 0028769398 scopus 로고
    • Cyclic scheduling to minimize inventory in a batch flow line
    • Dobson G., and Yano C.A. Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research 75 (1994) 441-461
    • (1994) European Journal of Operational Research , vol.75 , pp. 441-461
    • Dobson, G.1    Yano, C.A.2
  • 51
    • 34250007500 scopus 로고    scopus 로고
    • Dolgui, A., Ihnatsenka, I., 2004. Branch and bound algorithm for optimal design of transfer lines with multi-spindle stations, Working paper, Ecole Nationale Suoerieure des Mines, Saint-Etienne, France.
  • 52
    • 0033284277 scopus 로고    scopus 로고
    • Dolgui, A., Guschinski, N., Levin, G., 1999. On problem of optimal design of transfer lines with parallel and sequential operations. In: Fuertes, J.M. (Ed.), Proceedings of the 7th IEEE International Conference on Emerging Technologies and Factory Automation, Barcelona, Spain, vol. 1, 1999, pp. 329-334.
  • 53
    • 25144524152 scopus 로고    scopus 로고
    • Decomposition methods to optimize transfer line with parallel and sequential machining
    • Management and control of production and logistics. Binder Z. (Ed), Elsevier, Amsterdam
    • Dolgui A., Guschinsky N., and Levin G. Decomposition methods to optimize transfer line with parallel and sequential machining. In: Binder Z. (Ed). Management and control of production and logistics. Proceedings of the 2nd IFAC Conference, Grenoble, France, 2000 vol. 3 (2001), Elsevier, Amsterdam 983-988
    • (2001) Proceedings of the 2nd IFAC Conference, Grenoble, France, 2000 , vol.3 , pp. 983-988
    • Dolgui, A.1    Guschinsky, N.2    Levin, G.3
  • 54
    • 34249996573 scopus 로고    scopus 로고
    • Dolgui, A., Guschinsky, N., Levin, G., 2001b. A mixed integer program for balancing of transfer line with grouped operations. In: Proceedings of the 28th International Conference on Computer and Industrial Engineering, Florida, USA, 2001, pp. 541-547.
  • 55
    • 34249993232 scopus 로고    scopus 로고
    • Dolgui, A., Guschinsky, N., Levin, G., Harrath, Y., 2001c. Optimal design of a class of transfer lines with parallel operations. In: Groumpos, P.P., Tzes, A.A. (Eds.), Manufacturing, modeling, management and control, Proceedings of the IFAC Symposium, Patras, Greece, 2000, Elsevier, Amsterdam, pp. 36-41.
  • 56
    • 34250026539 scopus 로고    scopus 로고
    • Dolgui, A., Guschinsky, N., Levin, G., 2003. Optimal design of automated transfer lines with blocks of parallel operations. In: Camacho, E.F., Basanez, L., De la Puente, J.A. (Eds.), Proceedings of the 15th IFAC World Congress, Barcelona, Spain, 2002, Elsevier, Amsterdam (on cd-rom).
  • 58
    • 0345815673 scopus 로고    scopus 로고
    • Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung
    • Domschke W., Klein R., and Scholl A. Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung. Zeitschrift für Betriebswirtschaft 66 (1996) 1465-1490
    • (1996) Zeitschrift für Betriebswirtschaft , vol.66 , pp. 1465-1490
    • Domschke, W.1    Klein, R.2    Scholl, A.3
  • 59
    • 0032677007 scopus 로고    scopus 로고
    • Shortest route formulation of mixed-model assembly line balancing problem
    • Erel E., and Gökcen H. Shortest route formulation of mixed-model assembly line balancing problem. European Journal of Operational Research 116 (1999) 194-204
    • (1999) European Journal of Operational Research , vol.116 , pp. 194-204
    • Erel, E.1    Gökcen, H.2
  • 60
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel E., and Sarin S.C. A survey of the assembly line balancing procedures. Production Planning and Control 9 (1998) 414-434
    • (1998) Production Planning and Control , vol.9 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 63
    • 34249989201 scopus 로고    scopus 로고
    • Falkenauer, E., 2005. Line balancing in the real world. In: Proceedings of the International Conference on Product Lifecycle Management PLM 05, Lumiere University of Lyon, France, 2005 (on cd-rom).
  • 65
    • 0034690556 scopus 로고    scopus 로고
    • A cutting plane approach for the single-product assembly system design problem
    • Gadidov R., and Wilhelm W. A cutting plane approach for the single-product assembly system design problem. International Journal of Production Research 38 (2000) 1731-1754
    • (2000) International Journal of Production Research , vol.38 , pp. 1731-1754
    • Gadidov, R.1    Wilhelm, W.2
  • 66
    • 34250022728 scopus 로고    scopus 로고
    • Gamberini, R., Grassi, A., Gamberi, M., Manzini, R., Regattieri, A., 2004. U-shaped assembly lines with stochastic tasks execution times: heuristic procedures for balancing and re-balancing problems. In: Proceedings of the Business and Industry Symposium, 2004 Advanced Simulation Technologies Conference, Arlington, Virginia, .
  • 67
    • 0016971681 scopus 로고
    • Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach
    • Geoffrion A.M., and Graves G.W. Scheduling parallel production lines with changeover costs: Practical application of a quadratic assignment/LP approach. Operations Research 24 (1976) 595-610
    • (1976) Operations Research , vol.24 , pp. 595-610
    • Geoffrion, A.M.1    Graves, G.W.2
  • 68
    • 0034288452 scopus 로고    scopus 로고
    • Design and operation of manufacturing systems: The control-point policy
    • Gershwin S. Design and operation of manufacturing systems: The control-point policy. IIE Transactions 32 (2000) 891-906
    • (2000) IIE Transactions , vol.32 , pp. 891-906
    • Gershwin, S.1
  • 69
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh S., and Gagnon R.J. A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research 27 (1989) 637-670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 70
    • 28244475042 scopus 로고    scopus 로고
    • A goal programming approach to simple U-line balancing problem
    • Gökcen H., and Agpak K. A goal programming approach to simple U-line balancing problem. European Journal of Operational Research 171 (2006) 577-585
    • (2006) European Journal of Operational Research , vol.171 , pp. 577-585
    • Gökcen, H.1    Agpak, K.2
  • 71
    • 0030785015 scopus 로고    scopus 로고
    • A goal programming approach to mixed-model assembly line balancing problem
    • Gökcen H., and Erel E. A goal programming approach to mixed-model assembly line balancing problem. International Journal of Production Economics 48 (1997) 177-185
    • (1997) International Journal of Production Economics , vol.48 , pp. 177-185
    • Gökcen, H.1    Erel, E.2
  • 72
    • 0032043473 scopus 로고    scopus 로고
    • Binary integer formulation for mixed-model assembly line balancing problem
    • Gökcen H., and Erel E. Binary integer formulation for mixed-model assembly line balancing problem. Computers and Industrial Engineering 34 (1998) 451-461
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 451-461
    • Gökcen, H.1    Erel, E.2
  • 73
    • 13444306204 scopus 로고    scopus 로고
    • A shortest route formulation of simple U-type assembly line balancing problem
    • Gökcen H., Agpak K., Gencer C., and Kizilkaya E. A shortest route formulation of simple U-type assembly line balancing problem. Applied Mathematical Modelling 29 (2005) 373-380
    • (2005) Applied Mathematical Modelling , vol.29 , pp. 373-380
    • Gökcen, H.1    Agpak, K.2    Gencer, C.3    Kizilkaya, E.4
  • 77
    • 25144466582 scopus 로고
    • Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren
    • Hautsch K., John H., and Schürgers H. Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren. REFA-Nachrichten 25 (1972) 451-464
    • (1972) REFA-Nachrichten , vol.25 , pp. 451-464
    • Hautsch, K.1    John, H.2    Schürgers, H.3
  • 78
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • Henig M.I. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Computers and Operations Research 13 (1986) 443-449
    • (1986) Computers and Operations Research , vol.13 , pp. 443-449
    • Henig, M.I.1
  • 79
    • 0027251210 scopus 로고
    • Toward characterizing the optimal allocation of storage space in production line systems with variable processing times
    • Hillier F.S., So K.C., and Boling R.W. Toward characterizing the optimal allocation of storage space in production line systems with variable processing times. Management Science 39 (1993) 126-133
    • (1993) Management Science , vol.39 , pp. 126-133
    • Hillier, F.S.1    So, K.C.2    Boling, R.W.3
  • 80
    • 0020848902 scopus 로고
    • A branch and bound algorithm for assembly line balancing problems with formulation irregularities
    • Johnson R.V. A branch and bound algorithm for assembly line balancing problems with formulation irregularities. Management Science 29 (1983) 1309-1324
    • (1983) Management Science , vol.29 , pp. 1309-1324
    • Johnson, R.V.1
  • 82
    • 0016964033 scopus 로고
    • A preference order dynamic program for stochastic assembly line balancing
    • Kao E.P.C. A preference order dynamic program for stochastic assembly line balancing. Management Science 22 (1976) 1097-1104
    • (1976) Management Science , vol.22 , pp. 1097-1104
    • Kao, E.P.C.1
  • 83
    • 0018698137 scopus 로고
    • Computational experience with a stochastic assembly line balancing algorithm
    • Kao E.P.C. Computational experience with a stochastic assembly line balancing algorithm. Computers and Operations Research 6 (1979) 79-86
    • (1979) Computers and Operations Research , vol.6 , pp. 79-86
    • Kao, E.P.C.1
  • 84
    • 0037508541 scopus 로고    scopus 로고
    • Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
    • Karabati S., and Sayin S. Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. European Journal of Operational Research 149 (2003) 417-429
    • (2003) European Journal of Operational Research , vol.149 , pp. 417-429
    • Karabati, S.1    Sayin, S.2
  • 85
    • 33748696795 scopus 로고
    • Allocation of tasks to stations in small-batch assembly with learning: Basic concepts
    • Karini R., and Herer Y.T. Allocation of tasks to stations in small-batch assembly with learning: Basic concepts. International Journal of Production Research 33 (1995) 2973-2998
    • (1995) International Journal of Production Research , vol.33 , pp. 2973-2998
    • Karini, R.1    Herer, Y.T.2
  • 86
    • 0029358711 scopus 로고
    • A strong cutting plane algorithm for the robotic assembly line balancing problem
    • Kim H., and Park S. A strong cutting plane algorithm for the robotic assembly line balancing problem. International Journal of Production Research 33 (1995) 2311-2323
    • (1995) International Journal of Production Research , vol.33 , pp. 2311-2323
    • Kim, H.1    Park, S.2
  • 87
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided assembly line balancing: a genetic algorithm approach
    • Kim Y.K., Kim Y., and Kim Y.J. Two-sided assembly line balancing: a genetic algorithm approach. Production Planning and Control 11 (2000) 44-53
    • (2000) Production Planning and Control , vol.11 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 88
    • 0000945761 scopus 로고    scopus 로고
    • A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
    • Kim Y.K., Kim J.Y., and Kim Y. A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence 13 (2000) 247-258
    • (2000) Applied Intelligence , vol.13 , pp. 247-258
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 89
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
    • Kim Y.K., Kim S.J., and Kim J.Y. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Production Planning and Control 11 (2000) 754-764
    • (2000) Production Planning and Control , vol.11 , pp. 754-764
    • Kim, Y.K.1    Kim, S.J.2    Kim, J.Y.3
  • 90
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • Kim Y.K., Kim J.Y., and Kim Y. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research 168 (2006) 838-852
    • (2006) European Journal of Operational Research , vol.168 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 91
    • 0034466407 scopus 로고    scopus 로고
    • Minimal investment budgets for flow line configuration
    • Kimms A. Minimal investment budgets for flow line configuration. IIE Transactions 32 (2000) 287-298
    • (2000) IIE Transactions , vol.32 , pp. 287-298
    • Kimms, A.1
  • 93
    • 0015639656 scopus 로고
    • A cost-oriented approach to stochastic line balancing
    • Kottas J.F., and Lau H.-S. A cost-oriented approach to stochastic line balancing. AIIE Transactions 5 (1973) 164-171
    • (1973) AIIE Transactions , vol.5 , pp. 164-171
    • Kottas, J.F.1    Lau, H.-S.2
  • 94
    • 0016962322 scopus 로고
    • A total operating cost model for paced lines with stochastic task times
    • Kottas J.F., and Lau H.-S. A total operating cost model for paced lines with stochastic task times. AIIE Transactions 8 (1976) 234-240
    • (1976) AIIE Transactions , vol.8 , pp. 234-240
    • Kottas, J.F.1    Lau, H.-S.2
  • 99
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee T.O., Kim Y., and Kim Y.K. Two-sided assembly line balancing to maximize work relatedness and slackness. Computers and Industrial Engineering 40 (2001) 273-292
    • (2001) Computers and Industrial Engineering , vol.40 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 100
    • 84990609518 scopus 로고
    • Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria
    • Leu Y.Y., Matheson L.A., and Rees L.P. Assembly line balancing using genetic algorithms with heuristic-generated initial populations and multiple evaluation criteria. Decision Sciences 25 (1994) 581-606
    • (1994) Decision Sciences , vol.25 , pp. 581-606
    • Leu, Y.Y.1    Matheson, L.A.2    Rees, L.P.3
  • 102
    • 0036658173 scopus 로고    scopus 로고
    • Multi-section electronic assembly line balancing problems: A case study
    • Liu C.-M., and Chen C.-H. Multi-section electronic assembly line balancing problems: A case study. Production Planning and Control 13 (2002) 451-461
    • (2002) Production Planning and Control , vol.13 , pp. 451-461
    • Liu, C.-M.1    Chen, C.-H.2
  • 103
    • 0013055270 scopus 로고    scopus 로고
    • A single-run optimization algorithm for stochastic assembly line balancing problems
    • Lyu J. A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems 16 (1997) 204-210
    • (1997) Journal of Manufacturing Systems , vol.16 , pp. 204-210
    • Lyu, J.1
  • 104
    • 0015483845 scopus 로고
    • Production-line balances for mixed-model lines
    • Macaskill J.L.C. Production-line balances for mixed-model lines. Management Science 19 (1972) 423-434
    • (1972) Management Science , vol.19 , pp. 423-434
    • Macaskill, J.L.C.1
  • 105
    • 0026238769 scopus 로고
    • A multiple criteria decision making approach for the assembly line balancing problem
    • Malakooti B. A multiple criteria decision making approach for the assembly line balancing problem. International Journal of Production Research 29 (1991) 1979-2001
    • (1991) International Journal of Production Research , vol.29 , pp. 1979-2001
    • Malakooti, B.1
  • 106
    • 0001340484 scopus 로고
    • Assembly line balancing with buffers by multiple criteria optimization
    • Malakooti B. Assembly line balancing with buffers by multiple criteria optimization. International Journal of Production Research 32 (1994) 2159-2178
    • (1994) International Journal of Production Research , vol.32 , pp. 2159-2178
    • Malakooti, B.1
  • 107
    • 0030241346 scopus 로고    scopus 로고
    • A knowledge-based system for solving multi-objective assembly line balancing problems
    • Malakooti B., and Kumar A. A knowledge-based system for solving multi-objective assembly line balancing problems. International Journal of Production Research 34 (1996) 2533-2552
    • (1996) International Journal of Production Research , vol.34 , pp. 2533-2552
    • Malakooti, B.1    Kumar, A.2
  • 108
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • Matanachai S., and Yano C.A. Balancing mixed-model assembly lines to reduce work overload. IIE Transactions 33 (2001) 29-42
    • (2001) IIE Transactions , vol.33 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 110
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen P.R., and Frazier G.V. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics 51 (1997) 177-190
    • (1997) International Journal of Production Economics , vol.51 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 111
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen P.R., and Frazier G.V. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations. International Journal of Production Research 36 (1998) 2717-2741
    • (1998) International Journal of Production Research , vol.36 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 112
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen P.R., and Tarasewich P. Using ant techniques to solve the assembly line balancing problem. IIE Transactions 35 (2003) 605-617
    • (2003) IIE Transactions , vol.35 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 113
    • 29344438441 scopus 로고    scopus 로고
    • Multi-objective assembly line balancing via a modified ant colony optimization technique
    • McMullen P.R., and Tarasewich P. Multi-objective assembly line balancing via a modified ant colony optimization technique. International Journal of Production Research 44 (2006) 27-42
    • (2006) International Journal of Production Research , vol.44 , pp. 27-42
    • McMullen, P.R.1    Tarasewich, P.2
  • 115
    • 17444400924 scopus 로고    scopus 로고
    • Supply chain planning in the German automotive industry
    • Meyr H. Supply chain planning in the German automotive industry. OR Spectrum 26 (2004) 447-470
    • (2004) OR Spectrum , vol.26 , pp. 447-470
    • Meyr, H.1
  • 118
  • 119
    • 34249992682 scopus 로고    scopus 로고
    • Miralles, C., 2005. Solving procedures for the assembly line worker assignment and balancing problem: application to sheltered work centres for disabled. XI Escuela Latinoamericana de Verano en Investigación de Operaciones, Villa de Leyva, Colombia, .
  • 121
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • Moodie C.L., and Young H.H. A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16 (1965) 23-29
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 124
    • 0030570340 scopus 로고    scopus 로고
    • Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
    • Papadopoulos H.T., and Heavey C. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines. European Journal of Operational Research 92 (1996) 1-27
    • (1996) European Journal of Operational Research , vol.92 , pp. 1-27
    • Papadopoulos, H.T.1    Heavey, C.2
  • 125
    • 0031122267 scopus 로고    scopus 로고
    • A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    • Park K., Park S., and Kim W. A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Computers and Industrial Engineering 32 (1997) 321-332
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 321-332
    • Park, K.1    Park, S.2    Kim, W.3
  • 126
    • 25144441275 scopus 로고    scopus 로고
    • Assembly line balancing with incompatibilities and bounded workstation loads
    • Pastor R., and Corominas A. Assembly line balancing with incompatibilities and bounded workstation loads. Ricerca Operativa 30 (2000) 23-45
    • (2000) Ricerca Operativa , vol.30 , pp. 23-45
    • Pastor, R.1    Corominas, A.2
  • 127
    • 0036902263 scopus 로고    scopus 로고
    • Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion
    • Pastor R., Andres C., Duran A., and Perez M. Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion. Journal of the Operational Research Society 53 (2002) 1317-1323
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 1317-1323
    • Pastor, R.1    Andres, C.2    Duran, A.3    Perez, M.4
  • 130
    • 0011717224 scopus 로고    scopus 로고
    • A branch and cut approach for workload smoothing on assembly lines
    • Pinnoi A., and Wilhelm W.E. A branch and cut approach for workload smoothing on assembly lines. INFORMS Journal on Computing 9 (1997) 335-350
    • (1997) INFORMS Journal on Computing , vol.9 , pp. 335-350
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 131
    • 0031677329 scopus 로고    scopus 로고
    • Assembly system design: A branch and cut approach
    • Pinnoi A., and Wilhelm W.E. Assembly system design: A branch and cut approach. Management Science 44 (1998) 103-118
    • (1998) Management Science , vol.44 , pp. 103-118
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 133
    • 0000396642 scopus 로고
    • Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations
    • Pinto P.A., Dannenbring D.G., and Khumawala B.M. Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations. International Journal of Production Research 19 (1981) 565-576
    • (1981) International Journal of Production Research , vol.19 , pp. 565-576
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 134
    • 0020781916 scopus 로고
    • Assembly line balancing with processing alternatives: An application
    • Pinto P.A., Dannenbring D.G., and Khumawala B.M. Assembly line balancing with processing alternatives: An application. Management Science 29 (1983) 817-830
    • (1983) Management Science , vol.29 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 137
    • 0019899326 scopus 로고
    • A new method for assembly line balancing having stochastic work elements
    • Raouf A., and Tsui C. A new method for assembly line balancing having stochastic work elements. Computers and Industrial Engineering 6 (1982) 131-148
    • (1982) Computers and Industrial Engineering , vol.6 , pp. 131-148
    • Raouf, A.1    Tsui, C.2
  • 138
    • 0015660893 scopus 로고
    • Balancing stochastic assembly lines
    • Reeve N.R., and Thomas W.H. Balancing stochastic assembly lines. AIIE Transactions 5 (1973) 223-229
    • (1973) AIIE Transactions , vol.5 , pp. 223-229
    • Reeve, N.R.1    Thomas, W.H.2
  • 142
    • 84960656106 scopus 로고
    • On a multiproduct assembly line-balancing problem
    • Roberts S.D., and Villa C.D. On a multiproduct assembly line-balancing problem. AIIE Transactions 2 (1970) 361-364
    • (1970) AIIE Transactions , vol.2 , pp. 361-364
    • Roberts, S.D.1    Villa, C.D.2
  • 143
    • 0006102920 scopus 로고
    • A comparison of heuristic algorithms for cost-oriented assembly line balancing
    • Rosenberg O., and Ziegler H. A comparison of heuristic algorithms for cost-oriented assembly line balancing. Zeitschrift für Operations Research 36 (1992) 477-495
    • (1992) Zeitschrift für Operations Research , vol.36 , pp. 477-495
    • Rosenberg, O.1    Ziegler, H.2
  • 144
    • 0022075822 scopus 로고
    • Designing a production line to maximize profit
    • Rosenblatt M.J., and Carlson R.C. Designing a production line to maximize profit. IIE Transactions 17 (1985) 117-121
    • (1985) IIE Transactions , vol.17 , pp. 117-121
    • Rosenblatt, M.J.1    Carlson, R.C.2
  • 145
    • 0027148640 scopus 로고
    • RALB - A heuristic algorithm for design and balancing of robotic assembly lines
    • Rubinovitz J., and Bukchin J. RALB - A heuristic algorithm for design and balancing of robotic assembly lines. Annals of the CIRP 42 (1993) 497-500
    • (1993) Annals of the CIRP , vol.42 , pp. 497-500
    • Rubinovitz, J.1    Bukchin, J.2
  • 148
    • 0025462434 scopus 로고
    • Development of cost model for the single-model stochastic assembly line balancing problem
    • Sarin S.C., and Erel E. Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research 28 (1990) 1305-1316
    • (1990) International Journal of Production Research , vol.28 , pp. 1305-1316
    • Sarin, S.C.1    Erel, E.2
  • 149
    • 0013064892 scopus 로고    scopus 로고
    • A methodology for solving single-model, stochastic assembly line balancing problem
    • Sarin S.C., Erel E., and Dar-El E.M. A methodology for solving single-model, stochastic assembly line balancing problem. Omega 27 (1999) 525-535
    • (1999) Omega , vol.27 , pp. 525-535
    • Sarin, S.C.1    Erel, E.2    Dar-El, E.M.3
  • 151
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik T. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research 143 (2002) 115-124
    • (2002) European Journal of Operational Research , vol.143 , pp. 115-124
    • Sawik, T.1
  • 152
    • 0018672309 scopus 로고
    • Assembly line balancing and the application of computer techniques
    • Schofield N.A. Assembly line balancing and the application of computer techniques. Computers and Industrial Engineering 3 (1979) 53-59
    • (1979) Computers and Industrial Engineering , vol.3 , pp. 53-59
    • Schofield, N.A.1
  • 154
    • 20344397182 scopus 로고    scopus 로고
    • A note on an exact method for cost-oriented assembly line balancing
    • Scholl A., and Becker C. A note on an exact method for cost-oriented assembly line balancing. International Journal of Production Economics 97 (2005) 343-352
    • (2005) International Journal of Production Economics , vol.97 , pp. 343-352
    • Scholl, A.1    Becker, C.2
  • 155
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl A., and Becker C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operations Research 168 (2006) 666-693
    • (2006) European Journal of Operations Research , vol.168 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 157
    • 43449085514 scopus 로고    scopus 로고
    • Scholl, A., Boysen, N., Fliedner, M., 2006. The sequence-dependent assembly line balancing problem. Operation Research Spectrum, doi:10.1007/s00291-006-0070-3.
  • 158
    • 23544472233 scopus 로고
    • Planung der Montageanlage
    • Schöniger J., and Spingler J. Planung der Montageanlage. Technica 14 (1989) 27-32
    • (1989) Technica , vol.14 , pp. 27-32
    • Schöniger, J.1    Spingler, J.2
  • 159
    • 0009351586 scopus 로고
    • Uniform assembly line balancing with stochastic task times in just-in-time manufacturing
    • Shin D., and Min H. Uniform assembly line balancing with stochastic task times in just-in-time manufacturing. International Journal of Operations and Production Management 11/8 (1991) 23-34
    • (1991) International Journal of Operations and Production Management , Issue.11-8 , pp. 23-34
    • Shin, D.1    Min, H.2
  • 160
    • 0021392913 scopus 로고
    • The effect of incompletion cost on line balancing with multiple manning of work stations
    • Shtub A. The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research 22 (1984) 235-245
    • (1984) International Journal of Production Research , vol.22 , pp. 235-245
    • Shtub, A.1
  • 163
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman F.N., and Carter J.C. A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science 32 (1986) 455-463
    • (1986) Management Science , vol.32 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 164
    • 0019610050 scopus 로고
    • Analysis of a preference order assembly line problem
    • Sniedovich M. Analysis of a preference order assembly line problem. Management Science 27 (1981) 1067-1080
    • (1981) Management Science , vol.27 , pp. 1067-1080
    • Sniedovich, M.1
  • 166
    • 0032202723 scopus 로고    scopus 로고
    • Balancing JIT production units: The N U-line balancing problem
    • Sparling D. Balancing JIT production units: The N U-line balancing problem. Information Systems and Operational Research 36 (1998) 215-237
    • (1998) Information Systems and Operational Research , vol.36 , pp. 215-237
    • Sparling, D.1
  • 168
    • 0016961319 scopus 로고
    • Deterministic equivalents for stochastic assembly line balancing
    • Sphicas G.P., and Silverman F.N. Deterministic equivalents for stochastic assembly line balancing. AIIE Transactions 8 (1976) 280-282
    • (1976) AIIE Transactions , vol.8 , pp. 280-282
    • Sphicas, G.P.1    Silverman, F.N.2
  • 171
    • 0000423498 scopus 로고
    • Stochastic assembly line balancing using simulated annealing
    • Suresh G., and Sahu S. Stochastic assembly line balancing using simulated annealing. International Journal of Production Research 32 (1994) 1801-1810
    • (1994) International Journal of Production Research , vol.32 , pp. 1801-1810
    • Suresh, G.1    Sahu, S.2
  • 173
    • 0242270555 scopus 로고    scopus 로고
    • Practical considerations in the optimization of flow production systems
    • Tempelmeier H. Practical considerations in the optimization of flow production systems. International Journal of Production Research 41 (2003) 149-170
    • (2003) International Journal of Production Research , vol.41 , pp. 149-170
    • Tempelmeier, H.1
  • 174
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos N.T. Mixed model line balancing with smoothed station assignments. Management Science 16 (1970) 593-603
    • (1970) Management Science , vol.16 , pp. 593-603
    • Thomopoulos, N.T.1
  • 175
    • 0029368231 scopus 로고
    • Solving fuzzy assembly-line balancing problem with genetic algorithms
    • Tsujimura Y., Gen M., and Kubota E. Solving fuzzy assembly-line balancing problem with genetic algorithms. Computers and Industrial Engineering 29 (1995) 543-547
    • (1995) Computers and Industrial Engineering , vol.29 , pp. 543-547
    • Tsujimura, Y.1    Gen, M.2    Kubota, E.3
  • 177
    • 0032070937 scopus 로고    scopus 로고
    • Note. Optimal balancing of U-shaped assembly lines
    • Urban T.L. Note. Optimal balancing of U-shaped assembly lines. Management Science 44 (1998) 738-741
    • (1998) Management Science , vol.44 , pp. 738-741
    • Urban, T.L.1
  • 178
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear optimization of the U-line balancing problem with stochastic task times
    • Urban T.L., and Chiang W.-C. An optimal piecewise-linear optimization of the U-line balancing problem with stochastic task times. European Journal of Operational Research 168 (2006) 771-782
    • (2006) European Journal of Operational Research , vol.168 , pp. 771-782
    • Urban, T.L.1    Chiang, W.-C.2
  • 179
    • 34250021704 scopus 로고    scopus 로고
    • Urban, T.L., Chiang, W.-C., 2006b. Balancing unpaced synchronous production lines, Working Paper, University of Tulsa, Oklahoma, USA.
  • 180
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Van Hop N. A heuristic solution for fuzzy mixed-model line balancing problem. European Journal of Operational Research 168 (2006) 789-810
    • (2006) European Journal of Operational Research , vol.168 , pp. 789-810
    • Van Hop, N.1
  • 181
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 40 (2002) 1405-1420
    • (2002) International Journal of Production Research , vol.40 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 182
    • 29344441733 scopus 로고    scopus 로고
    • ANTBAL: An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. ANTBAL: An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 44 (2006) S.291-S.303
    • (2006) International Journal of Production Research , vol.44
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 183
    • 1642482577 scopus 로고    scopus 로고
    • Visich, J.K., Diaz-Saiz, J., Khumawala, B.M., 2002. Development of heuristics to reduce model imbalance for the mixed-model, U-shaped assembly line, In: Proceedings of Annual Meeting Decision Science Institute 2002, 1786-1791.
  • 184
    • 0032651420 scopus 로고    scopus 로고
    • A column-generation approach for the assembly system design problem with tool changes
    • Wilhelm W.E. A column-generation approach for the assembly system design problem with tool changes. International Journal of Flexible Manufacturing Systems 11 (1999) 177-205
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 177-205
    • Wilhelm, W.E.1
  • 185
    • 3843151430 scopus 로고    scopus 로고
    • A branch-and-cut approach for a generic multiple-product, assembly-system design problem
    • Wilhelm W.E., and Gadidov R. A branch-and-cut approach for a generic multiple-product, assembly-system design problem. INFORMS Journal on Computing 16 (2004) 39-55
    • (2004) INFORMS Journal on Computing , vol.16 , pp. 39-55
    • Wilhelm, W.E.1    Gadidov, R.2
  • 186
    • 0022441646 scopus 로고
    • Formulation of a problem involving assembly lines with multiple manning of work stations
    • Wilson J.M. Formulation of a problem involving assembly lines with multiple manning of work stations. International Journal of Production Research 24 (1986) 59-63
    • (1986) International Journal of Production Research , vol.24 , pp. 59-63
    • Wilson, J.M.1
  • 187
    • 0000544268 scopus 로고
    • Survey, development, and application of algorithms for sequencing paced assembly lines
    • Yano C.A., and Bolat A. Survey, development, and application of algorithms for sequencing paced assembly lines. Journal of Manufacturing and Operations Management 2 (1989) 172-198
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 172-198
    • Yano, C.A.1    Bolat, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.