메뉴 건너뛰기




Volumn 86, Issue , 2017, Pages 1339-1351

A Pareto improved artificial fish swarm algorithm for solving a multi-objective fuzzy disassembly line balancing problem

Author keywords

Artificial fish swarm algorithm; Disassembly line balancing problem; Multi objective optimization; Pareto optimal solutions; Triangular fuzzy number

Indexed keywords

FUZZY RULES; FUZZY SETS; GENETIC ALGORITHMS; MULTIOBJECTIVE OPTIMIZATION; OPTIMAL SYSTEMS; OPTIMIZATION; PARETO PRINCIPLE;

EID: 85020004694     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2017.05.053     Document Type: Article
Times cited : (184)

References (42)
  • 1
    • 84895062423 scopus 로고    scopus 로고
    • Improved binary artificial fish swarm algorithm for the 0-1 multidimensional knapsack problems
    • Azad, MdA.K., Rocha, A.M.A.C., Fernandes, EditeM.G.P., Improved binary artificial fish swarm algorithm for the 0-1 multidimensional knapsack problems. Swarm and Evolutionary Computation 14 (2014), 66–75.
    • (2014) Swarm and Evolutionary Computation , vol.14 , pp. 66-75
    • Azad, M.K.1    Rocha, A.M.A.C.2    Fernandes, E.G.P.3
  • 2
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • Agrawal, S., Tiwari, M., A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research 46 (2008), 1405–1429.
    • (2008) International Journal of Production Research , vol.46 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.2
  • 7
    • 84961289222 scopus 로고    scopus 로고
    • An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
    • Bentaha, M.L., Battaia, O., Dolgui, A., An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research 53 (2015), 1807–1818.
    • (2015) International Journal of Production Research , vol.53 , pp. 1807-1818
    • Bentaha, M.L.1    Battaia, O.2    Dolgui, A.3
  • 11
    • 84902194501 scopus 로고    scopus 로고
    • A hybrid of real coded genetic algorithm and artificial fish swarm algorithm for short-term optimal hydrothermal scheduling
    • Fang, N., Zhou, J., Zhang, R., Liu, Y., Zhang, Y., A hybrid of real coded genetic algorithm and artificial fish swarm algorithm for short-term optimal hydrothermal scheduling. International Journal of Electrical Power & Energy Systems 62 (2014), 617–629.
    • (2014) International Journal of Electrical Power & Energy Systems , vol.62 , pp. 617-629
    • Fang, N.1    Zhou, J.2    Zhang, R.3    Liu, Y.4    Zhang, Y.5
  • 13
    • 0030422390 scopus 로고    scopus 로고
    • Fuzzy assembly line balancing using genetic algorithms
    • Gen, M., Tsujimura, Y., Li, Y., Fuzzy assembly line balancing using genetic algorithms. Computers & Industrial Engineering 31 (1996), 631–634.
    • (1996) Computers & Industrial Engineering , vol.31 , pp. 631-634
    • Gen, M.1    Tsujimura, Y.2    Li, Y.3
  • 16
    • 84947559851 scopus 로고    scopus 로고
    • A novel artificial fish swarm algorithm for solving large-scale reliability-redundancy application problem
    • He, Q., Hu, X., Ren, H., Zhang, H., A novel artificial fish swarm algorithm for solving large-scale reliability-redundancy application problem. Isa Transactions 59 (2015), 105–113.
    • (2015) Isa Transactions , vol.59 , pp. 105-113
    • He, Q.1    Hu, X.2    Ren, H.3    Zhang, H.4
  • 17
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Hop, N.V., A heuristic solution for fuzzy mixed-model line balancing problem. European Journal of Operational Research 168 (2006), 798–810.
    • (2006) European Journal of Operational Research , vol.168 , pp. 798-810
    • Hop, N.V.1
  • 21
    • 84878666440 scopus 로고    scopus 로고
    • Ant colony optimization for sequence‐dependent disassembly line balancing problem
    • Kalayci, C.B., Gupta, S.M., Ant colony optimization for sequence‐dependent disassembly line balancing problem. Journal of Manufacturing Technology Management 24 (2013), 413–427.
    • (2013) Journal of Manufacturing Technology Management , vol.24 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 22
    • 84881185298 scopus 로고    scopus 로고
    • Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
    • Kalayci, C.B., Gupta, S.M., Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert Systems with Applications 40 (2013), 7231–7241.
    • (2013) Expert Systems with Applications , vol.40 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 23
    • 84887413772 scopus 로고    scopus 로고
    • Balancing a sequence-dependent disassembly line using simulated annealing algorithm
    • Kalayci, C.B., Gupta, S.M., Balancing a sequence-dependent disassembly line using simulated annealing algorithm. Applications of Management Science 16 (2013), 81–103.
    • (2013) Applications of Management Science , vol.16 , pp. 81-103
    • Kalayci, C.B.1    Gupta, S.M.2
  • 24
    • 84887821595 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
    • Kalayci, C.B., Gupta, S.M., A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem. International Journal of Advanced Manufacturing Technology 69 (2013), 197–209.
    • (2013) International Journal of Advanced Manufacturing Technology , vol.69 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 25
    • 84889821707 scopus 로고    scopus 로고
    • A tabu search algorithm for balancing a sequence-dependent disassembly line
    • Kalayci, C.B., Gupta, S.M., A tabu search algorithm for balancing a sequence-dependent disassembly line. Production Planning & Control 25 (2013), 149–160.
    • (2013) Production Planning & Control , vol.25 , pp. 149-160
    • Kalayci, C.B.1    Gupta, S.M.2
  • 28
    • 84954047904 scopus 로고    scopus 로고
    • Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
    • Kalayci, C.B., Hancilar, A., Gungor, A., Gupta, S.M., Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm. Journal of Manufacturing Systems 37 (2014), 672–682.
    • (2014) Journal of Manufacturing Systems , vol.37 , pp. 672-682
    • Kalayci, C.B.1    Hancilar, A.2    Gungor, A.3    Gupta, S.M.4
  • 30
    • 84902301531 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
    • Kalayci, C.B., Polat, O., Gupta, S.M., A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem. Annals of Operations Research 242 (2016), 321–354.
    • (2016) Annals of Operations Research , vol.242 , pp. 321-354
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 31
    • 33750124892 scopus 로고    scopus 로고
    • Applications of artificial fish school algorithm in combinatorial optimization problems
    • Li, X., Lu, F., Tian, G., Qian, J., Applications of artificial fish school algorithm in combinatorial optimization problems. Journal of Shandong University (Engineering Science) 34 (2004), 64–67.
    • (2004) Journal of Shandong University (Engineering Science) , vol.34 , pp. 64-67
    • Li, X.1    Lu, F.2    Tian, G.3    Qian, J.4
  • 34
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • McGovern, S.M., Gupta, S.M., A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research 179 (2007), 692–708.
    • (2007) European Journal of Operational Research , vol.179 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 36
    • 84939620796 scopus 로고    scopus 로고
    • Two-stage sequence generation for partial disassembly of products with sequence dependent task times
    • Riggs, R.J., Jin, X., Hu, S.J., Two-stage sequence generation for partial disassembly of products with sequence dependent task times. Procedia Cirp 29 (2015), 698–703.
    • (2015) Procedia Cirp , vol.29 , pp. 698-703
    • Riggs, R.J.1    Jin, X.2    Hu, S.J.3
  • 37
    • 84864403256 scopus 로고    scopus 로고
    • Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem
    • Tapkan, P., Ozbakir, L., Baykasoglu, A., Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem. Optimization Letters 6 (2012), 1039–1049.
    • (2012) Optimization Letters , vol.6 , pp. 1039-1049
    • Tapkan, P.1    Ozbakir, L.2    Baykasoglu, A.3
  • 38
    • 0029368231 scopus 로고
    • Solving fuzzy assembly-line balancing problem with genetic algorithms
    • Tsujimura, Y., Gen, M., Kubota, E., Solving fuzzy assembly-line balancing problem with genetic algorithms. Computers & Industrial Engineering 29 (1995), 543–547.
    • (1995) Computers & Industrial Engineering , vol.29 , pp. 543-547
    • Tsujimura, Y.1    Gen, M.2    Kubota, E.3
  • 39
    • 84904384763 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • Tuncel, E., Zeid, A., Kamarthi, S., Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing 25 (2014), 647–659.
    • (2014) Journal of Intelligent Manufacturing , vol.25 , pp. 647-659
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 40
    • 84892502782 scopus 로고    scopus 로고
    • An improved artificial fish swarm algorithm and its application in multiple sequence alignment
    • Yang, W.H., An improved artificial fish swarm algorithm and its application in multiple sequence alignment. Journal of Computational and Theoretical Nanoscience 11 (2014), 888–892.
    • (2014) Journal of Computational and Theoretical Nanoscience , vol.11 , pp. 888-892
    • Yang, W.H.1
  • 41
    • 84862303222 scopus 로고    scopus 로고
    • Multi-objective fuzzy assembly line balancing using genetic algorithms
    • Zacharia, P.T., Nearchou, A.C., Multi-objective fuzzy assembly line balancing using genetic algorithms. Journal of Intelligent Manufacturing 23 (2012), 1–13.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , pp. 1-13
    • Zacharia, P.T.1    Nearchou, A.C.2
  • 42
    • 84942323957 scopus 로고    scopus 로고
    • Routing optimization based on artificial fish swarm algorithm
    • Zhao, Y., Du, L., Routing optimization based on artificial fish swarm algorithm. Metallurgical & Mining Industry 7 (2015), 258–266.
    • (2015) Metallurgical & Mining Industry , vol.7 , pp. 258-266
    • Zhao, Y.1    Du, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.