메뉴 건너뛰기




Volumn 247, Issue 3, 2015, Pages 957-967

Second order conic approximation for disassembly line design with joint probabilistic constraints

Author keywords

Assembly and disassembly; Joint probabilistic constraints; Line design and balancing; Piecewise linear approximation; Stochastic programming

Indexed keywords

PIECEWISE LINEAR TECHNIQUES; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 84940610243     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2015.06.019     Document Type: Article
Times cited : (72)

References (81)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • Agrawal S., and Tiwari M.K. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem International Journal of Production Research 46 6 2006 1405 1429
    • (2006) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 5
    • 33847014539 scopus 로고    scopus 로고
    • A chance-constrained approach to stochastic line balancing problem
    • Aʇpak K., and Gökçen H. A chance-constrained approach to stochastic line balancing problem European Journal of Operational Research 180 3 2007 1098 1115
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1098-1115
    • Aʇpak, K.1    Gökçen, H.2
  • 6
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • Aydemir-Karadag A., and Turkbey O. Multi-objective optimization of stochastic disassembly line balancing with station paralleling Computers & Industrial Engineering 65 3 2013 413 425
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 8
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 8 1986 909 932
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 10
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 3 2006 694 715
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 11
    • 84922236941 scopus 로고    scopus 로고
    • Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
    • Springer Berlin Heidelberg
    • Bentaha M.L., Battaïa O., and Dolgui A. Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts IFIP advances in information and communication technology Vol. 414 2013 Springer Berlin Heidelberg 103 110
    • (2013) IFIP advances in information and communication technology , vol.414 , pp. 103-110
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 14
    • 84902248564 scopus 로고    scopus 로고
    • A sample average approximation method for disassembly line balancing problem under uncertainty
    • Bentaha M.L., Battaïa O., and Dolgui A. A sample average approximation method for disassembly line balancing problem under uncertainty Computers & Operations Research 51 2014 111 122
    • (2014) Computers & Operations Research , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 15
    • 84903557899 scopus 로고    scopus 로고
    • Disassembly line balancing and sequencing under uncertainty
    • Bentaha M.L., Battaïa O., and Dolgui A. Disassembly line balancing and sequencing under uncertainty Procedia CIRP 15 2014 239 244
    • (2014) Procedia CIRP , vol.15 , pp. 239-244
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 16
    • 84904503542 scopus 로고    scopus 로고
    • Lagrangian relaxation for stochastic disassembly line balancing problem
    • Bentaha M.L., Battaïa O., and Dolgui A. Lagrangian relaxation for stochastic disassembly line balancing problem Procedia CIRP 2014 17 2014 56 60
    • (2014) Procedia CIRP 2014 , vol.17 , pp. 56-60
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 18
    • 0024931651 scopus 로고
    • Identifying multiple solutions for assembly line balancing having stochastic task times
    • Betts J., and Mahmoud K.I. Identifying multiple solutions for assembly line balancing having stochastic task times Computers & Industrial Engineering 16 3 1989 427 445
    • (1989) Computers & Industrial Engineering , vol.16 , Issue.3 , pp. 427-445
    • Betts, J.1    Mahmoud, K.I.2
  • 19
    • 83555174965 scopus 로고    scopus 로고
    • Chance-constrained optimal path planning with obstacles
    • Blackmore L., Ono M., and Williams B. Chance-constrained optimal path planning with obstacles IEEE Transactions on Robotics 27 6 2011 1080 1094
    • (2011) IEEE Transactions on Robotics , vol.27 , Issue.6 , pp. 1080-1094
    • Blackmore, L.1    Ono, M.2    Williams, B.3
  • 21
    • 84858055787 scopus 로고    scopus 로고
    • Chance constrained problems: Penalty reformulation and performance of sample approximation technique
    • Branda M. Chance constrained problems: Penalty reformulation and performance of sample approximation technique Kybernetika 48 1 2012 105 122
    • (2012) Kybernetika , vol.48 , Issue.1 , pp. 105-122
    • Branda, M.1
  • 22
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm
    • Cakir B., Altiparmak F., and Dengiz B. Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm Computers & Industrial Engineering 60 3 2011 376 384
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 376-384
    • Cakir, B.1    Altiparmak, F.2    Dengiz, B.3
  • 23
    • 33745923484 scopus 로고    scopus 로고
    • The ASALB problem with processing alternatives involving different tasks: Definition, formalization and resolution
    • Springer-Verlag
    • Capacho L., and Pastor R. The ASALB problem with processing alternatives involving different tasks: Definition, formalization and resolution Computational science and its applications - ICCSA 2006 Vol. 3982 2006 Springer-Verlag 554 563
    • (2006) Computational science and its applications - ICCSA 2006 , vol.3982 , pp. 554-563
    • Capacho, L.1    Pastor, R.2
  • 24
    • 42649114477 scopus 로고    scopus 로고
    • ASALBP: the alternative subgraphs assembly line balancing problem
    • Capacho L., and Pastor R. ASALBP: the alternative subgraphs assembly line balancing problem International Journal of Production Research 46 13 2008 3503 3516
    • (2008) International Journal of Production Research , vol.46 , Issue.13 , pp. 3503-3516
    • Capacho, L.1    Pastor, R.2
  • 25
    • 64549088104 scopus 로고    scopus 로고
    • An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
    • Capacho L., Pastor R., Dolgui A., and Guschinskaya O. An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem Journal of Heuristics 15 2 2007 109 132
    • (2007) Journal of Heuristics , vol.15 , Issue.2 , pp. 109-132
    • Capacho, L.1    Pastor, R.2    Dolgui, A.3    Guschinskaya, O.4
  • 26
    • 48749137178 scopus 로고
    • A cost-effective approach to stochastic line balancing with off-line repairs
    • Carter J.C., and Silverman F.N. A cost-effective approach to stochastic line balancing with off-line repairs Journal of Operations Management 4 2 1984 145 157
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 145-157
    • Carter, J.C.1    Silverman, F.N.2
  • 27
    • 0022440844 scopus 로고
    • A cost minimization procedure for mixed model production lines with normally distributed task times
    • Chakravarty A.K., and Shtub A. A cost minimization procedure for mixed model production lines with normally distributed task times European Journal of Operational Research 23 1 1986 25 36
    • (1986) European Journal of Operational Research , vol.23 , Issue.1 , pp. 25-36
    • Chakravarty, A.K.1    Shtub, A.2
  • 28
    • 84864476267 scopus 로고    scopus 로고
    • A second-order cone programming approach for linear programs with joint probabilistic constraints
    • Cheng J., and Lisser A. A second-order cone programming approach for linear programs with joint probabilistic constraints Operations Research Letters 40 5 2012 325 328
    • (2012) Operations Research Letters , vol.40 , Issue.5 , pp. 325-328
    • Cheng, J.1    Lisser, A.2
  • 29
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem: A heuristic procedure
    • Chiang W.-C., and Urban T.L. The stochastic U-line balancing problem: A heuristic procedure European Journal of Operational Research 175 3 2006 1767 1781
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.-C.1    Urban, T.L.2
  • 30
    • 84883446228 scopus 로고    scopus 로고
    • A robustness information and visualization model for time and space assembly line balancing under uncertain demand
    • Chica M., Óscar Cordón, Damas S., and Bautista J. A robustness information and visualization model for time and space assembly line balancing under uncertain demand International Journal of Production Economics 145 2 2013 761 772
    • (2013) International Journal of Production Economics , vol.145 , Issue.2 , pp. 761-772
    • Chica, M.1    Óscar Cordón2    Damas, S.3    Bautista, J.4
  • 31
    • 33748981822 scopus 로고    scopus 로고
    • A heuristic algorithm for a chance constrained stochastic program
    • DePaolo C.A., and Rader Jr. D.J. A heuristic algorithm for a chance constrained stochastic program European Journal of Operational Research 176 1 2007 27 45
    • (2007) European Journal of Operational Research , vol.176 , Issue.1 , pp. 27-45
    • Depaolo, C.A.1    Rader, D.J.2
  • 34
  • 35
    • 66149139732 scopus 로고    scopus 로고
    • A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
    • Gamberini R., Gebennini E., Grassi A., and Regattieri A. A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem International Journal of Production Research 47 8 2009 2141 2164
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2141-2164
    • Gamberini, R.1    Gebennini, E.2    Grassi, A.3    Regattieri, A.4
  • 36
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini R., Grassi A., and Rimini B. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem International Journal of Production Economics 102 2 2006 226 243
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 38
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Güngör A., and Gupta S.M. A solution approach to the disassembly line balancing problem in the presence of task failures International Journal of Production Research 39 7 2001 1427 1467
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 40
    • 84870419286 scopus 로고    scopus 로고
    • Stability measure for a generalized assembly line balancing problem
    • Gurevsky E., Battaïa O., and Dolgui A. Stability measure for a generalized assembly line balancing problem Discrete Applied Mathematics 161 3 2013 377 394
    • (2013) Discrete Applied Mathematics , vol.161 , Issue.3 , pp. 377-394
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 42
    • 84876104666 scopus 로고    scopus 로고
    • Assembly line balancing under uncertainty: Robust optimization models and exact solution method
    • HazIr Ö., and Dolgui A. Assembly line balancing under uncertainty: Robust optimization models and exact solution method Computers & Industrial Engineering 65 2 2013 261 267
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.2 , pp. 261-267
    • Hazir, Ö.1    Dolgui, A.2
  • 43
    • 84923864493 scopus 로고    scopus 로고
    • A decomposition based solution algorithm for U-type assembly line balancing with interval data
    • HazIr Ö., and Dolgui A. A decomposition based solution algorithm for U-type assembly line balancing with interval data Computers & Operations Research 59 2015 126 131
    • (2015) Computers & Operations Research , vol.59 , pp. 126-131
    • Hazir, Ö.1    Dolgui, A.2
  • 44
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • Henig M.I. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems Computers & Operations Research 13 4 1986 443 449
    • (1986) Computers & Operations Research , vol.13 , Issue.4 , pp. 443-449
    • Henig, M.I.1
  • 45
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • Ilgin M.A., and Gupta S.M. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art Journal of Environmental Management 91 3 2010 563 591
    • (2010) Journal of Environmental Management , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 47
    • 0042361190 scopus 로고
    • Chance-constrained programming with joint constraints
    • Jagannathan R. Chance-constrained programming with joint constraints Operations Research 22 2 1974 358 372
    • (1974) Operations Research , vol.22 , Issue.2 , pp. 358-372
    • Jagannathan, R.1
  • 48
    • 0018698137 scopus 로고
    • Computational experience with a stochastic assembly line balancing algorithm
    • Kao E.P. Computational experience with a stochastic assembly line balancing algorithm Computers & Operations Research 6 2 1979 79 86
    • (1979) Computers & Operations Research , vol.6 , Issue.2 , pp. 79-86
    • Kao, E.P.1
  • 49
    • 0016964033 scopus 로고
    • A preference order dynamic program for stochastic assembly line balancing
    • Kao E.P.C. A preference order dynamic program for stochastic assembly line balancing Management Science 22 10 1976 1097 1104
    • (1976) Management Science , vol.22 , Issue.10 , pp. 1097-1104
    • Kao, E.P.C.1
  • 50
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • Koc A., Sabuncuoglu I., and Erel E. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph IIE Transactions 41 10 2009 866 881
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 51
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • Lambert A.J.D. Linear programming in disassembly/clustering sequence generation Computers & Industrial Engineering 36 4 1999 723 738
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 52
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • Lambert A.J.D. Determining optimum disassembly sequences in electronic equipment Computers & Industrial Engineering 43 2002 553 575
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 553-575
    • Lambert, A.J.D.1
  • 53
    • 84885420729 scopus 로고    scopus 로고
    • A dual-uncertainty-based chance-constrained model for municipal solid waste management
    • Liu F., Wen Z., and Xu Y. A dual-uncertainty-based chance-constrained model for municipal solid waste management Applied Mathematical Modelling 37 22 2013 9147 9159
    • (2013) Applied Mathematical Modelling , vol.37 , Issue.22 , pp. 9147-9159
    • Liu, F.1    Wen, Z.2    Xu, Y.3
  • 56
    • 0013055270 scopus 로고    scopus 로고
    • A single-run optimization algorithm for stochastic assembly line balancing problems
    • Lyu J. A single-run optimization algorithm for stochastic assembly line balancing problems Journal of Manufacturing Systems 16 3 1997 204 210
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.3 , pp. 204-210
    • Lyu, J.1
  • 57
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal
    • Ma Y.-S., Jun H.-B., Kim H.-W., and Lee D.-H. Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal International Journal of Production Research 49 23 2011 7007 7027
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.-S.1    Jun, H.-B.2    Kim, H.-W.3    Lee, D.-H.4
  • 59
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen P.R., and Frazier G.V. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations International Journal of Production Economics 51 3 1997 177 190
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 60
    • 77955552573 scopus 로고    scopus 로고
    • A chance constrained approach for a gas processing plant with uncertain feed conditions
    • Mesfin G., and Shuhaimi M. A chance constrained approach for a gas processing plant with uncertain feed conditions Computers and Chemical Engineering 34 8 2010 1256 1267
    • (2010) Computers and Chemical Engineering , vol.34 , Issue.8 , pp. 1256-1267
    • Mesfin, G.1    Shuhaimi, M.2
  • 61
    • 84857922903 scopus 로고    scopus 로고
    • On safe tractable approximations of chance constraints
    • Nemirovski A. On safe tractable approximations of chance constraints European Journal of Operational Research 219 3 2012 707 718
    • (2012) European Journal of Operational Research , vol.219 , Issue.3 , pp. 707-718
    • Nemirovski, A.1
  • 62
    • 36248992411 scopus 로고    scopus 로고
    • Convex approximations of chance constrained programs
    • Nemirovski A., and Shapiro A. Convex approximations of chance constrained programs SIAM Journal on Optimization 17 4 2007 969 996
    • (2007) SIAM Journal on Optimization , vol.17 , Issue.4 , pp. 969-996
    • Nemirovski, A.1    Shapiro, A.2
  • 63
    • 75849138540 scopus 로고    scopus 로고
    • Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
    • Özcan U. Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm European Journal of Operational Research 205 1 2010 81 97
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Özcan, U.1
  • 64
    • 78650589919 scopus 로고    scopus 로고
    • A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
    • Özcan U., Kellegöz T., and Toklu B. A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem International Journal of Production Research 49 6 2011 1605 1626
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1605-1626
    • Özcan, U.1    Kellegöz, T.2    Toklu, B.3
  • 65
    • 34848836096 scopus 로고    scopus 로고
    • Genetic algorithm based technique for solving chance constrained problems
    • Poojari C.A., and Varghese B. Genetic algorithm based technique for solving chance constrained problems European Journal of Operational Research 185 3 2008 1128 1154
    • (2008) European Journal of Operational Research , vol.185 , Issue.3 , pp. 1128-1154
    • Poojari, C.A.1    Varghese, B.2
  • 66
    • 79956086363 scopus 로고    scopus 로고
    • Uniform quasi-concavity in probabilistic constrained stochastic programming
    • Prékopa A., Yoda K., and Subasi M.M. Uniform quasi-concavity in probabilistic constrained stochastic programming Operations Research Letters 39 3 2011 188 192
    • (2011) Operations Research Letters , vol.39 , Issue.3 , pp. 188-192
    • Prékopa, A.1    Yoda, K.2    Subasi, M.M.3
  • 67
    • 0019899326 scopus 로고
    • A new method for assembly line balancing having stochastic work elements
    • Raouf A., and Tsui C.L. A new method for assembly line balancing having stochastic work elements Computers & Industrial Engineering 6 2 1982 131 148
    • (1982) Computers & Industrial Engineering , vol.6 , Issue.2 , pp. 131-148
    • Raouf, A.1    Tsui, C.L.2
  • 68
    • 84879497902 scopus 로고    scopus 로고
    • A linear programming approach for linear programs with probabilistic constraints
    • Reich D. A linear programming approach for linear programs with probabilistic constraints European Journal of Operational Research 230 3 2013 487 494
    • (2013) European Journal of Operational Research , vol.230 , Issue.3 , pp. 487-494
    • Reich, D.1
  • 70
    • 72249093141 scopus 로고    scopus 로고
    • Optimally solving the alternative subgraphs assembly line balancing problem
    • Scholl A., Boysen N., and Fliedner M. Optimally solving the alternative subgraphs assembly line balancing problem Annals of Operations Research 172 1 2009 143 258
    • (2009) Annals of Operations Research , vol.172 , Issue.1 , pp. 143-258
    • Scholl, A.1    Boysen, N.2    Fliedner, M.3
  • 71
    • 77958059429 scopus 로고    scopus 로고
    • Expectation and chance-constrained models and algorithms for insuring critical paths
    • Shen S., Smith J., and Ahmed S. Expectation and chance-constrained models and algorithms for insuring critical paths Management Science 56 10 2010 1794 1814
    • (2010) Management Science , vol.56 , Issue.10 , pp. 1794-1814
    • Shen, S.1    Smith, J.2    Ahmed, S.3
  • 72
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • Shin D. An efficient heuristic for solving stochastic assembly line balancing problems Computers & Industrial Engineering 18 3 1990 285 295
    • (1990) Computers & Industrial Engineering , vol.18 , Issue.3 , pp. 285-295
    • Shin, D.1
  • 73
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman F.N., and Carter J.C. A cost-based methodology for stochastic line balancing with intermittent line stoppages Management Science 32 4 1986 455 463
    • (1986) Management Science , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 74
    • 25144442374 scopus 로고    scopus 로고
    • Stability analysis of an optimal balance for an assembly line with fixed cycle time
    • Sotskov Y.N., Dolgui A., and Portmann M.-C. Stability analysis of an optimal balance for an assembly line with fixed cycle time European Journal of Operational Research 168 3 2006 783 797
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 783-797
    • Sotskov, Y.N.1    Dolgui, A.2    Portmann, M.-C.3
  • 76
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban T.L., and Chiang W.-C. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times European Journal of Operational Research 168 3 2006 771 782
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 771-782
    • Urban, T.L.1    Chiang, W.-C.2
  • 77
    • 84856290355 scopus 로고    scopus 로고
    • A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output
    • Wang Q., Guan Y., and Wang J. A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output IEEE Transactions on Power Systems 27 1 2012 206 215
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.1 , pp. 206-215
    • Wang, Q.1    Guan, Y.2    Wang, J.3
  • 78
    • 0028768512 scopus 로고
    • A joint chance-constrained programming model with row dependence
    • Watanabe T., and Ellis H. A joint chance-constrained programming model with row dependence European Journal of Operational Research 77 2 1994 325 343
    • (1994) European Journal of Operational Research , vol.77 , Issue.2 , pp. 325-343
    • Watanabe, T.1    Ellis, H.2
  • 79
    • 80054912363 scopus 로고    scopus 로고
    • Chance constrained programming for optimal power flow under uncertainty
    • Zhang H., and Li P. Chance constrained programming for optimal power flow under uncertainty IEEE Transactions on Power Systems 26 4 2011 2417 2424
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.4 , pp. 2417-2424
    • Zhang, H.1    Li, P.2
  • 80
    • 34548567778 scopus 로고    scopus 로고
    • Modeling and analysis of a mixed-model assembly line with stochastic operation times
    • Zhao X., Liu J., Ohno K., and Kotani S. Modeling and analysis of a mixed-model assembly line with stochastic operation times Naval Research Logistics 54 6 2007 681 691
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 681-691
    • Zhao, X.1    Liu, J.2    Ohno, K.3    Kotani, S.4
  • 81
    • 79952487235 scopus 로고    scopus 로고
    • Optimizing financial and physical assets with chance-constrained programming in the electrical industry
    • Zorgati R., and Van Ackooij W. Optimizing financial and physical assets with chance-constrained programming in the electrical industry Optimization and Engineering 12 1-2 2011 237 255
    • (2011) Optimization and Engineering , vol.12 , Issue.1-2 , pp. 237-255
    • Zorgati, R.1    Van Ackooij, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.