-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal S., and Tiwari M.K. A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem International Journal of Production Research 46 6 2006 1405 1429
-
(2006)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
5
-
-
33847014539
-
A chance-constrained approach to stochastic line balancing problem
-
Aʇpak K., and Gökçen H. A chance-constrained approach to stochastic line balancing problem European Journal of Operational Research 180 3 2007 1098 1115
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.3
, pp. 1098-1115
-
-
Aʇpak, K.1
Gökçen, H.2
-
6
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag A., and Turkbey O. Multi-objective optimization of stochastic disassembly line balancing with station paralleling Computers & Industrial Engineering 65 3 2013 413 425
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
8
-
-
0022768294
-
A survey of exact algorithms for the simple assembly line balancing problem
-
Baybars I. A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 8 1986 909 932
-
(1986)
Management Science
, vol.32
, Issue.8
, pp. 909-932
-
-
Baybars, I.1
-
10
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 3 2006 694 715
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
11
-
-
84922236941
-
Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
-
Springer Berlin Heidelberg
-
Bentaha M.L., Battaïa O., and Dolgui A. Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts IFIP advances in information and communication technology Vol. 414 2013 Springer Berlin Heidelberg 103 110
-
(2013)
IFIP advances in information and communication technology
, vol.414
, pp. 103-110
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
14
-
-
84902248564
-
A sample average approximation method for disassembly line balancing problem under uncertainty
-
Bentaha M.L., Battaïa O., and Dolgui A. A sample average approximation method for disassembly line balancing problem under uncertainty Computers & Operations Research 51 2014 111 122
-
(2014)
Computers & Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
15
-
-
84903557899
-
Disassembly line balancing and sequencing under uncertainty
-
Bentaha M.L., Battaïa O., and Dolgui A. Disassembly line balancing and sequencing under uncertainty Procedia CIRP 15 2014 239 244
-
(2014)
Procedia CIRP
, vol.15
, pp. 239-244
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
16
-
-
84904503542
-
Lagrangian relaxation for stochastic disassembly line balancing problem
-
Bentaha M.L., Battaïa O., and Dolgui A. Lagrangian relaxation for stochastic disassembly line balancing problem Procedia CIRP 2014 17 2014 56 60
-
(2014)
Procedia CIRP 2014
, vol.17
, pp. 56-60
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
17
-
-
84902539041
-
Dealing with uncertainty in disassembly line design
-
Bentaha M.L., Battaïa O., Dolgui A., and Hu S.J. Dealing with uncertainty in disassembly line design CIRP Annals - Manufacturing Technology 63 1 2014 21 24
-
(2014)
CIRP Annals - Manufacturing Technology
, vol.63
, Issue.1
, pp. 21-24
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
18
-
-
0024931651
-
Identifying multiple solutions for assembly line balancing having stochastic task times
-
Betts J., and Mahmoud K.I. Identifying multiple solutions for assembly line balancing having stochastic task times Computers & Industrial Engineering 16 3 1989 427 445
-
(1989)
Computers & Industrial Engineering
, vol.16
, Issue.3
, pp. 427-445
-
-
Betts, J.1
Mahmoud, K.I.2
-
19
-
-
83555174965
-
Chance-constrained optimal path planning with obstacles
-
Blackmore L., Ono M., and Williams B. Chance-constrained optimal path planning with obstacles IEEE Transactions on Robotics 27 6 2011 1080 1094
-
(2011)
IEEE Transactions on Robotics
, vol.27
, Issue.6
, pp. 1080-1094
-
-
Blackmore, L.1
Ono, M.2
Williams, B.3
-
21
-
-
84858055787
-
Chance constrained problems: Penalty reformulation and performance of sample approximation technique
-
Branda M. Chance constrained problems: Penalty reformulation and performance of sample approximation technique Kybernetika 48 1 2012 105 122
-
(2012)
Kybernetika
, vol.48
, Issue.1
, pp. 105-122
-
-
Branda, M.1
-
22
-
-
79751537157
-
Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm
-
Cakir B., Altiparmak F., and Dengiz B. Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm Computers & Industrial Engineering 60 3 2011 376 384
-
(2011)
Computers & Industrial Engineering
, vol.60
, Issue.3
, pp. 376-384
-
-
Cakir, B.1
Altiparmak, F.2
Dengiz, B.3
-
23
-
-
33745923484
-
The ASALB problem with processing alternatives involving different tasks: Definition, formalization and resolution
-
Springer-Verlag
-
Capacho L., and Pastor R. The ASALB problem with processing alternatives involving different tasks: Definition, formalization and resolution Computational science and its applications - ICCSA 2006 Vol. 3982 2006 Springer-Verlag 554 563
-
(2006)
Computational science and its applications - ICCSA 2006
, vol.3982
, pp. 554-563
-
-
Capacho, L.1
Pastor, R.2
-
24
-
-
42649114477
-
ASALBP: the alternative subgraphs assembly line balancing problem
-
Capacho L., and Pastor R. ASALBP: the alternative subgraphs assembly line balancing problem International Journal of Production Research 46 13 2008 3503 3516
-
(2008)
International Journal of Production Research
, vol.46
, Issue.13
, pp. 3503-3516
-
-
Capacho, L.1
Pastor, R.2
-
25
-
-
64549088104
-
An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
-
Capacho L., Pastor R., Dolgui A., and Guschinskaya O. An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem Journal of Heuristics 15 2 2007 109 132
-
(2007)
Journal of Heuristics
, vol.15
, Issue.2
, pp. 109-132
-
-
Capacho, L.1
Pastor, R.2
Dolgui, A.3
Guschinskaya, O.4
-
26
-
-
48749137178
-
A cost-effective approach to stochastic line balancing with off-line repairs
-
Carter J.C., and Silverman F.N. A cost-effective approach to stochastic line balancing with off-line repairs Journal of Operations Management 4 2 1984 145 157
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 145-157
-
-
Carter, J.C.1
Silverman, F.N.2
-
27
-
-
0022440844
-
A cost minimization procedure for mixed model production lines with normally distributed task times
-
Chakravarty A.K., and Shtub A. A cost minimization procedure for mixed model production lines with normally distributed task times European Journal of Operational Research 23 1 1986 25 36
-
(1986)
European Journal of Operational Research
, vol.23
, Issue.1
, pp. 25-36
-
-
Chakravarty, A.K.1
Shtub, A.2
-
28
-
-
84864476267
-
A second-order cone programming approach for linear programs with joint probabilistic constraints
-
Cheng J., and Lisser A. A second-order cone programming approach for linear programs with joint probabilistic constraints Operations Research Letters 40 5 2012 325 328
-
(2012)
Operations Research Letters
, vol.40
, Issue.5
, pp. 325-328
-
-
Cheng, J.1
Lisser, A.2
-
29
-
-
33748934553
-
The stochastic U-line balancing problem: A heuristic procedure
-
Chiang W.-C., and Urban T.L. The stochastic U-line balancing problem: A heuristic procedure European Journal of Operational Research 175 3 2006 1767 1781
-
(2006)
European Journal of Operational Research
, vol.175
, Issue.3
, pp. 1767-1781
-
-
Chiang, W.-C.1
Urban, T.L.2
-
30
-
-
84883446228
-
A robustness information and visualization model for time and space assembly line balancing under uncertain demand
-
Chica M., Óscar Cordón, Damas S., and Bautista J. A robustness information and visualization model for time and space assembly line balancing under uncertain demand International Journal of Production Economics 145 2 2013 761 772
-
(2013)
International Journal of Production Economics
, vol.145
, Issue.2
, pp. 761-772
-
-
Chica, M.1
Óscar Cordón2
Damas, S.3
Bautista, J.4
-
31
-
-
33748981822
-
A heuristic algorithm for a chance constrained stochastic program
-
DePaolo C.A., and Rader Jr. D.J. A heuristic algorithm for a chance constrained stochastic program European Journal of Operational Research 176 1 2007 27 45
-
(2007)
European Journal of Operational Research
, vol.176
, Issue.1
, pp. 27-45
-
-
Depaolo, C.A.1
Rader, D.J.2
-
34
-
-
0001304597
-
Bonferroni inequalities
-
Galambos J. Bonferroni inequalities The Annals of Probability 5 4 1977 577 581
-
(1977)
The Annals of Probability
, vol.5
, Issue.4
, pp. 577-581
-
-
Galambos, J.1
-
35
-
-
66149139732
-
A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
-
Gamberini R., Gebennini E., Grassi A., and Regattieri A. A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem International Journal of Production Research 47 8 2009 2141 2164
-
(2009)
International Journal of Production Research
, vol.47
, Issue.8
, pp. 2141-2164
-
-
Gamberini, R.1
Gebennini, E.2
Grassi, A.3
Regattieri, A.4
-
36
-
-
33646075952
-
A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
-
Gamberini R., Grassi A., and Rimini B. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem International Journal of Production Economics 102 2 2006 226 243
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.2
, pp. 226-243
-
-
Gamberini, R.1
Grassi, A.2
Rimini, B.3
-
38
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Güngör A., and Gupta S.M. A solution approach to the disassembly line balancing problem in the presence of task failures International Journal of Production Research 39 7 2001 1427 1467
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
40
-
-
84870419286
-
Stability measure for a generalized assembly line balancing problem
-
Gurevsky E., Battaïa O., and Dolgui A. Stability measure for a generalized assembly line balancing problem Discrete Applied Mathematics 161 3 2013 377 394
-
(2013)
Discrete Applied Mathematics
, vol.161
, Issue.3
, pp. 377-394
-
-
Gurevsky, E.1
Battaïa, O.2
Dolgui, A.3
-
41
-
-
84885985810
-
Robust balancing of straight assembly lines with interval task times
-
Gurevsky E., HazIr Ö., Battaïa O., and Dolgui A. Robust balancing of straight assembly lines with interval task times Journal of the Operational Research Society 64 11 2013 1607 1613
-
(2013)
Journal of the Operational Research Society
, vol.64
, Issue.11
, pp. 1607-1613
-
-
Gurevsky, E.1
Hazir, Ö.2
Battaïa, O.3
Dolgui, A.4
-
42
-
-
84876104666
-
Assembly line balancing under uncertainty: Robust optimization models and exact solution method
-
HazIr Ö., and Dolgui A. Assembly line balancing under uncertainty: Robust optimization models and exact solution method Computers & Industrial Engineering 65 2 2013 261 267
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.2
, pp. 261-267
-
-
Hazir, Ö.1
Dolgui, A.2
-
43
-
-
84923864493
-
A decomposition based solution algorithm for U-type assembly line balancing with interval data
-
HazIr Ö., and Dolgui A. A decomposition based solution algorithm for U-type assembly line balancing with interval data Computers & Operations Research 59 2015 126 131
-
(2015)
Computers & Operations Research
, vol.59
, pp. 126-131
-
-
Hazir, Ö.1
Dolgui, A.2
-
44
-
-
0022910386
-
Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
-
Henig M.I. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems Computers & Operations Research 13 4 1986 443 449
-
(1986)
Computers & Operations Research
, vol.13
, Issue.4
, pp. 443-449
-
-
Henig, M.I.1
-
45
-
-
72149096791
-
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
-
Ilgin M.A., and Gupta S.M. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art Journal of Environmental Management 91 3 2010 563 591
-
(2010)
Journal of Environmental Management
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
47
-
-
0042361190
-
Chance-constrained programming with joint constraints
-
Jagannathan R. Chance-constrained programming with joint constraints Operations Research 22 2 1974 358 372
-
(1974)
Operations Research
, vol.22
, Issue.2
, pp. 358-372
-
-
Jagannathan, R.1
-
48
-
-
0018698137
-
Computational experience with a stochastic assembly line balancing algorithm
-
Kao E.P. Computational experience with a stochastic assembly line balancing algorithm Computers & Operations Research 6 2 1979 79 86
-
(1979)
Computers & Operations Research
, vol.6
, Issue.2
, pp. 79-86
-
-
Kao, E.P.1
-
49
-
-
0016964033
-
A preference order dynamic program for stochastic assembly line balancing
-
Kao E.P.C. A preference order dynamic program for stochastic assembly line balancing Management Science 22 10 1976 1097 1104
-
(1976)
Management Science
, vol.22
, Issue.10
, pp. 1097-1104
-
-
Kao, E.P.C.1
-
50
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc A., Sabuncuoglu I., and Erel E. Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph IIE Transactions 41 10 2009 866 881
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
51
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert A.J.D. Linear programming in disassembly/clustering sequence generation Computers & Industrial Engineering 36 4 1999 723 738
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.4
, pp. 723-738
-
-
Lambert, A.J.D.1
-
52
-
-
0036721661
-
Determining optimum disassembly sequences in electronic equipment
-
Lambert A.J.D. Determining optimum disassembly sequences in electronic equipment Computers & Industrial Engineering 43 2002 553 575
-
(2002)
Computers & Industrial Engineering
, vol.43
, pp. 553-575
-
-
Lambert, A.J.D.1
-
53
-
-
84885420729
-
A dual-uncertainty-based chance-constrained model for municipal solid waste management
-
Liu F., Wen Z., and Xu Y. A dual-uncertainty-based chance-constrained model for municipal solid waste management Applied Mathematical Modelling 37 22 2013 9147 9159
-
(2013)
Applied Mathematical Modelling
, vol.37
, Issue.22
, pp. 9147-9159
-
-
Liu, F.1
Wen, Z.2
Xu, Y.3
-
56
-
-
0013055270
-
A single-run optimization algorithm for stochastic assembly line balancing problems
-
Lyu J. A single-run optimization algorithm for stochastic assembly line balancing problems Journal of Manufacturing Systems 16 3 1997 204 210
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.3
, pp. 204-210
-
-
Lyu, J.1
-
57
-
-
84862939665
-
Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal
-
Ma Y.-S., Jun H.-B., Kim H.-W., and Lee D.-H. Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal International Journal of Production Research 49 23 2011 7007 7027
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 7007-7027
-
-
Ma, Y.-S.1
Jun, H.-B.2
Kim, H.-W.3
Lee, D.-H.4
-
59
-
-
0031232825
-
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
-
McMullen P.R., and Frazier G.V. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations International Journal of Production Economics 51 3 1997 177 190
-
(1997)
International Journal of Production Economics
, vol.51
, Issue.3
, pp. 177-190
-
-
McMullen, P.R.1
Frazier, G.V.2
-
60
-
-
77955552573
-
A chance constrained approach for a gas processing plant with uncertain feed conditions
-
Mesfin G., and Shuhaimi M. A chance constrained approach for a gas processing plant with uncertain feed conditions Computers and Chemical Engineering 34 8 2010 1256 1267
-
(2010)
Computers and Chemical Engineering
, vol.34
, Issue.8
, pp. 1256-1267
-
-
Mesfin, G.1
Shuhaimi, M.2
-
61
-
-
84857922903
-
On safe tractable approximations of chance constraints
-
Nemirovski A. On safe tractable approximations of chance constraints European Journal of Operational Research 219 3 2012 707 718
-
(2012)
European Journal of Operational Research
, vol.219
, Issue.3
, pp. 707-718
-
-
Nemirovski, A.1
-
62
-
-
36248992411
-
Convex approximations of chance constrained programs
-
Nemirovski A., and Shapiro A. Convex approximations of chance constrained programs SIAM Journal on Optimization 17 4 2007 969 996
-
(2007)
SIAM Journal on Optimization
, vol.17
, Issue.4
, pp. 969-996
-
-
Nemirovski, A.1
Shapiro, A.2
-
63
-
-
75849138540
-
Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
-
Özcan U. Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm European Journal of Operational Research 205 1 2010 81 97
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.1
, pp. 81-97
-
-
Özcan, U.1
-
64
-
-
78650589919
-
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
-
Özcan U., Kellegöz T., and Toklu B. A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem International Journal of Production Research 49 6 2011 1605 1626
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1605-1626
-
-
Özcan, U.1
Kellegöz, T.2
Toklu, B.3
-
65
-
-
34848836096
-
Genetic algorithm based technique for solving chance constrained problems
-
Poojari C.A., and Varghese B. Genetic algorithm based technique for solving chance constrained problems European Journal of Operational Research 185 3 2008 1128 1154
-
(2008)
European Journal of Operational Research
, vol.185
, Issue.3
, pp. 1128-1154
-
-
Poojari, C.A.1
Varghese, B.2
-
66
-
-
79956086363
-
Uniform quasi-concavity in probabilistic constrained stochastic programming
-
Prékopa A., Yoda K., and Subasi M.M. Uniform quasi-concavity in probabilistic constrained stochastic programming Operations Research Letters 39 3 2011 188 192
-
(2011)
Operations Research Letters
, vol.39
, Issue.3
, pp. 188-192
-
-
Prékopa, A.1
Yoda, K.2
Subasi, M.M.3
-
67
-
-
0019899326
-
A new method for assembly line balancing having stochastic work elements
-
Raouf A., and Tsui C.L. A new method for assembly line balancing having stochastic work elements Computers & Industrial Engineering 6 2 1982 131 148
-
(1982)
Computers & Industrial Engineering
, vol.6
, Issue.2
, pp. 131-148
-
-
Raouf, A.1
Tsui, C.L.2
-
68
-
-
84879497902
-
A linear programming approach for linear programs with probabilistic constraints
-
Reich D. A linear programming approach for linear programs with probabilistic constraints European Journal of Operational Research 230 3 2013 487 494
-
(2013)
European Journal of Operational Research
, vol.230
, Issue.3
, pp. 487-494
-
-
Reich, D.1
-
70
-
-
72249093141
-
Optimally solving the alternative subgraphs assembly line balancing problem
-
Scholl A., Boysen N., and Fliedner M. Optimally solving the alternative subgraphs assembly line balancing problem Annals of Operations Research 172 1 2009 143 258
-
(2009)
Annals of Operations Research
, vol.172
, Issue.1
, pp. 143-258
-
-
Scholl, A.1
Boysen, N.2
Fliedner, M.3
-
71
-
-
77958059429
-
Expectation and chance-constrained models and algorithms for insuring critical paths
-
Shen S., Smith J., and Ahmed S. Expectation and chance-constrained models and algorithms for insuring critical paths Management Science 56 10 2010 1794 1814
-
(2010)
Management Science
, vol.56
, Issue.10
, pp. 1794-1814
-
-
Shen, S.1
Smith, J.2
Ahmed, S.3
-
72
-
-
0025603598
-
An efficient heuristic for solving stochastic assembly line balancing problems
-
Shin D. An efficient heuristic for solving stochastic assembly line balancing problems Computers & Industrial Engineering 18 3 1990 285 295
-
(1990)
Computers & Industrial Engineering
, vol.18
, Issue.3
, pp. 285-295
-
-
Shin, D.1
-
73
-
-
0022698734
-
A cost-based methodology for stochastic line balancing with intermittent line stoppages
-
Silverman F.N., and Carter J.C. A cost-based methodology for stochastic line balancing with intermittent line stoppages Management Science 32 4 1986 455 463
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
74
-
-
25144442374
-
Stability analysis of an optimal balance for an assembly line with fixed cycle time
-
Sotskov Y.N., Dolgui A., and Portmann M.-C. Stability analysis of an optimal balance for an assembly line with fixed cycle time European Journal of Operational Research 168 3 2006 783 797
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 783-797
-
-
Sotskov, Y.N.1
Dolgui, A.2
Portmann, M.-C.3
-
76
-
-
25144472327
-
An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
-
Urban T.L., and Chiang W.-C. An optimal piecewise-linear program for the U-line balancing problem with stochastic task times European Journal of Operational Research 168 3 2006 771 782
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 771-782
-
-
Urban, T.L.1
Chiang, W.-C.2
-
77
-
-
84856290355
-
A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output
-
Wang Q., Guan Y., and Wang J. A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output IEEE Transactions on Power Systems 27 1 2012 206 215
-
(2012)
IEEE Transactions on Power Systems
, vol.27
, Issue.1
, pp. 206-215
-
-
Wang, Q.1
Guan, Y.2
Wang, J.3
-
78
-
-
0028768512
-
A joint chance-constrained programming model with row dependence
-
Watanabe T., and Ellis H. A joint chance-constrained programming model with row dependence European Journal of Operational Research 77 2 1994 325 343
-
(1994)
European Journal of Operational Research
, vol.77
, Issue.2
, pp. 325-343
-
-
Watanabe, T.1
Ellis, H.2
-
79
-
-
80054912363
-
Chance constrained programming for optimal power flow under uncertainty
-
Zhang H., and Li P. Chance constrained programming for optimal power flow under uncertainty IEEE Transactions on Power Systems 26 4 2011 2417 2424
-
(2011)
IEEE Transactions on Power Systems
, vol.26
, Issue.4
, pp. 2417-2424
-
-
Zhang, H.1
Li, P.2
-
80
-
-
34548567778
-
Modeling and analysis of a mixed-model assembly line with stochastic operation times
-
Zhao X., Liu J., Ohno K., and Kotani S. Modeling and analysis of a mixed-model assembly line with stochastic operation times Naval Research Logistics 54 6 2007 681 691
-
(2007)
Naval Research Logistics
, vol.54
, Issue.6
, pp. 681-691
-
-
Zhao, X.1
Liu, J.2
Ohno, K.3
Kotani, S.4
-
81
-
-
79952487235
-
Optimizing financial and physical assets with chance-constrained programming in the electrical industry
-
Zorgati R., and Van Ackooij W. Optimizing financial and physical assets with chance-constrained programming in the electrical industry Optimization and Engineering 12 1-2 2011 237 255
-
(2011)
Optimization and Engineering
, vol.12
, Issue.1-2
, pp. 237-255
-
-
Zorgati, R.1
Van Ackooij, W.2
|