메뉴 건너뛰기




Volumn , Issue , 2017, Pages 421-425

A proposed multi-objective optimization model for sequence-dependent disassembly line balancing problem

Author keywords

Disassembly line balancing problem; Multi objective; Optimization model; Sequence dependent

Indexed keywords

BENCHMARKING; INFORMATION MANAGEMENT; OPTIMIZATION; PRODUCT DESIGN;

EID: 85024383853     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/INFOMAN.2017.7950420     Document Type: Conference Paper
Times cited : (13)

References (25)
  • 1
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • M. A. Ilgin and S. M. Gupta, "Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art, " Journal of Environmental Management, vol. 91, pp. 563-591, 2010.
    • (2010) Journal of Environmental Management , vol.91 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 3
    • 84885635477 scopus 로고    scopus 로고
    • Reverse supply chain optimisation with disassembly line balancing
    • E. Özceylan and T. Paksoy, "Reverse supply chain optimisation with disassembly line balancing, " International Journal of Production Research, vol. 51, pp. 5985-6001, 2013.
    • (2013) International Journal of Production Research , vol.51 , pp. 5985-6001
    • Özceylan, E.1    Paksoy, T.2
  • 4
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: Survey
    • A. Gungor and S. M. Gupta, "Issues in environmentally conscious manufacturing and product recovery: Survey, " Computers & Industrial Engineering, vol. 36, pp. 811-853, 1999.
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 7
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • A. Koc, I. Sabuncuoglu, and E. Erel, "Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, " IIE Transactions, vol. 41, pp. 866-881, 2009.
    • (2009) IIE Transactions , vol.41 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 9
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
    • S. M. Mcgovern and S. M. Gupta, "Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem, " International Journal of Production Research, vol. 45, pp. 4485-4511, 2007.
    • (2007) International Journal of Production Research , vol.45 , pp. 4485-4511
    • Mcgovern, S.M.1    Gupta, S.M.2
  • 11
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • S. M. Mcgovern and S. M. Gupta, "A balancing method and genetic algorithm for disassembly line balancing, " European Journal of Operational Research, vol. 179, pp. 692-708, 2007.
    • (2007) European Journal of Operational Research , vol.179 , pp. 692-708
    • Mcgovern, S.M.1    Gupta, S.M.2
  • 12
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • A. Aydemir-Karadag and O. Turkbey, "Multi-objective optimization of stochastic disassembly line balancing with station paralleling, " Computers & Industrial Engineering, vol. 65, pp. 413-425, 2013.
    • (2013) Computers & Industrial Engineering , vol.65 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 14
    • 84954047904 scopus 로고    scopus 로고
    • Multiobjective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
    • C. B. Kalayci, A. Hancilar, A. Gungor, and S. M. Gupta, "Multiobjective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm, " Journal of Manufacturing Systems, vol. 37, pp. 672-682, 2014.
    • (2014) Journal of Manufacturing Systems , vol.37 , pp. 672-682
    • Kalayci, C.B.1    Hancilar, A.2    Gungor, A.3    Gupta, S.M.4
  • 15
    • 84904384763 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • E. Tuncel, A. Zeid, and S. Kamarthi, "Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning, " Journal of Intelligent Manufacturing, vol. 25, pp. 647-659, 2014.
    • (2014) Journal of Intelligent Manufacturing , vol.25 , pp. 647-659
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 16
    • 84908355358 scopus 로고    scopus 로고
    • A Kano model, AHP and MTOPSIS method-based technique for disassembly line balancing under fuzzy environment
    • S. Avikal, R. Jain, and P. K. Mishra, "A Kano model, AHP and MTOPSIS method-based technique for disassembly line balancing under fuzzy environment, " Applied Soft Computing, vol. 25, pp. 519-529, 2014.
    • (2014) Applied Soft Computing , vol.25 , pp. 519-529
    • Avikal, S.1    Jain, R.2    Mishra, P.K.3
  • 17
    • 84881185298 scopus 로고    scopus 로고
    • Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
    • C. B. Kalayci and S. M. Gupta, "Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem, " Expert Systems with Applications, vol. 40, pp. 7231-7241, 2013.
    • (2013) Expert Systems with Applications , vol.40 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 18
    • 84878666440 scopus 로고    scopus 로고
    • Ant colony optimization for sequence-dependent disassembly line balancing problem
    • C. B. Kalayci and S. M. Gupta, "Ant colony optimization for sequence-dependent disassembly line balancing problem, " Journal of Manufacturing Technology Management, vol. 24, pp. 413-427, 2013.
    • (2013) Journal of Manufacturing Technology Management , vol.24 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 19
    • 84884314644 scopus 로고    scopus 로고
    • Simulated annealing algorithm for solving sequence-dependent disassembly line balancing problem
    • C. B. Kalayci and S. M. Gupta, "Simulated annealing algorithm for solving sequence-dependent disassembly line balancing problem, " IFAC Proceedings Volumes, vol. 46, pp. 93-98, 2013.
    • (2013) IFAC Proceedings Volumes , vol.46 , pp. 93-98
    • Kalayci, C.B.1    Gupta, S.M.2
  • 20
    • 84887821595 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
    • C. B. Kalayci and S. M. Gupta, "A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem, " The International Journal of Advanced Manufacturing Technology, vol. 69, pp. 197-209, 2013.
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.69 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 21
    • 84889821707 scopus 로고    scopus 로고
    • A tabu search algorithm for balancing a sequence-dependent disassembly line
    • C. B. Kalayci and S. M. Gupta, "A tabu search algorithm for balancing a sequence-dependent disassembly line, " Production Planning & Control, vol. 25, pp. 149-160, 2014.
    • (2014) Production Planning & Control , vol.25 , pp. 149-160
    • Kalayci, C.B.1    Gupta, S.M.2
  • 23
    • 84902301531 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
    • C. B. Kalayci, O. Polat, and S. M. Gupta, "A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem, " Annals of Operations Research, vol. 242, pp. 321-354, 2016.
    • (2016) Annals of Operations Research , vol.242 , pp. 321-354
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 24
    • 35148827874 scopus 로고    scopus 로고
    • Technical report-tr06, Erciyes university, engineering faculty, computer engineering department
    • D. Karaboga, "An idea based on honey bee swarm for numerical optimization, " Technical report-tr06, Erciyes university, engineering faculty, computer engineering department, 2005.
    • (2005) An Idea Based on Honey Bee Swarm for Numerical Optimization
    • Karaboga, D.1
  • 25
    • 67349273050 scopus 로고    scopus 로고
    • A comparative study of Artificial Bee Colony algorithm
    • D. Karaboga and B. Akay, "A comparative study of Artificial Bee Colony algorithm, " Applied Mathematics & Computation, vol. 214, pp. 108-132, 2009.
    • (2009) Applied Mathematics & Computation , vol.214 , pp. 108-132
    • Karaboga, D.1    Akay, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.