-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model u-shaped disassembly line balancing and sequencing problem
-
Agrawal, S., and M. K. Tiwari. 2008. "A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem." International Journal of Production Research 46 (6): 1405-1429.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
3
-
-
84925165830
-
Facility location selection using promethee ii method
-
Dhaka, Bangladesh, January
-
Athawale, V. M., and S. Chakraborty. 2010 Facility Location Selection using PROMETHEE II Method." In Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management, Dhaka, Bangladesh, January 9-10.
-
(2010)
Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management
, pp. 9-10
-
-
Athawale, V.1
Chakraborty, S.2
-
4
-
-
0000372281
-
A preference ranking organization method: The promethee method
-
Brans, J. P., and Ph. Vincke. 1985. "A Preference Ranking Organization Method: The PROMETHEE Method." Management Science 31: 647-656.
-
(1985)
Management Science
, vol.31
, pp. 647-656
-
-
Brans, J.P.1
Ph., Vincke.2
-
5
-
-
46549093655
-
Fuzzy hierarchical analysis
-
Buckley, J. J. 1985. "Fuzzy Hierarchical Analysis." Fuzzy Sets and System 17 (3): 233-247.
-
(1985)
Fuzzy Sets and System
, vol.17
, Issue.3
, pp. 233-247
-
-
Buckley, J.J.1
-
6
-
-
46149083525
-
Global supplier selection: A fuzzy-Ahp approach
-
Chan, F. T. S., N. Kumar, M. K. Tiwari, H. C. W. Lau, and K. L. Choy. 2007. "Global Supplier Selection: A Fuzzy-AHP Approach." International Journal of Production Research 46 (14): 3825-3857.
-
(2007)
International Journal of Production Research
, vol.46
, Issue.14
, pp. 3825-3857
-
-
Chan, F.T.S.1
Kumar, N.2
Tiwari, M.K.3
Lau, H.C.W.4
Choy, K.L.5
-
7
-
-
36148979678
-
The applicability of multicriteria-Analysis to the evaluation of intelligent transport systems (its)
-
De Brucker, K., A. Verbeke, and C. Macharis. 2004. "The Applicability of Multicriteria-Analysis to the Evaluation of Intelligent Transport Systems (ITS)." Research in Transportation Economics 8: 151-179.
-
(2004)
Research in Transportation Economics
, vol.8
, pp. 151-179
-
-
De Brucker, K.1
Verbeke, A.2
Macharis, C.3
-
8
-
-
0000002149
-
Multicriteria analysis with fuzzy pair wise comparison
-
Deng, H. 1999. "Multicriteria Analysis with Fuzzy Pair Wise Comparison." International Journal of Approximate Reasoning 21 (3): 215-231.
-
(1999)
International Journal of Approximate Reasoning
, vol.21
, Issue.3
, pp. 215-231
-
-
Deng, H.1
-
9
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problems
-
Ding, L. P., Y. X. Feng, J. R. Tan, and Y. C. Gao. 2010. "A New Multi-objective Ant Colony Algorithm for Solving the Disassembly Line Balancing Problems." International Journal of Advance Manufacturing Technology 48: 761-771.
-
(2010)
International Journal of Advance Manufacturing Technology
, vol.48
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
10
-
-
2642544848
-
A multi-criteria classification approach based on pair-wise comparison
-
Doumpos, M., and C. Zopounidis. 2004. "A Multi-criteria Classification Approach Based on Pair-wise Comparison." European Journal of Operational Research 158: 378-389.
-
(2004)
European Journal of Operational Research
, vol.158
, pp. 378-389
-
-
Doumpos, M.1
Zopounidis, C.2
-
11
-
-
0035866455
-
Disassembly sequence plan generation using a branch-And-bound algorithm
-
Gungor, A., and S. M. Gupta. 2001. "Disassembly Sequence Plan Generation Using a Branch-And-bound Algorithm." International Journal of Production Research 39 (3): 481-509.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.3
, pp. 481-509
-
-
Gungor, A.1
Gupta, S.M.2
-
14
-
-
84893911473
-
Solving disassembly sequence planning problems using combinatorial optimization
-
Providence, Rhode Island, March
-
Gupta, S. M., S. M. McGovern and S. V. Kamarthi. 2003. "Solving Disassembly Sequence Planning Problems using Combinatorial Optimization." In Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute, 178-180, Providence, Rhode Island, March 27-29.
-
(2003)
Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute, 178-180
, pp. 27-29
-
-
Gupta, S.M.1
McGovern, S.M.2
Kamarthi, S.V.3
-
16
-
-
34548403344
-
A comparison of multiple criteria analysis techniques for water resource management
-
Hajkowicz, S., and A. Higgins. 2008. "A Comparison of Multiple Criteria Analysis Techniques for Water Resource Management." European Journal of Operational Research 184: 255-265.
-
(2008)
European Journal of Operational Research
, vol.184
, pp. 255-265
-
-
Hajkowicz, S.1
Higgins, A.2
-
18
-
-
78049395804
-
Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line
-
Ilgin, M. A., and S. M. Gupta. 2010. "Comparison of Economic Benefits of Sensor Embedded Products and Conventional Products in a Multi-product Disassembly Line." Computers & Industrial Engineering 59: 748-763.
-
(2010)
Computers & Industrial Engineering
, vol.59
, pp. 748-763
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
20
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an and/or graph
-
Koc, A., I. Sabuncuoglu, and E. Erel. 2009. "Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an AND/OR Graph." IIE Transactions on Operation Engineering 41: 866-881.
-
(2009)
IIE Transactions on Operation Engineering
, vol.41
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
21
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert, A. J. D. 1999. "Linear Programming in Disassembly/ Clustering Sequence Generation." Computers & Industrial Engineering 36: 723-738.
-
(1999)
Computers & Industrial Engineering
, vol.36
, pp. 723-738
-
-
Lambert, A.J.D.1
-
23
-
-
0034230856
-
On consistency and ranking of alternatives in fuzzy ahp
-
Leung, L. C., and D. Cao. 2000. "On Consistency and Ranking of Alternatives in Fuzzy AHP." European Journal of Operation Research 124: 102-113.
-
(2000)
European Journal of Operation Research
, vol.124
, pp. 102-113
-
-
Leung, L.C.1
Cao, D.2
-
24
-
-
36148941708
-
The strategic evaluation of new technologies through multicriteria analysis: The advisors case
-
Macharis, C., A. Verbeke, and K. De Brucker. 2004. "The Strategic Evaluation of New Technologies through Multicriteria Analysis: The Advisors Case." Research in Transportation Economics 8: 443-462.
-
(2004)
Research in Transportation Economics
, vol.8
, pp. 443-462
-
-
Macharis, C.1
Verbeke, A.2
De Brucker, K.3
-
25
-
-
2142661748
-
2-opt heuristic for the disassembly line balancing problem
-
Providence, Rhode Island, October 29-30
-
McGovern, S. M., and S. M. Gupta. 2003. "2-opt Heuristic for the Disassembly Line Balancing Problem." In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, 71-84, Providence, Rhode Island, October 29-30.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing
, vol.3
, pp. 71-84
-
-
McGovern, S.M.1
Gupta, S.M.2
-
26
-
-
17044367526
-
Combinatorial optimization methods for disassembly line balancing
-
Philadelphia, Pennsylvania, October 26-27
-
McGovern, S. M., and S. M. Gupta. 2004. "Combinatorial optimization methods for disassembly line balancing." In Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing IV, 53-66, Philadelphia, Pennsylvania, October 26-27.
-
(2004)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing
, vol.4
, pp. 53-66
-
-
McGovern, S.M.1
Gupta, S.M.2
-
28
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S. M., and S. M. Gupta. 2007a. "A Balancing Method and Genetic Algorithm for Disassembly Line Balancing." European Journal of Operation Research 179: 692-708.
-
(2007)
European Journal of Operation Research
, vol.179
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
29
-
-
34548449384
-
Combinatorial optimization analysis of the unary np-complete disassembly line balancing problem
-
McGovern, S. M., and S. M. Gupta. 2007b. "Combinatorial Optimization Analysis of the Unary NP-complete Disassembly Line Balancing Problem." International Journal of Production Research 45 (18-19): 4485-4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
30
-
-
0038351785
-
Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines
-
Boston, MA, May 19-22
-
Ranky, R. J., M. Subramanyam, R. J. Caudill, K. Limaye and N. Alli. 2003. "Dynamic Scheduling and Line Balancing Methods, and Software Tools for Lean and Reconfigurable Disassembly Cells and Lines." In Proceedings of the IEEE International Symposium on Electronics and Environment, 234-239, Boston, MA, May 19-22.
-
(2003)
Proceedings of the IEEE International Symposium on Electronics and Environment
, pp. 234-239
-
-
Ranky, R.J.1
Subramanyam, M.2
Caudill, R.J.3
Limaye, K.4
Alli, N.5
-
31
-
-
84893063931
-
Robust strategies for mitigating operational and disruption risks: A fuzzy ahp approach
-
Singh, A. R., P. K. Mishra, R. Jain, and M. K. Khurana. 2012. "Robust Strategies for Mitigating Operational and Disruption Risks: A Fuzzy AHP Approach." International Journal of Multicriteria Decision Making 2 (1): 1-28.
-
(2012)
International Journal of Multicriteria Decision Making
, vol.2
, Issue.1
, pp. 1-28
-
-
Singh, A.R.1
Mishra, P.K.2
Jain, R.3
Khurana, M.K.4
-
33
-
-
0037139677
-
A petri net based approach to determine strategy of a product
-
Tiwari, M. K., N. Sinha, S. Kumar, R. Rai, and S. K. Mukhopadhyay. 2001. "A Petri Net Based Approach to Determine Strategy of a Product." International Journal of Production Research 40 (5): 1113-1129.
-
(2001)
International Journal of Production Research
, vol.40
, Issue.5
, pp. 1113-1129
-
-
Tiwari, M.K.1
Sinha, N.2
Kumar, S.3
Rai, R.4
Mukhopadhyay, S.K.5
-
34
-
-
80052989453
-
A combined ahp-promethee approach for selecting the most appropriate policy scenario to stimulate a clean vehicle fleet
-
Turcksin, L., A. Bernardini, and C. Macharis. 2011. "A Combined AHP-PROMETHEE Approach for Selecting the Most Appropriate Policy Scenario to Stimulate a Clean Vehicle Fleet." Procedia Social and Behavioral Sciences 20: 954-965.
-
(2011)
Procedia Social and Behavioral Sciences
, vol.20
, pp. 954-965
-
-
Turcksin, L.1
Bernardini, A.2
Macharis, C.3
-
35
-
-
34248666540
-
Fuzzy sets'
-
Zadeh, L. A. 1965. "'Fuzzy Sets'." Information Control 8 (3): 338-353.
-
(1965)
Information Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
36
-
-
0001378506
-
Environmentally conscious design and manufacturing: A state-of-the-Art survey
-
Zhang, H. C., Tsai C. Kuo, Huitian Lu, and Samuel H. Huang. 1997. "Environmentally Conscious Design and Manufacturing: A State-of-the-Art Survey." Journal of Manufacturing Systems 16 (5): 352-371.
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.5
, pp. 352-371
-
-
Zhang, H.C.1
Kuo, T.C.2
Lu, H.3
Huang, S.H.4
|