Volumn 37, Issue , 2015, Pages 638-648

Disassembly line balancing under high variety of end of life states using a joint precedence graph approach

Author keywords

Disassembly line balancing (DLB); End of life (EOL) condition; Joint precedence graph; Stochastic line balancing

Indexed keywords

GRAPHIC METHODS; NORMAL DISTRIBUTION;

EID: 84954070118     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2014.11.002     Document Type: Article
Times cited : (68)

References (32)
  • 1
    • 84862513246 scopus 로고    scopus 로고
    • Recovery decisions of a producer in a legislative disposal fee environment
    • O. Ozdemir, M. Denizel, and V.D.R. Guide Recovery decisions of a producer in a legislative disposal fee environment Eur J Oper Res 216 2012 293 300
    • (2012) Eur J Oper Res , vol.216 , pp. 293-300
    • Ozdemir, O.1    Denizel, M.2    Guide, V.D.R.3
  • 3
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • O. Battaïa, and A. Dolgui A taxonomy of line balancing problems and their solution approaches Int J Prod Econ 142 2013 259 277
    • (2013) Int J Prod Econ , vol.142 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 4
    • 0001754245 scopus 로고    scopus 로고
    • Optimal disassembly configurations for single and multiple products
    • A. Meacham, R. Uzsoy, and U. Venkatadri Optimal disassembly configurations for single and multiple products J Manuf Syst 18 5 1999 311 322
    • (1999) J Manuf Syst , vol.18 , Issue.5 , pp. 311-322
    • Meacham, A.1    Uzsoy, R.2    Venkatadri, U.3
  • 5
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • A. Gungor, and S.M. Gupta A solution approach to the disassembly line balancing problem in the presence of task failures Int J Prod Res 39 2001 1427 1467
    • (2001) Int J Prod Res , vol.39 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2
  • 7
    • 2142658953 scopus 로고    scopus 로고
    • Disassembly line balancing with limited supply and subassembly availability
    • F.T. Altekin, L. Kandiller, and N.E. Ozdemirel Disassembly line balancing with limited supply and subassembly availability Proc SPIE 5262 2004 59 70
    • (2004) Proc SPIE , vol.5262 , pp. 59-70
    • Altekin, F.T.1    Kandiller, L.2    Ozdemirel, N.E.3
  • 8
    • 33746432209 scopus 로고    scopus 로고
    • A systematic approach to design and operation of disassembly lines
    • Y. Tang, and M. Zhou A systematic approach to design and operation of disassembly lines IEEE Trans Autom Sci Eng 3 3 2006 324 330
    • (2006) IEEE Trans Autom Sci Eng , vol.3 , Issue.3 , pp. 324-330
    • Tang, Y.1    Zhou, M.2
  • 9
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • S.M. McGovern, and S.M. Gupta A balancing method and genetic algorithm for disassembly line balancing Eur J Oper Res 179 2007 692 708
    • (2007) Eur J Oper Res , vol.179 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 10
    • 34548398404 scopus 로고    scopus 로고
    • Profit-oriented disassembly-line balancing
    • F.T. Altekin, L. Kandiller, and N.E. Ozdemirel Profit-oriented disassembly-line balancing Int J Prod Res 46 10 2008 2675 2693
    • (2008) Int J Prod Res , vol.46 , Issue.10 , pp. 2675-2693
    • Altekin, F.T.1    Kandiller, L.2    Ozdemirel, N.E.3
  • 11
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA)
    • M. Tripathi, S. Agrawal, M.K. Pandey, R. Shankar, and M.K. Tiwari Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA) Robot Comput Integr Manuf 25 2009 483 496
    • (2009) Robot Comput Integr Manuf , vol.25 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.K.5
  • 12
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • A. Koc, I. Sabuncuoglu, and E. Erel Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph IIE Trans 41 2009 866 881
    • (2009) IIE Trans , vol.41 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 13
    • 84867068820 scopus 로고    scopus 로고
    • Task-failure-driven rebalancing of disassembly lines
    • F.T. Altekin, and C. Akkan Task-failure-driven rebalancing of disassembly lines Int J Prod Res 50 18 2012 4955 4976
    • (2012) Int J Prod Res , vol.50 , Issue.18 , pp. 4955-4976
    • Altekin, F.T.1    Akkan, C.2
  • 14
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal
    • Y.S. Ma, H.B. Jun, H.W. Kim, and D.H. Lee Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal Int J Prod Res 49 23 2011 7007 7027
    • (2011) Int J Prod Res , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.S.1    Jun, H.B.2    Kim, H.W.3    Lee, D.H.4
  • 15
    • 84911984779 scopus 로고    scopus 로고
    • Multi-objective partial disassembly optimization based on sequence feasibility
    • J.L. Rickli, and J.A. Cameilio Multi-objective partial disassembly optimization based on sequence feasibility J Manuf Syst 32 1 2013 281 293
    • (2013) J Manuf Syst , vol.32 , Issue.1 , pp. 281-293
    • Rickli, J.L.1    Cameilio, J.A.2
  • 16
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • M.A. Ilgin, and S.M. Gupta Environmentally conscious manufacturing and product recovery (ECMPRO): a review of the state of the art J Environ Manage 91 3 2010 563 591
    • (2010) J Environ Manage , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 17
    • 84904384763 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • E. Tuncel, A. Zeid, and S. Kamarthi Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning J Intell Manufact 25 4 2012 647 659
    • (2012) J Intell Manufact , vol.25 , Issue.4 , pp. 647-659
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 18
    • 0038156629 scopus 로고    scopus 로고
    • Disassembly sequencing: A survey
    • A.J.D. Lambert Disassembly sequencing: a survey Int J Prod Res 41 16 2003 3721 3759
    • (2003) Int J Prod Res , vol.41 , Issue.16 , pp. 3721-3759
    • Lambert, A.J.D.1
  • 19
    • 77951145054 scopus 로고    scopus 로고
    • Automatic derivation of transition matrix for end-of-life decision making
    • M.K. Kang, M.J. Kwak, N.W. Cho, and Y.S. Hong Automatic derivation of transition matrix for end-of-life decision making Int J Prod Res 48 11 2010 3269 3298
    • (2010) Int J Prod Res , vol.48 , Issue.11 , pp. 3269-3298
    • Kang, M.K.1    Kwak, M.J.2    Cho, N.W.3    Hong, Y.S.4
  • 20
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • A. Aydemir-Karadag, and O. Turkbey Multi-objective optimization of stochastic disassembly line balancing with station paralleling Comput Ind Eng 65 2013 413 425
    • (2013) Comput Ind Eng , vol.65 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 21
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • S. Agrawal, and M.K. Tiwari A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem Int J Prod Res 46 6 2008 1405 1429
    • (2008) Int J Prod Res , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 22
    • 0041368822 scopus 로고    scopus 로고
    • Disassembly modeling: Planning, and application
    • Y. Tang, M. Zhou, E. Zussman, and R. Caudill Disassembly modeling: planning, and application J Manuf Syst 21 3 2002 200 217
    • (2002) J Manuf Syst , vol.21 , Issue.3 , pp. 200-217
    • Tang, Y.1    Zhou, M.2    Zussman, E.3    Caudill, R.4
  • 23
    • 58249083327 scopus 로고    scopus 로고
    • Assembly line balancing: Joint precedence graphs under high product variety
    • N. Boysen, M. Fliedner, and A. Scholl Assembly line balancing: joint precedence graphs under high product variety IIE Trans 41 3 2009 183 193
    • (2009) IIE Trans , vol.41 , Issue.3 , pp. 183-193
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 24
    • 0023537240 scopus 로고
    • Simplified generation of all mechanical assembly sequences
    • T.L. De Fazio, and D.E. Whitney Simplified generation of all mechanical assembly sequences IEEE J Robot Autom 3 6 1987 640 658
    • (1987) IEEE J Robot Autom , vol.3 , Issue.6 , pp. 640-658
    • De Fazio, T.L.1    Whitney, D.E.2
  • 25
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Manage Sci 32 8 1986 909 932
    • (1986) Manage Sci , vol.32 , Issue.8 , pp. 909-932
    • Baybars, I.1
  • 27
    • 84883888931 scopus 로고    scopus 로고
    • Disassembly liaison graphs inspired by word clouds
    • R.J. Riggs, and S.J. Hu Disassembly liaison graphs inspired by word clouds Procedia CIRP 7 2013 521 526
    • (2013) Procedia CIRP , vol.7 , pp. 521-526
    • Riggs, R.J.1    Hu, S.J.2
  • 28
    • 84881185298 scopus 로고    scopus 로고
    • Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
    • C.B. Kalayci, and S.M. Gupta Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem Expert Syst Appl 40 18 2013 7231 7241
    • (2013) Expert Syst Appl , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 29
    • 84939620796 scopus 로고    scopus 로고
    • Two-stage sequence generation for partial disassembly of products with sequence dependent task times
    • R.J. Riggs, X. Jin, and S.J. Hu Two-stage sequence generation for partial disassembly of products with sequence dependent task times Procedia CIRP 29 2015 698 703
    • (2015) Procedia CIRP , vol.29 , pp. 698-703
    • Riggs, R.J.1    Jin, X.2    Hu, S.J.3
  • 31
    • 84902248564 scopus 로고    scopus 로고
    • A sample average approximation method for disassembly line balancing problem under uncertainty
    • M.L. Bentaha, O. Battaïa, and A. Dolgui A sample average approximation method for disassembly line balancing problem under uncertainty Comput Oper Res 51 2014 111 122
    • (2014) Comput Oper Res , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 32
    • 84961289222 scopus 로고    scopus 로고
    • An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
    • M.L. Bentaha, O. Battaïa, and A. Dolgui An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times Int J Prod Res 53 6 2015 1807 1818
    • (2015) Int J Prod Res , vol.53 , Issue.6 , pp. 1807-1818
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.