-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S., Tiwari, M.K., A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research 46:6 (2008), 1405–1429.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
3
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., Ozdemir, N.E., Profit-oriented disassembly-line balancing. International Journal of Production Research 46:10 (2008), 2675–2693.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemir, N.E.3
-
4
-
-
84867068820
-
Task-failure-driven rebalancing of disassembly lines
-
Altekin, F.T., Akkan, C., Task-failure-driven rebalancing of disassembly lines. International Journal of Production Research 50:18 (2012), 4955–4976.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 4955-4976
-
-
Altekin, F.T.1
Akkan, C.2
-
5
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir, A.K., Ttirkbey, O., Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering 65:3 (2013), 413–425.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir, A.K.1
Ttirkbey, O.2
-
6
-
-
84922259130
-
A new U-shaped heuristic for disassembly line balancing problems
-
Avikal, S., Mishra, P.K., A new U-shaped heuristic for disassembly line balancing problems. Pratibha: International Journal of Science, Spirituality, Business and Technology 1:1 (2012), 2277–7261.
-
(2012)
Pratibha: International Journal of Science, Spirituality, Business and Technology
, vol.1
, Issue.1
, pp. 2277-7261
-
-
Avikal, S.1
Mishra, P.K.2
-
7
-
-
84893957110
-
A heuristic for U-shaped disassembly line balancing problems
-
Avikal, S., Jain, R., Mishra, P., A heuristic for U-shaped disassembly line balancing problems. MIT International Journal of Mechanical Engineering 3:1 (2013), 51–56.
-
(2013)
MIT International Journal of Mechanical Engineering
, vol.3
, Issue.1
, pp. 51-56
-
-
Avikal, S.1
Jain, R.2
Mishra, P.3
-
8
-
-
84961289222
-
An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
-
Bentaha, M.L., Battaia, O., Dolgui, A., An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research 53:6 (2015), 1807–1818.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaia, O.2
Dolgui, A.3
-
9
-
-
79953833807
-
Assembly line balancing: general resource- constrained case
-
Corominas, A., Ferrer, L., Pastor, R., Assembly line balancing: general resource- constrained case. International Journal of Production Research 49:12 (2010), 3527–3542.
-
(2010)
International Journal of Production Research
, vol.49
, Issue.12
, pp. 3527-3542
-
-
Corominas, A.1
Ferrer, L.2
Pastor, R.3
-
10
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
-
Ding, L.P., Feng, Y.X., Tan, J.R., Gao, Y.C., A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology 48:5-8 (2010), 761–771.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5-8
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
11
-
-
0035837942
-
"A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
-
Güngör, A., Gupta, S.M., "A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures. International Journal of Production Research 39:7 (2001), 1427–1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
12
-
-
84922251741
-
A network-based shortest route model for parallel disassembly line balancing problem
-
Hezer, S., Kara, Y., A network-based shortest route model for parallel disassembly line balancing problem. International Journal of Production Research 53:6 (2014), 1849–1865.
-
(2014)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1849-1865
-
-
Hezer, S.1
Kara, Y.2
-
13
-
-
84878666440
-
Ant colony optimization for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M., Ant colony optimization for sequence-dependent disassembly line balancing problem. Journal of Manufacturing Technology Management 24:3 (2013), 413–427.
-
(2013)
Journal of Manufacturing Technology Management
, vol.24
, Issue.3
, pp. 413-427
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
14
-
-
84889821707
-
A Tabu Search Algorithm for Balancing a Sequence-dependent disassembly line
-
Kalayci, C.B., Gupta, S.M., A Tabu Search Algorithm for Balancing a Sequence-dependent disassembly line. Production Planning & Control: The Management of Operations 25:2 (2014), 149–160.
-
(2014)
Production Planning & Control: The Management of Operations
, vol.25
, Issue.2
, pp. 149-160
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
15
-
-
84902301531
-
-
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem. Annals of Operations Research, doi: 10.1007/sl0479-014-1641-3.
-
Kalayci, C.B., Polat, O. and Gupta, S.M. (2015). A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem. Annals of Operations Research, doi: 10.1007/sl0479-014-1641-3.
-
(2015)
-
-
Kalayci, C.B.1
Polat, O.2
Gupta, S.M.3
-
16
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koç, A., Sabuncuoglu, I., Erel, E., Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. HE Transactions 41:10 (2009), 866–881.
-
(2009)
HE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koç, A.1
Sabuncuoglu, I.2
Erel, E.3
-
17
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S.M., Gupta, S.M., A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research 179:3 (2007), 692–708.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
18
-
-
84890351862
-
Multi objective generalized resource constrained two sided assembly line balancing problem and computational analaysis. [In Turkish]
-
Mete, S., Agpak, K., Multi objective generalized resource constrained two sided assembly line balancing problem and computational analaysis. [In Turkish]. Journal of the Faculty Engineering and Architecture ofGazi University 28:2 (2013), 567–576.
-
(2013)
Journal of the Faculty Engineering and Architecture ofGazi University
, vol.28
, Issue.2
, pp. 567-576
-
-
Mete, S.1
Agpak, K.2
-
19
-
-
84885625406
-
Mixed model disassembly line balancing problem with fuzzy goals
-
Paksoy, T., Güngör, A., Özceylan, E., Hancilar, A., Mixed model disassembly line balancing problem with fuzzy goals. International Journal of Production Research 51:20 (2013), 6082–6096.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
20
-
-
0030823620
-
A family of hierarchical models for assembly system design
-
Pinnoi, A., Wilhelm, W.E., A family of hierarchical models for assembly system design. International Journal of Production Research 35:1 (1997), 253–280.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.1
, pp. 253-280
-
-
Pinnoi, A.1
Wilhelm, W.E.2
|