메뉴 건너뛰기




Volumn 55, Issue 24, 2017, Pages 7412-7434

A comparison of piecewise linear programming formulations for stochastic disassembly line balancing

Author keywords

Disassembly; Line balancing; Piecewise linear model; Second order cone programming; Stochastic task times

Indexed keywords

INTEGER PROGRAMMING; LINEAR PROGRAMMING; OPTIMAL SYSTEMS; PIECEWISE LINEAR TECHNIQUES; STOCHASTIC SYSTEMS;

EID: 85026227847     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2017.1351639     Document Type: Article
Times cited : (50)

References (66)
  • 1
    • 33847014539 scopus 로고    scopus 로고
    • A Chance-Constrained Approach to Stochastic Line Balancing Problem
    • Ağpak, K., and H. Gökçen. 2007. “A Chance-Constrained Approach to Stochastic Line Balancing Problem.” European Journal of Operational Research 180 (3): 1098–1115.
    • (2007) European Journal of Operational Research , vol.180 , Issue.3 , pp. 1098-1115
    • Ağpak, K.1    Gökçen, H.2
  • 2
    • 36448976916 scopus 로고    scopus 로고
    • A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem
    • Agrawal, S., and M. K. Tiwari. 2008. “A Collaborative Ant Colony Algorithm to Stochastic Mixed-Model U-Shaped Disassembly Line Balancing and Sequencing Problem.” International Journal of Production Research 46 (6): 1405–1429.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 7
    • 84893943458 scopus 로고    scopus 로고
    • A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems
    • Avikal, S., P. K. Mishra, and R. Jain. 2014. “A Fuzzy AHP and PROMETHEE Method-Based Heuristic for Disassembly Line Balancing Problems.” International Journal of Production Research 52 (5): 1306–1317.
    • (2014) International Journal of Production Research , vol.52 , Issue.5 , pp. 1306-1317
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 8
    • 84876972240 scopus 로고    scopus 로고
    • Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling
    • Aydemir-Karadag, A., and O. Turkbey. 2013. “Multi-Objective Optimization of Stochastic Disassembly Line Balancing with Station Paralleling.” Computers & Industrial Engineering 65 (3): 413–425.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 9
    • 25144450992 scopus 로고    scopus 로고
    • A Survey on Problems and Methods in Generalized Assembly Line Balancing
    • Becker, C., and A. Scholl. 2006. “A Survey on Problems and Methods in Generalized Assembly Line Balancing.” European Journal of Operational Research 168 (3): 694–715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 10
    • 84922236941 scopus 로고    scopus 로고
    • Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts
    • edited by V. Prabhu, M. Taisch, and D. Kiritsis, 103–110. State College, PA: Springer
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2013a. “Chance Constrained Programming Model for Stochastic Profit–Oriented Disassembly Line Balancing in the Presence of Hazardous Parts.” In Advances in Production Management Systems .Sustainable Production and Service Supply Chains, edited by V. Prabhu, M. Taisch, and D. Kiritsis, 103–110. State College, PA: Springer.
    • (2013) In Advances in Production Management Systems .Sustainable Production and Service Supply Chains
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 13
    • 84902248564 scopus 로고    scopus 로고
    • A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014a. “A Sample Average Approximation Method for Disassembly Line Balancing Problem under Uncertainty.” Computers & Operations Research 51: 111–122.
    • (2014) Computers & Operations Research , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 14
    • 84903557899 scopus 로고    scopus 로고
    • Disassembly Line Balancing and Sequencing Under Uncertainty
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014b. “Disassembly Line Balancing and Sequencing Under Uncertainty.” Procedia CIRP 15: 239–244.
    • (2014) Procedia CIRP , vol.15 , pp. 239-244
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 15
    • 84904503542 scopus 로고    scopus 로고
    • Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014c. “Lagrangian Relaxation for Stochastic Disassembly Line Balancing Problem.” Procedia CIRP 17 (17): 56–60.
    • (2014) Procedia CIRP , vol.17 , Issue.17 , pp. 56-60
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 16
    • 84961289222 scopus 로고    scopus 로고
    • An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014d. “An Exact Solution Approach for Disassembly Line Balancing Problem under Uncertainty of the Task Processing times.” International Journal of Production Research 53 (6): 1807–1818.
    • (2014) International Journal of Production Research , vol.53 , Issue.6 , pp. 1807-1818
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 17
    • 84929774090 scopus 로고    scopus 로고
    • Disassembly Line Balancing Problem with Fixed Number of Workstations Under Uncertainty
    • Bentaha, M. L., O. Battaïa, and A. Dolgui. 2014e. “Disassembly Line Balancing Problem with Fixed Number of Workstations Under Uncertainty.” In Proceedings of the 19th IFAC World Congress. Vol. 47, 3522–3526. Cape Town.
    • (2014) In Proceedings of the 19Th IFAC World Congress , vol.47 , pp. 3522-3526
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 19
    • 85054886050 scopus 로고    scopus 로고
    • Problem Instances I Have Used in the Numerical Experiments of My Work on Disassembly Line Design and Balancing under Uncertainty
    • Bentaha, M. L., A. Dolgui, and O. Battaïa. 2015b. “Problem Instances I Have Used in the Numerical Experiments of My Work on Disassembly Line Design and Balancing under Uncertainty.” Researchgate 1: 1–14. doi:10.13140/RG.2.1.5163.5043.
    • (2015) Researchgate , vol.1 , pp. 1-14
    • Bentaha, M.L.1    Dolgui, A.2    Battaïa, O.3
  • 21
    • 84940610243 scopus 로고    scopus 로고
    • Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints
    • Bentaha, M. L., O. Battaïa, A. Dolgui, and S. J. Hu. 2015. “Second Order Conic Approximation for Disassembly Line Design with Joint Probabilistic Constraints.” European Journal of Operational Research 247 (3): 957–967.
    • (2015) European Journal of Operational Research , vol.247 , Issue.3 , pp. 957-967
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3    Hu, S.J.4
  • 22
    • 0000416102 scopus 로고
    • Assembly-Line Balancing by Linear Programming
    • Bowman, E. H. 1960. “Assembly-Line Balancing by Linear Programming.” Operations Research 8 (3): 385–389.
    • (1960) Operations Research , vol.8 , Issue.3 , pp. 385-389
    • Bowman, E.H.1
  • 23
    • 33748934553 scopus 로고    scopus 로고
    • The Stochastic U-Line Balancing Problem: A Heuristic Procedure
    • Chiang, W. C., and T. L. Urban. 2006. “The Stochastic U-Line Balancing Problem: A Heuristic Procedure.” European Journal of Operational Research 175 (3): 1767–1781.
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.C.1    Urban, T.L.2
  • 26
    • 79960737645 scopus 로고    scopus 로고
    • Applying Equal Piles Approach to Disassembly Line Balancing Problem
    • Duta, L., F. G. Filip, and J. M. Henrioud. 2005. “Applying Equal Piles Approach to Disassembly Line Balancing Problem.” IFAC Proceedings Volumes 38 (1): 152–157.
    • (2005) IFAC Proceedings Volumes , vol.38 , Issue.1 , pp. 152-157
    • Duta, L.1    Filip, F.G.2    Henrioud, J.M.3
  • 27
    • 0032117097 scopus 로고    scopus 로고
    • A Survey of the Assembly Line Balancing Procedures
    • Erel, E., and S. C. Sarin. 1998. “A Survey of the Assembly Line Balancing Procedures.” Production Planning & Control 9 (5): 414–434.
    • (1998) Production Planning & Control , vol.9 , Issue.5 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 28
    • 28244475042 scopus 로고    scopus 로고
    • A Goal Programming Approach to Simple U-Line Balancing Problem
    • Gökçen, H., and K. Ağpak. 2006. “A Goal Programming Approach to Simple U-Line Balancing Problem.” European Journal of Operational Research 171 (2): 577–585.
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 577-585
    • Gökçen, H.1    Ağpak, K.2
  • 29
    • 0035837942 scopus 로고    scopus 로고
    • A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures
    • Güngör, A., and S. M. Gupta. 2001. “A Solution Approach to the Disassembly Line Balancing Problem in the Presence of Task Failures.” International Journal of Production Research 39 (7): 1427–1467.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 31
    • 84887821595 scopus 로고    scopus 로고
    • A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M. Gupta. 2013a. “A Particle Swarm Optimization Algorithm with Neighborhood-Based Mutation for Sequence-Dependent Disassembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 69 (1–4): 197–209.
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.69 , Issue.1-4 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 32
    • 84878666440 scopus 로고    scopus 로고
    • Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M. Gupta. 2013b. “Ant Colony Optimization for Sequence-Dependent Disassembly Line Balancing Problem.” Journal of Manufacturing Technology Management 24 (3): 413–427.
    • (2013) Journal of Manufacturing Technology Management , vol.24 , Issue.3 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 33
    • 84881185298 scopus 로고    scopus 로고
    • Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., and S. M. Gupta. 2013c. “Artificial Bee Colony Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.” Expert Systems with Applications 40 (18): 7231–7241.
    • (2013) Expert Systems with Applications , vol.40 , Issue.18 , pp. 7231-7241
    • Kalayci, C.B.1    Gupta, S.M.2
  • 34
    • 84889821707 scopus 로고    scopus 로고
    • A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line
    • Kalayci, C. B., and S. M. Gupta. 2014. “A Tabu Search Algorithm for Balancing a Sequence-Dependent Disassembly Line.” Production Planning & Control 25 (2): 149–160.
    • (2014) Production Planning & Control , vol.25 , Issue.2 , pp. 149-160
    • Kalayci, C.B.1    Gupta, S.M.2
  • 35
    • 84902301531 scopus 로고    scopus 로고
    • A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem
    • Kalayci, C. B., O. Polat, and S. M. Gupta. 2016. “A Hybrid Genetic Algorithm for Sequence-Dependent Disassembly Line Balancing Problem.” Annals of Operations Research 242 (2): 321–354.
    • (2016) Annals of Operations Research , vol.242 , Issue.2 , pp. 321-354
    • Kalayci, C.B.1    Polat, O.2    Gupta, S.M.3
  • 38
    • 34447283264 scopus 로고    scopus 로고
    • A Case Study of Serial-Flow Car Disassembly: Ergonomics, Productivity and Potential System Performance
    • Kazmierczak, K., W. P. Neumann, and J. Winkel. 2007. “A Case Study of Serial-Flow Car Disassembly: Ergonomics, Productivity and Potential System Performance.” Human Factors and Ergonomics in Manufacturing 17 (4): 331–351.
    • (2007) Human Factors and Ergonomics in Manufacturing , vol.17 , Issue.4 , pp. 331-351
    • Kazmierczak, K.1    Neumann, W.P.2    Winkel, J.3
  • 39
    • 0142029542 scopus 로고    scopus 로고
    • Models for Representing Piecewise Linear Cost Functions
    • Keha, A. B., I. R. de Farias, and G. L. Nemhauser. 2004. “Models for Representing Piecewise Linear Cost Functions.” Operations Research Letters 32 (1): 44–48.
    • (2004) Operations Research Letters , vol.32 , Issue.1 , pp. 44-48
    • Keha, A.B.1    de Farias, I.R.2    Nemhauser, G.L.3
  • 40
    • 70749116514 scopus 로고    scopus 로고
    • Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph
    • Koc, A., I. Sabuncuoglu, and E. Erel. 2009. “Two Exact Formulations for Disassembly Line Balancing Problems with Task Precedence Diagram Construction Using an aND/oR Graph.” IIE Transactions 41 (10): 866–881.
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 41
    • 31044432230 scopus 로고    scopus 로고
    • Disassembly to Order System under Uncertainty
    • Kongar, E., and S. M. Gupta. 2006. “Disassembly to Order System under Uncertainty.” Omega 34 (6): 550–561.
    • (2006) Omega , vol.34 , Issue.6 , pp. 550-561
    • Kongar, E.1    Gupta, S.M.2
  • 42
    • 0016962322 scopus 로고
    • A Total Operating Cost Model for Paced Lines with Stochastic Task times
    • Kottas, J. F., and H. S. Lau. 1976. “A Total Operating Cost Model for Paced Lines with Stochastic Task times.” AIIE Transactions 8 (2): 234–240.
    • (1976) AIIE Transactions , vol.8 , Issue.2 , pp. 234-240
    • Kottas, J.F.1    Lau, H.S.2
  • 43
    • 0033358055 scopus 로고    scopus 로고
    • Linear Programming in Disassembly/Clustering Sequence Generation
    • Lambert, A. J. D. 1999. “Linear Programming in Disassembly/Clustering Sequence Generation.” Computers & Industrial Engineering 36 (4): 723–738.
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 44
    • 0023586184 scopus 로고
    • An Exploratory Study on Stopping a Paced Line When Incompletions Occur
    • Lau, H. S., and A. Shtub. 1987. “An Exploratory Study on Stopping a Paced Line When Incompletions Occur.” IIE Transactions 19 (4): 463–467.
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 463-467
    • Lau, H.S.1    Shtub, A.2
  • 45
    • 0142011931 scopus 로고    scopus 로고
    • Polyhedral Methods for Piecewise-Linear Functions I: The Lambda Method
    • Lee, J., and D. Wilson. 2001. “Polyhedral Methods for Piecewise-Linear Functions I: The Lambda Method.” Discrete Applied Mathematics 108 (3): 269–285.
    • (2001) Discrete Applied Mathematics , vol.108 , Issue.3 , pp. 269-285
    • Lee, J.1    Wilson, D.2
  • 47
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem
    • McGovern, S. M., and S. M. Gupta. 2007a. “Combinatorial Optimization Analysis of the Unary NP-Complete Disassembly Line Balancing Problem.” International Journal of Production Research 45 (18–19): 4485–4511.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 48
    • 33845939092 scopus 로고    scopus 로고
    • A Balancing Method and Genetic Algorithm for Disassembly Line Balancing
    • McGovern, S. M., and S. M. Gupta. 2007b. “A Balancing Method and Genetic Algorithm for Disassembly Line Balancing.” European Journal of Operational Research 179 (3): 692–708.
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 49
    • 84988918149 scopus 로고    scopus 로고
    • A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem
    • Mete, S., Z. A. Çil, K. Ağpak, E. Özceylan, and A. Dolgui. 2016. “A Solution Approach Based on Beam Search Algorithm for Disassembly Line Balancing Problem.” Journal of Manufacturing Systems 41: 188–200.
    • (2016) Journal of Manufacturing Systems , vol.41 , pp. 188-200
    • Mete, S.1    Çil, Z.A.2    Ağpak, K.3    Özceylan, E.4    Dolgui, A.5
  • 50
    • 0002569892 scopus 로고
    • A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element times
    • Moodie, C. L., and H. H. Young. 1965. “A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element times.” Journal of Industrial Engineering 16 (1): 23–29.
    • (1965) Journal of Industrial Engineering , vol.16 , Issue.1 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 51
    • 75849138540 scopus 로고    scopus 로고
    • Balancing Stochastic Two-Sided Assembly Lines: A Chance-Constrained, Piecewise-Linear, Mixed Integer Program and a Simulated Annealing Algorithm
    • Özcan, U. 2010. “Balancing Stochastic Two-Sided Assembly Lines: A Chance-Constrained, Piecewise-Linear, Mixed Integer Program and a Simulated Annealing Algorithm.” European Journal of Operational Research 205 (1): 81–97.
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Özcan, U.1
  • 52
    • 0034238783 scopus 로고    scopus 로고
    • Approximating Separable Nonlinear Functions via Mixed Zero-One Programs
    • Padberg, M. 2000. “Approximating Separable Nonlinear Functions via Mixed Zero-One Programs.” Operations Research Letters 27 (1): 1–5.
    • (2000) Operations Research Letters , vol.27 , Issue.1 , pp. 1-5
    • Padberg, M.1
  • 55
    • 70449674529 scopus 로고    scopus 로고
    • An Improved Mathematical Program to Solve the Simple Assembly Line Balancing Problem
    • Pastor, R., and L. Ferrer. 2009. “An Improved Mathematical Program to Solve the Simple Assembly Line Balancing Problem.” International Journal of Production Research 47 (11): 2943–2959.
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 2943-2959
    • Pastor, R.1    Ferrer, L.2
  • 56
    • 0016428867 scopus 로고
    • Assembly-line balancing: Zero-one programming with Fibonacci Search
    • Patterson, J. H., and J. J. Albracht. 1975. “Assembly-line balancing: Zero-one programming with Fibonacci Search.” Operations Research 23 (1): 166–172.
    • (1975) Operations Research , vol.23 , Issue.1 , pp. 166-172
    • Patterson, J.H.1    Albracht, J.J.2
  • 58
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing
    • Scholl, A., and C. Becker. 2006. “State-of-the-Art Exact and Heuristic Solution Procedures for Simple Assembly Line Balancing.” European Journal of Operational Research 168 (3): 694–693.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 693-694
    • Scholl, A.1    Becker, C.2
  • 59
    • 0022698734 scopus 로고
    • A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages
    • Silverman, F. N., and J. C. Carter. 1986. “A Cost-Based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages.” Management Science 32: 455–463.
    • (1986) Management Science , vol.32 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 61
    • 84884265006 scopus 로고    scopus 로고
    • Locally Ideal Formulations for Piecewise Linear Functions with Indicator Variables
    • Sridhar, S., J. Linderoth, and J. Luedtke. 2013. “Locally Ideal Formulations for Piecewise Linear Functions with Indicator Variables.” Operations Research Letters 41 (6): 627–632.
    • (2013) Operations Research Letters , vol.41 , Issue.6 , pp. 627-632
    • Sridhar, S.1    Linderoth, J.2    Luedtke, J.3
  • 62
    • 0010549168 scopus 로고
    • Assembly Line Balancing by Zero-One Integer Programming
    • Thangavelu, S. R., and C. M. Shetty. 1971. “Assembly Line Balancing by Zero-One Integer Programming.” AIIE Transactions 3 (1): 61–68.
    • (1971) AIIE Transactions , vol.3 , Issue.1 , pp. 61-68
    • Thangavelu, S.R.1    Shetty, C.M.2
  • 63
    • 25144472327 scopus 로고    scopus 로고
    • An Optimal Piecewise-Linear Program for the U-Line Balancing Problem with Stochastic Task times
    • Urban, T. L., and W. C. Chiang. 2006. “An Optimal Piecewise-Linear Program for the U-Line Balancing Problem with Stochastic Task times.” European Journal of Operational Research 168 (3): 771–782.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 771-782
    • Urban, T.L.1    Chiang, W.C.2
  • 64
    • 84923104626 scopus 로고    scopus 로고
    • Mixed Integer Linear Programming Formulation Techniques
    • SIAM
    • Vielma, J. P. 2015. “Mixed Integer Linear Programming Formulation Techniques.” SIAM Review 57 (1): 3–57.
    • (2015) Review , vol.57 , Issue.1 , pp. 3-57
    • Vielma, J.P.1
  • 65
    • 77951161656 scopus 로고    scopus 로고
    • Mixed-Integer Models for Nonseparable Piecewise-Linear Optimization: Unifying Framework and Extensions
    • Vielma, J. P., S. Ahmed, and G. Nemhauser. 2010. “Mixed-Integer Models for Nonseparable Piecewise-Linear Optimization: Unifying Framework and Extensions.” Operations Research 58 (2): 303–315.
    • (2010) Operations Research , vol.58 , Issue.2 , pp. 303-315
    • Vielma, J.P.1    Ahmed, S.2    Nemhauser, G.3
  • 66
    • 0000028230 scopus 로고
    • Comments on a paper by Bowman
    • White, W. W. 1961. “Comments on a paper by Bowman.” Operations Research 9 (2): 274–276.
    • (1961) Operations Research , vol.9 , Issue.2 , pp. 274-276
    • White, W.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.