|
Volumn 38, Issue 1, 2005, Pages 152-157
|
Applying equal piles approach to disassembly line balancing problem
|
Author keywords
Environmental engineering; Optimal load flow; Process control; Time schedule control
|
Indexed keywords
BALANCING;
ELECTRIC LOAD FLOW;
ENVIRONMENTAL ENGINEERING;
PILES;
DISASSEMBLY LINE;
DISASSEMBLY LINE BALANCING;
DISASSEMBLY PROCESS;
OPTIMAL LOAD FLOW;
TIME SCHEDULES;
PROCESS CONTROL;
|
EID: 79960737645
PISSN: 14746670
EISSN: None
Source Type: Conference Proceeding
DOI: 10.3182/20050703-6-cz-1902.01450 Document Type: Conference Paper |
Times cited : (14)
|
References (15)
|