|
Volumn 40, Issue 11, 2002, Pages 2569-2589
|
Disassembly line in product recovery
a a |
Author keywords
[No Author keywords available]
|
Indexed keywords
ASSEMBLY;
HEURISTIC METHODS;
MATERIALS BALANCE;
PROCESS CONTROL;
RECYCLING;
ASSEMBLY LINE BALANCING;
DIASSEMBLY LINES;
PRODUCTION ENGINEERING;
|
EID: 0037143030
PISSN: 00207543
EISSN: None
Source Type: Journal
DOI: 10.1080/00207540210135622 Document Type: Article |
Times cited : (255)
|
References (33)
|