-
1
-
-
84908355358
-
A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment
-
Avikal, S., Jain, R., and Mishra, P. K. (2014), A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment, Applied Soft Computing, 25, 519-529.
-
(2014)
Applied Soft Computing
, vol.25
, pp. 519-529
-
-
Avikal, S.1
Jain, R.2
Mishra, P.K.3
-
2
-
-
84902248564
-
A sample average approximation method for disassembly line balancing problem under uncertainty
-
Bentaha, M. L., Battaïa, O., and Dolgui, A. (2014), A sample average approximation method for disassembly line balancing problem under uncertainty, Computers and Operations Research, 51, 111-122.
-
(2014)
Computers and Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
3
-
-
84904503542
-
Lagrangian relaxation for stochastic disassembly line balancing problem
-
Bentaha, M. L., Battaïa, O., and Dolgui, A. (2014), Lagrangian relaxation for stochastic disassembly line balancing problem, Procedia CIRP, 17, 56-60.
-
(2014)
Procedia CIRP
, vol.17
, pp. 56-60
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
4
-
-
0030422390
-
Fuzzy assembly line balancing using genetic algorithms
-
Gen, M., Tsujimura, Y., and Li, Y. (1996), Fuzzy assembly line balancing using genetic algorithms, Computers and Industrial Engineering, 31(3), 631-634.
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.3
, pp. 631-634
-
-
Gen, M.1
Tsujimura, Y.2
Li, Y.3
-
5
-
-
84855874288
-
Genetically optimised disassembly sequence for automotive component reuse
-
Go, T. F., Wahab, D. A., Rahman, M. A., Ramli, R., and Hussain, A. (2012), Genetically optimised disassembly sequence for automotive component reuse, Expert Systems with Applications, 39(5), 5409-5417.
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.5
, pp. 5409-5417
-
-
Go, T.F.1
Wahab, D.A.2
Rahman, M.A.3
Ramli, R.4
Hussain, A.5
-
7
-
-
0037143030
-
Disassembly line in product recovery
-
Güngör, A. and Gupta, S. M. (2002), Disassembly line in product recovery, International Journal of Production Research, 40(11), 2569-2589.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Güngör, A.1
Gupta, S.M.2
-
9
-
-
84881185298
-
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
-
Kalayci, C. B. and Gupta, S. M. (2013), Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem, Expert Systems with Applications, 40(18), 7231-7241.
-
(2013)
Expert Systems with Applications
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
10
-
-
84954047904
-
Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm
-
Kalayci, C. B., Hancilar, A., Gungor, A., and Gupta, S. M. (2015), Multi-objective fuzzy disassembly line balancing using a hybrid discrete artificial bee colony algorithm, Journal of Manufacturing Systems, 37, 672-682.
-
(2015)
Journal of Manufacturing Systems
, vol.37
, pp. 672-682
-
-
Kalayci, C.B.1
Hancilar, A.2
Gungor, A.3
Gupta, S.M.4
-
11
-
-
0001130859
-
Comparison of fuzzy numbers based on the probability measure of fuzzy events
-
Lee, E. S. and Li, R. J. (1988), Comparison of fuzzy numbers based on the probability measure of fuzzy events, Computers and Mathematics with Applications, 15(10), 887-896.
-
(1988)
Computers and Mathematics with Applications
, vol.15
, Issue.10
, pp. 887-896
-
-
Lee, E.S.1
Li, R.J.2
-
12
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S. M. and Gupta, S. M. (2007), A balancing method and genetic algorithm for disassembly line balancing, European Journal of Operational Research, 179(3), 692-708.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
13
-
-
84890189031
-
Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
-
Özceylan, E., Paksoy, T., and Bektas, T. (2014), Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing, Transportation research part E: logistics and transportation review, 61, 142-164.
-
(2014)
Transportation Research Part E: Logistics and Transportation Review
, vol.61
, pp. 142-164
-
-
Özceylan, E.1
Paksoy, T.2
Bektas, T.3
-
14
-
-
84885625406
-
Mixed model disassembly line balancing problem with fuzzy goals
-
Paksoy, T., Güngör, A., Özceylan, E., and Hancilar, A. (2013), Mixed model disassembly line balancing problem with fuzzy goals, International Journal of Production Research, 51(20), 6082-6096.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
15
-
-
84864403256
-
Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem
-
Tapkan, P., Özbakir, L., and Baykasoglu, A. (2012), Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem, Optimization Letters, 6(6), 1039-1049.
-
(2012)
Optimization Letters
, vol.6
, Issue.6
, pp. 1039-1049
-
-
Tapkan, P.1
Özbakir, L.2
Baykasoglu, A.3
-
16
-
-
0036558763
-
Tutorial on computational complexity
-
Tovey, C. A. (2002), Tutorial on computational complexity.Interfaces, 32(3), 30-61.
-
(2002)
Interfaces
, vol.32
, Issue.3
, pp. 30-61
-
-
Tovey, C.A.1
-
17
-
-
0029368231
-
Solving fuzzy assembly-line balancing problem with genetic algorithms
-
Tsujimura, Y., Gen, M., and Kubota, E. (1995), Solving fuzzy assembly-line balancing problem with genetic algorithms, Computers and Industrial Engineering, 29(1), 543-547.
-
(1995)
Computers and Industrial Engineering
, vol.29
, Issue.1
, pp. 543-547
-
-
Tsujimura, Y.1
Gen, M.2
Kubota, E.3
-
18
-
-
25144504530
-
A heuristic solution for fuzzy mixed-model line balancing problem
-
Van Hop, N. (2006), A heuristic solution for fuzzy mixed-model line balancing problem, European Journal of Operational Research, 168(3), 798-810.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 798-810
-
-
Van Hop, N.1
|