메뉴 건너뛰기




Volumn 2, Issue , 2003, Pages 1737-1744

Greedy algorithm for dissassembly line scheduling

Author keywords

Combinatorial optimization; Disassembly; Disassembly line balancing; Greedy algorithm; Heuristics; Hill climbing; Product recovery

Indexed keywords

ALGORITHMS; HEURISTIC METHODS; INVENTORY CONTROL; LAND FILL; MANUFACTURE; RELIABILITY;

EID: 0242492016     PISSN: 08843627     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (38)

References (12)
  • 4
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • A. Gungor, and S. M. Gupta, "Issues in environmentally conscious manufacturing and product recovery: a survey", Computers and Industrial Engineering, Vol 36, No. 4, pp. 811-853, 1999.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.4 , pp. 811-853
    • Gungor, A.1    Gupta, S.M.2
  • 7
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line problem in the presence of task failures
    • A. Gungor, and S. M. Gupta, "A solution approach to the disassembly line problem in the presence of task failures", International Journal of Production Research, Vol 39, No. 7, pp. 1427-1467, 2001.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Gungor, A.1    Gupta, S.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.