메뉴 건너뛰기




Volumn 19, Issue , 2014, Pages 3522-3526

Disassembly line balancing problem with fixed number of workstations under uncertainty

Author keywords

Disassembly; Line balancing; Monte Carlo sampling; Stochastic programming

Indexed keywords

AUTOMATION; MONTE CARLO METHODS; STOCHASTIC PROGRAMMING; STOCHASTIC SYSTEMS;

EID: 84929774090     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.3182/20140824-6-za-1003.02788     Document Type: Conference Paper
Times cited : (23)

References (27)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • Agrawal, S. and Tiwari, M.K. (2006). A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International journal of production research, 46(6), 1405-1429.
    • (2006) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 5
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • Aydemir-Karadag, A. and Turkbey, O. (2013). Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering, 65(3), 413-425.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 10
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Güngör, A. and Gupta, S.M. (2001). A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 12
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • Güngör, A. and Gupta, S.M. (1999b). Issues in environmentally conscious manufacturing and product recovery: a survey. Computers & Industrial Engineering, 36, 811-853.
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 811-853
    • Güngör, A.1    Gupta, S.M.2
  • 14
    • 0034837192 scopus 로고    scopus 로고
    • Product recovery using a disassembly line: Challenges and solution
    • Proceedings of the 2001 IEEE International Symposium
    • Gupta, S. and Gungor, A. (2001). Product recovery using a disassembly line: challenges and solution. In Electronics and the Environment, 2001. Proceedings of the 2001 IEEE International Symposium, 36-40.
    • (2001) Electronics and the Environment, 2001 , pp. 36-40
    • Gupta, S.1    Gungor, A.2
  • 15
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • Koc, A., Sabuncuoglu, I., and Erel, E. (2009). Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Transactions, 41(10), 866-881.
    • (2009) IIE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 16
    • 0033358055 scopus 로고    scopus 로고
    • Linear programming in disassembly/clustering sequence generation
    • Lambert, A.J.D. (1999). Linear programming in disassembly/clustering sequence generation. Computers & Industrial Engineering, 36(4), 723-738.
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.4 , pp. 723-738
    • Lambert, A.J.D.1
  • 17
    • 0036721661 scopus 로고    scopus 로고
    • Determining optimum disassembly sequences in electronic equipment
    • Lambert, A.J.D. (2002). Determining optimum disassembly sequences in electronic equipment. Computers & Industrial Engineering, 43, 553-575.
    • (2002) Computers & Industrial Engineering , vol.43 , pp. 553-575
    • Lambert, A.J.D.1
  • 18
    • 33644622040 scopus 로고    scopus 로고
    • A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs
    • Lambert, A.J.D. and Gupta, S.M. (2005). A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970A.
    • (2005) Proc. SPIE 5997, Environmentally Conscious Manufacturing , vol.5
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 19
    • 84862939665 scopus 로고    scopus 로고
    • Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal
    • Ma, Y.S., Jun, H.B., Kim, H.W., and Lee, D.H. (2011). Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal. International journal of production research, 49(23), 7007-7027.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 7007-7027
    • Ma, Y.S.1    Jun, H.B.2    Kim, H.W.3    Lee, D.H.4
  • 20
    • 0032632474 scopus 로고    scopus 로고
    • Monte Carlo bounding techniques for determining solution quality in stochastic programs
    • Mak, W.K., Morton, D.P., and Wood, R.K. (1999). Monte carlo bounding techniques for determining solution quality in stochastic programs. Operations Research Letters, 24(1-2), 47-56.
    • (1999) Operations Research Letters , vol.24 , Issue.1-2 , pp. 47-56
    • Mak, W.K.1    Morton, D.P.2    Wood, R.K.3
  • 21
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
    • McGovern, S.M. and Gupta, S.M. (2007). Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research, 45(18-19), 4485-4511.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 22
    • 33644615165 scopus 로고    scopus 로고
    • Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
    • McGovern, S.M. and Gupta, S.M. (2005). Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970B.
    • (2005) Proc. SPIE 5997, Environmentally Conscious Manufacturing , vol.5
    • McGovern, S.M.1    Gupta, S.M.2
  • 26
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
    • Tripathi, M., Agrawal, S., Pandey, M.K., Shankar, R., and Tiwari, M. (2009). Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA). Robotics and Computer-Integrated Manufacturing, 25(3), 483-496.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.3 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.5
  • 27
    • 84904390908 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • Tuncel, E., Zeid, A., and Kamarthi, S. (2012). Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing, 1-13.
    • (2012) Journal of Intelligent Manufacturing , pp. 1-13
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.