1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S. and Tiwari, M.K. (2006). A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International journal of production research, 46(6), 1405-1429.
-
(2006)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
3
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., and Ozdemirel, N.E. (2008). Profit-oriented disassembly-line balancing. International Journal of Production Research, 46(10), 2675-2693.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
4
-
-
84893957110
-
A heuristic for U-shaped disassembly line balancing problems
-
Avikal, S., Jain, R., and Mishra, P. (2013). A heuristic for U-shaped disassembly line balancing problems. MIT International Journal of Mechanical Engineering, 3(1), 51-56.
-
(2013)
MIT International Journal of Mechanical Engineering
, vol.3
, Issue.1
, pp. 51-56
-
-
Avikal, S.1
Jain, R.2
Mishra, P.3
-
5
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag, A. and Turkbey, O. (2013). Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering, 65(3), 413-425.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
6
-
-
84922236941
-
Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
-
V. Prabhu, M. Taisch, and D. Kiritsis (eds.) Springer Berlin Heidelberg
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013a). Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts. In V. Prabhu, M. Taisch, and D. Kiritsis (eds.), Advances in Production Management Systems. Sustainable Production and Service Supply Chains, Volume 414 of IFIP Advances in Information and Communication Technology, 103-110. Springer Berlin Heidelberg.
-
(2013)
Advances in Production Management Systems. Sustainable Production and Service Supply Chains, Volume 414 of IFIP Advances in Information and Communication Technology
, pp. 103-110
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
7
-
-
84896097591
-
A stochastic formulation of the disassembly line balancing problem
-
C. Emmanouilidis, M. Taisch, and D. Kiritsis (eds.) Springer Berlin Heidelberg
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013b). A stochastic formulation of the disassembly line balancing problem. In C. Emmanouilidis, M. Taisch, and D. Kiritsis (eds.), Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, Volume 397 of IFIP Advances in Information and Communication Technology, 397-404. Springer Berlin Heidelberg.
-
(2013)
Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, Volume 397 of IFIP Advances in Information and Communication Technology
, pp. 397-404
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
9
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
-
Ding, L.P., Feng, Y.X., Tan, J.R., and Gao, Y.C. (2010). A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 48(5-8), 761-771.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5-8
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
10
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Güngör, A. and Gupta, S.M. (2001). A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
12
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
Güngör, A. and Gupta, S.M. (1999b). Issues in environmentally conscious manufacturing and product recovery: a survey. Computers & Industrial Engineering, 36, 811-853.
-
(1999)
Computers & Industrial Engineering
, vol.36
, pp. 811-853
-
-
Güngör, A.1
Gupta, S.M.2
-
14
-
-
0034837192
-
Product recovery using a disassembly line: Challenges and solution
-
Proceedings of the 2001 IEEE International Symposium
-
Gupta, S. and Gungor, A. (2001). Product recovery using a disassembly line: challenges and solution. In Electronics and the Environment, 2001. Proceedings of the 2001 IEEE International Symposium, 36-40.
-
(2001)
Electronics and the Environment, 2001
, pp. 36-40
-
-
Gupta, S.1
Gungor, A.2
-
15
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., and Erel, E. (2009). Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Transactions, 41(10), 866-881.
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
16
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert, A.J.D. (1999). Linear programming in disassembly/clustering sequence generation. Computers & Industrial Engineering, 36(4), 723-738.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.4
, pp. 723-738
-
-
Lambert, A.J.D.1
-
17
-
-
0036721661
-
Determining optimum disassembly sequences in electronic equipment
-
Lambert, A.J.D. (2002). Determining optimum disassembly sequences in electronic equipment. Computers & Industrial Engineering, 43, 553-575.
-
(2002)
Computers & Industrial Engineering
, vol.43
, pp. 553-575
-
-
Lambert, A.J.D.1
-
18
-
-
33644622040
-
A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs
-
Lambert, A.J.D. and Gupta, S.M. (2005). A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970A.
-
(2005)
Proc. SPIE 5997, Environmentally Conscious Manufacturing
, vol.5
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
19
-
-
84862939665
-
Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal
-
Ma, Y.S., Jun, H.B., Kim, H.W., and Lee, D.H. (2011). Disassembly process planning algorithms for end of life product recovery and environmentally conscious disposal. International journal of production research, 49(23), 7007-7027.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 7007-7027
-
-
Ma, Y.S.1
Jun, H.B.2
Kim, H.W.3
Lee, D.H.4
-
20
-
-
0032632474
-
Monte Carlo bounding techniques for determining solution quality in stochastic programs
-
Mak, W.K., Morton, D.P., and Wood, R.K. (1999). Monte carlo bounding techniques for determining solution quality in stochastic programs. Operations Research Letters, 24(1-2), 47-56.
-
(1999)
Operations Research Letters
, vol.24
, Issue.1-2
, pp. 47-56
-
-
Mak, W.K.1
Morton, D.P.2
Wood, R.K.3
-
21
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
McGovern, S.M. and Gupta, S.M. (2007). Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research, 45(18-19), 4485-4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
22
-
-
33644615165
-
Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
-
McGovern, S.M. and Gupta, S.M. (2005). Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970B.
-
(2005)
Proc. SPIE 5997, Environmentally Conscious Manufacturing
, vol.5
-
-
McGovern, S.M.1
Gupta, S.M.2
-
25
-
-
0034828875
-
A systematic approach to disassembly line design
-
Tang, Y., Zhou, M., and Caudill, R. (2001). A systematic approach to disassembly line design. In Electronics and the Environment. Proceedings of the IEEE International Symposium, 173-178.
-
(2001)
Electronics and the Environment. Proceedings of the IEEE International Symposium
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
-
26
-
-
61349137696
-
Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
-
Tripathi, M., Agrawal, S., Pandey, M.K., Shankar, R., and Tiwari, M. (2009). Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA). Robotics and Computer-Integrated Manufacturing, 25(3), 483-496.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 483-496
-
-
Tripathi, M.1
Agrawal, S.2
Pandey, M.K.3
Shankar, R.4
Tiwari, M.5
-
27
-
-
84904390908
-
Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
-
Tuncel, E., Zeid, A., and Kamarthi, S. (2012). Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing, 1-13.
-
(2012)
Journal of Intelligent Manufacturing
, pp. 1-13
-
-
Tuncel, E.1
Zeid, A.2
Kamarthi, S.3
|