-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S. and Tiwari, M.K. (2008). A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research, 46(6), 1405-1429.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
3
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., and Ozdemirel, N.E. (2008). Profit-oriented disassembly-line balancing. International Journal of Production Research, 46(10), 2675-2693.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
4
-
-
33847014539
-
A chance-constrained approach to stochastic line balancing problem
-
Aʇpak, K. and Gökçen, H. (2007). A chance-constrained approach to stochastic line balancing problem. European Journal of Operational Research, 180, 1098-1115.
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 1098-1115
-
-
Aʇpak, K.1
Gökçen, H.2
-
5
-
-
84893943458
-
A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems
-
Avikal, S., Mishra, P.K., and Jain, R. (2014). A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems. International Journal of Production Research, 52(5), 1306-1317.
-
(2014)
International Journal of Production Research
, vol.52
, Issue.5
, pp. 1306-1317
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
6
-
-
84893957110
-
A heuristic for U-shaped disassembly line balancing problems
-
Avikal, S., Jain, R., and Mishra, P. (2013). A heuristic for U-shaped disassembly line balancing problems. MIT International Journal of Mechanical Engineering, 3(1), 51-56.
-
(2013)
MIT International Journal of Mechanical Engineering
, vol.3
, Issue.1
, pp. 51-56
-
-
Avikal, S.1
Jain, R.2
Mishra, P.3
-
7
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag, A. and Turkbey, O. (2013). Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering, 65(3), 413-425.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
8
-
-
79955672885
-
Balancing of stochastic U-type assembly lines: An imperialist competitive algorithm
-
Bagher, M., Zandieh, M., and Farsijani, H. (2011). Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm. The International Journal of Advanced Manufacturing Technology, 54(1-4), 271-285.
-
(2011)
The International Journal of Advanced Manufacturing Technology
, vol.54
, Issue.1-4
, pp. 271-285
-
-
Bagher, M.1
Zandieh, M.2
Farsijani, H.3
-
9
-
-
84874540167
-
A taxonomy of line balancing problems and their solution approaches
-
Battaïa, O. and Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142(2), 259-277.
-
(2013)
International Journal of Production Economics
, vol.142
, Issue.2
, pp. 259-277
-
-
Battaïa, O.1
Dolgui, A.2
-
11
-
-
25144450992
-
A survey on problems and methods in generalized assembly line balancing
-
Becker, C. and Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 694-715
-
-
Becker, C.1
Scholl, A.2
-
12
-
-
84929377517
-
A cone programming approach for stochastic disassembly line balancing in the presence of hazardous parts
-
Iguassu Falls, Brazil
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013a). A cone programming approach for stochastic disassembly line balancing in the presence of hazardous parts. In Proceedings of the 22nd International Conference on Production Research (ICPR 22). Iguassu Falls, Brazil.
-
(2013)
Proceedings of the 22nd International Conference on Production Research (ICPR 22)
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
13
-
-
84891551126
-
A decomposition method for stochastic partial disassembly line balancing with profit maximization
-
Madison, WI
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013b). A decomposition method for stochastic partial disassembly line balancing with profit maximization. In IEEE Automation Science and Engineering (CASE), 410-415. Madison, WI.
-
(2013)
IEEE Automation Science and Engineering (CASE)
, pp. 410-415
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
14
-
-
84884302027
-
Reshaped algorithm for stochastic disassembly line balancing problem
-
N. Bakhtadze, K. Chernyshov, A. Dolgui, and V. Lototsky (eds.) Saint Petersburg, Russia
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013c). reshaped algorithm for stochastic disassembly line balancing problem. In N. Bakhtadze, K. Chernyshov, A. Dolgui, and V. Lototsky (eds.), 7th IF AC Conference on Manufacturing Modelling, Management, and Control, Volume 7, 407-411. Saint Petersburg, Russia.
-
(2013)
7th IF AC Conference on Manufacturing Modelling, Management, and Control
, vol.7
, pp. 407-411
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
15
-
-
84929774090
-
Disassembly line balancing problem with fixed number of workstations under uncertainty
-
Cape Town, South Africa
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014a). Disassembly line balancing problem with fixed number of workstations under uncertainty. In 19th IFAC World Congress, 3522-3526. Cape Town, South Africa.
-
(2014)
19th IFAC World Congress
, pp. 3522-3526
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
16
-
-
84902539041
-
Dealing with uncertainty in disassembly line design
-
Bentaha, M.L., Battaïa, O., Dolgui, A., and Hu, S.J. (2014b). Dealing with uncertainty in disassembly line design. CIRP Annals - Manufacturing Technology, 63(1), 21-24.
-
(2014)
CIRP Annals - Manufacturing Technology
, vol.63
, Issue.1
, pp. 21-24
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
17
-
-
84922236941
-
Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts
-
V. Prabhu, M. Taisch, and D. Kiritsis (eds.) Springer Berlin Heidelberg, State College, PA, USA
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013d). Chance constrained programming model for stochastic profit-oriented disassembly line balancing in the presence of hazardous parts. In V. Prabhu, M. Taisch, and D. Kiritsis (eds.), Advances in Production Management Systems. Sustainable Production and Service Supply Chains, Volume 414 of IFIP Advances in Information and Communication Technology, 103-110. Springer Berlin Heidelberg, State College, PA, USA.
-
(2013)
Advances in Production Management Systems. Sustainable Production and Service Supply Chains, Volume 414 of IFIP Advances in Information and Communication Technology
, pp. 103-110
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
18
-
-
84896097591
-
A stochastic formulation of the disassembly line balancing problem
-
C. Emmanouilidis, M. Taisch, and D. Kiritsis (eds.) Springer Berlin Heidelberg, Rhodes, Greece
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013e). A stochastic formulation of the disassembly line balancing problem. In C. Emmanouilidis, M. Taisch, and D. Kiritsis (eds.), Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, Volume 397 of IFIP Advances in Information and Communication Technology, 397-404. Springer Berlin Heidelberg, Rhodes, Greece.
-
(2013)
Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, Volume 397 of IFIP Advances in Information and Communication Technology
, pp. 397-404
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
19
-
-
84903557899
-
Disassembly line balancing and sequencing under uncertainty
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014c). Disassembly line balancing and sequencing under uncertainty. Procedia CIRP, 15, 239-244.
-
(2014)
Procedia CIRP
, vol.15
, pp. 239-244
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
20
-
-
84904503542
-
La-grangian relaxation for stochastic disassembly line balancing problem
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014d). La-grangian relaxation for stochastic disassembly line balancing problem. Procedia CIRP, 17, 56-60.
-
(2014)
Procedia CIRP
, vol.17
, pp. 56-60
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
21
-
-
84902248564
-
A sample average approximation method for disassembly line balancing problem under uncertainty
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014e). A sample average approximation method for disassembly line balancing problem under uncertainty. Computers & Operations Research, 51, 111-122.
-
(2014)
Computers & Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
22
-
-
84961289222
-
An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
-
Bentaha, M.L., Battaïa, O., and Dolgui, A. (2015). An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research, 53(6), 1807-1818.
-
(2015)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
23
-
-
0024931651
-
Identifying multiple solutions for assembly line balancing having stochastic task times
-
Betts, J. and Mahmoud, K.I. (1989). Identifying multiple solutions for assembly line balancing having stochastic task times. Computers and Engineering, 16(3), 427-445.
-
(1989)
Computers and Engineering
, vol.16
, Issue.3
, pp. 427-445
-
-
Betts, J.1
Mahmoud, K.I.2
-
24
-
-
34249995941
-
A classification of assembly line balancing problems
-
Boysen, N., Fliedner, M., and Scholl, A. (2007). A classification of assembly line balancing problems. European Journal of Operational Research, 183(2), 674-693.
-
(2007)
European Journal of Operational Research
, vol.183
, Issue.2
, pp. 674-693
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
25
-
-
79751537157
-
Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm
-
Cakir, B., Altiparmak, F., and Dengiz, B. (2011). Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm. Computers & Industrial Engineering, 60(3), 376-384.
-
(2011)
Computers & Industrial Engineering
, vol.60
, Issue.3
, pp. 376-384
-
-
Cakir, B.1
Altiparmak, F.2
Dengiz, B.3
-
26
-
-
48749137178
-
A cost-effective approach to stochastic line balancing with off-line repairs
-
Carter, J.C. and Silverman, F.N. (1984). A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management, 4(2), 145-157.
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 145-157
-
-
Carter, J.C.1
Silverman, F.N.2
-
27
-
-
0022440844
-
A cost minimization procedure for mixed model production lines with normally distributed task times
-
Chakravarty, A.K. and Shtub, A. (1986). A cost minimization procedure for mixed model production lines with normally distributed task times. European Journal of Operational Research, 23(1), 25-36.
-
(1986)
European Journal of Operational Research
, vol.23
, Issue.1
, pp. 25-36
-
-
Chakravarty, A.K.1
Shtub, A.2
-
28
-
-
33748934553
-
The stochastic U-line balancing problem: A heuristic procedure
-
Chiang, W.C. and Urban, T.L. (2006). The stochastic U-line balancing problem: a heuristic procedure. European Journal of Operational Research, 175, 1767-1781.
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 1767-1781
-
-
Chiang, W.C.1
Urban, T.L.2
-
29
-
-
84883446228
-
A robustness information and visualization model for time and space assembly line balancing under uncertain demand
-
Chica, M., Óscar Cordón, Damas, S., and Bautista, J. (2013). A robustness information and visualization model for time and space assembly line balancing under uncertain demand. International Journal of Production Economics, 145(2), 761-772.
-
(2013)
International Journal of Production Economics
, vol.145
, Issue.2
, pp. 761-772
-
-
Chica, M.1
Cordón, O.2
Damas, S.3
Bautista, J.4
-
30
-
-
78650595728
-
Multi-objective disassembly line balancing via modified ant colony optimization algorithm
-
Ding, L.P., Feng, Y.X., Tan, J.R., and Gao, Y.C. (2010a). Multi-objective disassembly line balancing via modified ant colony optimization algorithm. In Bio-Inspired Computing: Theories and Applications (BIC-TA), 2010 IEEE Fifth International Conference, 426-430.
-
(2010)
Bio-Inspired Computing: Theories and Applications (BIC-TA), 2010 IEEE Fifth International Conference
, pp. 426-430
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
31
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
-
Ding, L.P., Feng, Y.X., Tan, J.R., and Gao, Y.C. (2010b). A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 48(5-8), 761-771.
-
(2010)
The International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5-8
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
32
-
-
69249245295
-
Multiobjective optimization for disassembly line balancing based on pareto ant colony algorithm
-
Ding, L.P., Tan, J.R., Feng, Y.X., and Gao, Y.C. (2009). Multiobjective optimization for disassembly line balancing based on pareto ant colony algorithm. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 15(7), 1406-1413+1429.
-
(2009)
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS
, vol.15
, Issue.7
-
-
Ding, L.P.1
Tan, J.R.2
Feng, Y.X.3
Gao, Y.C.4
-
33
-
-
84862191908
-
Scenario based robust line balancing: Computational complexity
-
Dolgui, A. and Kovalev, S. (2012). Scenario based robust line balancing: Computational complexity. Discrete Applied Mathematics, 160(13-14), 1955-1963.
-
(2012)
Discrete Applied Mathematics
, vol.160
, Issue.13-14
, pp. 1955-1963
-
-
Dolgui, A.1
Kovalev, S.2
-
34
-
-
79961018940
-
Real time balancing of complex disassembly lines
-
Duta, L., Filip, F.G., and Caciula, I. (2008). Real time balancing of complex disassembly lines. In Proceedings of the 17th World Congress, The International Federation of Automatic Control, 913-918.
-
(2008)
Proceedings of the 17th World Congress, the International Federation of Automatic Control
, pp. 913-918
-
-
Duta, L.1
Filip, F.G.2
Caciula, I.3
-
35
-
-
79960737645
-
Applying equal piles approach to disassembly line balancing problem
-
Duta, L., Filip, F.G., and Henrioud, J.M. (2005). Applying equal piles approach to disassembly line balancing problem. In Proceedings of the 16th IFAC World Congress, 1449-1449.
-
(2005)
Proceedings of the 16th IFAC World Congress
, pp. 1449
-
-
Duta, L.1
Filip, F.G.2
Henrioud, J.M.3
-
36
-
-
27744559270
-
Stochastic assembly line balancing using beam search
-
Erel, E., Sabuncuoglu, I., and Sekerci, H. (2005). Stochastic assembly line balancing using beam search. International Journal of Production Research, 43(7), 1411-1426.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1411-1426
-
-
Erel, E.1
Sabuncuoglu, I.2
Sekerci, H.3
-
37
-
-
79751532696
-
A heuristic methodology for assembly line balancing considering stochastic time and validity testing
-
Fazlollahtabar, H., Hajmohammadi, H., and Es'haghzadeh, A. (2011). A heuristic methodology for assembly line balancing considering stochastic time and validity testing. The International Journal of Advanced Manufacturing Technology, 52(1-4), 311-320.
-
(2011)
The International Journal of Advanced Manufacturing Technology
, vol.52
, Issue.1-4
, pp. 311-320
-
-
Fazlollahtabar, H.1
Hajmohammadi, H.2
Es'Haghzadeh, A.3
-
38
-
-
66149139732
-
A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
-
Gamberini, R., Gebennini, E., Grassi, A., and Regattieri, A. (2009). A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem. International Journal of Production Research, 47(8), 2141-2164.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.8
, pp. 2141-2164
-
-
Gamberini, R.1
Gebennini, E.2
Grassi, A.3
Regattieri, A.4
-
39
-
-
33646075952
-
A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
-
Gamberini, R., Grassi, A., and Rimini, B. (2006). A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics, 102(2), 226-243.
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.2
, pp. 226-243
-
-
Gamberini, R.1
Grassi, A.2
Rimini, B.3
-
41
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Güngör, A. and Gupta, S.M. (2001). A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
44
-
-
84885985810
-
Robust balancing of straight assembly lines with interval task times
-
Gurevsky, E., Hazir, O., Battaïa, O., and Dolgui, A. (2013a). Robust balancing of straight assembly lines with interval task times. Journal of the Operational Research Society, 64(11), 1607-1613.
-
(2013)
Journal of the Operational Research Society
, vol.64
, Issue.11
, pp. 1607-1613
-
-
Gurevsky, E.1
Hazir, O.2
Battaïa, O.3
Dolgui, A.4
-
45
-
-
84870545654
-
Balancing of simple assembly lines under variations of task processing times
-
Gurevsky, E., Battaïa, O., and Dolgui, A. (2012). Balancing of simple assembly lines under variations of task processing times. Annals of Operations Research, 201(1), 265-286.
-
(2012)
Annals of Operations Research
, vol.201
, Issue.1
, pp. 265-286
-
-
Gurevsky, E.1
Battaïa, O.2
Dolgui, A.3
-
46
-
-
84870419286
-
Stability measure for a generalized assembly line balancing problem
-
Gurevsky, E., Battaïa, O., and Dolgui, A. (2013b). Stability measure for a generalized assembly line balancing problem. Discrete Applied Mathematics, 161(3), 377-394.
-
(2013)
Discrete Applied Mathematics
, vol.161
, Issue.3
, pp. 377-394
-
-
Gurevsky, E.1
Battaïa, O.2
Dolgui, A.3
-
47
-
-
84876104666
-
Assembly line balancing under uncertainty: Robust optimization models and exact solution method
-
Hazir, O. and Dolgui, A. (2013). Assembly line balancing under uncertainty: Robust optimization models and exact solution method. Computers & Industrial Engineering, 65(2), 261-267.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.2
, pp. 261-267
-
-
Hazir, O.1
Dolgui, A.2
-
48
-
-
0022910386
-
Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
-
Henig, M.I. (1986). Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Computers & Operations Research, 13(4), 443-449.
-
(1986)
Computers & Operations Research
, vol.13
, Issue.4
, pp. 443-449
-
-
Henig, M.I.1
-
49
-
-
25144504530
-
A heuristic solution for fuzzy mixed-model line balancing problem
-
Hop, N.V. (2006). A heuristic solution for fuzzy mixed-model line balancing problem. European Journal Of Operational Research, 168, 789-810.
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 789-810
-
-
Hop, N.V.1
-
50
-
-
0020848902
-
A branch and bound algorithm for assembling line balancing problems with formulation irregularities
-
Johnson, R.V. (1983). A branch and bound algorithm for assembling line balancing problems with formulation irregularities. Management Science, 29(11), 1309-1324.
-
(1983)
Management Science
, vol.29
, Issue.11
, pp. 1309-1324
-
-
Johnson, R.V.1
-
52
-
-
84878666440
-
Ant colony optimization for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B. and Gupta, S.M. (2013b). Ant colony optimization for sequence-dependent disassembly line balancing problem. Journal of Manufacturing Technology Management, 24(3), 413-427.
-
(2013)
Journal of Manufacturing Technology Management
, vol.24
, Issue.3
, pp. 413-427
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
53
-
-
84887821595
-
A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B. and Gupta, S.M. (2013c). A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 69(1-4), 197-209.
-
(2013)
The International Journal of Advanced Manufacturing Technology
, vol.69
, Issue.1-4
, pp. 197-209
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
55
-
-
84889821707
-
A tabu search algorithm for balancing a sequence-dependent disassembly line
-
Kalayci, C.B. and Gupta, S.M. (2014). A tabu search algorithm for balancing a sequence-dependent disassembly line. Production Planning & Control, 25(2), 149-160.
-
(2014)
Production Planning & Control
, vol.25
, Issue.2
, pp. 149-160
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
56
-
-
84881134234
-
A simulated annealing algorithm for balancing a disassembly line
-
M. Matsumoto, Y. Umeda, K. Masui, and S. Fukushige (eds.) Springer Netherlands
-
Kalayci, C.B., Gupta, S.M., and Nakashima, K. (2012). A simulated annealing algorithm for balancing a disassembly line. In M. Matsumoto, Y. Umeda, K. Masui, and S. Fukushige (eds.), Design for Innovative Value Towards a Sustainable Society, 714-719. Springer Netherlands.
-
(2012)
Design for Innovative Value Towards a Sustainable Society
, pp. 714-719
-
-
Kalayci, C.B.1
Gupta, S.M.2
Nakashima, K.3
-
57
-
-
0016964033
-
A preference order dynamic program for stochastic assembly line balancing
-
Kao, E.P.C. (1976). A preference order dynamic program for stochastic assembly line balancing. Management Science, 22(10), 1097-1104.
-
(1976)
Management Science
, vol.22
, Issue.10
, pp. 1097-1104
-
-
Kao, E.P.C.1
-
58
-
-
0018698137
-
Computational experience with a stochastic assembly line balancing algorithm
-
Kao, E.P.C. (1979). Computational experience with a stochastic assembly line balancing algorithm. Computers & Operations Research, 6(2), 79-86.
-
(1979)
Computers & Operations Research
, vol.6
, Issue.2
, pp. 79-86
-
-
Kao, E.P.C.1
-
59
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., and Erel, E. (2009). Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. HE Transactions, 41(10), 866-881.
-
(2009)
HE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
60
-
-
33644622040
-
A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs
-
59970A
-
Lambert, A.J.D. and Gupta, S.M. (2005). A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970A, 73-80.
-
(2005)
Proc. SPIE 5997, Environmentally Conscious Manufacturing
, vol.5
, pp. 73-80
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
61
-
-
84891761309
-
Research on disassembly line balancing problem in the presence of uncertain cycle time
-
IEMI 2012 - Proceedings
-
Liu, B.Y., Chen, W.D., and Huang, S. (2013). Research on disassembly line balancing problem in the presence of uncertain cycle time. In International Asia Conference on Industrial Engineering and Management Innovation: Core Areas of Industrial Engineering, IEMI 2012 - Proceedings, 497-507.
-
(2013)
International Asia Conference on Industrial Engineering and Management Innovation: Core Areas of Industrial Engineering
, pp. 497-507
-
-
Liu, B.Y.1
Chen, W.D.2
Huang, S.3
-
62
-
-
11144304066
-
A bidirectional heuristic for stochastic assembly line balancing type II problem
-
Liu, S., Ong, H., and Huang, H. (2005). A bidirectional heuristic for stochastic assembly line balancing Type ii problem. International Journal of Advanced Manufacturing Technology, 25, 71-77.
-
(2005)
International Journal of Advanced Manufacturing Technology
, vol.25
, pp. 71-77
-
-
Liu, S.1
Ong, H.2
Huang, H.3
-
63
-
-
0013055270
-
A single-run optimization algorithm for stochastic assembly line balancing problems
-
Lyu, J. (1997). A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems, 16(3), 204-210.
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.3
, pp. 204-210
-
-
Lyu, J.1
-
64
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
McGovern, S.M. and Gupta, S.M. (2007a). Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research, 45(18-19), 4485-4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
65
-
-
33644615165
-
Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
-
59970B
-
McGovern, S.M. and Gupta, S.M. (2005). Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970B.
-
(2005)
Proc. SPIE 5997, Environmentally Conscious Manufacturing
, vol.5
-
-
McGovern, S.M.1
Gupta, S.M.2
-
67
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S.M. and Gupta, S.M. (2007b). A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research, 179(3), 692-708.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
68
-
-
80053576447
-
-
McGraw-Hill Companies, New York, 2011 edition
-
McGovern, S.M. and Gupta, S.M. (2011). The Disassembly Line, Balancing and Modeling. McGraw-Hill Companies, New York, 2011 edition.
-
(2011)
The Disassembly Line, Balancing and Modeling
-
-
McGovern, S.M.1
Gupta, S.M.2
-
69
-
-
0031232825
-
A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
-
McMullen, P.R. and Frazier, G.V. (1997). A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics, 51(3), 177-190.
-
(1997)
International Journal of Production Economics
, vol.51
, Issue.3
, pp. 177-190
-
-
McMullen, P.R.1
Frazier, G.V.2
-
70
-
-
78650589919
-
A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
-
Özcan, IJ., Kellegöz, T., and Toklu, B. (2011). A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem. International Journal of Production Research, 49(6), 1605-1626.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.6
, pp. 1605-1626
-
-
Özcan, I.J.1
Kellegöz, T.2
Toklu, B.3
-
71
-
-
75849138540
-
Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
-
Özcan, U. (2010). Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm. European Journal of Operational Research, 205(1), 81-97.
-
(2010)
European Journal of Operational Research
, vol.205
, Issue.1
, pp. 81-97
-
-
Özcan, U.1
-
72
-
-
84885635477
-
Reverse supply chain optimisation with disassembly line balancing
-
Özceylan, E. and Paksoy, T. (2013). Reverse supply chain optimisation with disassembly line balancing. International Journal of Production Research, 51(20), 5985-6001.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 5985-6001
-
-
Özceylan, E.1
Paksoy, T.2
-
73
-
-
84890189031
-
Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
-
Özceylan, E., Paksoy, T., and Bektaş, T. (2014). Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing. Transportation Research Part E: Logistics and Transportation Review, 61, 142-164.
-
(2014)
Transportation Research Part E: Logistics and Transportation Review
, vol.61
, pp. 142-164
-
-
Özceylan, E.1
Paksoy, T.2
Bektaş, T.3
-
74
-
-
84897679104
-
Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem
-
Özceylan, E. and Paksoy, T. (2014a). Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem. Journal of Intelligent and Fuzzy Systems, 26(4), 1969-1985.
-
(2014)
Journal of Intelligent and Fuzzy Systems
, vol.26
, Issue.4
, pp. 1969-1985
-
-
Özceylan, E.1
Paksoy, T.2
-
75
-
-
84896400446
-
Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty
-
Özceylan, E. and Paksoy, T. (2014b). Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty. International Journal of Production Research, 52(8), 2363-2387.
-
(2014)
International Journal of Production Research
, vol.52
, Issue.8
, pp. 2363-2387
-
-
Özceylan, E.1
Paksoy, T.2
-
76
-
-
84885625406
-
Mixed model disassembly line balancing problem with fuzzy goals
-
Paksoy, T., Güngör, A., Özceylan, E., and Hancilar, A. (2013). Mixed model disassembly line balancing problem with fuzzy goals. International Journal of Production Research, 51(20), 6082-6096.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
77
-
-
0019899326
-
A new method for assembly line balancing having stochastic work elements
-
Raouf, A. and Tsui, C.L. (1982). A new method for assembly line balancing having stochastic work elements. Computers & Industrial Engineering, 6(2), 131-148.
-
(1982)
Computers & Industrial Engineering
, vol.6
, Issue.2
, pp. 131-148
-
-
Raouf, A.1
Tsui, C.L.2
-
78
-
-
0013064892
-
A methodology for solving single-model, stochastic assembly line balancing problem
-
Sarin, S.C., Erel, E., and Darel, E.M. (1999). A methodology for solving single-model, stochastic assembly line balancing problem. The International Journal of Management Science, 27, 525-535.
-
(1999)
The International Journal of Management Science
, vol.27
, pp. 525-535
-
-
Sarin, S.C.1
Erel, E.2
Darel, E.M.3
-
79
-
-
25144482035
-
State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
-
Scholl, A. and Becker, C. (2006). State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 168(3), 666-693.
-
(2006)
European Journal of Operational Research
, vol.168
, Issue.3
, pp. 666-693
-
-
Scholl, A.1
Becker, C.2
-
80
-
-
0033115142
-
Balancing assembly lines effectively - A computational comparison
-
Scholl, A. and Klein, R. (1999). Balancing assembly lines effectively-a computational comparison. European Journal of Operational Research, 114(1), 50-58.
-
(1999)
European Journal of Operational Research
, vol.114
, Issue.1
, pp. 50-58
-
-
Scholl, A.1
Klein, R.2
-
81
-
-
0025603598
-
An efficient heuristic for solving stochastic assembly line balancing problems
-
Shin, D. (1990). An efficient heuristic for solving stochastic assembly line balancing problems. Computers & Industrial Engineering, 18(3), 285-295.
-
(1990)
Computers & Industrial Engineering
, vol.18
, Issue.3
, pp. 285-295
-
-
Shin, D.1
-
82
-
-
0022698734
-
A cost-based methodology for stochastic line balancing with intermittent line stoppages
-
Silverman, F.N. and Carter, J.C. (1986). A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science, 32(4), 455-463.
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
84
-
-
0034828875
-
A systematic approach to disassembly line design
-
Tang, Y., Zhou, M., and Caudill, R. (2001). A systematic approach to disassembly line design. In Electronics and the Environment. Proceedings of the IEEE International Symposium, 173-178.
-
(2001)
Electronics and the Environment. Proceedings of the IEEE International Symposium
, pp. 173-178
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.3
-
85
-
-
61349137696
-
Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
-
Tripathi, M., Agrawal, S., Pandey, M.K., Shankar, R., and Tiwari, M. (2009). Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA). Robotics and Computer-Integrated Manufacturing, 25(3), 483-496.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 483-496
-
-
Tripathi, M.1
Agrawal, S.2
Pandey, M.K.3
Shankar, R.4
Tiwari, M.5
-
86
-
-
0029368231
-
Solving fuzzy assembly-line balancing problem with genetic algorithms
-
Tsujimura, Y., Gen, M., and Kubota, E. (1995). Solving fuzzy assembly-line balancing problem with genetic algorithms. Computersand Industrial Engineering, 29, 543-547.
-
(1995)
Computersand Industrial Engineering
, vol.29
, pp. 543-547
-
-
Tsujimura, Y.1
Gen, M.2
Kubota, E.3
-
87
-
-
84904390908
-
Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
-
Tuncel, E., Zeid, A., and Kamarthi, S. (2012). Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing, 1-13.
-
(2012)
Journal of Intelligent Manufacturing
, pp. 1-13
-
-
Tuncel, E.1
Zeid, A.2
Kamarthi, S.3
-
88
-
-
27944510108
-
Disassembly line design with uncertainty
-
Turowski, M. and Morgan, M. (2005). Disassembly line design with uncertainty. 2005 IEEE International Conference on Systems, Man and Cybernetics, 1, 954-959.
-
(2005)
2005 IEEE International Conference on Systems, Man and Cybernetics
, vol.1
, pp. 954-959
-
-
Turowski, M.1
Morgan, M.2
-
89
-
-
25144472327
-
An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
-
Urban, T.L. and Chiang, W.C. (2006). An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research, 168, 771-782.
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 771-782
-
-
Urban, T.L.1
Chiang, W.C.2
-
91
-
-
79958174505
-
Strategic robust mixed model assembly line balancing based on scenario planning
-
Xu, W. and Xiao, T. (2011). Strategic robust mixed model assembly line balancing based on scenario planning. Tsinghua Science & Technology, 16(3), 308-314.
-
(2011)
Tsinghua Science & Technology
, vol.16
, Issue.3
, pp. 308-314
-
-
Xu, W.1
Xiao, T.2
-
92
-
-
84862303222
-
Multi-objective fuzzy assembly line balancing using genetic algorithms
-
Zacharia, P. and Nearchou, A. (2012). Multi-objective fuzzy assembly line balancing using genetic algorithms. Journal of Intelligent Manufacturing, 23(3), 615-627.
-
(2012)
Journal of Intelligent Manufacturing
, vol.23
, Issue.3
, pp. 615-627
-
-
Zacharia, P.1
Nearchou, A.2
-
93
-
-
34548567778
-
Modeling and analysis of a mixed-model assembly line with stochastic operation times
-
Zhao, X., Liu, J., Ohno, K., and Kotani, S. (2007). Modeling and analysis of a mixed-model assembly line with stochastic operation times. Naval Research Logistics (NRL), 54(6), 681-691.
-
(2007)
Naval Research Logistics (NRL)
, vol.54
, Issue.6
, pp. 681-691
-
-
Zhao, X.1
Liu, J.2
Ohno, K.3
Kotani, S.4
-
94
-
-
84900007770
-
An ant colony optimization algorithm for multi-objective disassembly line balancing problem
-
Zhu, X., Zhang, Z., Zhu, X., and Hu, J. (2014). An ant colony optimization algorithm for multi-objective disassembly line balancing problem. Zhongguo Jixie China Mechanical Engineering, 25(8), 1075-1079.
-
(2014)
Zhongguo Jixie China Mechanical Engineering
, vol.25
, Issue.8
, pp. 1075-1079
-
-
Zhu, X.1
Zhang, Z.2
Zhu, X.3
Hu, J.4
|