메뉴 건너뛰기




Volumn 28, Issue 3, 2015, Pages 70-75

A bibliographic review of production line design and balancing under uncertainty

Author keywords

Assembly; Disassembly; Line design and balancing; Uncertainty

Indexed keywords

BIBLIOGRAPHIES; MULTIOBJECTIVE OPTIMIZATION; STOCHASTIC SYSTEMS; ASSEMBLY; DESIGN;

EID: 84953880323     PISSN: None     EISSN: 24058963     Source Type: Conference Proceeding    
DOI: 10.1016/j.ifacol.2015.06.060     Document Type: Conference Paper
Times cited : (41)

References (94)
  • 1
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
    • Agrawal, S. and Tiwari, M.K. (2008). A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research, 46(6), 1405-1429.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 4
    • 33847014539 scopus 로고    scopus 로고
    • A chance-constrained approach to stochastic line balancing problem
    • Aʇpak, K. and Gökçen, H. (2007). A chance-constrained approach to stochastic line balancing problem. European Journal of Operational Research, 180, 1098-1115.
    • (2007) European Journal of Operational Research , vol.180 , pp. 1098-1115
    • Aʇpak, K.1    Gökçen, H.2
  • 5
    • 84893943458 scopus 로고    scopus 로고
    • A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems
    • Avikal, S., Mishra, P.K., and Jain, R. (2014). A fuzzy ahp and promethee method-based heuristic for disassembly line balancing problems. International Journal of Production Research, 52(5), 1306-1317.
    • (2014) International Journal of Production Research , vol.52 , Issue.5 , pp. 1306-1317
    • Avikal, S.1    Mishra, P.K.2    Jain, R.3
  • 7
    • 84876972240 scopus 로고    scopus 로고
    • Multi-objective optimization of stochastic disassembly line balancing with station paralleling
    • Aydemir-Karadag, A. and Turkbey, O. (2013). Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering, 65(3), 413-425.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.3 , pp. 413-425
    • Aydemir-Karadag, A.1    Turkbey, O.2
  • 9
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaïa, O. and Dolgui, A. (2013). A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics, 142(2), 259-277.
    • (2013) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 11
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker, C. and Scholl, A. (2006). A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research, 168(3), 694-715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 13
    • 84891551126 scopus 로고    scopus 로고
    • A decomposition method for stochastic partial disassembly line balancing with profit maximization
    • Madison, WI
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013b). A decomposition method for stochastic partial disassembly line balancing with profit maximization. In IEEE Automation Science and Engineering (CASE), 410-415. Madison, WI.
    • (2013) IEEE Automation Science and Engineering (CASE) , pp. 410-415
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 14
    • 84884302027 scopus 로고    scopus 로고
    • Reshaped algorithm for stochastic disassembly line balancing problem
    • N. Bakhtadze, K. Chernyshov, A. Dolgui, and V. Lototsky (eds.) Saint Petersburg, Russia
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2013c). reshaped algorithm for stochastic disassembly line balancing problem. In N. Bakhtadze, K. Chernyshov, A. Dolgui, and V. Lototsky (eds.), 7th IF AC Conference on Manufacturing Modelling, Management, and Control, Volume 7, 407-411. Saint Petersburg, Russia.
    • (2013) 7th IF AC Conference on Manufacturing Modelling, Management, and Control , vol.7 , pp. 407-411
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 15
    • 84929774090 scopus 로고    scopus 로고
    • Disassembly line balancing problem with fixed number of workstations under uncertainty
    • Cape Town, South Africa
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014a). Disassembly line balancing problem with fixed number of workstations under uncertainty. In 19th IFAC World Congress, 3522-3526. Cape Town, South Africa.
    • (2014) 19th IFAC World Congress , pp. 3522-3526
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 19
    • 84903557899 scopus 로고    scopus 로고
    • Disassembly line balancing and sequencing under uncertainty
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014c). Disassembly line balancing and sequencing under uncertainty. Procedia CIRP, 15, 239-244.
    • (2014) Procedia CIRP , vol.15 , pp. 239-244
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 20
    • 84904503542 scopus 로고    scopus 로고
    • La-grangian relaxation for stochastic disassembly line balancing problem
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014d). La-grangian relaxation for stochastic disassembly line balancing problem. Procedia CIRP, 17, 56-60.
    • (2014) Procedia CIRP , vol.17 , pp. 56-60
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 21
    • 84902248564 scopus 로고    scopus 로고
    • A sample average approximation method for disassembly line balancing problem under uncertainty
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2014e). A sample average approximation method for disassembly line balancing problem under uncertainty. Computers & Operations Research, 51, 111-122.
    • (2014) Computers & Operations Research , vol.51 , pp. 111-122
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 22
    • 84961289222 scopus 로고    scopus 로고
    • An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
    • Bentaha, M.L., Battaïa, O., and Dolgui, A. (2015). An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research, 53(6), 1807-1818.
    • (2015) International Journal of Production Research , vol.53 , Issue.6 , pp. 1807-1818
    • Bentaha, M.L.1    Battaïa, O.2    Dolgui, A.3
  • 23
    • 0024931651 scopus 로고
    • Identifying multiple solutions for assembly line balancing having stochastic task times
    • Betts, J. and Mahmoud, K.I. (1989). Identifying multiple solutions for assembly line balancing having stochastic task times. Computers and Engineering, 16(3), 427-445.
    • (1989) Computers and Engineering , vol.16 , Issue.3 , pp. 427-445
    • Betts, J.1    Mahmoud, K.I.2
  • 25
    • 79751537157 scopus 로고    scopus 로고
    • Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm
    • Cakir, B., Altiparmak, F., and Dengiz, B. (2011). Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm. Computers & Industrial Engineering, 60(3), 376-384.
    • (2011) Computers & Industrial Engineering , vol.60 , Issue.3 , pp. 376-384
    • Cakir, B.1    Altiparmak, F.2    Dengiz, B.3
  • 26
    • 48749137178 scopus 로고
    • A cost-effective approach to stochastic line balancing with off-line repairs
    • Carter, J.C. and Silverman, F.N. (1984). A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management, 4(2), 145-157.
    • (1984) Journal of Operations Management , vol.4 , Issue.2 , pp. 145-157
    • Carter, J.C.1    Silverman, F.N.2
  • 27
    • 0022440844 scopus 로고
    • A cost minimization procedure for mixed model production lines with normally distributed task times
    • Chakravarty, A.K. and Shtub, A. (1986). A cost minimization procedure for mixed model production lines with normally distributed task times. European Journal of Operational Research, 23(1), 25-36.
    • (1986) European Journal of Operational Research , vol.23 , Issue.1 , pp. 25-36
    • Chakravarty, A.K.1    Shtub, A.2
  • 28
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic U-line balancing problem: A heuristic procedure
    • Chiang, W.C. and Urban, T.L. (2006). The stochastic U-line balancing problem: a heuristic procedure. European Journal of Operational Research, 175, 1767-1781.
    • (2006) European Journal of Operational Research , vol.175 , pp. 1767-1781
    • Chiang, W.C.1    Urban, T.L.2
  • 29
    • 84883446228 scopus 로고    scopus 로고
    • A robustness information and visualization model for time and space assembly line balancing under uncertain demand
    • Chica, M., Óscar Cordón, Damas, S., and Bautista, J. (2013). A robustness information and visualization model for time and space assembly line balancing under uncertain demand. International Journal of Production Economics, 145(2), 761-772.
    • (2013) International Journal of Production Economics , vol.145 , Issue.2 , pp. 761-772
    • Chica, M.1    Cordón, O.2    Damas, S.3    Bautista, J.4
  • 33
    • 84862191908 scopus 로고    scopus 로고
    • Scenario based robust line balancing: Computational complexity
    • Dolgui, A. and Kovalev, S. (2012). Scenario based robust line balancing: Computational complexity. Discrete Applied Mathematics, 160(13-14), 1955-1963.
    • (2012) Discrete Applied Mathematics , vol.160 , Issue.13-14 , pp. 1955-1963
    • Dolgui, A.1    Kovalev, S.2
  • 38
    • 66149139732 scopus 로고    scopus 로고
    • A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
    • Gamberini, R., Gebennini, E., Grassi, A., and Regattieri, A. (2009). A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem. International Journal of Production Research, 47(8), 2141-2164.
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2141-2164
    • Gamberini, R.1    Gebennini, E.2    Grassi, A.3    Regattieri, A.4
  • 39
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., Grassi, A., and Rimini, B. (2006). A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics, 102(2), 226-243.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 41
    • 0035837942 scopus 로고    scopus 로고
    • A solution approach to the disassembly line balancing problem in the presence of task failures
    • Güngör, A. and Gupta, S.M. (2001). A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research, 39(7), 1427-1467.
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1427-1467
    • Güngör, A.1    Gupta, S.M.2
  • 45
    • 84870545654 scopus 로고    scopus 로고
    • Balancing of simple assembly lines under variations of task processing times
    • Gurevsky, E., Battaïa, O., and Dolgui, A. (2012). Balancing of simple assembly lines under variations of task processing times. Annals of Operations Research, 201(1), 265-286.
    • (2012) Annals of Operations Research , vol.201 , Issue.1 , pp. 265-286
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 46
    • 84870419286 scopus 로고    scopus 로고
    • Stability measure for a generalized assembly line balancing problem
    • Gurevsky, E., Battaïa, O., and Dolgui, A. (2013b). Stability measure for a generalized assembly line balancing problem. Discrete Applied Mathematics, 161(3), 377-394.
    • (2013) Discrete Applied Mathematics , vol.161 , Issue.3 , pp. 377-394
    • Gurevsky, E.1    Battaïa, O.2    Dolgui, A.3
  • 47
    • 84876104666 scopus 로고    scopus 로고
    • Assembly line balancing under uncertainty: Robust optimization models and exact solution method
    • Hazir, O. and Dolgui, A. (2013). Assembly line balancing under uncertainty: Robust optimization models and exact solution method. Computers & Industrial Engineering, 65(2), 261-267.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.2 , pp. 261-267
    • Hazir, O.1    Dolgui, A.2
  • 48
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • Henig, M.I. (1986). Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Computers & Operations Research, 13(4), 443-449.
    • (1986) Computers & Operations Research , vol.13 , Issue.4 , pp. 443-449
    • Henig, M.I.1
  • 49
    • 25144504530 scopus 로고    scopus 로고
    • A heuristic solution for fuzzy mixed-model line balancing problem
    • Hop, N.V. (2006). A heuristic solution for fuzzy mixed-model line balancing problem. European Journal Of Operational Research, 168, 789-810.
    • (2006) European Journal of Operational Research , vol.168 , pp. 789-810
    • Hop, N.V.1
  • 50
    • 0020848902 scopus 로고
    • A branch and bound algorithm for assembling line balancing problems with formulation irregularities
    • Johnson, R.V. (1983). A branch and bound algorithm for assembling line balancing problems with formulation irregularities. Management Science, 29(11), 1309-1324.
    • (1983) Management Science , vol.29 , Issue.11 , pp. 1309-1324
    • Johnson, R.V.1
  • 52
    • 84878666440 scopus 로고    scopus 로고
    • Ant colony optimization for sequence-dependent disassembly line balancing problem
    • Kalayci, C.B. and Gupta, S.M. (2013b). Ant colony optimization for sequence-dependent disassembly line balancing problem. Journal of Manufacturing Technology Management, 24(3), 413-427.
    • (2013) Journal of Manufacturing Technology Management , vol.24 , Issue.3 , pp. 413-427
    • Kalayci, C.B.1    Gupta, S.M.2
  • 53
    • 84887821595 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
    • Kalayci, C.B. and Gupta, S.M. (2013c). A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem. The International Journal of Advanced Manufacturing Technology, 69(1-4), 197-209.
    • (2013) The International Journal of Advanced Manufacturing Technology , vol.69 , Issue.1-4 , pp. 197-209
    • Kalayci, C.B.1    Gupta, S.M.2
  • 55
    • 84889821707 scopus 로고    scopus 로고
    • A tabu search algorithm for balancing a sequence-dependent disassembly line
    • Kalayci, C.B. and Gupta, S.M. (2014). A tabu search algorithm for balancing a sequence-dependent disassembly line. Production Planning & Control, 25(2), 149-160.
    • (2014) Production Planning & Control , vol.25 , Issue.2 , pp. 149-160
    • Kalayci, C.B.1    Gupta, S.M.2
  • 56
    • 84881134234 scopus 로고    scopus 로고
    • A simulated annealing algorithm for balancing a disassembly line
    • M. Matsumoto, Y. Umeda, K. Masui, and S. Fukushige (eds.) Springer Netherlands
    • Kalayci, C.B., Gupta, S.M., and Nakashima, K. (2012). A simulated annealing algorithm for balancing a disassembly line. In M. Matsumoto, Y. Umeda, K. Masui, and S. Fukushige (eds.), Design for Innovative Value Towards a Sustainable Society, 714-719. Springer Netherlands.
    • (2012) Design for Innovative Value Towards a Sustainable Society , pp. 714-719
    • Kalayci, C.B.1    Gupta, S.M.2    Nakashima, K.3
  • 57
    • 0016964033 scopus 로고
    • A preference order dynamic program for stochastic assembly line balancing
    • Kao, E.P.C. (1976). A preference order dynamic program for stochastic assembly line balancing. Management Science, 22(10), 1097-1104.
    • (1976) Management Science , vol.22 , Issue.10 , pp. 1097-1104
    • Kao, E.P.C.1
  • 58
    • 0018698137 scopus 로고
    • Computational experience with a stochastic assembly line balancing algorithm
    • Kao, E.P.C. (1979). Computational experience with a stochastic assembly line balancing algorithm. Computers & Operations Research, 6(2), 79-86.
    • (1979) Computers & Operations Research , vol.6 , Issue.2 , pp. 79-86
    • Kao, E.P.C.1
  • 59
    • 70749116514 scopus 로고    scopus 로고
    • Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
    • Koc, A., Sabuncuoglu, I., and Erel, E. (2009). Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. HE Transactions, 41(10), 866-881.
    • (2009) HE Transactions , vol.41 , Issue.10 , pp. 866-881
    • Koc, A.1    Sabuncuoglu, I.2    Erel, E.3
  • 60
    • 33644622040 scopus 로고    scopus 로고
    • A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs
    • 59970A
    • Lambert, A.J.D. and Gupta, S.M. (2005). A heuristic solution for the disassembly line balancing problem incorporating sequence dependent costs. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970A, 73-80.
    • (2005) Proc. SPIE 5997, Environmentally Conscious Manufacturing , vol.5 , pp. 73-80
    • Lambert, A.J.D.1    Gupta, S.M.2
  • 63
    • 0013055270 scopus 로고    scopus 로고
    • A single-run optimization algorithm for stochastic assembly line balancing problems
    • Lyu, J. (1997). A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems, 16(3), 204-210.
    • (1997) Journal of Manufacturing Systems , vol.16 , Issue.3 , pp. 204-210
    • Lyu, J.1
  • 64
    • 34548449384 scopus 로고    scopus 로고
    • Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
    • McGovern, S.M. and Gupta, S.M. (2007a). Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research, 45(18-19), 4485-4511.
    • (2007) International Journal of Production Research , vol.45 , Issue.18-19 , pp. 4485-4511
    • McGovern, S.M.1    Gupta, S.M.2
  • 65
    • 33644615165 scopus 로고    scopus 로고
    • Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem
    • 59970B
    • McGovern, S.M. and Gupta, S.M. (2005). Uninformed and probabilistic distributed agent combinatorial searches for the unary NP-complete disassembly line balancing problem. In Proc. SPIE 5997, Environmentally Conscious Manufacturing V, 59970B.
    • (2005) Proc. SPIE 5997, Environmentally Conscious Manufacturing , vol.5
    • McGovern, S.M.1    Gupta, S.M.2
  • 67
    • 33845939092 scopus 로고    scopus 로고
    • A balancing method and genetic algorithm for disassembly line balancing
    • McGovern, S.M. and Gupta, S.M. (2007b). A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research, 179(3), 692-708.
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 692-708
    • McGovern, S.M.1    Gupta, S.M.2
  • 69
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen, P.R. and Frazier, G.V. (1997). A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics, 51(3), 177-190.
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 70
    • 78650589919 scopus 로고    scopus 로고
    • A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem
    • Özcan, IJ., Kellegöz, T., and Toklu, B. (2011). A genetic algorithm for the stochastic mixed-model U-line balancing and sequencing problem. International Journal of Production Research, 49(6), 1605-1626.
    • (2011) International Journal of Production Research , vol.49 , Issue.6 , pp. 1605-1626
    • Özcan, I.J.1    Kellegöz, T.2    Toklu, B.3
  • 71
    • 75849138540 scopus 로고    scopus 로고
    • Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
    • Özcan, U. (2010). Balancing stochastic two-sided assembly lines: A chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm. European Journal of Operational Research, 205(1), 81-97.
    • (2010) European Journal of Operational Research , vol.205 , Issue.1 , pp. 81-97
    • Özcan, U.1
  • 72
    • 84885635477 scopus 로고    scopus 로고
    • Reverse supply chain optimisation with disassembly line balancing
    • Özceylan, E. and Paksoy, T. (2013). Reverse supply chain optimisation with disassembly line balancing. International Journal of Production Research, 51(20), 5985-6001.
    • (2013) International Journal of Production Research , vol.51 , Issue.20 , pp. 5985-6001
    • Özceylan, E.1    Paksoy, T.2
  • 73
    • 84890189031 scopus 로고    scopus 로고
    • Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing
    • Özceylan, E., Paksoy, T., and Bektaş, T. (2014). Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing. Transportation Research Part E: Logistics and Transportation Review, 61, 142-164.
    • (2014) Transportation Research Part E: Logistics and Transportation Review , vol.61 , pp. 142-164
    • Özceylan, E.1    Paksoy, T.2    Bektaş, T.3
  • 74
    • 84897679104 scopus 로고    scopus 로고
    • Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem
    • Özceylan, E. and Paksoy, T. (2014a). Fuzzy mathematical programming approaches for reverse supply chain optimization with disassembly line balancing problem. Journal of Intelligent and Fuzzy Systems, 26(4), 1969-1985.
    • (2014) Journal of Intelligent and Fuzzy Systems , vol.26 , Issue.4 , pp. 1969-1985
    • Özceylan, E.1    Paksoy, T.2
  • 75
    • 84896400446 scopus 로고    scopus 로고
    • Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty
    • Özceylan, E. and Paksoy, T. (2014b). Interactive fuzzy programming approaches to the strategic and tactical planning of a closed-loop supply chain under uncertainty. International Journal of Production Research, 52(8), 2363-2387.
    • (2014) International Journal of Production Research , vol.52 , Issue.8 , pp. 2363-2387
    • Özceylan, E.1    Paksoy, T.2
  • 77
    • 0019899326 scopus 로고
    • A new method for assembly line balancing having stochastic work elements
    • Raouf, A. and Tsui, C.L. (1982). A new method for assembly line balancing having stochastic work elements. Computers & Industrial Engineering, 6(2), 131-148.
    • (1982) Computers & Industrial Engineering , vol.6 , Issue.2 , pp. 131-148
    • Raouf, A.1    Tsui, C.L.2
  • 78
    • 0013064892 scopus 로고    scopus 로고
    • A methodology for solving single-model, stochastic assembly line balancing problem
    • Sarin, S.C., Erel, E., and Darel, E.M. (1999). A methodology for solving single-model, stochastic assembly line balancing problem. The International Journal of Management Science, 27, 525-535.
    • (1999) The International Journal of Management Science , vol.27 , pp. 525-535
    • Sarin, S.C.1    Erel, E.2    Darel, E.M.3
  • 79
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl, A. and Becker, C. (2006). State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, 168(3), 666-693.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 80
    • 0033115142 scopus 로고    scopus 로고
    • Balancing assembly lines effectively - A computational comparison
    • Scholl, A. and Klein, R. (1999). Balancing assembly lines effectively-a computational comparison. European Journal of Operational Research, 114(1), 50-58.
    • (1999) European Journal of Operational Research , vol.114 , Issue.1 , pp. 50-58
    • Scholl, A.1    Klein, R.2
  • 81
    • 0025603598 scopus 로고
    • An efficient heuristic for solving stochastic assembly line balancing problems
    • Shin, D. (1990). An efficient heuristic for solving stochastic assembly line balancing problems. Computers & Industrial Engineering, 18(3), 285-295.
    • (1990) Computers & Industrial Engineering , vol.18 , Issue.3 , pp. 285-295
    • Shin, D.1
  • 82
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman, F.N. and Carter, J.C. (1986). A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science, 32(4), 455-463.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 85
    • 61349137696 scopus 로고    scopus 로고
    • Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
    • Tripathi, M., Agrawal, S., Pandey, M.K., Shankar, R., and Tiwari, M. (2009). Real world disassembly modeling and sequencing problem: Optimization by Algorithm of Self-Guided Ants (ASGA). Robotics and Computer-Integrated Manufacturing, 25(3), 483-496.
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.3 , pp. 483-496
    • Tripathi, M.1    Agrawal, S.2    Pandey, M.K.3    Shankar, R.4    Tiwari, M.5
  • 86
    • 0029368231 scopus 로고
    • Solving fuzzy assembly-line balancing problem with genetic algorithms
    • Tsujimura, Y., Gen, M., and Kubota, E. (1995). Solving fuzzy assembly-line balancing problem with genetic algorithms. Computersand Industrial Engineering, 29, 543-547.
    • (1995) Computersand Industrial Engineering , vol.29 , pp. 543-547
    • Tsujimura, Y.1    Gen, M.2    Kubota, E.3
  • 87
    • 84904390908 scopus 로고    scopus 로고
    • Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
    • Tuncel, E., Zeid, A., and Kamarthi, S. (2012). Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing, 1-13.
    • (2012) Journal of Intelligent Manufacturing , pp. 1-13
    • Tuncel, E.1    Zeid, A.2    Kamarthi, S.3
  • 89
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
    • Urban, T.L. and Chiang, W.C. (2006). An optimal piecewise-linear program for the U-line balancing problem with stochastic task times. European Journal of Operational Research, 168, 771-782.
    • (2006) European Journal of Operational Research , vol.168 , pp. 771-782
    • Urban, T.L.1    Chiang, W.C.2
  • 91
    • 79958174505 scopus 로고    scopus 로고
    • Strategic robust mixed model assembly line balancing based on scenario planning
    • Xu, W. and Xiao, T. (2011). Strategic robust mixed model assembly line balancing based on scenario planning. Tsinghua Science & Technology, 16(3), 308-314.
    • (2011) Tsinghua Science & Technology , vol.16 , Issue.3 , pp. 308-314
    • Xu, W.1    Xiao, T.2
  • 92
    • 84862303222 scopus 로고    scopus 로고
    • Multi-objective fuzzy assembly line balancing using genetic algorithms
    • Zacharia, P. and Nearchou, A. (2012). Multi-objective fuzzy assembly line balancing using genetic algorithms. Journal of Intelligent Manufacturing, 23(3), 615-627.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.3 , pp. 615-627
    • Zacharia, P.1    Nearchou, A.2
  • 93
    • 34548567778 scopus 로고    scopus 로고
    • Modeling and analysis of a mixed-model assembly line with stochastic operation times
    • Zhao, X., Liu, J., Ohno, K., and Kotani, S. (2007). Modeling and analysis of a mixed-model assembly line with stochastic operation times. Naval Research Logistics (NRL), 54(6), 681-691.
    • (2007) Naval Research Logistics (NRL) , vol.54 , Issue.6 , pp. 681-691
    • Zhao, X.1    Liu, J.2    Ohno, K.3    Kotani, S.4
  • 94
    • 84900007770 scopus 로고    scopus 로고
    • An ant colony optimization algorithm for multi-objective disassembly line balancing problem
    • Zhu, X., Zhang, Z., Zhu, X., and Hu, J. (2014). An ant colony optimization algorithm for multi-objective disassembly line balancing problem. Zhongguo Jixie China Mechanical Engineering, 25(8), 1075-1079.
    • (2014) Zhongguo Jixie China Mechanical Engineering , vol.25 , Issue.8 , pp. 1075-1079
    • Zhu, X.1    Zhang, Z.2    Zhu, X.3    Hu, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.