-
1
-
-
36448976916
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
-
Agrawal, S., Tiwari, M.K., A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research 46:6 (2008), 1405–1429.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1405-1429
-
-
Agrawal, S.1
Tiwari, M.K.2
-
2
-
-
84867068820
-
Task-failure-driven rebalancing of disassembly lines
-
Altekin, F.T., Akkan, C., Task-failure-driven rebalancing of disassembly lines. International Journal of Production Research 50:18 (2012), 4955–4976.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 4955-4976
-
-
Altekin, F.T.1
Akkan, C.2
-
3
-
-
34548398404
-
Profit-oriented disassembly-line balancing
-
Altekin, F.T., Kandiller, L., Ozdemirel, N.E., Profit-oriented disassembly-line balancing. International Journal of Production Research 46:10 (2008), 2675–2693.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.10
, pp. 2675-2693
-
-
Altekin, F.T.1
Kandiller, L.2
Ozdemirel, N.E.3
-
4
-
-
84893957110
-
A heuristic for U-shaped disassembly line balancing problems
-
Avikal, S., Jain, R., Mishra, P.K., A heuristic for U-shaped disassembly line balancing problems. MIT International Journal of Mechanical Engineering 3:1 (2013), 51–56.
-
(2013)
MIT International Journal of Mechanical Engineering
, vol.3
, Issue.1
, pp. 51-56
-
-
Avikal, S.1
Jain, R.2
Mishra, P.K.3
-
5
-
-
84893943458
-
A fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems
-
Avikal, S., Mishra, P.K., Jain, R., A fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems. International Journal of Production Research 52:5 (2014), 1306–1317.
-
(2014)
International Journal of Production Research
, vol.52
, Issue.5
, pp. 1306-1317
-
-
Avikal, S.1
Mishra, P.K.2
Jain, R.3
-
6
-
-
84876972240
-
Multi-objective optimization of stochastic disassembly line balancing with station paralleling
-
Aydemir-Karadag, A., Turkbey, O., Multi-objective optimization of stochastic disassembly line balancing with station paralleling. Computers & Industrial Engineering 65:3 (2013), 413–425.
-
(2013)
Computers & Industrial Engineering
, vol.65
, Issue.3
, pp. 413-425
-
-
Aydemir-Karadag, A.1
Turkbey, O.2
-
7
-
-
84874540167
-
A taxonomy of line balancing problems and their solution approaches
-
Battaïa, O., Dolgui, A., A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics 142:2 (2013), 259–277.
-
(2013)
International Journal of Production Economics
, vol.142
, Issue.2
, pp. 259-277
-
-
Battaïa, O.1
Dolgui, A.2
-
8
-
-
84922236941
-
Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts
-
V. Prabhu M. Taisch D. Kiritsis Springer State College, PA
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Chance constrained programming model for stochastic profit–oriented disassembly line balancing in the presence of hazardous parts. Prabhu, V., Taisch, M., Kiritsis, D., (eds.) Advances in production management systems. Sustainable production and service supply chains, 2013, Springer, State College, PA, 103–110.
-
(2013)
Advances in production management systems. Sustainable production and service supply chains
, pp. 103-110
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
9
-
-
84891551126
-
A decomposition method for stochastic partial disassembly line balancing with profit maximization
-
Bentaha, M.L., Battaïa, O., Dolgui, A., A decomposition method for stochastic partial disassembly line balancing with profit maximization. IEEE conference on automation science and engineering (CASE 2013), Madison, WI, 2013, 410–415.
-
(2013)
IEEE conference on automation science and engineering (CASE 2013), Madison, WI
, pp. 410-415
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
10
-
-
84896097591
-
A stochastic formulation of the disassembly line balancing problem
-
C. Emmanouilidis M. Taisch D. Kiritsis Springer Rhodes
-
Bentaha, M.L., Battaïa, O., Dolgui, A., A stochastic formulation of the disassembly line balancing problem. Emmanouilidis, C., Taisch, M., Kiritsis, D., (eds.) Advances in production management systems competitive manufacturing for innovative products and services, 2013, Springer, Rhodes, 397–404.
-
(2013)
Advances in production management systems competitive manufacturing for innovative products and services
, pp. 397-404
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
11
-
-
84902248564
-
A sample average approximation method for disassembly line balancing problem under uncertainty
-
Bentaha, M.L., Battaïa, O., Dolgui, A., A sample average approximation method for disassembly line balancing problem under uncertainty. Computers & Operations Research 51 (2014), 111–122.
-
(2014)
Computers & Operations Research
, vol.51
, pp. 111-122
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
12
-
-
84903557899
-
Disassembly line balancing and sequencing under uncertainty
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Disassembly line balancing and sequencing under uncertainty. Procedia CIRP 15 (2014), 239–244.
-
(2014)
Procedia CIRP
, vol.15
, pp. 239-244
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
13
-
-
84904503542
-
Lagrangian relaxation for stochastic disassembly line balancing problem
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Lagrangian relaxation for stochastic disassembly line balancing problem. Procedia CIRP 2014:17 (2014), 56–60.
-
(2014)
Procedia CIRP
, vol.2014
, Issue.17
, pp. 56-60
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
14
-
-
84961289222
-
An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
-
Bentaha, M.L., Battaïa, O., Dolgui, A., An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times. International Journal of Production Research 53:6 (2014), 1807–1818.
-
(2014)
International Journal of Production Research
, vol.53
, Issue.6
, pp. 1807-1818
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
15
-
-
84929774090
-
Disassembly line balancing problem with fixed number of workstations under uncertainty
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Disassembly line balancing problem with fixed number of workstations under uncertainty. 19th IFAC World Congress, Cape Town, South Africa, 2014, 3522–3526.
-
(2014)
19th IFAC World Congress, Cape Town, South Africa
, pp. 3522-3526
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
16
-
-
84953880323
-
A bibliographic review of production line design and balancing under uncertainty
-
Bentaha, M.L., Battaïa, O., Dolgui, A., A bibliographic review of production line design and balancing under uncertainty. IFAC-PapersOnLine 48:3 (2015), 70–75.
-
(2015)
IFAC-PapersOnLine
, vol.48
, Issue.3
, pp. 70-75
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
-
17
-
-
84902539041
-
Dealing with uncertainty in disassembly line design
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Hu, S.J., Dealing with uncertainty in disassembly line design. CIRP Annals – Manufacturing Technology 63:1 (2014), 21–24.
-
(2014)
CIRP Annals – Manufacturing Technology
, vol.63
, Issue.1
, pp. 21-24
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
18
-
-
84940610243
-
Second order conic approximation for disassembly line design with joint probabilistic constraints
-
Bentaha, M.L., Battaïa, O., Dolgui, A., Hu, S.J., Second order conic approximation for disassembly line design with joint probabilistic constraints. European Journal of Operational Research 247:3 (2015), 957–967.
-
(2015)
European Journal of Operational Research
, vol.247
, Issue.3
, pp. 957-967
-
-
Bentaha, M.L.1
Battaïa, O.2
Dolgui, A.3
Hu, S.J.4
-
19
-
-
0002545111
-
Stochastic programming computation and applications
-
Birge, J.R., Stochastic programming computation and applications. INFORMS Journal on Computing 9:2 (1997), 111–133.
-
(1997)
INFORMS Journal on Computing
, vol.9
, Issue.2
, pp. 111-133
-
-
Birge, J.R.1
-
20
-
-
48749137178
-
A cost-effective approach to stochastic line balancing with off-line repairs
-
Carter, J.C., Silverman, F.N., A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management 4:2 (1984), 145–157.
-
(1984)
Journal of Operations Management
, vol.4
, Issue.2
, pp. 145-157
-
-
Carter, J.C.1
Silverman, F.N.2
-
21
-
-
77953610368
-
A new multi-objective ant colony algorithm for solving the disassembly line balancing problem
-
Ding, L.P., Feng, Y.X., Tan, J.R., Gao, Y.C., A new multi-objective ant colony algorithm for solving the disassembly line balancing problem. International Journal of Advanced Manufacturing Technology 48:5 (2010), 761–771.
-
(2010)
International Journal of Advanced Manufacturing Technology
, vol.48
, Issue.5
, pp. 761-771
-
-
Ding, L.P.1
Feng, Y.X.2
Tan, J.R.3
Gao, Y.C.4
-
22
-
-
85057632798
-
Applying equal piles approach to disassembly line balancing problem
-
[on CDROM]
-
Duta, L., Filip, F.G., Henrioud, J.M., Applying equal piles approach to disassembly line balancing problem. Proceedings of the 16th world congress of the international federation of automatic control, IFAC 2007. July 2007, Prague, Czech Republic, 2007 [on CDROM].
-
(2007)
Proceedings of the 16th world congress of the international federation of automatic control, IFAC 2007. July 2007, Prague, Czech Republic
-
-
Duta, L.1
Filip, F.G.2
Henrioud, J.M.3
-
23
-
-
27744559270
-
Stochastic assembly line balancing using beam search
-
Erel, E., Sabuncuoglu, I., Sekerci, H., Stochastic assembly line balancing using beam search. International Journal of Production Research 43:7 (2005), 1411–1426.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.7
, pp. 1411-1426
-
-
Erel, E.1
Sabuncuoglu, I.2
Sekerci, H.3
-
24
-
-
0032761669
-
A new line remedial policy for the paced lines with stochastic task times
-
Gökçen, H., Baykoç, Ö.F., A new line remedial policy for the paced lines with stochastic task times. International Journal of Production Economics 58:2 (1999), 191–197.
-
(1999)
International Journal of Production Economics
, vol.58
, Issue.2
, pp. 191-197
-
-
Gökçen, H.1
Baykoç, Ö.F.2
-
25
-
-
0037316822
-
The stochastic U-line balancing problem
-
Guerriero, D., Miltenburg, J., The stochastic U-line balancing problem. Naval Research Logistics 50:1 (2003), 31–57.
-
(2003)
Naval Research Logistics
, vol.50
, Issue.1
, pp. 31-57
-
-
Guerriero, D.1
Miltenburg, J.2
-
26
-
-
0033738099
-
Production planning and control for remanufacturing: Industry practice and research needs
-
Guide, V.D.R. Jr., Production planning and control for remanufacturing: Industry practice and research needs. Journal of Operations Management 18:4 (2000), 467–483.
-
(2000)
Journal of Operations Management
, vol.18
, Issue.4
, pp. 467-483
-
-
Guide, V.D.R.1
-
27
-
-
0035837942
-
A solution approach to the disassembly line balancing problem in the presence of task failures
-
Güngör, A., Gupta, S.M., A solution approach to the disassembly line balancing problem in the presence of task failures. International Journal of Production Research 39:7 (2001), 1427–1467.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Güngör, A.1
Gupta, S.M.2
-
28
-
-
0037143030
-
Disassembly line in product recovery
-
Güngör, A., Gupta, S.M., Disassembly line in product recovery. International Journal of Production Research 40:11 (2002), 2569–2589.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Güngör, A.1
Gupta, S.M.2
-
29
-
-
0001353411
-
Scheduling disassembly
-
Gupta, S.M., Taleb, K.N., Scheduling disassembly. International Journal of Production Research 32:8 (1994), 1857–1866.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.8
, pp. 1857-1866
-
-
Gupta, S.M.1
Taleb, K.N.2
-
30
-
-
84912593681
-
A comparison of several methods for determining the number of readings in a time study
-
Hicks, C.R., Young, H.H., A comparison of several methods for determining the number of readings in a time study. Journal of Industrial Engineering 13:2 (1962), 93–96.
-
(1962)
Journal of Industrial Engineering
, vol.13
, Issue.2
, pp. 93-96
-
-
Hicks, C.R.1
Young, H.H.2
-
32
-
-
84887821595
-
A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M., A particle swarm optimization algorithm with neighborhood-based mutation for sequence-dependent disassembly line balancing problem. International Journal of Advanced Manufacturing Technology 69:1 (2013), 197–209.
-
(2013)
International Journal of Advanced Manufacturing Technology
, vol.69
, Issue.1
, pp. 197-209
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
33
-
-
84878666440
-
Ant colony optimization for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M., Ant colony optimization for sequence-dependent disassembly line balancing problem. Journal of Manufacturing Technology Management 24:3 (2013), 413–427.
-
(2013)
Journal of Manufacturing Technology Management
, vol.24
, Issue.3
, pp. 413-427
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
34
-
-
84881185298
-
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Gupta, S.M., Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem. Expert Systems with Applications 40:18 (2013), 7231–7241.
-
(2013)
Expert Systems with Applications
, vol.40
, Issue.18
, pp. 7231-7241
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
35
-
-
84889821707
-
A tabu search algorithm for balancing a sequence-dependent disassembly line
-
Kalayci, C.B., Gupta, S.M., A tabu search algorithm for balancing a sequence-dependent disassembly line. Production Planning & Control 25:2 (2014), 149–160.
-
(2014)
Production Planning & Control
, vol.25
, Issue.2
, pp. 149-160
-
-
Kalayci, C.B.1
Gupta, S.M.2
-
36
-
-
84902301531
-
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
-
Kalayci, C.B., Polat, O., Gupta, S.M., A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem. Annals of Operations Research, 2014, 1–34, 10.1007/s10479-014-1641-3.
-
(2014)
Annals of Operations Research
, pp. 1-34
-
-
Kalayci, C.B.1
Polat, O.2
Gupta, S.M.3
-
37
-
-
34447283264
-
A case study of serial-flow car disassembly: Ergonomics, productivity and potential system performance
-
Kazmierczak, K., Neumann, W.P., Winkel, J., A case study of serial-flow car disassembly: Ergonomics, productivity and potential system performance. Human Factors and Ergonomics in Manufacturing & Service Industries 17:4 (2007), 331–351.
-
(2007)
Human Factors and Ergonomics in Manufacturing & Service Industries
, vol.17
, Issue.4
, pp. 331-351
-
-
Kazmierczak, K.1
Neumann, W.P.2
Winkel, J.3
-
38
-
-
70749116514
-
Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
-
Koc, A., Sabuncuoglu, I., Erel, E., Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Transactions 41:10 (2009), 866–881.
-
(2009)
IIE Transactions
, vol.41
, Issue.10
, pp. 866-881
-
-
Koc, A.1
Sabuncuoglu, I.2
Erel, E.3
-
39
-
-
0015639656
-
A cost-oriented approach to stochastic line balancing
-
Kottas, J.F., Lau, H.S., A cost-oriented approach to stochastic line balancing. AIIE Transactions 5:2 (1973), 164–171.
-
(1973)
AIIE Transactions
, vol.5
, Issue.2
, pp. 164-171
-
-
Kottas, J.F.1
Lau, H.S.2
-
40
-
-
0016962322
-
A total operating cost model for paced lines with stochastic task times
-
Kottas, J.F., Lau, H.S., A total operating cost model for paced lines with stochastic task times. AIIE Transactions 8:2 (1976), 234–240.
-
(1976)
AIIE Transactions
, vol.8
, Issue.2
, pp. 234-240
-
-
Kottas, J.F.1
Lau, H.S.2
-
41
-
-
84885869652
-
A stochastic line balancing procedure
-
Kottas, J.F., Lau, H.S., A stochastic line balancing procedure. International Journal of Production Research 19:2 (1981), 177–193.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.2
, pp. 177-193
-
-
Kottas, J.F.1
Lau, H.S.2
-
42
-
-
0033358055
-
Linear programming in disassembly/clustering sequence generation
-
Lambert, A.J.D., Linear programming in disassembly/clustering sequence generation. Computers & Industrial Engineering 36:4 (1999), 723–738.
-
(1999)
Computers & Industrial Engineering
, vol.36
, Issue.4
, pp. 723-738
-
-
Lambert, A.J.D.1
-
43
-
-
0036721661
-
Determining optimum disassembly sequences in electronic equipment
-
Lambert, A.J.D., Determining optimum disassembly sequences in electronic equipment. Computers and Industrial Engineering 43:3 (2002), 553–575.
-
(2002)
Computers and Industrial Engineering
, vol.43
, Issue.3
, pp. 553-575
-
-
Lambert, A.J.D.1
-
44
-
-
33644618730
-
Determining optimum and suboptimum disassembly sequences with an application to a cell phone
-
Lambert, A.J.D., Gupta, S.M., Determining optimum and suboptimum disassembly sequences with an application to a cell phone. Proceedings of the 6th IEEE international symposium on assembly and task planning (ISATP2005). Montreal, Canada, July 19–21, 2005, 260–265.
-
(2005)
Proceedings of the 6th IEEE international symposium on assembly and task planning (ISATP2005). Montreal, Canada, July 19–21
, pp. 260-265
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
45
-
-
0023586184
-
An exploratory study on stopping a paced line when incompletions occur
-
Lau, H.S., Shtub, A., An exploratory study on stopping a paced line when incompletions occur. IIE Transactions 19:4 (1987), 463–467.
-
(1987)
IIE Transactions
, vol.19
, Issue.4
, pp. 463-467
-
-
Lau, H.S.1
Shtub, A.2
-
46
-
-
84891761309
-
Research on disassembly line balancing problem in the presence of uncertain cycle time
-
Liu, B.Y., Chen, W.D., Huang, S., Research on disassembly line balancing problem in the presence of uncertain cycle time. International Asia conference on industrial engineering and management innovation: Core areas of industrial engineering, IEMI 2012 – Proceedings, 2013, 497–507.
-
(2013)
International Asia conference on industrial engineering and management innovation: Core areas of industrial engineering, IEMI 2012 – Proceedings
, pp. 497-507
-
-
Liu, B.Y.1
Chen, W.D.2
Huang, S.3
-
47
-
-
0013055270
-
A single-run optimization algorithm for stochastic assembly line balancing problems
-
Lyu, J., A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems 16:3 (1997), 204–210.
-
(1997)
Journal of Manufacturing Systems
, vol.16
, Issue.3
, pp. 204-210
-
-
Lyu, J.1
-
48
-
-
33748559516
-
Ant colony optimization for disassembly sequencing with multiple objectives
-
McGovern, S.M., Gupta, S.M., Ant colony optimization for disassembly sequencing with multiple objectives. International Journal of Advanced Manufacturing Technology 30:5 (2006), 481–496.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.5
, pp. 481-496
-
-
McGovern, S.M.1
Gupta, S.M.2
-
49
-
-
34548449384
-
Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem
-
McGovern, S.M., Gupta, S.M., Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem. International Journal of Production Research 45:18–19 (2007), 4485–4511.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.18-19
, pp. 4485-4511
-
-
McGovern, S.M.1
Gupta, S.M.2
-
50
-
-
33845939092
-
A balancing method and genetic algorithm for disassembly line balancing
-
McGovern, S.M., Gupta, S.M., A balancing method and genetic algorithm for disassembly line balancing. European Journal of Operational Research 179:3 (2007), 692–708.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 692-708
-
-
McGovern, S.M.1
Gupta, S.M.2
-
51
-
-
0002569892
-
A heuristic method of assembly line balancing for assumptions of constant or variable work element times
-
Moodie, C.L., Young, H.H., A heuristic method of assembly line balancing for assumptions of constant or variable work element times. Journal of Industrial Engineering 16:1 (1965), 23–29.
-
(1965)
Journal of Industrial Engineering
, vol.16
, Issue.1
, pp. 23-29
-
-
Moodie, C.L.1
Young, H.H.2
-
52
-
-
84885625406
-
Mixed model disassembly line balancing problem with fuzzy goals
-
Paksoy, T., Güngör, A., Özceylan, E., Hancilar, A., Mixed model disassembly line balancing problem with fuzzy goals. International Journal of Production Research 51:20 (2013), 6082–6096.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.20
, pp. 6082-6096
-
-
Paksoy, T.1
Güngör, A.2
Özceylan, E.3
Hancilar, A.4
-
53
-
-
13544260501
-
A stochastic programming approach for supply chain network design under uncertainty
-
Santoso, T., Ahmed, S., Goetschalckx, M., Shapiro, A., A stochastic programming approach for supply chain network design under uncertainty. European Journal of Operational Research 167:1 (2005), 96–115.
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 96-115
-
-
Santoso, T.1
Ahmed, S.2
Goetschalckx, M.3
Shapiro, A.4
-
54
-
-
0025462434
-
Development of cost model for the single-model stochastic assembly line balancing problem
-
Sarin, S.C., Erel, E., Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research 28:7 (1990), 1305–1316.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.7
, pp. 1305-1316
-
-
Sarin, S.C.1
Erel, E.2
-
55
-
-
0013064892
-
A methodology for solving single-model, stochastic assembly line balancing problem
-
Sarin, S.C., Erel, E., Dar-El, E.M., A methodology for solving single-model, stochastic assembly line balancing problem. OMEGA—The International Journal of Management Science 27:5 (1999), 525–535.
-
(1999)
OMEGA—The International Journal of Management Science
, vol.27
, Issue.5
, pp. 525-535
-
-
Sarin, S.C.1
Erel, E.2
Dar-El, E.M.3
-
56
-
-
0025603598
-
An efficient heuristic for solving stochastic assembly line balancing problems
-
Shin, D., An efficient heuristic for solving stochastic assembly line balancing problems. Computers & Industrial Engineering 18:3 (1990), 285–295.
-
(1990)
Computers & Industrial Engineering
, vol.18
, Issue.3
, pp. 285-295
-
-
Shin, D.1
-
57
-
-
0009351586
-
Uniform assembly line balancing with stochastic task times in just-in-time manufacturing
-
Shin, D., Min, H., Uniform assembly line balancing with stochastic task times in just-in-time manufacturing. International Journal of Operations and Production Management 11:8 (1991), 23–34.
-
(1991)
International Journal of Operations and Production Management
, vol.11
, Issue.8
, pp. 23-34
-
-
Shin, D.1
Min, H.2
-
58
-
-
0021392913
-
The effect of incompletion cost on line balancing with multiple manning of work stations
-
Shtub, A., The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research 22 (1984), 235–245.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 235-245
-
-
Shtub, A.1
-
59
-
-
0022698734
-
A cost-based methodology for stochastic line balancing with intermittent line stoppages
-
Silverman, F.N., Carter, J.C., A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science 32 (1986), 455–463.
-
(1986)
Management Science
, vol.32
, pp. 455-463
-
-
Silverman, F.N.1
Carter, J.C.2
-
60
-
-
61349137696
-
Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA)
-
Tripathi, M., Agrawal, S., Pandey, M.K., Shankar, R., Tiwari, M.K., Real world disassembly modeling and sequencing problem: Optimization by algorithm of self-guided ants (ASGA). Robotics and Computer-Integrated Manufacturing 25:3 (2009), 483–496.
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.3
, pp. 483-496
-
-
Tripathi, M.1
Agrawal, S.2
Pandey, M.K.3
Shankar, R.4
Tiwari, M.K.5
-
61
-
-
84904384763
-
Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning
-
Tuncel, E., Zeid, A., Kamarthi, S., Solving large scale disassembly line balancing problem with uncertainty using reinforcement learning. Journal of Intelligent Manufacturing 25:4 (2014), 647–659.
-
(2014)
Journal of Intelligent Manufacturing
, vol.25
, Issue.4
, pp. 647-659
-
-
Tuncel, E.1
Zeid, A.2
Kamarthi, S.3
-
62
-
-
0016974393
-
A cost model for optimal mix of balanced stochastic assembly line and the modular assembly system for a customer oriented production system
-
Vrat, P., Virani, A., A cost model for optimal mix of balanced stochastic assembly line and the modular assembly system for a customer oriented production system. International Journal of Production Research 14:4 (1976), 445–463.
-
(1976)
International Journal of Production Research
, vol.14
, Issue.4
, pp. 445-463
-
-
Vrat, P.1
Virani, A.2
|