메뉴 건너뛰기




Volumn 19, Issue 1, 2006, Pages 112-120

A survey of automated material handling systems in 300-mm semiconductor fabs

Author keywords

300 mm semiconductor manufacturing; Automated material handling systems (AMHS); Fab layouts; Survey

Indexed keywords

AUTOMATED MATERIAL HANDLING SYSTEM (AMHS); FAB LAYOUTS;

EID: 33144486490     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2005.863217     Document Type: Conference Paper
Times cited : (102)

References (65)
  • 1
    • 0000793139 scopus 로고
    • Cramming more components onto integrated circuits
    • Apr.
    • G. E. Moore, "Cramming more components onto integrated circuits," Electron., vol. 38, no. 8, Apr. 1965.
    • (1965) Electron. , vol.38 , Issue.8
    • Moore, G.E.1
  • 2
    • 0010437386 scopus 로고    scopus 로고
    • Planning for the 300 mm transition
    • D. Seligson, "Planning for the 300 mm transition," Intel Technol, J., vol. Q3, 1998.
    • (1998) Intel Technol, J. , vol.Q3
    • Seligson, D.1
  • 3
    • 84858541960 scopus 로고    scopus 로고
    • Sematech [Online]. Available: www.sematech.org
  • 4
    • 6544245058 scopus 로고    scopus 로고
    • 300 mm moves into the next century
    • Jul.
    • V. Bakshi, D. Youngson, and R. Goodall, "300 mm moves into the next century," Semiconduct. Int., vol. 22, no. 8, pp. 92-97, Jul. 1999.
    • (1999) Semiconduct. Int. , vol.22 , Issue.8 , pp. 92-97
    • Bakshi, V.1    Youngson, D.2    Goodall, R.3
  • 5
    • 33144480573 scopus 로고    scopus 로고
    • Wafer fabrication moves to open controls
    • Feb.
    • B. Waterbury, "Wafer fabrication moves to open controls," Conn; Design, Feb. 2001.
    • (2001) Conn; Design
    • Waterbury, B.1
  • 6
    • 10044245339 scopus 로고    scopus 로고
    • Intel's 300, program is on-line
    • Apr.
    • T. M. Garrett, "Intel's 300, program is on-line," Electron. J., Apr. 2001.
    • (2001) Electron. J.
    • Garrett, T.M.1
  • 7
    • 33144459503 scopus 로고    scopus 로고
    • U.S. companies move up to 300-mm wafer fabs
    • Jul.
    • D. Lammers, "U.S. companies move up to 300-mm wafer fabs," EE Times, Jul. 2002.
    • (2002) EE Times
    • Lammers, D.1
  • 10
    • 0034226752 scopus 로고    scopus 로고
    • 300 mm begins full-fab automation challenges
    • Jul.
    • M. Chase, "300 mm begins full-fab automation challenges," Semiconduct. Int., p. 152, Jul. 2000.
    • (2000) Semiconduct. Int. , pp. 152
    • Chase, M.1
  • 11
    • 0034301145 scopus 로고    scopus 로고
    • The challenges of macro integration for fully automated 300 mm fabs
    • Oct.
    • M. Chase, D. Scott, and J. Nestel-Patt, "The challenges of macro integration for fully automated 300 mm fabs," Solid State Technol., pp. 52-64, Oct. 2000.
    • (2000) Solid State Technol. , pp. 52-64
    • Chase, M.1    Scott, D.2    Nestel-Patt, J.3
  • 13
    • 2142811512 scopus 로고    scopus 로고
    • Trends in 300 mm factory automation
    • Jun.
    • R. Hunter and C. Humphreys, "Trends in 300 mm factory automation," Semiconduct. Int., pp. 60-64, Jun. 2003.
    • (2003) Semiconduct. Int. , pp. 60-64
    • Hunter, R.1    Humphreys, C.2
  • 15
    • 0031119940 scopus 로고    scopus 로고
    • Alternative facility layouts for semiconductor wafer fabrication facilities
    • Apr.
    • C. D. Geiger, R. Hase, C. G. Takoudis, and R. Uzsoy, "Alternative facility layouts for semiconductor wafer fabrication facilities," IEEE Trans. Comput, Pack. Manufact. Technol, vol. 20, no. 2, part C, pp. 152-163, Apr. 1997.
    • (1997) IEEE Trans. Comput, Pack. Manufact. Technol , vol.20 , Issue.2 PART C , pp. 152-163
    • Geiger, C.D.1    Hase, R.2    Takoudis, C.G.3    Uzsoy, R.4
  • 16
    • 6744260811 scopus 로고    scopus 로고
    • Automation needs reach new levels
    • Jul.
    • K. Gartland and E. Sherwood, "Automation needs reach new levels," Semiconduct. Int., pp. 157-163, Jul. 2000.
    • (2000) Semiconduct. Int. , pp. 157-163
    • Gartland, K.1    Sherwood, E.2
  • 17
    • 18144434748 scopus 로고    scopus 로고
    • An automation route to upgrading fabs toward 300 mm
    • Oct.
    • M. Brain, "An automation route to upgrading fabs toward 300 mm," Solid State Technol., pp. 69-76, Oct. 2000.
    • (2000) Solid State Technol. , pp. 69-76
    • Brain, M.1
  • 18
    • 0032119904 scopus 로고    scopus 로고
    • Fab layout design methodology: Case of the 300 mm fabs
    • Jul.
    • D. Meyersdorf and A. Taghizadeh, "Fab layout design methodology: Case of the 300 mm fabs," Semiconduct. Int., vol. 22, no. 8, pp. 187-196, Jul. 1998.
    • (1998) Semiconduct. Int. , vol.22 , Issue.8 , pp. 187-196
    • Meyersdorf, D.1    Taghizadeh, A.2
  • 19
    • 0032108928 scopus 로고    scopus 로고
    • Integration risk in 300-mm wafer fab automation
    • Jul.
    • J. Chrisos and J. Nestel-Patt, "Integration risk in 300-mm wafer fab automation," Solid State Technol, vol. 41, no. 7, p. 193, Jul. 1998.
    • (1998) Solid State Technol , vol.41 , Issue.7 , pp. 193
    • Chrisos, J.1    Nestel-Patt, J.2
  • 21
    • 0003907376 scopus 로고    scopus 로고
    • 21st Century semiconductor manufacturing capabilities
    • E. S. Meieran, "21st Century semiconductor manufacturing capabilities," Intel Technol. J., vol. Q4, 1998.
    • (1998) Intel Technol. J. , vol.Q4
    • Meieran, E.S.1
  • 22
    • 33144459701 scopus 로고    scopus 로고
    • Accelerating 300 mm conversion using industry standards
    • Dec. 1
    • D. Pillai and T. Abell, "Accelerating 300 mm conversion using industry standards," in Proc. SEMICON Conf. Japan, Dec. 1, 1999.
    • (1999) Proc. SEMICON Conf. Japan
    • Pillai, D.1    Abell, T.2
  • 24
    • 0042887635 scopus 로고    scopus 로고
    • The evaluation of manual FOUP handling in 300 mm wafer fab
    • Aug.
    • M. J. Wang, H. C. Chung, and H. S. Wu, "The evaluation of manual FOUP handling in 300 mm wafer fab," IEEE Trans. Semiconduct. Manufact., vol. 16, no. 3, Aug. 2003.
    • (2003) IEEE Trans. Semiconduct. Manufact. , vol.16 , Issue.3
    • Wang, M.J.1    Chung, H.C.2    Wu, H.S.3
  • 26
    • 0025531102 scopus 로고
    • Material handling automation for wafer fabrication facilitites
    • D. Pillai, "Material handling automation for wafer fabrication facilitites," in Proc. IEEE/CHMT '90 IEMT Symp., 1990.
    • (1990) Proc. IEEE/CHMT '90 IEMT Symp.
    • Pillai, D.1
  • 27
    • 33144461785 scopus 로고    scopus 로고
    • Material handling automation-Trends, vision, and future plans
    • Tokyo, Japan
    • D. Pillai and S. R. Srinivasan, "Material handling automation-Trends, vision, and future plans," in Proc. ISSM, Tokyo, Japan, 1996.
    • (1996) Proc. ISSM
    • Pillai, D.1    Srinivasan, S.R.2
  • 28
    • 0033320285 scopus 로고    scopus 로고
    • Integration of 300 mm fab layouts and material handling automation
    • Oct.
    • D. Pillai, T. Quinn, K. Kryder, and D. Charlson, "Integration of 300 mm fab layouts and material handling automation," in Proc. ISSM, Oct. 1999.
    • (1999) Proc. ISSM
    • Pillai, D.1    Quinn, T.2    Kryder, K.3    Charlson, D.4
  • 30
    • 3543064131 scopus 로고    scopus 로고
    • A spine layout design method for semiconductor fabrication facilities containing automated material-handling systems
    • T. Yang and B. A. Peters, "A spine layout design method for semiconductor fabrication facilities containing automated material-handling systems," Int. J. Oper. Prod. Manage., vol. 17, no. 5, pp. 490-501, 1997.
    • (1997) Int. J. Oper. Prod. Manage. , vol.17 , Issue.5 , pp. 490-501
    • Yang, T.1    Peters, B.A.2
  • 31
    • 0031200370 scopus 로고    scopus 로고
    • Integrated facility layout and material handling system design in semiconductor fabrication facilities
    • Aug.
    • B. A. Peters and T. Yang, "Integrated facility layout and material handling system design in semiconductor fabrication facilities," IEEE Trans. Semiconduct. Manufact., vol. 10, no. 3, pp. 360-369, Aug. 1997.
    • (1997) IEEE Trans. Semiconduct. Manufact. , vol.10 , Issue.3 , pp. 360-369
    • Peters, B.A.1    Yang, T.2
  • 32
    • 0033161827 scopus 로고    scopus 로고
    • Semiconductor fabrication facility design using a hybrid search methodology
    • T. Yang, M. Rajasekharan, and B. A. Peters, "Semiconductor fabrication facility design using a hybrid search methodology," Commuters Indust. Eng., vol. 36, pp. 565-583, 1999.
    • (1999) Commuters Indust. Eng. , vol.36 , pp. 565-583
    • Yang, T.1    Rajasekharan, M.2    Peters, B.A.3
  • 33
    • 0031140607 scopus 로고    scopus 로고
    • The multi-bay manufacturing facility layout problem
    • R. D. Meiler, "The multi-bay manufacturing facility layout problem," Int. J. Prod. Res., vol. 35, no. 5, pp. 1229-1237, 1997.
    • (1997) Int. J. Prod. Res. , vol.35 , Issue.5 , pp. 1229-1237
    • Meiler, R.D.1
  • 34
  • 35
    • 6744237811 scopus 로고    scopus 로고
    • The case for continuous flow transport of wafer carriers
    • Jul.
    • D. Feindel and U. Kaempf, "The case for continuous flow transport of wafer carriers," Semiconduct. Int., pp. 299-308, Jul. 2000.
    • (2000) Semiconduct. Int. , pp. 299-308
    • Feindel, D.1    Kaempf, U.2
  • 36
    • 33144464532 scopus 로고    scopus 로고
    • A new low cost approach in 200 mm and 300 mm AMHS
    • T. Arzt and F. Bulcke, "A new low cost approach in 200 mm and 300 mm AMHS," Semiconductor Fabtech 10th ed. pp. 19-26, 2000.
    • (2000) Semiconductor Fabtech 10th Ed. , pp. 19-26
    • Arzt, T.1    Bulcke, F.2
  • 37
    • 0034634803 scopus 로고    scopus 로고
    • Unidirectional circular layout for overhead material handling systems
    • J. H. Ting and J. M. A. Tanchoco, "Unidirectional circular layout for overhead material handling systems," Int. J. Prod. Res., vol. 38, no. 16, pp. 3913-3935, 2000.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.16 , pp. 3913-3935
    • Ting, J.H.1    Tanchoco, J.M.A.2
  • 38
    • 0035248599 scopus 로고    scopus 로고
    • Optimal bidirectional spine layout for overhead material handling systems
    • Feb.
    • _, "Optimal bidirectional spine layout for overhead material handling systems," IEEE Trans. Semiconduct. Manufact., vol. 14, no. 1, pp. 57-64, Feb. 2001.
    • (2001) IEEE Trans. Semiconduct. Manufact. , vol.14 , Issue.1 , pp. 57-64
  • 39
    • 0041958041 scopus 로고    scopus 로고
    • Connecting transport AMHS in a wafer fab
    • J. T. Lin, F. K. Wang, and C. K. Wu, "Connecting transport AMHS in a wafer fab," Int. J. Prod. Res., vol. 41, no. 3, pp. 529-544, 2003.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.3 , pp. 529-544
    • Lin, J.T.1    Wang, F.K.2    Wu, C.K.3
  • 40
    • 0020140765 scopus 로고
    • Design of automatic guided vehicle systems
    • W. L. Maxwell and J. A. Muckstadt, "Design of automatic guided vehicle systems," Inst. Indust. Eng. Trans., vol. 14, no. 2, pp. 114-124, 1982.
    • (1982) Inst. Indust. Eng. Trans. , vol.14 , Issue.2 , pp. 114-124
    • Maxwell, W.L.1    Muckstadt, J.A.2
  • 41
    • 0042386738 scopus 로고    scopus 로고
    • Simulation analysis of the connecting transport AMHS in a wafer fab
    • Aug.
    • J. T. Lin, F. K. Wang, and C. K. Wu, "Simulation analysis of the connecting transport AMHS in a wafer fab," IEEE Trans. Semiconduct. Manufact., vol. 16, no. 3, pp. 555-564, Aug. 2003.
    • (2003) IEEE Trans. Semiconduct. Manufact. , vol.16 , Issue.3 , pp. 555-564
    • Lin, J.T.1    Wang, F.K.2    Wu, C.K.3
  • 42
    • 3142592494 scopus 로고    scopus 로고
    • Virtual vehicle in the connecting transport automated material-handling system (AMHS)
    • Jul.
    • J. T. Lin, F. K. Wang, and J. R. Young, "Virtual vehicle in the connecting transport automated material-handling system (AMHS)," Int. J. Prod. Res., vol. 42, no. 13, pp. 2599-2610, Jul. 2004.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.13 , pp. 2599-2610
    • Lin, J.T.1    Wang, F.K.2    Young, J.R.3
  • 43
    • 0034802698 scopus 로고    scopus 로고
    • Application of a layout/material handling design method to a furnace area in a 300 mm wafer fab
    • P. M. C. Hesen, P. J. J. Renders, and J. E. Rooda, "Application of a layout/material handling design method to a furnace area in a 300 mm wafer fab," Int. J. Adv. Manuf. Technol., vol. 17, pp. 216-220, 2001.
    • (2001) Int. J. Adv. Manuf. Technol. , vol.17 , pp. 216-220
    • Hesen, P.M.C.1    Renders, P.J.J.2    Rooda, J.E.3
  • 44
    • 0036058626 scopus 로고    scopus 로고
    • Modeling and performance evaluation for automated material handling systems in a 300 mm foundry fab
    • May
    • H. P. Huang and C. T. Wang, "Modeling and performance evaluation for automated material handling systems in a 300 mm foundry fab," in Proc. IEEE Int. Conf. Robotics Automation, May 2002, pp. 3181-3186.
    • (2002) Proc. IEEE Int. Conf. Robotics Automation , pp. 3181-3186
    • Huang, H.P.1    Wang, C.T.2
  • 45
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Aug.
    • L. W. Wein, "Scheduling semiconductor wafer fabrication," IEEE Trans. Semiconduct. Manufact., vol. 1, no. 3, pp. 115-130, Aug. 1988.
    • (1988) IEEE Trans. Semiconduct. Manufact. , vol.1 , Issue.3 , pp. 115-130
    • Wein, L.W.1
  • 46
    • 0037323581 scopus 로고    scopus 로고
    • MaxFlow theory for availability calculation of automated material handling systems
    • A. Beschorner and D. Gluer, "MaxFlow theory for availability calculation of automated material handling systems," Robotics Computer Integrated Manufact., vol. 19, pp. 141-145, 2003.
    • (2003) Robotics Computer Integrated Manufact. , vol.19 , pp. 141-145
    • Beschorner, A.1    Gluer, D.2
  • 48
    • 4344657271 scopus 로고    scopus 로고
    • 300-mm full factory simulations for 90- And 65-nm IC manufacturing
    • Aug.
    • D. D. Pillai, E. L. Bass, J. C. Dempsey, and E. J. Yellig, "300-mm full factory simulations for 90- and 65-nm IC manufacturing," IEEE Trans. Semiconduct. Manufact., vol. 17, no. 3, pp. 115-130, Aug. 2004.
    • (2004) IEEE Trans. Semiconduct. Manufact. , vol.17 , Issue.3 , pp. 115-130
    • Pillai, D.D.1    Bass, E.L.2    Dempsey, J.C.3    Yellig, E.J.4
  • 49
    • 0028731002 scopus 로고
    • Simulation in automated material handling system design for semiconductor manufacturing
    • G. Nadoli and D. Pillai, "Simulation in automated material handling system design for semiconductor manufacturing," in Proc. Winter Sim. Conf., 1994, pp. 892-899.
    • (1994) Proc. Winter Sim. Conf. , pp. 892-899
    • Nadoli, G.1    Pillai, D.2
  • 50
    • 0028741639 scopus 로고
    • Modeling and simulation of material handling for semiconductor wafer fabrication
    • N. G. Pierce and R. Stafford, "Modeling and simulation of material handling for semiconductor wafer fabrication," in Proc. Winter Sim. Conf., 1994, pp. 900-906.
    • (1994) Proc. Winter Sim. Conf. , pp. 900-906
    • Pierce, N.G.1    Stafford, R.2
  • 51
    • 0002893970 scopus 로고
    • Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab
    • Feb.
    • G. Cardarelli and P. Marcello, "Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab," IEEE Trans. Semiconduct. Manufact., vol. 8, no. 1, pp. 44-49, Feb. 1995.
    • (1995) IEEE Trans. Semiconduct. Manufact. , vol.8 , Issue.1 , pp. 44-49
    • Cardarelli, G.1    Marcello, P.2
  • 52
    • 0030421922 scopus 로고    scopus 로고
    • Simulation in the design of ground-based intrabay automation systems
    • T. Jefferson, M. Rangaswami, and G. Stoner, "Simulation in the design of ground-based intrabay automation systems," in Proc. Winter Sim Conf., 1996, pp. 1008-1013.
    • (1996) Proc. Winter Sim Conf. , pp. 1008-1013
    • Jefferson, T.1    Rangaswami, M.2    Stoner, G.3
  • 54
    • 0032254703 scopus 로고    scopus 로고
    • Effective simulation model reuse: A case study for AMHS modeling
    • G. T. Mackulak, F. P. Lawrence, and T. Colvin, "Effective simulation model reuse: A case study for AMHS modeling," in Proc. Winter Sim. Conf., 1998, pp. 979-984.
    • (1998) Proc. Winter Sim. Conf. , pp. 979-984
    • Mackulak, G.T.1    Lawrence, F.P.2    Colvin, T.3
  • 56
    • 0035421294 scopus 로고    scopus 로고
    • A simulation-based experiment for comparing amhs performance in a semiconductor fabrication facility
    • Aug.
    • G. T. Mackulak and P. Savory, "A simulation-based experiment for comparing amhs performance in a semiconductor fabrication facility," IEEE Trans. Semiconduct. Manufact., vol. 14, no. 3, pp. 273-280, Aug. 2001.
    • (2001) IEEE Trans. Semiconduct. Manufact. , vol.14 , Issue.3 , pp. 273-280
    • Mackulak, G.T.1    Savory, P.2
  • 57
    • 0034430093 scopus 로고    scopus 로고
    • Integrating dynamic fab capacity and automation models from 300 mm semiconductor manufacturing
    • C. D. DeJong and S. A. Fischbein, "Integrating dynamic fab capacity and automation models from 300 mm semiconductor manufacturing," in Proc. Winter Sim. Conf., 2000, pp. 1505-1509.
    • (2000) Proc. Winter Sim. Conf. , pp. 1505-1509
    • Dejong, C.D.1    Fischbein, S.A.2
  • 59
    • 0034429298 scopus 로고    scopus 로고
    • Simulation based comparison of semiconductor AMHS alternatives: Continuous flow versus overhead monorail
    • I. Paprotny, J. Y. Shiau, Y. Huh, and G. T. Mackulak, "Simulation based comparison of semiconductor AMHS alternatives: Continuous flow versus overhead monorail," in Proc. Winter Sim. Conf., 2000, pp. 1333-1338.
    • (2000) Proc. Winter Sim. Conf. , pp. 1333-1338
    • Paprotny, I.1    Shiau, J.Y.2    Huh, Y.3    Mackulak, G.T.4
  • 60
    • 0034427809 scopus 로고    scopus 로고
    • Automated material handling system traffic control by means of node balancing
    • N. Bahri and R. J. Gaskins, "Automated material handling system traffic control by means of node balancing," in Proc. Winter Sim. Conf, 2000, pp. 1344-1346.
    • (2000) Proc. Winter Sim. Conf , pp. 1344-1346
    • Bahri, N.1    Gaskins, R.J.2
  • 61
    • 0034428150 scopus 로고    scopus 로고
    • Simulation based decision support for future 300 mm automated material handling
    • M. Schulz, T. D. Stanley, and B. Renelt, "Simulation based decision support for future 300 mm automated material handling," in Proc. Winter Sim. Conf., 2000, pp. 1518-1522.
    • (2000) Proc. Winter Sim. Conf. , pp. 1518-1522
    • Schulz, M.1    Stanley, T.D.2    Renelt, B.3
  • 62
    • 0036923657 scopus 로고    scopus 로고
    • Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication
    • J. Jimenez, B. Kim, J. Fowler, G. Mackulak, and Y. I. Choung, "Operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication," in Proc. Winter Sim. Conf., 2002, pp. 137-1382.
    • (2002) Proc. Winter Sim. Conf. , pp. 137-1382
    • Jimenez, J.1    Kim, B.2    Fowler, J.3    Mackulak, G.4    Choung, Y.I.5
  • 63
    • 1642477910 scopus 로고    scopus 로고
    • A simulation-based design framework for automated material handling systems in 300 mm fabrication facilities
    • D. Nazzal and D. A. Bodner, "A simulation-based design framework for automated material handling systems in 300 mm fabrication facilities," in Proc. Winter Sim. Conf., pp. 1351-1359.
    • Proc. Winter Sim. Conf. , pp. 1351-1359
    • Nazzal, D.1    Bodner, D.A.2
  • 64
    • 1642587713 scopus 로고    scopus 로고
    • Performance evaluation of an automated material handling system for a wafer fab
    • F. K. Wang and J. T. Lin, "Performance evaluation of an automated material handling system for a wafer fab," Robotics Comput. Integrated Manufact., vol. 20, pp. 91-100, 2004.
    • (2004) Robotics Comput. Integrated Manufact. , vol.20 , pp. 91-100
    • Wang, F.K.1    Lin, J.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.