메뉴 건너뛰기




Volumn 26, Issue 6, 2003, Pages 60-64

Trends in 300 mm factory automation

Author keywords

[No Author keywords available]

Indexed keywords

FACTORY OPERATION SYSTEM (FOS); FRONT-OPENING UNIFIED POD (FOUP); MATERIAL CONTROL SYSTEM (MCS); OVERHEAD HOIST TRANSPORT (OHT);

EID: 2142811512     PISSN: 01633767     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (10)

References (7)
  • 2
    • 3142606616 scopus 로고    scopus 로고
    • 300 mm wafer factory automation and the logistics infrastructure challenge
    • June 29
    • L. Foster, "300 mm Wafer Factory Automation and the Logistics Infrastructure Challenge," Future Fab, June 29, 2001.
    • (2001) Future Fab
    • Foster, L.1
  • 3
    • 0035360452 scopus 로고    scopus 로고
    • Integration key for 300 mm fab automation
    • June
    • C. Harris, "Integration Key for 300 mm Fab Automation," Semiconductor International, June 2001, p. 85.
    • (2001) Semiconductor International , pp. 85
    • Harris, C.1
  • 5
    • 3142534306 scopus 로고    scopus 로고
    • Pushing the limits of factory automation
    • July
    • K. Hurley, "Pushing the Limits of Factory Automation," Semiconductor Fabtech, July 2000.
    • (2000) Semiconductor Fabtech
    • Hurley, K.1
  • 6
    • 3142638530 scopus 로고    scopus 로고
    • A comparison of AMHS delivery-models in the fab of the future
    • July
    • T. Inoue, "A Comparison of AMHS Delivery-Models in the Fab of the Future," Future Fab, July 2002.
    • (2002) Future Fab
    • Inoue, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.