메뉴 건너뛰기




Volumn 38, Issue 16, 2000, Pages 3913-3935

Unidirectional circular layout for overhead material handling systems

Author keywords

[No Author keywords available]

Indexed keywords

CONTROL SYSTEM ANALYSIS; COSTS; DYNAMIC PROGRAMMING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0034634803     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540050176085     Document Type: Article
Times cited : (33)

References (24)
  • 1
    • 0029375614 scopus 로고
    • Evaluation of the tandem configuration automated guided vehicle system
    • Bischak, D.P. and Stevens, K.B. Jr., 1995, Evaluation of the tandem configuration automated guided vehicle system. Production Planning and Control, 6, 438-444.
    • (1995) Production Planning and Control , vol.6 , pp. 438-444
    • Bischak, D.P.1    Stevens K.B., Jr.2
  • 2
    • 0026117415 scopus 로고
    • Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops
    • Bozer, Y.A. and Srinivasan, M.M., 1991, Tandem configurations for automated guided vehicle systems and the analysis of single vehicle loops, IIE Transactions, 23, 72-82.
    • (1991) IIE Transactions , vol.23 , pp. 72-82
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 3
    • 0026966782 scopus 로고
    • Tandem AGV systems: A partitioning algorithm and performance comparison with conventional AGV systems
    • Bozer, Y.A. and Srinivasan, M.M., 1992, Tandem AGV systems: a partitioning algorithm and performance comparison with conventional AGV systems. European Journal of Operational Research, 63, 173-191.
    • (1992) European Journal of Operational Research , vol.63 , pp. 173-191
    • Bozer, Y.A.1    Srinivasan, M.M.2
  • 5
    • 0345504726 scopus 로고    scopus 로고
    • Design and operation of single-loop dualrail interbay material handling system
    • Chen, M.E., McGinnis, L. and Zhou, C., 1999, Design and operation of single-loop dualrail interbay material handling system. International Journal of Production Research, 37, 2217-2237.
    • (1999) International Journal of Production Research , vol.37 , pp. 2217-2237
    • Chen, M.E.1    McGinnis, L.2    Zhou, C.3
  • 6
    • 0028490593 scopus 로고
    • Traditional and tandem AGV system layouts: A simulation study
    • Choi, H.G., Kwon, H.J. and Lee, J., 1994, Traditional and tandem AGV system layouts: a simulation study. Simulation, 63, 85-93.
    • (1994) Simulation , vol.63 , pp. 85-93
    • Choi, H.G.1    Kwon, H.J.2    Lee, J.3
  • 9
    • 0031140607 scopus 로고    scopus 로고
    • The multi-bay manufacturing facility layout problem
    • Meller, R.D., 1997, The multi-bay manufacturing facility layout problem. International Journal of Production Research, 35, 1229-1237.
    • (1997) International Journal of Production Research , vol.35 , pp. 1229-1237
    • Meller, R.D.1
  • 10
    • 0032119904 scopus 로고    scopus 로고
    • Fab layout design methodology: Case of the 300 mm fabs
    • July
    • Meyersdorf, D., 1998, Fab layout design methodology: case of the 300 mm fabs. Semiconductor International, July, 187-196.
    • (1998) Semiconductor International , pp. 187-196
    • Meyersdorf, D.1
  • 11
    • 0031200370 scopus 로고    scopus 로고
    • Integrated facility layout and material handling system design in semiconductor fabrication facilities
    • Peters, B.A. and Yang, T., 1997, Integrated facility layout and material handling system design in semiconductor fabrication facilities. IEEE Transactions on Semiconductor Manufacturing, 10, 360-369.
    • (1997) IEEE Transactions on Semiconductor Manufacturing , vol.10 , pp. 360-369
    • Peters, B.A.1    Yang, T.2
  • 12
    • 0031165530 scopus 로고    scopus 로고
    • Automation-centric processing bay layout
    • June
    • Schroeder, J.P., 1997, Automation-centric processing bay layout. Semiconductor International, June, 209-214.
    • (1997) Semiconductor International , pp. 209-214
    • Schroeder, J.P.1
  • 13
    • 0025417539 scopus 로고
    • An analytical method for configuring fixed-path, closed-loop material handling systems
    • Sharp, G.P. and Liu, F.H., 1990, An analytical method for configuring fixed-path, closed-loop material handling systems. International Journal of Production Research, 28, 757-783.
    • (1990) International Journal of Production Research , vol.28 , pp. 757-783
    • Sharp, G.P.1    Liu, F.H.2
  • 14
    • 0026938781 scopus 로고
    • The impact of empty vehicle flow on the performance of single-loop AGV guide paths
    • Sinriech, D. and Tanchoco, J.M.A., 1992a, The impact of empty vehicle flow on the performance of single-loop AGV guide paths. International Journal of Production Research, 30, 2237-2252.
    • (1992) International Journal of Production Research , vol.30 , pp. 2237-2252
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 15
    • 0000331266 scopus 로고
    • Location of pick-up/delivery stations in single-loop AGV systems
    • Sinriech, D. and Tanchoco, J.M.A., 1992b, Location of pick-up/delivery stations in single-loop AGV systems. Journal of Manufacturing Systems, 11, 297-307.
    • (1992) Journal of Manufacturing Systems , vol.11 , pp. 297-307
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 17
    • 0031117220 scopus 로고    scopus 로고
    • Design procedures and implementation of the segmented flow topology (SFT) for discrete material flow systems
    • Sinriech, D. and Tanchoco, J.M.A., 1997, Design procedures and implementation of the segmented flow topology (SFT) for discrete material flow systems, IIE Transactions, 29, 323-335.
    • (1997) IIE Transactions , vol.29 , pp. 323-335
    • Sinriech, D.1    Tanchoco, J.M.A.2
  • 20
    • 0011755829 scopus 로고    scopus 로고
    • Optimal bi-directional spine layout for overhead material handling systems
    • to appear
    • Ting, J.H. and Tanchoco, J.M.A., 2000, Optimal bi-directional spine layout for overhead material handling systems. IEEE Trans. Semiconductor Manufacturing (to appear).
    • (2000) IEEE Trans. Semiconductor Manufacturing
    • Ting, J.H.1    Tanchoco, J.M.A.2
  • 23
    • 0028407569 scopus 로고
    • Performance evaluation of tandem and conventional AGV systems using generalized stochastic petri nets
    • Wang, H.P.B. and Hafeez, S.A., 1994, Performance evaluation of tandem and conventional AGV systems using generalized stochastic petri nets. International Journal of Production Research, 32, 917-932.
    • (1994) International Journal of Production Research , vol.32 , pp. 917-932
    • Wang, H.P.B.1    Hafeez, S.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.