메뉴 건너뛰기




Volumn 12, Issue 2, 2015, Pages 690-700

Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Author keywords

Branch and bound (B B) algorithm; cluster tool; noncyclic scheduling; Petri net

Indexed keywords

ALGORITHMS; BRANCH AND BOUND METHOD; CLUSTERING ALGORITHMS; MATERIALS HANDLING; PETRI NETS; SCHEDULING ALGORITHMS; SEMICONDUCTOR DEVICE MANUFACTURE; TOOLS;

EID: 85027947961     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2013.2293552     Document Type: Article
Times cited : (93)

References (52)
  • 1
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach
    • Aug.
    • M. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach," IEEE Trans. Semicond. Manuf., vol. 11, no. 3, pp. 333-357, Aug. 1998.
    • (1998) IEEE Trans. Semicond. Manuf. , vol.11 , Issue.3 , pp. 333-357
    • Zhou, M.1    Jeng, M.D.2
  • 3
    • 84864684799 scopus 로고    scopus 로고
    • Cyclic scheduling of cluster tools with nonidentical chamber access times between parallel chambers
    • Aug.
    • D.-K. Kim, Y.-J. Jung, C. Jung, and T.-E. Lee, "Cyclic scheduling of cluster tools with nonidentical chamber access times between parallel chambers," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 420-431, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 420-431
    • Kim, D.-K.1    Jung, Y.-J.2    Jung, C.3    Lee, T.-E.4
  • 4
    • 84880197775 scopus 로고    scopus 로고
    • Scheduling dual-armed cluster tools with cleaning processes
    • H. Kim, H.-J. Kim, J.-H. Lee, and T.-E. Lee, "Scheduling dual-armed cluster tools with cleaning processes," Int. J. Prod. Res., vol. 51, no. 12, pp. 3671-3687, 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3671-3687
    • Kim, H.1    Kim, H.-J.2    Lee, J.-H.3    Lee, T.-E.4
  • 5
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • May
    • N. Wu, C. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
    • (2008) IEEE Trans. Semicond. Manuf. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.C.4
  • 6
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr.
    • N. Wu and M. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng. , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.1    Zhou, M.2
  • 7
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr.
    • N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.1    Zhou, M.2
  • 8
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • Feb.
    • N. Wu and M. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
    • (2010) IEEE Trans. Semicond. Manuf. , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.1    Zhou, M.2
  • 9
    • 84864687325 scopus 로고    scopus 로고
    • Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation
    • Aug.
    • Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 432-446
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 10
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul.
    • Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 11
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • Oct.
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 12
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • Aug.
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 13
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variations by an extended Petri net
    • Jul.
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variations by an extended Petri net," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 14
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan.
    • N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.1    Zhou, M.2
  • 15
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • Oct.
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 16
    • 84887067395 scopus 로고    scopus 로고
    • Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern. Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
    • (2013) IEEE Trans. Syst., Man, Cybern. Syst. , vol.43 , Issue.1 , pp. 196-207
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 17
    • 84873384586 scopus 로고    scopus 로고
    • A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
    • Feb.
    • Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
    • (2013) IEEE Trans. Semicond. Manuf. , vol.26 , Issue.1 , pp. 100-110
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 18
    • 84887074610 scopus 로고    scopus 로고
    • A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting
    • Sep.
    • N. Wu, M. Zhou, F. Chu, and C. Chu, "A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern. Syst., vol. 43, no. 5, pp. 1182-1194, Sep. 2013.
    • (2013) IEEE Trans. Syst., Man, Cybern. Syst. , vol.43 , Issue.5 , pp. 1182-1194
    • Wu, N.1    Zhou, M.2    Chu, F.3    Chu, C.4
  • 19
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 20
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flow
    • May
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flow," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 21
    • 84860664318 scopus 로고    scopus 로고
    • An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
    • May
    • C. Jung and T.-E. Lee, "An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, May 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 22
    • 84920716049 scopus 로고    scopus 로고
    • A branch and bound algorithm for cyclic scheduling of timed Petri nets
    • C. Jung, H.-J. Kim, and T.-E. Lee, "A branch and bound algorithm for cyclic scheduling of timed Petri nets," IEEE Trans. Autom. Sci. Eng., DOI: 10.1109/TASE.2013.2285221.
    • IEEE Trans. Autom. Sci. Eng.
    • Jung, C.1    Kim, H.-J.2    Lee, T.-E.3
  • 26
    • 84871811802 scopus 로고    scopus 로고
    • Scheduling cluster tools with ready time constraints for consecutive small lots
    • Jan.
    • H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 145-159
    • Kim, H.-J.1    Lee, J.-H.2    Jung, C.3    Lee, T.-E.4
  • 27
    • 84892570718 scopus 로고    scopus 로고
    • Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using Pareto-optimal optimization
    • Jul.
    • U. Wikborg and T.-E. Lee, "Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using Pareto-optimal optimization," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 3, pp. 699-710, Jul. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.3 , pp. 699-710
    • Wikborg, U.1    Lee, T.-E.2
  • 28
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct.
    • W. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.1
  • 29
    • 85023501284 scopus 로고    scopus 로고
    • Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation
    • T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation," Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.10 , pp. 2785-2795
    • Kim, T.-K.1    Jung, C.2    Lee, T.-E.3
  • 31
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using Petri nets and heuristic search
    • Apr.
    • D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri nets and heuristic search," IEEE Trans. Robot. Autom., vol. 10, no. 2, pp. 123-132, Apr. 1994.
    • (1994) IEEE Trans. Robot. Autom. , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 33
    • 84861189470 scopus 로고    scopus 로고
    • Deadlock-free genetic scheduling algorithm for automated manufacturing systems based on deadlock control policy
    • Jun.
    • K. Xing, L. Han, M. Zhou, and F. Wang, "Deadlock-free genetic scheduling algorithm for automated manufacturing systems based on deadlock control policy," IEEE Trans. Syst., Man, Cybern., Part B: Cybern., vol. 42, no. 3, pp. 603-615, Jun. 2012.
    • (2012) IEEE Trans. Syst., Man, Cybern., Part B: Cybern. , vol.42 , Issue.3 , pp. 603-615
    • Xing, K.1    Han, L.2    Zhou, M.3    Wang, F.4
  • 34
    • 0025671258 scopus 로고
    • Deadlock prevention and deadlock avoidance in flexible manufacturing systems using Petri net models
    • Dec.
    • N. Viswanadham, Y. Narahari, and T. L. Johnson, "Deadlock prevention and deadlock avoidance in flexible manufacturing systems using Petri net models," IEEE Trans. Robot. Autom., vol. 6, no. 6, pp. 713-723, Dec. 1990.
    • (1990) IEEE Trans. Robot. Autom. , vol.6 , Issue.6 , pp. 713-723
    • Viswanadham, N.1    Narahari, Y.2    Johnson, T.L.3
  • 35
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • Feb.
    • A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Autom., vol. 18, no. 1, pp. 69-80, Feb. 2002.
    • (2002) IEEE Trans. Robot. Autom. , vol.18 , Issue.1 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 36
    • 74549120245 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
    • A. Che, P. Yan, N. Yang, and C. Chu, "Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times," Int. J. Prod. Res., vol. 48, no. 5, pp. 1225-1243, 2010.
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.5 , pp. 1225-1243
    • Che, A.1    Yan, P.2    Yang, N.3    Chu, C.4
  • 37
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
    • Jan.
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 38
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations
    • Jan.
    • W. K. V. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.K.V.1    Ding, S.2    Yi, J.3    Song, D.4
  • 39
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 40
    • 78651080378 scopus 로고    scopus 로고
    • Productivity improvement from using machine buffers in dual-gripper cluster tools
    • Jan.
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 29-41
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 42
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and application
    • T. Murata, "Petri nets: Properties, analysis and application," Proc. IEEE, vol. 77, no. 4, pp. 541-580, 1989.
    • (1989) Proc. IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 43
    • 0028378348 scopus 로고
    • Petri nets for modeling of dynamic systems - A survey
    • R. Divid and H. Alla, "Petri nets for modeling of dynamic systems - A survey," Automatica, vol. 30, no. 2, pp. 175-202, 1994.
    • (1994) Automatica , vol.30 , Issue.2 , pp. 175-202
    • Divid, R.1    Alla, H.2
  • 44
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A tutorial
    • Dec.
    • R. Zurawski and M. Zhou, "Petri nets and industrial applications: A tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, Dec. 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.2
  • 45
    • 0032630279 scopus 로고    scopus 로고
    • Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
    • May
    • N. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model," IEEE Trans. Syst., Man, Cybern., Part C: Appl. Rev., vol. 29, no. 2, pp. 192-204, May 1999.
    • (1999) IEEE Trans. Syst., Man, Cybern., Part C: Appl. Rev. , vol.29 , Issue.2 , pp. 192-204
    • Wu, N.1
  • 47
    • 28244447024 scopus 로고    scopus 로고
    • Scheduling dual gripper robotic cells: One-unit cycles
    • I. Drobouchevitch, S. Sethi, and C. Sriskandarajah, "Scheduling dual gripper robotic cells: One-unit cycles," Eur. J. Oper. Res., vol. 171, no. 2, pp. 598-631, 2006.
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.2 , pp. 598-631
    • Drobouchevitch, I.1    Sethi, S.2    Sriskandarajah, C.3
  • 48
    • 0039770263 scopus 로고
    • An implicit enumeration algorithm for the machine sequencing problem
    • M. Florian, P. Trepant, and G. McMahon, "An implicit enumeration algorithm for the machine sequencing problem," Manage. Sci., vol. 17, no. 12, pp. 782-792, 1971.
    • (1971) Manage. Sci. , vol.17 , Issue.12 , pp. 782-792
    • Florian, M.1    Trepant, P.2    McMahon, G.3
  • 49
    • 0020178733 scopus 로고
    • The one-machine sequencing problem
    • J. Carlier, "The one-machine sequencing problem," Eur. J. Oper. Res., vol. 11, no. 1, pp. 42-47, 1982.
    • (1982) Eur. J. Oper. Res. , vol.11 , Issue.1 , pp. 42-47
    • Carlier, J.1
  • 50
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop problem
    • J. Carlier and E. Pinson, "An algorithm for solving the job-shop problem," Manage. Sci., vol. 35, no. 2, pp. 164-176, 1989.
    • (1989) Manage. Sci. , vol.35 , Issue.2 , pp. 164-176
    • Carlier, J.1    Pinson, E.2
  • 51
    • 84880234285 scopus 로고    scopus 로고
    • Modeling and simulation of automated manufacturing systems for evaluation of complex schedules
    • C. Kim and T.-E. Lee, "Modeling and simulation of automated manufacturing systems for evaluation of complex schedules," Int. J. Prod. Res., vol. 51, no. 12, pp. 3734-3747, 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3734-3747
    • Kim, C.1    Lee, T.-E.2
  • 52
    • 35248854880 scopus 로고    scopus 로고
    • The Petri net markup language: Concepts, technology, and tools
    • J. Billington et al., "The Petri net markup language: Concepts, technology, and tools," Appl. Theory of Petri Nets, vol. 2679, pp. 483-505, 2003.
    • (2003) Appl. Theory of Petri Nets , vol.2679 , pp. 483-505
    • Billington, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.