-
1
-
-
0025430281
-
Integrated processing equipment
-
M. Bader, R. Hall, and G. Strasser, "Integrated processing equipment," Solid State Technol., vol. 33, no. 5, pp. 149-154, 1990.
-
(1990)
Solid State Technol
, vol.33
, Issue.5
, pp. 149-154
-
-
Bader, M.1
Hall, R.2
Strasser, G.3
-
2
-
-
33747465464
-
Coping with the high cost of wafer fabs
-
P. Burggraaf, "Coping with the high cost of wafer fabs," Semicond. Int., vol. 38, pp. 45-50, 1995.
-
(1995)
Semicond. Int
, vol.38
, pp. 45-50
-
-
Burggraaf, P.1
-
3
-
-
17644374193
-
Multi-degree cyclic scheduling of two robots in a nowait flowshop
-
Apr
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a nowait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 2, pp. 173-183, Apr. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng
, vol.2
, Issue.2
, pp. 173-183
-
-
Che, A.1
Chu, C.2
-
4
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
Jul
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectr., vol. 29, no. 3, pp. 445-470, Jul. 2007.
-
(2007)
OR Spectr
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
5
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
Feb
-
H. X. Chen, C. B. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Autom., vol. 14, no. 1, pp. 144-152, Feb. 1998.
-
(1998)
IEEE Trans. Robot. Autom
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.X.1
Chu, C.B.2
Proth, J.-M.3
-
6
-
-
33747443542
-
Scheduling multi-cluster tools: An integrated event graph and network model approach
-
Aug
-
S. Ding, J. Yi, and M. Zhang, "Scheduling multi-cluster tools: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.3
-
7
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
Aug
-
V. Kats, E. Levner, and L. Mayzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol. 15, no. 4, pp. 704-713, Aug. 1999.
-
(1999)
IEEE Trans. Robot. Autom
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Mayzin, L.3
-
8
-
-
0041384559
-
Scheduling analysis of timed-constrained dual-armed cluster tools
-
Aug
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
9
-
-
33646717079
-
Scheduling single-arm cluster tools with reentrant wafer flows
-
May
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-arm cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
-
(2006)
IEEE Trans. Semicond. Manuf
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
10
-
-
27644434964
-
An extended event graph with negative places and tokens for timed window constraints
-
Oct
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for timed window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
11
-
-
0038077627
-
Cluster tools, Part 1: Emerging processes
-
T. K. McNab, "Cluster tools, Part 1: Emerging processes," Semicond. Int., vol. 13, no. 9, pp. 58-63, 1990.
-
(1990)
Semicond. Int
, vol.13
, Issue.9
, pp. 58-63
-
-
McNab, T.K.1
-
12
-
-
0024645936
-
Petri nets: Properties, analysis and applications
-
Apr
-
T. Murata, "Petri nets: Properties, analysis and applications," Proc. IEEE, vol. 77, no. 4, pp. 541-580, Apr. 1989.
-
(1989)
Proc IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
13
-
-
0025457170
-
Cluster tools: A process solution
-
B. Newboe, "Cluster tools: A process solution," Semicond. Int., vol. 13, no. 8, pp. 82-88, 1990.
-
(1990)
Semicond. Int
, vol.13
, Issue.8
, pp. 82-88
-
-
Newboe, B.1
-
14
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
Aug
-
T. L. Perkinson, P. K. MacLarty, R. S. Gyurcsik, and R. K. Cavin, III, "Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semicond. Manuf., vol. 7, no. 3, pp. 369-373, Aug. 1994.
-
(1994)
IEEE Trans. Semicond. Manuf
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.L.1
Maclarty, P.K.2
Gyurcsik, R.S.3
Cavin Iii., R.K.4
-
15
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput
-
Aug
-
T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput," IEEE Trans. Semicond. Manuf., vol. 9, no. 3, pp. 384-400, Aug. 1996.
-
(1996)
IEEE Trans. Semicond. Manuf
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, R.S.2
Maclarty, P.K.3
-
16
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
17
-
-
0035334186
-
Modeling and implementing a real-time scheduler for dual-armed cluster tools
-
May
-
Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol. 45, no. 1, pp. 13-27, May 2001.
-
(2001)
Comput. Ind
, vol.45
, Issue.1
, pp. 13-27
-
-
Shin, Y.-H.1
Lee, T.-E.2
Kim, J.-H.3
Lee, H.-Y.4
-
18
-
-
0029342264
-
The driving forces in cluster tool development
-
P. Singer, "The driving forces in cluster tool development," Semicond. Int., vol. 18, no. 8, pp. 113-118, 1995.
-
(1995)
Semicond. Int
, vol.18
, Issue.8
, pp. 113-118
-
-
Singer, P.1
-
19
-
-
0031276238
-
A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semicond. Manuf
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
20
-
-
67650690609
-
An effective algorithm to find elementary siphons in a class of Petri nets
-
Jul
-
A. R.Wang, Z.W. Li, J. Y. Jia, andM. C. Zhou, "An effective algorithm to find elementary siphons in a class of Petri nets," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 39, no. 4, pp. 912-923, Jul. 2009.
-
(2009)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.39
, Issue.4
, pp. 912-923
-
-
Wang, A.R.1
Li, Z.W.2
Jia, J.Y.3
Zhou, M.C.4
-
21
-
-
0032630279
-
Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
-
May
-
N. Q. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model," IEEE Trans. Syst.,Man, Cybern. C, Appl. Rev., vol. 29, no. 2, pp. 192-204, May 1999.
-
(1999)
IEEE Trans. Syst.,Man, Cybern. C, Appl. Rev
, vol.29
, Issue.2
, pp. 192-204
-
-
Wu, N.Q.1
-
22
-
-
0035485815
-
Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model
-
Oct
-
N. Q. Wu and M. C. Zhou, "Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 658-669, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom
, vol.17
, Issue.5
, pp. 658-669
-
-
Wu, N.Q.1
Zhou, M.C.2
-
23
-
-
1942518458
-
Modeling and deadlock control of automated guided vehicle systems
-
N. Q. Wu and M. C. Zhou, "Modeling and deadlock control of automated guided vehicle systems," IEEE/ASME Trans. Mechatronics, vol. 9, no. 1, pp. 50-57, Mar. 2004.
-
(2004)
IEEE/ASME Trans. Mechatronics Mar
, vol.9
, Issue.1
, pp. 50-57
-
-
Wu, N.Q.1
Zhou, M.C.2
-
24
-
-
29144513578
-
Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles
-
Dec
-
N. Q. Wu and M. C. Zhou, "Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 35, no. 6, pp. 1193-1202, Dec. 2005.
-
(2005)
IEEE Trans. Syst., Man, Cybern. B, Cybern
, vol.35
, Issue.6
, pp. 1193-1202
-
-
Wu, N.Q.1
Zhou, M.C.2
-
25
-
-
34547426517
-
Deadlock resolution in automated manufacturing systems with robots
-
Jul
-
N. Q. Wu and M. C. Zhou, "Deadlock resolution in automated manufacturing systems with robots," IEEE Trans. Autom. Sci. Eng., vol. 4, no. 3, pp. 474-480, Jul. 2007.
-
(2007)
IEEE Trans. Autom. Sci. Eng
, vol.4
, Issue.3
, pp. 474-480
-
-
Wu, N.Q.1
Zhou, M.C.2
-
26
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
May
-
N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
-
(2008)
IEEE Trans. Semicond. Manuf
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.Q.1
Chu, C.B.2
Chu, F.3
Zhou, M.C.4
-
27
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr.
-
N. Q.Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Autom. Sci. Eng
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.Q.1
Zhou, M.C.2
-
28
-
-
77955311048
-
Process vs resource-oriented Petri net modeling of automated manufacturing systems
-
May
-
N. Q.Wu and M. C. Zhou, "Process vs resource-oriented Petri net modeling of automated manufacturing systems," Asian J. Control, vol. 12, no. 3, pp. 267-280, May 2010.
-
(2010)
Asian J. Control
, vol.12
, Issue.3
, pp. 267-280
-
-
Wu, N.Q.1
Zhou, M.C.2
-
29
-
-
77955321056
-
Colored timed Petri nets for modeling and analysis of cluster tools
-
May
-
N. Q. Wu and M. C. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools," Asian J. Control, vol. 12, no. 3, pp. 253-266, May 2010.
-
(2010)
Asian J. Control
, vol.12
, Issue.3
, pp. 253-266
-
-
Wu, N.Q.1
Zhou, M.C.2
-
30
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Q.Wu, F. Chu, C. B. Chu, andM. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.B.3
Zhou, M.C.4
-
31
-
-
58149136242
-
Optimal Petri net-based polynomial-complexity deadlock avoidance policies for automated manufacturing systems
-
Jan
-
K. Xing, M. C. Zhou, X. Yang, and F. Tian, "Optimal Petri net-based polynomial-complexity deadlock avoidance policies for automated manufacturing systems," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 39, no. 1, pp. 188-199, Jan. 2009.
-
(2009)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.39
, Issue.1
, pp. 188-199
-
-
Xing, K.1
Zhou, M.C.2
Yang, X.3
Tian, F.4
-
32
-
-
77249176545
-
A Petri net approach to analysis and composition of web services
-
Mar.
-
P. C. Xiong, Y. Fan, andM. C. Zhou, "A Petri net approach to analysis and composition of web services," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 40, no. 2, pp. 376-387, Mar. 2010.
-
(2010)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.40
, Issue.2
, pp. 376-387
-
-
Xiong, P.C.1
Fan, Y.2
Zhou, M.C.3
-
33
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
Apr
-
J. Yi, S. Ding, D. Song, and M. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.4
-
34
-
-
25144432280
-
On-line scheduling of integrated singlewafer processing tools with temporal constraints
-
Aug
-
H. J. Yoon and D. Y. Lee, "On-line scheduling of integrated singlewafer processing tools with temporal constraints," IEEE Trans. Semicond. Manuf., vol. 18, no. 3, pp. 390-398, Aug. 2005.
-
(2005)
IEEE Trans. Semicond. Manuf
, vol.18
, Issue.3
, pp. 390-398
-
-
Yoon, H.J.1
Lee, D.Y.2
-
36
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
37
-
-
4344571843
-
Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets
-
Aug
-
W. M. Zuberek, "Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
-
(2004)
IEEE Trans. Semicond. Manuf
, vol.17
, Issue.3
, pp. 333-344
-
-
Zuberek, W.M.1
|