메뉴 건너뛰기




Volumn 17, Issue 5, 2001, Pages 609-618

An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints

Author keywords

Cluster tool; Residency constraint; Robotics; Scheduling; Semiconductor manufacturing

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; COST EFFECTIVENESS; HEURISTIC METHODS; NORMAL DISTRIBUTION; PROCESS CONTROL; ROBOTIC ARMS; ROBOTICS; SCHEDULING; THROUGHPUT;

EID: 0035485501     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.964662     Document Type: Article
Times cited : (167)

References (14)
  • 10
    • 0003569152 scopus 로고    scopus 로고
    • A proof: The cyclic hoist scheduling problem in NP-complete
    • Rutgers Univ., New Brunswick, NJ, Working Paper #89-0016, Aug.
    • (1996)
    • Lei, L.1    Wang, T.J.2
  • 11
    • 0000402860 scopus 로고
    • The minimum common-cycle algorithm for cyclic scheduling of two material handling hoist with time window constraints
    • Dec.
    • (1991) Manage. Sci. , vol.37 , pp. 1629-1639
    • Lei, L.1    Wang, T.J.2
  • 13
    • 0028395989 scopus 로고
    • An algorithm for hoist scheduling problems (PCB electroplating)
    • Mar.
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.3 , pp. 501-516
    • Yih, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.