-
1
-
-
84863232177
-
Cyclic scheduling of cluster tools with non-identical chamber access times
-
D. K. Kim, C. Jung, Y. J. Jung, and T. E. Lee, "Cyclic scheduling of cluster tools with non-identical chamber access times," in Proc. Winter Simulation Conf., 2011, pp. 2073-2084.
-
(2011)
Proc. Winter Simulation Conf.
, pp. 2073-2084
-
-
Kim, D.K.1
Jung, C.2
Jung, Y.J.3
Lee, T.E.4
-
3
-
-
60749114750
-
A review of scheduling theory and methods for semiconductor manufacturing cluster tools
-
T. E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tools," in Proc. Winter Simulation Conf., 2008, pp. 2127-2135.
-
(2008)
Proc. Winter Simulation Conf.
, pp. 2127-2135
-
-
Lee, T.E.1
-
4
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
Aug.
-
T. L. Perkinson, R. S. Gyurcsik, and P. K. McLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput," IEEE Trans. Semicond. Manuf., vol. 9, no. 3, pp. 384-400, Aug. 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, R.S.2
McLarty, P.K.3
-
5
-
-
0031276238
-
A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov.
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semicond. Manuf.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
6
-
-
0035485501
-
An optimal periodic scheduler for dual-Arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-Arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Automat., vol. 17, no. 5, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
7
-
-
0041384559
-
Scheduling analysis of time-constrained dual-Armed cluster tools
-
Aug.
-
J. H. Kim, T. E. Lee, H. Y. Lee, and D. B. Park, "Scheduling analysis of time-constrained dual-Armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.H.1
Lee, T.E.2
Lee, H.Y.3
Park, D.B.4
-
8
-
-
46849094532
-
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
-
Jul.
-
J. H. Kim and T. E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
-
(2008)
IEEE Trans. Automat. Sci. Eng.
, vol.5
, Issue.3
, pp. 490-503
-
-
Kim, J.H.1
Lee, T.E.2
-
9
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-Arm cluster tools with wafer residency time constraints
-
May
-
N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedulability and scheduling problems in single-Arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.4
-
10
-
-
76849088211
-
Analysis of wafer sojourn time in dual-Arm cluster tools with residency time constraint and activity time variation
-
Feb.
-
N. Wu and M. Zhou, "Analysis of wafer sojourn time in dual-Arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.1
Zhou, M.2
-
11
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-Arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr.
-
N. Wu and M. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-Arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Automat. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Automat. Sci. Eng.
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.1
Zhou, M.2
-
12
-
-
0035721526
-
Timed Petri net models of multi-robot cluster tools
-
Oct.
-
W. M. Zuberek, "Timed Petri net models of multi-robot cluster tools," in Proc. IEEE Int. Conf. Syst., Man, Cybern., vol. 4. Oct. 2001, pp. 2729-2734.
-
(2001)
Proc. IEEE Int. Conf. Syst., Man, Cybern.
, vol.4
, pp. 2729-2734
-
-
Zuberek, W.M.1
-
13
-
-
4344571843
-
Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets
-
Aug.
-
W. M. Zuberek, "Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
-
(2004)
IEEE Trans. Semicond. Manuf.
, vol.17
, Issue.3
, pp. 333-344
-
-
Zuberek, W.M.1
-
14
-
-
85027957575
-
Petri net-based scheduling of single-Arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-Arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
15
-
-
78651098378
-
Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
-
Jan.
-
W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
16
-
-
78651094962
-
Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations
-
Jan.
-
W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 17-28
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
17
-
-
78651080378
-
Productivity improvement from using machine buffers in dual-gripper cluster tools
-
Jan.
-
N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 29-41
-
-
Geismar, N.1
Dawande, M.2
Sriskandarajah, C.3
-
18
-
-
33646152358
-
Conflict resolving algorithm to improve productivity in singlewafer processing
-
H. Oh, "Conflict resolving algorithm to improve productivity in singlewafer processing," in Proc. Int. Conf. MASM, 2000, pp. 246-251.
-
(2000)
Proc. Int. Conf. MASM
, pp. 246-251
-
-
Oh, H.1
-
19
-
-
4043145060
-
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
-
H. N. Geismar, M. Dawande, and C. Sriskandarajah, "Robotic cells with parallel machines: Throughput maximization in constant travel-time cells," J. Schedul., vol. 7, no. 5, pp. 375-395, 2004.
-
(2004)
J. Schedul.
, vol.7
, Issue.5
, pp. 375-395
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
20
-
-
54949132214
-
Optimal scheduling of dual-Armed cluster tools without swap restriction
-
Aug.
-
J. H. Paek and T. E. Lee, "Optimal scheduling of dual-Armed cluster tools without swap restriction," in Proc. IEEE Int. Conf. Automat. Sci. Eng., Aug. 2008, pp. 103-108.
-
(2008)
Proc. IEEE Int. Conf. Automat. Sci. Eng.
, pp. 103-108
-
-
Paek, J.H.1
Lee, T.E.2
-
21
-
-
33646731658
-
Workload balancing and scheduling of a single-Armed cluster tool
-
T. E. Lee, H. Y. Lee, and Y. H. Shin, "Workload balancing and scheduling of a single-Armed cluster tool," in Proc. 5th Asia Pacific Industr. Eng. Manag. Syst. Conf., 2004, pp. 1-15.
-
(2004)
Proc. 5th Asia Pacific Industr. Eng. Manag. Syst. Conf.
, pp. 1-15
-
-
Lee, T.E.1
Lee, H.Y.2
Shin, Y.H.3
-
22
-
-
44449176198
-
Throughput analysis of linear cluster tools
-
J. Yi, S. Ding, M. T. Zhang, and P. V. D. Meulen, "Throughput analysis of linear cluster tools," in Proc. IEEE Int. Conf. Automat. Sci. Eng., Sep. 2007, pp. 1063-1068.
-
(2007)
Proc. IEEE Int. Conf. Automat. Sci. Eng., Sep.
, pp. 1063-1068
-
-
Yi, J.1
Ding, S.2
Zhang, M.T.3
Meulen, P.V.D.4
-
23
-
-
0035816116
-
Cycles and permutations in robotic cells
-
N. Brauner and G. Finke "Cycles and permutations in robotic cells," Math. Comput. Model., vol. 34, nos. 5-6, pp. 565-591, 2001.
-
(2001)
Math. Comput. Model.
, vol.34
, Issue.5-6
, pp. 565-591
-
-
Brauner, N.1
Finke, G.2
-
25
-
-
0024645936
-
Petri nets: Properties, analysis and applications
-
Apr.
-
T. Murata, "Petri nets: Properties, analysis and applications," Proc. IEEE, vol. 77, no. 4, pp. 541-580, Apr. 1989.
-
(1989)
Proc. IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
26
-
-
0000136120
-
A parametric critical path problem and an application for cyclic scheduling
-
E. Levner and V. Kats, "A parametric critical path problem and an application for cyclic scheduling," Discrete Appl. Math., vol. 87, no. 1, pp. 149-158, 1998.
-
(1998)
Discrete Appl. Math.
, vol.87
, Issue.1
, pp. 149-158
-
-
Levner, E.1
Kats, V.2
-
27
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama and J. V. D. Klundert, "Cyclic scheduling of identical parts in a robotic cell," Oper. Res., vol. 45, no. 6, pp. 952-965, 1997.
-
(1997)
Oper. Res., vol. 45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Klundert, J.V.D.2
-
28
-
-
0032136168
-
Modeling and performance analysis of cluster tools using Petri nets
-
Aug.
-
R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Trans. Semicond. Manuf., vol. 11, no. 3, pp. 394-403, Aug. 1998.
-
(1998)
IEEE Trans. Semicond. Manuf.
, vol.11
, Issue.3
, pp. 394-403
-
-
Srinivasan, R.S.1
-
29
-
-
0035334186
-
Modeling and implementing a real-time scheduler for dual-Armed cluster tools
-
Y. H. Shin, T. E. Lee, J. H. Kim, and H. Y. Lee, "Modeling and implementing a real-time scheduler for dual-Armed cluster tools," Comput. Indust., vol. 45, no. 1, pp. 13-27, 2001.
-
(2001)
Comput. Indust.
, vol.45
, Issue.1
, pp. 13-27
-
-
Shin, Y.H.1
Lee, T.E.2
Kim, J.H.3
Lee, H.Y.4
-
30
-
-
0035357074
-
Scheduling in dual gripper robotic cells for productivity gains
-
Jun.
-
S. P. Sethi, J. B. Sidney, and C. Sriskandarajah, "Scheduling in dual gripper robotic cells for productivity gains," IEEE Trans. Robot. Automat., vol. 17, no. 3, pp. 324-341, Jun. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.3
, pp. 324-341
-
-
Sethi, S.P.1
Sidney, J.B.2
Sriskandarajah, C.3
-
31
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach
-
Apr.
-
J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
-
(2008)
IEEE Trans. Automat. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
|