메뉴 건너뛰기




Volumn 5, Issue 3, 2008, Pages 490-503

Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended petri net

Author keywords

Cluster tool; Petri net; Scheduling; Time constraint; Time variation; Wafer delay

Indexed keywords

FISH; GRAPH THEORY; LOW PRESSURE CHEMICAL VAPOR DEPOSITION; METALLIZING; OPTICAL DESIGN; PETRI NETS; THEOREM PROVING; TOOLS;

EID: 46849094532     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2007.912716     Document Type: Article
Times cited : (136)

References (41)
  • 1
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • Oct
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol. 17, pp. 609-618, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom , vol.17 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 2
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling of dualarmed cluster tools with time constraints
    • Aug
    • J.-H. Kim. T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling of dualarmed cluster tools with time constraints," IEEE Trans. Semiconduct. Manuf., vol. 16, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semiconduct. Manuf , vol.16 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 3
    • 0025510962 scopus 로고
    • Statistical equipment modeling for VLSI manufacturing: An application for LPCVD
    • Nov
    • K.-K. Lin and C. J. Spanos, "Statistical equipment modeling for VLSI manufacturing: An application for LPCVD," IEEE Trans. Semiconduct. Manuf, vol. 3, pp. 216-229, Nov. 1990.
    • (1990) IEEE Trans. Semiconduct. Manuf , vol.3 , pp. 216-229
    • Lin, K.-K.1    Spanos, C.J.2
  • 6
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • H. Chen. C. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Autom., vol. 14, no. 1, pp. 144-152, 1998.
    • (1998) IEEE Trans. Robot. Autom , vol.14 , Issue.1 , pp. 144-152
    • Chen, H.1    Chu, C.2    Proth, J.-M.3
  • 7
    • 1242307786 scopus 로고    scopus 로고
    • Cluster tool module communication based on a high-level fieldbus
    • J.-H. Lee. T.-E. Lee, and J.-H. Park, "Cluster tool module communication based on a high-level fieldbus," Int. J. Comput. Integr. Manuf. vol. 17, no. 2, pp. 151-170, 2004.
    • (2004) Int. J. Comput. Integr. Manuf , vol.17 , Issue.2 , pp. 151-170
    • Lee, J.-H.1    Lee, T.-E.2    Park, J.-H.3
  • 8
    • 60749084585 scopus 로고    scopus 로고
    • Operating strategies of cluster tools with intermediate buffers
    • J.-H. Baek and T.-E. Lee, "Operating strategies of cluster tools with intermediate buffers." in Proc. 7th Annu. Int. Conf Ind. Eng., 2002, vol. 7, pp. 1-5.
    • (2002) Proc. 7th Annu. Int. Conf Ind. Eng , vol.7 , pp. 1-5
    • Baek, J.-H.1    Lee, T.-E.2
  • 9
    • 28244475768 scopus 로고    scopus 로고
    • Semiconductor manufacturing process control and monitoring: A fab-wide framework
    • S. J. Qin, G. Cherry, R. Good, J. Wang, and C. A. Harrison, "Semiconductor manufacturing process control and monitoring: A fab-wide framework." J. Process Control, vol. 16, pp. 179-191, 2006.
    • (2006) J. Process Control , vol.16 , pp. 179-191
    • Qin, S.J.1    Cherry, G.2    Good, R.3    Wang, J.4    Harrison, C.A.5
  • 10
    • 0017001923 scopus 로고
    • Recoverability of communication protocols-Implications of a theoretical study
    • Sep
    • P. M. Merlin and D. J. Farber, "Recoverability of communication protocols-Implications of a theoretical study," IEEE Trans. Commun., vol. 24, pp. 1036-1043, Sep. 1976.
    • (1976) IEEE Trans. Commun , vol.24 , pp. 1036-1043
    • Merlin, P.M.1    Farber, D.J.2
  • 12
    • 0005861308 scopus 로고    scopus 로고
    • p-time Petri nets for manufacturing systems with staying time constraints
    • May
    • S. Calvez, P. Aygalinc, and W. Khansa, "p-time Petri nets for manufacturing systems with staying time constraints," in Proc. IFAC CIS'97 Conf. Control Ind. Syst., May 1997, pp. 495-500.
    • (1997) Proc. IFAC CIS'97 Conf. Control Ind. Syst , pp. 495-500
    • Calvez, S.1    Aygalinc, P.2    Khansa, W.3
  • 14
    • 0029184479 scopus 로고
    • Timing constraint Petri nets and their application to schedulability analysis of real-time system specifications
    • J. J. P. Tsai, S. J. Yang, and Y.-H. Chang, "Timing constraint Petri nets and their application to schedulability analysis of real-time system specifications," IEEE Trans. Softw. Eng., vol. 21, no. 1, pp. 32-49, 1995.
    • (1995) IEEE Trans. Softw. Eng , vol.21 , Issue.1 , pp. 32-49
    • Tsai, J.J.P.1    Yang, S.J.2    Chang, Y.-H.3
  • 15
    • 0033691256 scopus 로고    scopus 로고
    • Dynamic dispatching of cyclic real-time tasks with relative timing constraints
    • S. Choi and A. K. Agrawala, "Dynamic dispatching of cyclic real-time tasks with relative timing constraints." Int. J. Time-Critical Comput. Syst., vol. 19, pp. 5-40, 2000.
    • (2000) Int. J. Time-Critical Comput. Syst , vol.19 , pp. 5-40
    • Choi, S.1    Agrawala, A.K.2
  • 16
    • 0035333368 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a robotic processing line with two-product and time-window constraints
    • May
    • L. Lei and Q. Liu, "Optimal cyclic scheduling of a robotic processing line with two-product and time-window constraints," INFOR, vol. 39, pp. 185-199, May 2001.
    • (2001) INFOR , vol.39 , pp. 185-199
    • Lei, L.1    Liu, Q.2
  • 17
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and negative tokens for time window constraints
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and negative tokens for time window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2. no. 4, pp. 319-332, 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 18
    • 33847040478 scopus 로고    scopus 로고
    • Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
    • T.-E. Lee, H.-Y. Lee, and S.-J. Lee, "Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots," Int. J. Prod. Res., vol. 45, no. 3, pp. 487-507, 2007.
    • (2007) Int. J. Prod. Res , vol.45 , Issue.3 , pp. 487-507
    • Lee, T.-E.1    Lee, H.-Y.2    Lee, S.-J.3
  • 20
    • 44949269544 scopus 로고
    • Model-checking in dense real-time
    • R. Alur, C. Courcoubetis, and D. L. Dill, "Model-checking in dense real-time," Inf. Comput., vol. 104, no. 1, pp. 2-34, 1993.
    • (1993) Inf. Comput , vol.104 , Issue.1 , pp. 2-34
    • Alur, R.1    Courcoubetis, C.2    Dill, D.L.3
  • 21
    • 0028413052 scopus 로고
    • A theory of timed automata
    • R. Alur and D. L. Dill, "A theory of timed automata." Theoretical Comput. Sci., vol. 126, pp. 183-235, 1994.
    • (1994) Theoretical Comput. Sci , vol.126 , pp. 183-235
    • Alur, R.1    Dill, D.L.2
  • 22
    • 0037097076 scopus 로고    scopus 로고
    • A note on the verification of automata specifications of probabilistic real-time systems
    • Jun
    • A. V. Moura and G. A. Pinto, "A note on the verification of automata specifications of probabilistic real-time systems," Inf. Pmcess. Lett., vol. 82, pp. 223-228, Jun. 2002.
    • (2002) Inf. Pmcess. Lett , vol.82 , pp. 223-228
    • Moura, A.V.1    Pinto, G.A.2
  • 24
    • 84960924881 scopus 로고
    • Interval timed colored peutri nets and their analysis
    • W. Aalst, "Interval timed colored peutri nets and their analysis," Lecture Notes in Computer Science, vol. 691, pp. 453-472, 1993.
    • (1993) Lecture Notes in Computer Science , vol.691 , pp. 453-472
    • Aalst, W.1
  • 26
    • 0031276238 scopus 로고    scopus 로고
    • A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semiconduct. Manuf., vol. 10, no. 4, pp. 418-424, 1997.
    • (1997) IEEE Trans. Semiconduct. Manuf , vol.10 , Issue.4 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 27
    • 0032136168 scopus 로고    scopus 로고
    • Modeling and performance analysis of cluster tools using Petri nets
    • R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Trans. Semiconduct. Manuf. vol. 11, no. 3, pp. 394-403, 1998.
    • (1998) IEEE Trans. Semiconduct. Manuf , vol.11 , Issue.3 , pp. 394-403
    • Srinivasan, R.S.1
  • 28
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, pp. 562-575, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom , vol.17 , pp. 562-575
    • Zuberek, W.M.1
  • 29
    • 0035334186 scopus 로고    scopus 로고
    • Modeling andimple-mentating a real-time scheduler for dual-armed cluster tools
    • Y.-H. Shin, T.-E. Lee. J.-H. Kim, and H.-Y. Lee, "Modeling andimple-mentating a real-time scheduler for dual-armed cluster tools," Comput. Industry, vol. 45, no. 1, pp. 13-27, 2001.
    • (2001) Comput. Industry , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4
  • 30
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting-Modeling and analysis using timed Petri nets
    • W. M. Zuberek, "Cluster tools with chamber revisiting-Modeling and analysis using timed Petri nets," IEEE Trans. Semiconduct. Manuf., vol. 17, no. 3, pp. 333-344, 2004.
    • (2004) IEEE Trans. Semiconduct. Manuf , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1
  • 31
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flows
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flows," IEEE Trons. Semiconduct. Manuf., vol. 19, no. 2, pp. 224-240, 2006.
    • (2006) IEEE Trons. Semiconduct. Manuf , vol.19 , Issue.2 , pp. 224-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 32
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semiconduct. Manuf., vol. 19, no. 3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semiconduct. Manuf , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 33
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach
    • Aug
    • M. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach," IEEE Trans. Semiconduct. Manuf, vol. 11, pp. 333-357, Aug. 1998.
    • (1998) IEEE Trans. Semiconduct. Manuf , vol.11 , pp. 333-357
    • Zhou, M.1    Jeng, M.D.2
  • 34
    • 0025623508 scopus 로고
    • Performance evaluation of automated manufacturing systems using generalized stochastic Petri nets
    • R. Y. Al-Jaar and A. A. Desrochers, "Performance evaluation of automated manufacturing systems using generalized stochastic Petri nets," IEEE Trans. Robot. Autom., vol. 6, no. 6, pp. 621-639, 1990.
    • (1990) IEEE Trans. Robot. Autom , vol.6 , Issue.6 , pp. 621-639
    • Al-Jaar, R.Y.1    Desrochers, A.A.2
  • 35
    • 0034295919 scopus 로고    scopus 로고
    • Reachability analysis of real-time systems using time Petri nets
    • J. Wang, Y. Deng, and G. Xu, "Reachability analysis of real-time systems using time Petri nets," IEEE Trans. Syst., Man, Cybern. - Part B: Cybern., vol. 30, no. 5, pp. 725-436, 2000.
    • (2000) IEEE Trans. Syst., Man, Cybern. - Part B: Cybern , vol.30 , Issue.5 , pp. 725-436
    • Wang, J.1    Deng, Y.2    Xu, G.3
  • 36
    • 0026392461 scopus 로고
    • A Petri net with negative tokens and its application to automated reasoning
    • Aug
    • T. Murata and H. Yamauchi, "A Petri net with negative tokens and its application to automated reasoning," in Proc. 33rd Midwest Symp. CAS. Aug. 1990, pp. 762-765.
    • (1990) Proc. 33rd Midwest Symp. CAS , pp. 762-765
    • Murata, T.1    Yamauchi, H.2
  • 37
    • 0142153994 scopus 로고    scopus 로고
    • Fuzzy timed Petri nets
    • W. Pedrycz and H. Camargo, "Fuzzy timed Petri nets," Fuzzy Sets Syst., vol. 140, no. 2, pp. 301-330, 2003.
    • (2003) Fuzzy Sets Syst , vol.140 , Issue.2 , pp. 301-330
    • Pedrycz, W.1    Camargo, H.2
  • 38
    • 0030488164 scopus 로고    scopus 로고
    • Reduction rules for time Petri nets
    • R. H. Sloan and U. Buy, "Reduction rules for time Petri nets," Acta Informatica, vol. 33, pp. 687-706, 1996.
    • (1996) Acta Informatica , vol.33 , pp. 687-706
    • Sloan, R.H.1    Buy, U.2
  • 39
    • 0031336149 scopus 로고    scopus 로고
    • Reversibility verification of Petri nets using unfoldings
    • T. Miyamoto and S. Kumagai, "Reversibility verification of Petri nets using unfoldings," in Proc. IEEE Int. Conf. Syst., Man, Cybern., 1997, vol. 5, pp. 4272-4278.
    • (1997) Proc. IEEE Int. Conf. Syst., Man, Cybern , vol.5 , pp. 4272-4278
    • Miyamoto, T.1    Kumagai, S.2
  • 41
    • 0344013491 scopus 로고    scopus 로고
    • Schedule stabilization and robust timing control for time-constrained cluster tools
    • Sep
    • J.-H. Kim and T.-E. Lee, "Schedule stabilization and robust timing control for time-constrained cluster tools," in Proc. IEEE Conf. Robot. Autom., Sep. 2003, pp. 1034-1044.
    • (2003) Proc. IEEE Conf. Robot. Autom , pp. 1034-1044
    • Kim, J.-H.1    Lee, T.-E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.