-
1
-
-
0033974208
-
Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor pro cesses
-
J.-K. Lu, F.-H. Ko, T.-C. Chu, Y.-C. Sun, M.-Y. Wang, and T.-K. Wang, "Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor pro cesses," Analytica Chimica Acta, vol. 407, no. 1-2, pp. 291-300, 2000.
-
(2000)
Analytica Chimica Acta
, vol.407
, Issue.1-2
, pp. 291-300
-
-
Lu, J.-K.1
Ko, F.-H.2
Chu, T.-C.3
Sun, Y.-C.4
Wang, M.-Y.5
Wang, T.-K.6
-
2
-
-
33847040478
-
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
-
T.-E. Lee, H.-Y. Lee, and S.-J. Lee, "Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots," Int. J. Prod. Res., vol. 45, no. 3, pp. 487-507, 2007.
-
(2007)
Int. J. Prod. Res.
, vol.45
, Issue.3
, pp. 487-507
-
-
Lee, T.-E.1
Lee, H.-Y.2
Lee, S.-J.3
-
3
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual gripper robot
-
C. Sriskandarajah, I. Drobouchevitch, S. P. Sethi, and R. Chan-drasekaran, "Scheduling multiple parts in a robotic cell served by a dual gripper robot," Oper. Res., vol. 52, no. 1, pp. 65-82, 2004.
-
(2004)
Oper. Res.
, vol.52
, Issue.1
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.2
Sethi, S.P.3
Chan-Drasekaran, R.4
-
4
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: recent developments," J. Scheduling, vol. 8, no. 5, pp. 387-426, 2005.
-
(2005)
J. Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
5
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
Aug.
-
V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol. 15, no. 4, pp. 704-713, Aug. 1999.
-
(1999)
IEEE Trans. Robot. Autom.
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Meyzin, L.3
-
6
-
-
3543073493
-
Complexity of one-cycle robotic flow-shops
-
N. Brauner, G. Finke, and W. Kubiak, "Complexity of one-cycle robotic flow-shops," J. Scheduling, vol. 6, no. 4, pp. 355-372, 2003.
-
(2003)
J. Scheduling
, vol.6
, Issue.4
, pp. 355-372
-
-
Brauner, N.1
Finke, G.2
Kubiak, W.3
-
7
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
Feb.
-
A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Autom., vol. 18, no. 1, pp. 69-80, Feb. 2002.
-
(2002)
IEEE Trans. Robot. Autom.
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
8
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, no. 3, pp. 445-470, 2007.
-
(2007)
OR Spectrum
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
9
-
-
74549120245
-
Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
-
A. Che, P. Yan, N. Yang, and C. Chu, "Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times," Int. J. Prod. Res., vol. 48, no. 5, pp. 1225-1243, 2010.
-
(2010)
Int. J. Prod. Res.
, vol.48
, Issue.5
, pp. 1225-1243
-
-
Che, A.1
Yan, P.2
Yang, N.3
Chu, C.4
-
10
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
G. W. Shapiro and H. L. W. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, no. 2, pp. 157-167, 1988.
-
(1988)
IIE Trans.
, vol.20
, Issue.2
, pp. 157-167
-
-
Shapiro, G.W.1
Nuttle, H.L.W.2
-
11
-
-
78651098378
-
Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis
-
Jan.
-
W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
12
-
-
78651094962
-
Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations
-
Jan.
-
W. K. V. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 17-28
-
-
Chan, W.K.V.1
Ding, S.2
Yi, J.3
Song, D.4
-
13
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
14
-
-
84873384586
-
A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
-
Feb.
-
Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semiconductor Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
-
(2013)
IEEE Trans. Semiconductor Manuf.
, vol.26
, Issue.1
, pp. 100-110
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
15
-
-
84887067395
-
Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting
-
Jan.
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern.: Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
-
(2013)
IEEE Trans. Syst., Man, Cybern.: Syst.
, vol.43
, Issue.1
, pp. 196-207
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
16
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots
-
Jan.
-
H. N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots," IEEE Trans. Autom. Sci. Eng., vol. 1, no. 1, pp. 84-89, Jan. 2004.
-
(2004)
IEEE Trans. Autom. Sci. Eng.
, vol.1
, Issue.1
, pp. 84-89
-
-
Geismar, H.N.1
Sriskandarajah, C.2
Ramanan, N.3
-
17
-
-
12344318544
-
Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
-
J. M. Y. Leung, G. Zhang, X. Yang, R. Mak, and K. Lam, "Optimal cyclic multi-hoist scheduling: A mixed integer programming approach," Oper. Res., vol. 52, no. 6, pp. 965-976, 2004.
-
(2004)
Oper. Res.
, vol.52
, Issue.6
, pp. 965-976
-
-
Leung, J.M.Y.1
Zhang, G.2
Yang, X.3
Mak, R.4
Lam, K.5
-
18
-
-
0031635632
-
A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
-
K. Kogan and E. Levner, "A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots," Comput. Oper. Res., vol. 25, no. 1, pp. 53-62, 1998.
-
(1998)
Comput. Oper. Res.
, vol.25
, Issue.1
, pp. 53-62
-
-
Kogan, K.1
Levner, E.2
-
19
-
-
33747443542
-
Multicluster tools scheduling: An integrated event graph and network model approach
-
Aug.
-
S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semiconductor Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
-
(2006)
IEEE Trans. Semiconductor Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
20
-
-
37049026687
-
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
-
V. Kats, L. Lei, and E. Levner, "Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints," Eur. J. Oper. Res., vol. 187, no. 3, pp. 1196-1211, 2008.
-
(2008)
Eur. J. Oper. Res.
, vol.187
, Issue.3
, pp. 1196-1211
-
-
Kats, V.1
Lei, L.2
Levner, E.3
-
21
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
A. Agnetis, "Scheduling no-wait robotic cells with two and three machines," Eur. J. Oper. Res., vol. 123, no. 2, pp. 303-314, 2000.
-
(2000)
Eur. J. Oper. Res.
, vol.123
, Issue.2
, pp. 303-314
-
-
Agnetis, A.1
-
22
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
May
-
N. Wu, C. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May, 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.C.4
-
23
-
-
27644434964
-
An extended event graph with negative places and tokens for time window constraints
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
24
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr.
-
N. Wu and M. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Autom. Sci. Eng.
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.1
Zhou, M.2
-
25
-
-
84859753478
-
Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
-
Apr.
-
N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 446-454
-
-
Wu, N.1
Zhou, M.2
-
26
-
-
84864687325
-
Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation
-
Aug.
-
Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, Aug. 2012.
-
(2012)
IEEE Trans. Semicond. Manuf.
, vol.25
, Issue.3
, pp. 432-446
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
27
-
-
84855355646
-
Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
-
Jan.
-
N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 203-209
-
-
Wu, N.1
Zhou, M.2
-
28
-
-
84863456306
-
Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
-
Jul.
-
Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.3
, pp. 564-577
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
29
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
Aug.
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
30
-
-
84875324908
-
Real-time hoist scheduling for multistage material handling process under uncertainties
-
N. Tian, A. Che, and J. Feng, "Real-time hoist scheduling for multistage material handling process under uncertainties," AIChE Journal, vol. 59, no. 2, pp. 1046-1048, 2013.
-
(2013)
AIChE Journal
, vol.59
, Issue.2
, pp. 1046-1048
-
-
Tian, N.1
Che, A.2
Feng, J.3
-
31
-
-
84872840026
-
Real-time dynamic hoist scheduling for multistage material handling process under uncertainties
-
C. Zhou, J. Fu, and Q. Xu, "Real-time dynamic hoist scheduling for multistage material handling process under uncertainties," AIChE Journal, vol. 59, no. 2, pp. 465-482, 2013.
-
(2013)
AIChE Journal
, vol.59
, Issue.2
, pp. 465-482
-
-
Zhou, C.1
Fu, J.2
Xu, Q.3
-
32
-
-
0018011301
-
Multiple resource-constrained scheduling using branch and bound
-
J. P. Stinson, E. W. Davis, and B. M. Khumawala, "Multiple resource-constrained scheduling using branch and bound," AIIE Trans., vol. 10, no. 3, pp. 252-259, 1978.
-
(1978)
AIIE Trans.
, vol.10
, Issue.3
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
33
-
-
25844526594
-
Fair resource allocation in wireless networking using queue-length-based scheduling and congestion control
-
Miami, FL, USA
-
A. Eryilmaz and R. Srikant, "Fair resource allocation in wireless networking using queue-length-based scheduling and congestion control," in Proc. Annu. Joint Conf. IEEE Comput. Commun. Soc., Miami, FL, USA, 2005, pp. 1794-1803.
-
(2005)
Proc. Annu. Joint Conf. IEEE Comput. Commun. Soc
, pp. 1794-1803
-
-
Eryilmaz, A.1
Srikant, R.2
-
34
-
-
84871811802
-
Scheduling cluster tools with ready time constraints for consecutive small lots
-
Jan.
-
H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
-
(2013)
IEEE Trans. Autom. Sci. Eng.
, vol.10
, Issue.1
, pp. 145-159
-
-
Kim, H.-J.1
Lee, J.-H.2
Jung, C.3
Lee, T.-E.4
-
35
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct.
-
W. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.1
-
36
-
-
85023501284
-
Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation
-
T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation," Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
-
(2012)
Int. J. Prod. Res.
, vol.50
, Issue.10
, pp. 2785-2795
-
-
Kim, T.-K.1
Jung, C.2
Lee, T.-E.3
-
37
-
-
0024645936
-
Petri nets: Properties, analysis and application
-
T. Murata, "Petri nets: Properties, analysis and application," Proc. IEEE, vol. 77, no. 4, pp. 541-580, 1989.
-
(1989)
Proc. IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
38
-
-
0028378348
-
Petri nets for modeling of dynamic systems-A survey
-
R. Divid and H. Alla, "Petri nets for modeling of dynamic systems-A survey," Automatica, vol. 30, no. 2, pp. 175-202, 1994.
-
(1994)
Automatica
, vol.30
, Issue.2
, pp. 175-202
-
-
Divid, R.1
Alla, H.2
-
39
-
-
33646717079
-
Scheduling single-armed cluster tools with reentrant wafer flow
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flow," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
40
-
-
82455215680
-
-
Ph.D. dissertation, Dept. Industrial and Systems Engineering, Korea Advanced Institute of Science and Technology, Daejeon, Republic of Korea
-
C. Jung, "Cyclic scheduling of timed petri nets: behavior, optimization, and application to cluster tools," Ph.D. dissertation, Dept. Industrial and Systems Engineering, Korea Advanced Institute of Science and Technology, Daejeon, Republic of Korea, 2010.
-
(2010)
Cyclic Scheduling of Timed Petri Nets: Behavior, Optimization, and Application to Cluster Tools
-
-
Jung, C.1
-
41
-
-
0029486579
-
Petri net scheduling of FMS using branch and bound method
-
M. Zhou, H.-S. Chiu, and H. Xiong, "Petri net scheduling of FMS using branch and bound method," in Proc. IEEE Int. Conf. Ind. Electron., Control, Instrumentation, Orlando, 1995, pp. 211-216.
-
(1995)
Proc. IEEE Int. Conf. Ind. Electron., Control, Instrumentation, Orlando
, pp. 211-216
-
-
Zhou, M.1
Chiu, H.-S.2
Xiong, H.3
-
42
-
-
0028413979
-
Scheduling flexible manufacturing systems using Petri nets and heuristic search
-
D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri nets and heuristic search," IEEE Trans. Robot. Autom., vol. 10, no. 2, pp. 123-132, 1994.
-
(1994)
IEEE Trans. Robot. Autom.
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
Dicesare, F.2
-
43
-
-
0039770263
-
An implicit enumeration algorithm for the machine sequencing problem
-
M. Florian, P. Trepant, and G. McMahon, "An implicit enumeration algorithm for the machine sequencing problem," Manage. Sci., vol. 17, no. 12, pp. 782-792, 1971.
-
(1971)
Manage. Sci.
, vol.17
, Issue.12
, pp. 782-792
-
-
Florian, M.1
Trepant, P.2
McMahon, G.3
-
44
-
-
0020178733
-
The one-machine sequencing problem
-
J. Carlier, "The one-machine sequencing problem," Eur. J. Oper. Res., vol. 11, no. 1, pp. 42-47, 1982.
-
(1982)
Eur. J. Oper. Res.
, vol.11
, Issue.1
, pp. 42-47
-
-
Carlier, J.1
-
45
-
-
84871291726
-
Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems
-
C. Kim and T.-E. Lee, "Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems," in Proc. Eur. Modeling Simulation Symposium, Roma, 2011, pp. 319-324.
-
(2011)
Proc. Eur. Modeling Simulation Symposium, Roma
, pp. 319-324
-
-
Kim, C.1
Lee, T.-E.2
|