메뉴 건너뛰기




Volumn 11, Issue 4, 2014, Pages 1262-1274

Non-cyclic scheduling of a wet station

Author keywords

Branch and bound algorithm; Cluster tool; Deadlock; No wait; Petri nets; Wet station

Indexed keywords


EID: 84908672464     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2013.2255037     Document Type: Article
Times cited : (23)

References (45)
  • 1
    • 0033974208 scopus 로고    scopus 로고
    • Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor pro cesses
    • J.-K. Lu, F.-H. Ko, T.-C. Chu, Y.-C. Sun, M.-Y. Wang, and T.-K. Wang, "Evaluation of cleaning efficiency with a radioactive tracer and development of a microwave digestion method for semiconductor pro cesses," Analytica Chimica Acta, vol. 407, no. 1-2, pp. 291-300, 2000.
    • (2000) Analytica Chimica Acta , vol.407 , Issue.1-2 , pp. 291-300
    • Lu, J.-K.1    Ko, F.-H.2    Chu, T.-C.3    Sun, Y.-C.4    Wang, M.-Y.5    Wang, T.-K.6
  • 2
    • 33847040478 scopus 로고    scopus 로고
    • Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
    • T.-E. Lee, H.-Y. Lee, and S.-J. Lee, "Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots," Int. J. Prod. Res., vol. 45, no. 3, pp. 487-507, 2007.
    • (2007) Int. J. Prod. Res. , vol.45 , Issue.3 , pp. 487-507
    • Lee, T.-E.1    Lee, H.-Y.2    Lee, S.-J.3
  • 3
    • 9644286254 scopus 로고    scopus 로고
    • Scheduling multiple parts in a robotic cell served by a dual gripper robot
    • C. Sriskandarajah, I. Drobouchevitch, S. P. Sethi, and R. Chan-drasekaran, "Scheduling multiple parts in a robotic cell served by a dual gripper robot," Oper. Res., vol. 52, no. 1, pp. 65-82, 2004.
    • (2004) Oper. Res. , vol.52 , Issue.1 , pp. 65-82
    • Sriskandarajah, C.1    Drobouchevitch, I.2    Sethi, S.P.3    Chan-Drasekaran, R.4
  • 4
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: recent developments," J. Scheduling, vol. 8, no. 5, pp. 387-426, 2005.
    • (2005) J. Scheduling , vol.8 , Issue.5 , pp. 387-426
    • Dawande, M.1    Geismar, H.N.2    Sethi, S.P.3    Sriskandarajah, C.4
  • 5
    • 0032646146 scopus 로고    scopus 로고
    • Multiple-part cyclic hoist scheduling using a sieve method
    • Aug.
    • V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol. 15, no. 4, pp. 704-713, Aug. 1999.
    • (1999) IEEE Trans. Robot. Autom. , vol.15 , Issue.4 , pp. 704-713
    • Kats, V.1    Levner, E.2    Meyzin, L.3
  • 6
    • 3543073493 scopus 로고    scopus 로고
    • Complexity of one-cycle robotic flow-shops
    • N. Brauner, G. Finke, and W. Kubiak, "Complexity of one-cycle robotic flow-shops," J. Scheduling, vol. 6, no. 4, pp. 355-372, 2003.
    • (2003) J. Scheduling , vol.6 , Issue.4 , pp. 355-372
    • Brauner, N.1    Finke, G.2    Kubiak, W.3
  • 7
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • Feb.
    • A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Autom., vol. 18, no. 1, pp. 69-80, Feb. 2002.
    • (2002) IEEE Trans. Robot. Autom. , vol.18 , Issue.1 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 8
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, no. 3, pp. 445-470, 2007.
    • (2007) OR Spectrum , vol.29 , Issue.3 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 9
    • 74549120245 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
    • A. Che, P. Yan, N. Yang, and C. Chu, "Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times," Int. J. Prod. Res., vol. 48, no. 5, pp. 1225-1243, 2010.
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.5 , pp. 1225-1243
    • Che, A.1    Yan, P.2    Yang, N.3    Chu, C.4
  • 10
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • G. W. Shapiro and H. L. W. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, no. 2, pp. 157-167, 1988.
    • (1988) IIE Trans. , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.L.W.2
  • 11
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis
    • Jan.
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 12
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations
    • Jan.
    • W. K. V. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.K.V.1    Ding, S.2    Yi, J.3    Song, D.4
  • 13
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 14
    • 84873384586 scopus 로고    scopus 로고
    • A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
    • Feb.
    • Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semiconductor Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
    • (2013) IEEE Trans. Semiconductor Manuf. , vol.26 , Issue.1 , pp. 100-110
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 15
    • 84887067395 scopus 로고    scopus 로고
    • Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net modeling and cycle-time analysis of dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern.: Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
    • (2013) IEEE Trans. Syst., Man, Cybern.: Syst. , vol.43 , Issue.1 , pp. 196-207
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 16
    • 3242715937 scopus 로고    scopus 로고
    • Increasing throughput for robotic cells with parallel machines and multiple robots
    • Jan.
    • H. N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots," IEEE Trans. Autom. Sci. Eng., vol. 1, no. 1, pp. 84-89, Jan. 2004.
    • (2004) IEEE Trans. Autom. Sci. Eng. , vol.1 , Issue.1 , pp. 84-89
    • Geismar, H.N.1    Sriskandarajah, C.2    Ramanan, N.3
  • 17
    • 12344318544 scopus 로고    scopus 로고
    • Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
    • J. M. Y. Leung, G. Zhang, X. Yang, R. Mak, and K. Lam, "Optimal cyclic multi-hoist scheduling: A mixed integer programming approach," Oper. Res., vol. 52, no. 6, pp. 965-976, 2004.
    • (2004) Oper. Res. , vol.52 , Issue.6 , pp. 965-976
    • Leung, J.M.Y.1    Zhang, G.2    Yang, X.3    Mak, R.4    Lam, K.5
  • 18
    • 0031635632 scopus 로고    scopus 로고
    • A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots
    • K. Kogan and E. Levner, "A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots," Comput. Oper. Res., vol. 25, no. 1, pp. 53-62, 1998.
    • (1998) Comput. Oper. Res. , vol.25 , Issue.1 , pp. 53-62
    • Kogan, K.1    Levner, E.2
  • 19
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • Aug.
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semiconductor Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
    • (2006) IEEE Trans. Semiconductor Manuf. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 20
    • 37049026687 scopus 로고    scopus 로고
    • Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints
    • V. Kats, L. Lei, and E. Levner, "Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints," Eur. J. Oper. Res., vol. 187, no. 3, pp. 1196-1211, 2008.
    • (2008) Eur. J. Oper. Res. , vol.187 , Issue.3 , pp. 1196-1211
    • Kats, V.1    Lei, L.2    Levner, E.3
  • 21
    • 0033871635 scopus 로고    scopus 로고
    • Scheduling no-wait robotic cells with two and three machines
    • A. Agnetis, "Scheduling no-wait robotic cells with two and three machines," Eur. J. Oper. Res., vol. 123, no. 2, pp. 303-314, 2000.
    • (2000) Eur. J. Oper. Res. , vol.123 , Issue.2 , pp. 303-314
    • Agnetis, A.1
  • 22
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • May
    • N. Wu, C. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May, 2008.
    • (2008) IEEE Trans. Semicond. Manuf. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.C.4
  • 23
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 24
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr.
    • N. Wu and M. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng. , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.1    Zhou, M.2
  • 25
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr.
    • N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.1    Zhou, M.2
  • 26
    • 84864687325 scopus 로고    scopus 로고
    • Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation
    • Aug.
    • Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraints and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 432-446
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 27
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan.
    • N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.1    Zhou, M.2
  • 28
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul.
    • Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 29
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • Aug.
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 30
    • 84875324908 scopus 로고    scopus 로고
    • Real-time hoist scheduling for multistage material handling process under uncertainties
    • N. Tian, A. Che, and J. Feng, "Real-time hoist scheduling for multistage material handling process under uncertainties," AIChE Journal, vol. 59, no. 2, pp. 1046-1048, 2013.
    • (2013) AIChE Journal , vol.59 , Issue.2 , pp. 1046-1048
    • Tian, N.1    Che, A.2    Feng, J.3
  • 31
    • 84872840026 scopus 로고    scopus 로고
    • Real-time dynamic hoist scheduling for multistage material handling process under uncertainties
    • C. Zhou, J. Fu, and Q. Xu, "Real-time dynamic hoist scheduling for multistage material handling process under uncertainties," AIChE Journal, vol. 59, no. 2, pp. 465-482, 2013.
    • (2013) AIChE Journal , vol.59 , Issue.2 , pp. 465-482
    • Zhou, C.1    Fu, J.2    Xu, Q.3
  • 32
    • 0018011301 scopus 로고
    • Multiple resource-constrained scheduling using branch and bound
    • J. P. Stinson, E. W. Davis, and B. M. Khumawala, "Multiple resource-constrained scheduling using branch and bound," AIIE Trans., vol. 10, no. 3, pp. 252-259, 1978.
    • (1978) AIIE Trans. , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 33
    • 25844526594 scopus 로고    scopus 로고
    • Fair resource allocation in wireless networking using queue-length-based scheduling and congestion control
    • Miami, FL, USA
    • A. Eryilmaz and R. Srikant, "Fair resource allocation in wireless networking using queue-length-based scheduling and congestion control," in Proc. Annu. Joint Conf. IEEE Comput. Commun. Soc., Miami, FL, USA, 2005, pp. 1794-1803.
    • (2005) Proc. Annu. Joint Conf. IEEE Comput. Commun. Soc , pp. 1794-1803
    • Eryilmaz, A.1    Srikant, R.2
  • 34
    • 84871811802 scopus 로고    scopus 로고
    • Scheduling cluster tools with ready time constraints for consecutive small lots
    • Jan.
    • H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 145-159
    • Kim, H.-J.1    Lee, J.-H.2    Jung, C.3    Lee, T.-E.4
  • 35
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct.
    • W. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.1
  • 36
    • 85023501284 scopus 로고    scopus 로고
    • Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation
    • T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation," Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.10 , pp. 2785-2795
    • Kim, T.-K.1    Jung, C.2    Lee, T.-E.3
  • 37
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and application
    • T. Murata, "Petri nets: Properties, analysis and application," Proc. IEEE, vol. 77, no. 4, pp. 541-580, 1989.
    • (1989) Proc. IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 38
    • 0028378348 scopus 로고
    • Petri nets for modeling of dynamic systems-A survey
    • R. Divid and H. Alla, "Petri nets for modeling of dynamic systems-A survey," Automatica, vol. 30, no. 2, pp. 175-202, 1994.
    • (1994) Automatica , vol.30 , Issue.2 , pp. 175-202
    • Divid, R.1    Alla, H.2
  • 39
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flow
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flow," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 40
  • 42
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using Petri nets and heuristic search
    • D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri nets and heuristic search," IEEE Trans. Robot. Autom., vol. 10, no. 2, pp. 123-132, 1994.
    • (1994) IEEE Trans. Robot. Autom. , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    Dicesare, F.2
  • 43
    • 0039770263 scopus 로고
    • An implicit enumeration algorithm for the machine sequencing problem
    • M. Florian, P. Trepant, and G. McMahon, "An implicit enumeration algorithm for the machine sequencing problem," Manage. Sci., vol. 17, no. 12, pp. 782-792, 1971.
    • (1971) Manage. Sci. , vol.17 , Issue.12 , pp. 782-792
    • Florian, M.1    Trepant, P.2    McMahon, G.3
  • 44
    • 0020178733 scopus 로고
    • The one-machine sequencing problem
    • J. Carlier, "The one-machine sequencing problem," Eur. J. Oper. Res., vol. 11, no. 1, pp. 42-47, 1982.
    • (1982) Eur. J. Oper. Res. , vol.11 , Issue.1 , pp. 42-47
    • Carlier, J.1
  • 45
    • 84871291726 scopus 로고    scopus 로고
    • Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems
    • C. Kim and T.-E. Lee, "Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems," in Proc. Eur. Modeling Simulation Symposium, Roma, 2011, pp. 319-324.
    • (2011) Proc. Eur. Modeling Simulation Symposium, Roma , pp. 319-324
    • Kim, C.1    Lee, T.-E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.