-
1
-
-
0025430281
-
Integrated processing equipment
-
M. Bader, R. Hall, and G. Strasser, "Integrated processing equipment," Solid State Technol., vol.33, pp. 149-154, 1990. (Pubitemid 20718631)
-
(1990)
Solid State Technology
, vol.33
, Issue.5
, pp. 149-154
-
-
Bader Martin, E.1
Hall Robert, P.2
Strasser Gregor3
-
2
-
-
33747465464
-
Coping with the high cost of wafer fabs
-
P. Burggraaf, "Coping with the high cost of wafer fabs," Semiconduct. Int., vol.38, pp. 45-50, 1995.
-
(1995)
Semiconduct. Int.
, vol.38
, pp. 45-50
-
-
Burggraaf, P.1
-
3
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
DOI 10.1109/70.988976, PII S1042296X02017780
-
A. D. Che and C. B. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Autom., vol.18, no.1, pp. 69-80, 2002. (Pubitemid 34414687)
-
(2002)
IEEE Transactions on Robotics and Automation
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
4
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. D. Che and C. B. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol.29, no.3, pp. 445-470, 2007.
-
(2007)
OR Spectrum
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.D.1
Chu, C.B.2
-
5
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
H. X. Chen, C. B. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Autom., vol.14, pp. 291-318, 1998.
-
(1998)
IEEE Trans. Robot. Autom.
, vol.14
, pp. 291-318
-
-
Chen, H.X.1
Chu, C.B.2
Proth, J.-M.3
-
7
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
V. Kats, E. Levner, and L. Mayzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol.15, pp. 704-713, 1999.
-
(1999)
IEEE Trans. Robot. Autom.
, vol.15
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Mayzin, L.3
-
8
-
-
0041384559
-
Scheduling analysis of timed-constrained dual-armed cluster tools
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol.16, no.3, pp. 521-534, 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
9
-
-
27644434964
-
An extended event graph with negative places and tokens for time window constraints
-
DOI 10.1109/TASE.2005.851236
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for timed window constraints," IEEE Trans. Autom. Sci. Eng., vol.2, no.4, pp. 319-332, 2005. (Pubitemid 41560387)
-
(2005)
IEEE Transactions on Automation Science and Engineering
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
10
-
-
34447295641
-
Design of liveness-enforcing supervisors for flexible manufacturing systems using Petri nets
-
DOI 10.1109/TSMCC.2007.897333
-
Z. Li, H. Hu, and A. Wang, "Design of liveness-enforcing supervisors for flexible manufacturing systems using Petri nets," IEEE Trans. Syst., Man, Cybern., Part C: Appl. Rev., vol.37, no.4, pp. 517-526, July 2007. (Pubitemid 47061954)
-
(2007)
IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews
, vol.37
, Issue.4
, pp. 517-526
-
-
Li, Z.W.1
Hu, H.S.2
Wang, A.R.3
-
11
-
-
40949124277
-
Control of elementary and dependent siphons of Petri nets and their application
-
Jan.
-
Z. W. Li and M. C. Zhou, "Control of elementary and dependent siphons of Petri nets and their application," IEEE Trans. Syst., Man, Cybern., Part A: Syst. Human, vol.38, no.1, pp. 133-148, Jan. 2008.
-
(2008)
IEEE Trans. Syst., Man, Cybern., Part A: Syst. Human
, vol.38
, Issue.1
, pp. 133-148
-
-
Li, Z.W.1
Zhou, M.C.2
-
12
-
-
3042550235
-
Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300 mm semiconductor manufacturing
-
New Orleans, LA
-
D.-Y. Liao, M. D. Jeng, and M. C. Zhou, "Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300 mm semiconductor manufacturing," in Proc. 2004 IEEE Conf. Robot. Autom., New Orleans, LA, 2004, pp. 5301-5306.
-
Proc. 2004 IEEE Conf. Robot. Autom.
, vol.2004
, pp. 5301-5306
-
-
Liao, D.-Y.1
Jeng, M.D.2
Zhou, M.C.3
-
13
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput
-
T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput," IEEE Trans. Semicond. Manuf., vol.9, pp. 384-400, 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, R.S.2
MacLarty, P.K.3
-
14
-
-
0028481573
-
III, Single-wafer cluster tool performance: An analysis of throughput
-
T. L. Perkinson, P. K. MacLarty, R. S. Gyurcsik, and R. K. Cavin, "III, Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semicond. Manuf., vol.7, pp. 369-373, 1994.
-
(1994)
IEEE Trans. Semicond. Manuf.
, vol.7
, pp. 369-373
-
-
Perkinson, T.L.1
MacLarty, P.K.2
Gyurcsik, R.S.3
Cavin, R.K.4
-
15
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
DOI 10.1109/70.964662, PII S1042296X01094666
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol.17, pp. 609-618, 2001. (Pubitemid 33137777)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
16
-
-
0035334186
-
Modeling and implementing a real-time scheduler for dual-armed cluster tools
-
Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. in Industry, vol.45, no.1, pp. 13-27, 2001.
-
(2001)
Comput. in Industry
, vol.45
, Issue.1
, pp. 13-27
-
-
Shin, Y.-H.1
Lee, T.-E.2
Kim, J.-H.3
Lee, H.-Y.4
-
17
-
-
0030086424
-
Optimal sequencing of double-Gripper gantry robot moves in tightly-coupled serial production systems
-
PII S1042296X96010640
-
Q. Su and F. F. Chen, "Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Autom., vol.12, pp. 22-30, 1996. (Pubitemid 126780445)
-
(1996)
IEEE Transactions on Robotics and Automation
, vol.12
, Issue.1
, pp. 22-30
-
-
Su, Q.1
Chen, F.F.2
-
18
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
PII S0894650797075519
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady state throughput analysis of cluster tools: Dual-blade versus singleblade robots," IEEE Trans. Semiconduct. Manuf., vol.10, pp. 418-424, 1997. (Pubitemid 127763010)
-
(1997)
IEEE Transactions on Semiconductor Manufacturing
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
19
-
-
0030212052
-
Simple performance models for integrated processing tools
-
PII S0894650796056709
-
S. C. Wood, "Simple performance models for integrated processing tools," IEEE Trans. Semicond. Manuf., vol.9, pp. 320-328, 1996. (Pubitemid 126776264)
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.3
, pp. 320-328
-
-
Wood, S.C.1
-
20
-
-
0032630279
-
Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
-
N. Q. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model," IEEE Trans. Syst., Man, Cybern., Part C., vol.29, no.2, pp. 192-204, 1999.
-
(1999)
IEEE Trans. Syst., Man, Cybern., Part C.
, vol.29
, Issue.2
, pp. 192-204
-
-
Wu, N.Q.1
-
21
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
DOI 10.1109/TSM.2008.2000425, 4512066
-
N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol.21, no.2, pp. 224-237, 2008. (Pubitemid 351695248)
-
(2008)
IEEE Transactions on Semiconductor Manufacturing
, vol.21
, Issue.2
, pp. 224-236
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.C.4
-
22
-
-
0035485815
-
Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems
-
N. Q. Wu and M. C. Zhou, "Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems," IEEE Trans. Robot. Autom., vol.17, no.5, pp. 657-668, 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 657-668
-
-
Wu, N.Q.1
Zhou, M.C.2
-
23
-
-
1942518458
-
Modeling and deadlock control of automated guided vehicle systems
-
N. Q. Wu and M. C. Zhou, "Modeling and deadlock control of automated guided vehicle systems," IEEE/ASME Trans. Mechatronics, vol.9, no.1, pp. 50-57, 2004.
-
(2004)
IEEE/ASME Trans. Mechatronics
, vol.9
, Issue.1
, pp. 50-57
-
-
Wu, N.Q.1
Zhou, M.C.2
-
24
-
-
29144513578
-
Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles
-
DOI 10.1109/TSMCB.2005.850141
-
N. Q. Wu and M. C. Zhou, "Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles," IEEE Trans. Syst., Man, Cybern., Part B., vol.35, no.6, pp. 1193-1202, 2005. (Pubitemid 41800419)
-
(2005)
IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics
, vol.35
, Issue.6
, pp. 1193-1202
-
-
Wu, N.1
Zhou, M.2
-
25
-
-
0036055642
-
Deadlock avoidance in semiconductor track systems
-
Washington, D.C., May.
-
N. Q.Wu and M. C. Zhou, "Deadlock avoidance in semiconductor track systems," in Proc. 2002 IEEE Int. Conf. Robot. Autom., Washington, D.C., May 2002, pp. 193-198.
-
(2002)
Proc. 2002 IEEE Int. Conf. Robot. Autom.
, pp. 193-198
-
-
Wu, N.1
Zhou, M.C.2
-
26
-
-
0026204001
-
Parallel and sequential mutual exclusions for Petri net modeling of manufacturing systems with shared resources
-
DOI 10.1109/70.86081
-
M. Zhou and F. DiCesare, "Parallel and sequential mutual exclusions for Petri net modeling of manufacturing systems with shared resources," IEEE Trans. Robot. Autom., vol.7, no.4, pp. 515-527, 1991. (Pubitemid 21674694)
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, Issue.4
, pp. 515-527
-
-
Zhou MengChu1
DiCesare Frank2
-
27
-
-
0026882077
-
A hybrid methodology for synthesis of Petri nets for manufacturing systems
-
M. Zhou, F. DiCesare, and A. Desrochers, "A hybrid methodology for synthesis of Petri nets for manufacturing systems," IEEE Trans. Robot. Autom., vol.8, pp. 350-361, 1992.
-
(1992)
IEEE Trans. Robot. Autom.
, vol.8
, pp. 350-361
-
-
Zhou, M.1
Dicesare, F.2
Desrochers, A.3
-
28
-
-
0032141060
-
Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems:APetri net approach
-
M. C. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems:APetri net approach," IEEE Trans. Semicond. Manuf., vol.11, no.3, pp. 333-357, 1998.
-
(1998)
IEEE Trans. Semicond. Manuf.
, vol.11
, Issue.3
, pp. 333-357
-
-
Zhou, M.C.1
Jeng, M.D.2
-
30
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
DOI 10.1109/70.964658, PII S1042296X01094630
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol.17, no.5, pp. 562-575, 2001. (Pubitemid 33137773)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
31
-
-
34250222467
-
Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets
-
DOI 10.1080/00207540600863738, PII 779451839
-
N. Q. Wu and M. C. Zhou, "Deadlock modeling and control of semiconductor track systems using resource-oriented Petri nets," Int. J. Prod. Res., vol.45, no.15, pp. 3439-3456, 2007. (Pubitemid 46907031)
-
(2007)
International Journal of Production Research
, vol.45
, Issue.15
, pp. 3439-3456
-
-
Wu, N.1
Zhou, M.2
-
32
-
-
46849094532
-
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
-
Oct.
-
J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Autom. Sci. Eng., vol.5, no.3, pp. 490-503, Oct. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.3
, pp. 490-503
-
-
Kim, J.-H.1
Lee, T.-E.2
-
33
-
-
35348862663
-
A Petri-net approach to modular supervision with conflict resolution for semiconductor manufacturing systems
-
Oct.
-
J. S. Lee, M. C. Zhou, and P. L. Hsu , "A Petri-net approach to modular supervision with conflict resolution for semiconductor manufacturing systems," IEEE Trans. Autom. Sci. Eng., vol.4, no.4, pp. 584-588, Oct 2007.
-
(2007)
IEEE Trans. Autom. Sci. Eng.
, vol.4
, Issue.4
, pp. 584-588
-
-
Lee, J.S.1
Zhou, M.C.2
Hsu, P.L.3
-
34
-
-
41149102377
-
Multi-paradigm modeling for hybrid dynamic systems using Petri net framework
-
Mar.
-
J. S. Lee, M. C. Zhou, and P. L. Hsu , "Multi-paradigm modeling for hybrid dynamic systems using Petri net framework," IEEE Trans. Syst., Man, Cybern.: Part A, vol.38, no.2, pp. 493-498, Mar. 2008.
-
(2008)
IEEE Trans. Syst., Man, Cybern.: Part A
, vol.38
, Issue.2
, pp. 493-498
-
-
Lee, J.S.1
Zhou, M.C.2
Hsu, P.L.3
|