메뉴 건너뛰기




Volumn 8, Issue 1, 2011, Pages 5-16

Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis

Author keywords

Cluster tools; multiple machines; performance productivity; scheduling; semiconductor manufacturing

Indexed keywords

CLOSED-FORM EXPRESSION; CLUSTER TOOL; CYCLE TIME; MULTIPLE MACHINE; OPTIMAL SCHEDULE; OPTIMAL SCHEDULING; PERFORMANCE/PRODUCTIVITY; POLYNOMIAL-TIME; PRODUCTIVITY IMPROVEMENTS; SEMICONDUCTOR MANUFACTURING;

EID: 78651098378     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2010.2046891     Document Type: Article
Times cited : (129)

References (27)
  • 1
    • 33846131213 scopus 로고    scopus 로고
    • Method and aparatus for managing scheduling a multiple cluster tool
    • Patent 1 Dec.
    • D. Jevtic, "Method and aparatus for managing scheduling a multiple cluster tool," European Patent 1,132,792 (A2), Dec. 2001.
    • (2001) European , vol.132 , Issue.792
    • Jevtic, D.1
  • 3
    • 0031276238 scopus 로고    scopus 로고
    • A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semiconduct. Manufact., vol. 10, no. 4, pp. 418-424, 1997.
    • (1997) IEEE Trans. Semiconduct. Manufact. , vol.10 , Issue.4 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 4
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • Y. Crama and J. van de Klundert, "Cyclic scheduling of identical parts in a robotic cell," Opers. Res., vol. 45, no. 6, pp. 952-965, 1997.
    • (1997) Opers. Res. , vol.45 , Issue.6 , pp. 952-965
    • Crama, Y.1    Klundert De J.Van2
  • 5
  • 7
    • 0036769403 scopus 로고    scopus 로고
    • On throughtput maximization in constant travel-time robotic cells
    • M. Dawande, C. Sriskandarajah, and S. Sethi, "On throughtput maximization in constant travel-time robotic cells," Manuf. Serv. Oper. Manage., vol. 4, no. 4, pp. 296-312, 2002.
    • (2002) Manuf. Serv. Oper. Manage. , vol.4 , Issue.4 , pp. 296-312
    • Dawande, M.1    Sriskandarajah, C.2    Sethi, S.3
  • 8
    • 28244447024 scopus 로고    scopus 로고
    • Scheduling dual gripper robotic cells: One-unit cycles
    • I. Drobouchevitch, S. Sethi, and C. Sriskandarajah, "Scheduling dual gripper robotic cells: One-unit cycles," Eur. J. Oper. Res., vol. 171, no. 2, pp. 598-631,2006.
    • (2006) Eur. J. Oper. Res. , vol.171 , Issue.2 , pp. 598-631
    • Drobouchevitch, I.1    Sethi, S.2    Sriskandarajah, C.3
  • 9
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper granty robot moves in tightly-coupled serial production systems,"
    • Q. Su and F. Chen, "Optimal sequencing of double-gripper granty robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Automat., vol. 12, no. 1, pp. 22-30, 1996.
    • (1996) IEEE Trans. Robot. Automat. , vol.12 , Issue.1 , pp. 22-30
    • Su, Q.1    Chen, F.2
  • 10
    • 0035357074 scopus 로고    scopus 로고
    • Scheduling in dual gripper robotic cells for productivity gains
    • S. Sethi, J. Sidney, and C. Sriskandarajah, "Scheduling in dual gripper robotic cells for productivity gains," IEEE Trans. Robot. Automat., vol. 17, no. 3, pp. 324-341, 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , Issue.3 , pp. 324-341
    • Sethi, S.1    Sidney, J.2    Sriskandarajah, C.3
  • 11
    • 9644286254 scopus 로고    scopus 로고
    • Scheduling multiple parts in a robotic cell served by a dual-gripper robot
    • C. Sriskandarajah, I. Drobouchevitch, S. Sethi, and R. Chandrasekaran, "Scheduling multiple parts in a robotic cell served by a dual-gripper robot," Oper. Res., vol. 52, no. 1, pp. 65-82, 2004.
    • (2004) Oper. Res. , vol.52 , Issue.1 , pp. 65-82
    • Sriskandarajah, C.1    Drobouchevitch, I.2    Sethi, S.3    Chandrasekaran, R.4
  • 12
    • 23944522312 scopus 로고    scopus 로고
    • Sequencing and scheduling in robotic cells: Recent developments
    • M. Dawande, H. Geismar, S. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: Recent developments," J. Scheduling, vol. 8, pp. 387-426, 2005.
    • (2005) J. Scheduling , vol.8 , pp. 387-426
    • Dawande, M.1    Geismar, H.2    Sethi, S.3    Sriskandarajah, C.4
  • 13
    • 9644308134 scopus 로고    scopus 로고
    • Approximation algorithms for fc-unit cyclic solutions in robotic cells
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Approximation algorithms for fc-unit cyclic solutions in robotic cells," Eur. J. Oper. Res., vol. 162, pp. 291-309, 2005.
    • (2005) Eur. J. Oper. Res. , vol.162 , pp. 291-309
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 14
    • 11844251167 scopus 로고    scopus 로고
    • Minimizing cycle time in large robotics cell
    • S. Kuma, N. Ramanan, and C. Sriskandarajah, "Minimizing cycle time in large robotics cell," IIE Trans., vol. 37, no. 2, pp. 123-136, 2005.
    • (2005) IIE Trans. , vol.37 , Issue.2 , pp. 123-136
    • Kuma, S.1    Ramanan, N.2    Sriskandarajah, C.3
  • 16
    • 3242715937 scopus 로고    scopus 로고
    • Increasing throughput for robotic cells with parallel machines and multiple robots
    • N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots," IEEE Trans. Automat. Sci. Eng., vol. 1, no. 1, pp. 84-89, 2004.
    • (2004) IEEE Trans. Automat. Sci. Eng. , vol.1 , Issue.1 , pp. 84-89
    • Geismar, N.1    Sriskandarajah, C.2    Ramanan, N.3
  • 17
    • 33747443542 scopus 로고    scopus 로고
    • Multi-cluster tools scheduling: An integrated event graph and network model approach
    • S. Ding, J. Yi, and M. T. Zhang, "Multi-cluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semi-conduct. Manufact., vol. 19, no. 3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semi-conduct. Manufact. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 18
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multi-cluster tools: An decomposition approach
    • J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: An decomposition approach," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 2, pp. 321-336, 2008.
    • (2008) IEEE Trans. Automat. Sci. Eng. , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.T.4
  • 19
    • 44449131528 scopus 로고    scopus 로고
    • On the optimality of one-unit cycle scheduling of multi-cluster tools with single-blade robots
    • Scottsdale, AZ
    • W.-K. Chan, J. Yi, and S. Ding, "On the optimality of one-unit cycle scheduling of multi-cluster tools with single-blade robots," in Proc. IEEE Int. Conf. Auto. Sci. Eng., Scottsdale, AZ, 2007, pp. 392-397.
    • (2007) Proc. IEEE Int. Conf. Auto. Sci. Eng. , pp. 392-397
    • Chan, W.-K.1    Yi, J.2    Ding, S.3
  • 20
    • 54949096231 scopus 로고    scopus 로고
    • Optimal scheduling offc-unit production of cluster tools with single-blade robots
    • Washington, DC
    • W.-K. Chan, J. Yi, S. Ding, and D. Song, "Optimal scheduling offc-unit production of cluster tools with single-blade robots," in Proc. IEEE Int. Conf. Auto. Sci. Eng., Washington, DC, 2008, pp. 335-340.
    • (2008) Proc. IEEE Int. Conf. Auto. Sci. Eng. , pp. 335-340
    • Chan, W.-K.1    Yi, J.2    Ding, S.3    Song, D.4
  • 21
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations
    • Jan.
    • W.-K. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1,pp. 17-28, Jan. 2011.
    • (2011) IEEE Trans. Automat. Sci. Eng. , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.-K.1    Ding, S.2    Yi, J.3    Song, D.4
  • 22
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • DOI 10.1109/70.964658, PII S1042296X01094630
    • W. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Automat., vol. 17, no. 5, pp. 562-575, 2001. (Pubitemid 33137773)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.M.1
  • 23
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedu-lability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedu-lability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semiconduct. Manufact., vol. 21, no. 2, pp. 224-237, 2008.
    • (2008) IEEE Trans. Semiconduct. Manufact. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.4
  • 24
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 3, pp. 490-503, 2008.
    • (2008) IEEE Trans. Automat. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 25
    • 46149112500 scopus 로고    scopus 로고
    • Mathematical programming representations of discrete-event system dynamics,"
    • Ph.D. dissertation Univ. California, Berkeley, CA
    • W.-K. Chan, "Mathematical programming representations of discrete-event system dynamics," Ph.D. dissertation, Dept. Ind. Eng. Oper. Res., Univ. California, Berkeley, CA, 2005.
    • (2005) Dept. Ind. Eng. Oper. Res.
    • Chan, W.-K.1
  • 26
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, pp. 445-470, 2007.
    • (2007) OR Spectrum , vol.29 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 27
    • 26444468924 scopus 로고    scopus 로고
    • Constrained shortest path computation
    • C. B. Medeiros, M. J. Egenhofer, and E. Bertino, Eds., Angra dos Reis, Brazil
    • M. Terrovitis, S. Bakiras, D. Papadias, and K. K. Mouratidis, "Constrained shortest path computation," in Proc. Int. Symp. Spat. Temp. Databases (SSTD), C. B. Medeiros, M. J. Egenhofer, and E. Bertino, Eds., Angra dos Reis, Brazil, 2005, pp. 181-199.
    • (2005) Proc. Int. Symp. Spat. Temp. Databases (SSTD) , pp. 181-199
    • Terrovitis, M.1    Bakiras, S.2    Papadias, D.3    Mouratidis, K.K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.