-
1
-
-
33846131213
-
Method and aparatus for managing scheduling a multiple cluster tool
-
Patent 1 Dec.
-
D. Jevtic, "Method and aparatus for managing scheduling a multiple cluster tool," European Patent 1,132,792 (A2), Dec. 2001.
-
(2001)
European
, vol.132
, Issue.792
-
-
Jevtic, D.1
-
2
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput,"
-
T. Perkinson, P. McLarty, R. Gyurcsik, and R. Cavin, "Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semiconduct. Manufact., vol. 7, no. 3, pp. 369-373, 1994.
-
(1994)
IEEE Trans. Semiconduct. Manufact.
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.1
McLarty, P.2
Gyurcsik, R.3
Cavin, R.4
-
3
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semiconduct. Manufact., vol. 10, no. 4, pp. 418-424, 1997.
-
(1997)
IEEE Trans. Semiconduct. Manufact.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
4
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama and J. van de Klundert, "Cyclic scheduling of identical parts in a robotic cell," Opers. Res., vol. 45, no. 6, pp. 952-965, 1997.
-
(1997)
Opers. Res.
, vol.45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Klundert De J.Van2
-
5
-
-
0034367676
-
Cyclic scheduling of robotic flowshops
-
Y. Crama, V. Kats, J. van de Klundert, and E. Levner, "Cyclic scheduling of robotic flowshops," Anns. Oper. Res., vol. 96, no. 1, pp. 97-124, 2000.
-
(2000)
Anns. Oper. Res.
, vol.96
, Issue.1
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
Klundert De J.Van3
Levner, E.4
-
7
-
-
0036769403
-
On throughtput maximization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah, and S. Sethi, "On throughtput maximization in constant travel-time robotic cells," Manuf. Serv. Oper. Manage., vol. 4, no. 4, pp. 296-312, 2002.
-
(2002)
Manuf. Serv. Oper. Manage.
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
8
-
-
28244447024
-
Scheduling dual gripper robotic cells: One-unit cycles
-
I. Drobouchevitch, S. Sethi, and C. Sriskandarajah, "Scheduling dual gripper robotic cells: One-unit cycles," Eur. J. Oper. Res., vol. 171, no. 2, pp. 598-631,2006.
-
(2006)
Eur. J. Oper. Res.
, vol.171
, Issue.2
, pp. 598-631
-
-
Drobouchevitch, I.1
Sethi, S.2
Sriskandarajah, C.3
-
9
-
-
0030086424
-
Optimal sequencing of double-gripper granty robot moves in tightly-coupled serial production systems,"
-
Q. Su and F. Chen, "Optimal sequencing of double-gripper granty robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Automat., vol. 12, no. 1, pp. 22-30, 1996.
-
(1996)
IEEE Trans. Robot. Automat.
, vol.12
, Issue.1
, pp. 22-30
-
-
Su, Q.1
Chen, F.2
-
10
-
-
0035357074
-
Scheduling in dual gripper robotic cells for productivity gains
-
S. Sethi, J. Sidney, and C. Sriskandarajah, "Scheduling in dual gripper robotic cells for productivity gains," IEEE Trans. Robot. Automat., vol. 17, no. 3, pp. 324-341, 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.3
, pp. 324-341
-
-
Sethi, S.1
Sidney, J.2
Sriskandarajah, C.3
-
11
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual-gripper robot
-
C. Sriskandarajah, I. Drobouchevitch, S. Sethi, and R. Chandrasekaran, "Scheduling multiple parts in a robotic cell served by a dual-gripper robot," Oper. Res., vol. 52, no. 1, pp. 65-82, 2004.
-
(2004)
Oper. Res.
, vol.52
, Issue.1
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.2
Sethi, S.3
Chandrasekaran, R.4
-
12
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, H. Geismar, S. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: Recent developments," J. Scheduling, vol. 8, pp. 387-426, 2005.
-
(2005)
J. Scheduling
, vol.8
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.2
Sethi, S.3
Sriskandarajah, C.4
-
13
-
-
9644308134
-
Approximation algorithms for fc-unit cyclic solutions in robotic cells
-
N. Geismar, M. Dawande, and C. Sriskandarajah, "Approximation algorithms for fc-unit cyclic solutions in robotic cells," Eur. J. Oper. Res., vol. 162, pp. 291-309, 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.162
, pp. 291-309
-
-
Geismar, N.1
Dawande, M.2
Sriskandarajah, C.3
-
14
-
-
11844251167
-
Minimizing cycle time in large robotics cell
-
S. Kuma, N. Ramanan, and C. Sriskandarajah, "Minimizing cycle time in large robotics cell," IIE Trans., vol. 37, no. 2, pp. 123-136, 2005.
-
(2005)
IIE Trans.
, vol.37
, Issue.2
, pp. 123-136
-
-
Kuma, S.1
Ramanan, N.2
Sriskandarajah, C.3
-
16
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots
-
N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots," IEEE Trans. Automat. Sci. Eng., vol. 1, no. 1, pp. 84-89, 2004.
-
(2004)
IEEE Trans. Automat. Sci. Eng.
, vol.1
, Issue.1
, pp. 84-89
-
-
Geismar, N.1
Sriskandarajah, C.2
Ramanan, N.3
-
17
-
-
33747443542
-
Multi-cluster tools scheduling: An integrated event graph and network model approach
-
S. Ding, J. Yi, and M. T. Zhang, "Multi-cluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semi-conduct. Manufact., vol. 19, no. 3, pp. 339-351, 2006.
-
(2006)
IEEE Trans. Semi-conduct. Manufact.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
18
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: An decomposition approach
-
J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: An decomposition approach," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 2, pp. 321-336, 2008.
-
(2008)
IEEE Trans. Automat. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
-
19
-
-
44449131528
-
On the optimality of one-unit cycle scheduling of multi-cluster tools with single-blade robots
-
Scottsdale, AZ
-
W.-K. Chan, J. Yi, and S. Ding, "On the optimality of one-unit cycle scheduling of multi-cluster tools with single-blade robots," in Proc. IEEE Int. Conf. Auto. Sci. Eng., Scottsdale, AZ, 2007, pp. 392-397.
-
(2007)
Proc. IEEE Int. Conf. Auto. Sci. Eng.
, pp. 392-397
-
-
Chan, W.-K.1
Yi, J.2
Ding, S.3
-
20
-
-
54949096231
-
Optimal scheduling offc-unit production of cluster tools with single-blade robots
-
Washington, DC
-
W.-K. Chan, J. Yi, S. Ding, and D. Song, "Optimal scheduling offc-unit production of cluster tools with single-blade robots," in Proc. IEEE Int. Conf. Auto. Sci. Eng., Washington, DC, 2008, pp. 335-340.
-
(2008)
Proc. IEEE Int. Conf. Auto. Sci. Eng.
, pp. 335-340
-
-
Chan, W.-K.1
Yi, J.2
Ding, S.3
Song, D.4
-
21
-
-
78651094962
-
Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations
-
Jan.
-
W.-K. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1,pp. 17-28, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 17-28
-
-
Chan, W.-K.1
Ding, S.2
Yi, J.3
Song, D.4
-
22
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
DOI 10.1109/70.964658, PII S1042296X01094630
-
W. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Automat., vol. 17, no. 5, pp. 562-575, 2001. (Pubitemid 33137773)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
23
-
-
43849109024
-
A Petri net method for schedu-lability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedu-lability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semiconduct. Manufact., vol. 21, no. 2, pp. 224-237, 2008.
-
(2008)
IEEE Trans. Semiconduct. Manufact.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.4
-
24
-
-
46849094532
-
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
-
J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 3, pp. 490-503, 2008.
-
(2008)
IEEE Trans. Automat. Sci. Eng.
, vol.5
, Issue.3
, pp. 490-503
-
-
Kim, J.-H.1
Lee, T.-E.2
-
25
-
-
46149112500
-
Mathematical programming representations of discrete-event system dynamics,"
-
Ph.D. dissertation Univ. California, Berkeley, CA
-
W.-K. Chan, "Mathematical programming representations of discrete-event system dynamics," Ph.D. dissertation, Dept. Ind. Eng. Oper. Res., Univ. California, Berkeley, CA, 2005.
-
(2005)
Dept. Ind. Eng. Oper. Res.
-
-
Chan, W.-K.1
-
26
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, pp. 445-470, 2007.
-
(2007)
OR Spectrum
, vol.29
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
27
-
-
26444468924
-
Constrained shortest path computation
-
C. B. Medeiros, M. J. Egenhofer, and E. Bertino, Eds., Angra dos Reis, Brazil
-
M. Terrovitis, S. Bakiras, D. Papadias, and K. K. Mouratidis, "Constrained shortest path computation," in Proc. Int. Symp. Spat. Temp. Databases (SSTD), C. B. Medeiros, M. J. Egenhofer, and E. Bertino, Eds., Angra dos Reis, Brazil, 2005, pp. 181-199.
-
(2005)
Proc. Int. Symp. Spat. Temp. Databases (SSTD)
, pp. 181-199
-
-
Terrovitis, M.1
Bakiras, S.2
Papadias, D.3
Mouratidis, K.K.4
|