Volumn 12, Issue 1, 2015, Pages 309-323

A branch and bound algorithm for cyclic scheduling of timed petri nets

Author keywords

Branch and bound algorithm; cluster tool; cyclic scheduling; timed event graph (TEG); timed Petri net (TPN)

Indexed keywords

ALGORITHMS; BRANCH AND BOUND METHOD; CLUSTERING ALGORITHMS; COMPUTATIONAL EFFICIENCY; DISCRETE EVENT SIMULATION; LINEAR PROGRAMMING; MACHINE SHOP PRACTICE; MANUFACTURE; MATHEMATICAL TRANSFORMATIONS; PETRI NETS; PROBLEM SOLVING; ROBOTICS; SCHEDULING ALGORITHMS; TOOLS; TREES (MATHEMATICS);

EID: 84920716049     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2013.2285221     Document Type: Article
Times cited : (53)

References (48)
  • 1
    • 0002591492 scopus 로고
    • Cyclic scheduling on parallel processors: An overview
    • P. Chrétienne, E. G. Coffman, J. K. Lenstra, and Z. Liu, Eds. New York, NY, USA: Wiley
    • C. Hanen and A. Munier, "Cyclic scheduling on parallel processors: An overview," in Scheduling Theory and Its Applications, P. Chrétienne, E. G. Coffman, J. K. Lenstra, and Z. Liu, Eds. New York, NY, USA: Wiley, 1994, pp. 193-226.
    • (1994) Scheduling Theory and Its Applications , pp. 193-226
    • Hanen, C.1    Munier, A.2
  • 2
    • 77955700913 scopus 로고    scopus 로고
    • Complexity of cyclic scheduling problems: A state-of-the-art survey
    • E. Levner,V.Kats, D. A.L. de Pablo, andT.C.E.Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey," Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
    • (2010) Comput. Ind. Eng. , vol.59 , Issue.2 , pp. 352-361
    • Levner, E.1    Kats, V.2    De Pablo, D.A.L.3    Cheng, T.C.E.4
  • 4
    • 0031142587 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Classification, two and three machine cells
    • N. G. Hall, H. Kamoun, and C. Sriskandarajah, "Scheduling in robotic cells: Classification, two and three machine cells," Oper. Res., vol. 45, no. 3, pp. 421-439, 1997.
    • (1997) Oper. Res. , vol.45 , Issue.3 , pp. 421-439
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 5
    • 84920741511 scopus 로고    scopus 로고
    • Stable earliest schedule for cyclic job shops: A linear system approach
    • T.-E. Lee, "Stable earliest schedule for cyclic job shops: A linear system approach," Int. J. Flexible Manuf. Syst., vol. 17, no. 5, pp. 562-575, 2001.
    • (2001) Int. J. Flexible Manuf. Syst. , vol.17 , Issue.5 , pp. 562-575
    • Lee, T.-E.1
  • 6
    • 0000136120 scopus 로고    scopus 로고
    • A parametric critical path problem and an application for cyclic scheduling
    • E. V. Levner and V. Kats, "A parametric critical path problem and an application for cyclic scheduling," Discrete Appl. Math., vol. 87, no. 1, pp. 149-158, 1998.
    • (1998) Discrete Appl. Math. , vol.87 , Issue.1 , pp. 149-158
    • Levner, E.V.1    Kats, V.2
  • 7
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 8
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with reentrant wafer flows
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 9
    • 54949132214 scopus 로고    scopus 로고
    • Optimal scheduling of dual-armed cluster tools without swap restriction
    • Washington, DC, USA
    • J.-H. Paek and T.-E. Lee, "Optimal scheduling of dual-armed cluster tools without swap restriction," in Proc. IEEE Conf. Autom. Sci.,Washington, DC, USA, 2008, pp. 103-108.
    • (2008) Proc. IEEE Conf. Autom. Sci. , pp. 103-108
    • Paek, J.-H.1    Lee, T.-E.2
  • 10
    • 84860664318 scopus 로고    scopus 로고
    • An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems
    • C. Jung and T.-E. Lee, "An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 12
    • 78651080378 scopus 로고    scopus 로고
    • Productivity improvement from using machine buffers in dual-gripper cluster tools
    • Jan
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 29-41
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 13
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, 2008.
    • (2008) IEEE Trans. Semicond. Manuf. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.4
  • 14
    • 82455167620 scopus 로고    scopus 로고
    • Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy
    • Shanghai
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy," in Proc. IEEE Int. Conf. Robot. Autom., Shanghai, 2011, pp. 5499-5504.
    • (2011) Proc. IEEE Int. Conf. Robot. Autom. , pp. 5499-5504
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 15
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan
    • N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 16
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr
    • N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng. , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.Q.1    Zhou, M.C.2
  • 17
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, 2010.
    • (2010) IEEE Trans. Semicond. Manuf. , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.Q.1    Zhou, M.C.2
  • 19
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr
    • N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.1    Zhou, M.2
  • 20
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan
    • N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.1    Zhou, M.2
  • 21
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul
    • Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 22
    • 84864687325 scopus 로고    scopus 로고
    • Petri net modeling and wafer sojourn time analysis of single-arm cluster toolswith residency time constraints and activity time variation
    • Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster toolswith residency time constraints and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 432-446
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 23
    • 84887067395 scopus 로고    scopus 로고
    • Petri net modeling and cycletime analysis of dual-arm cluster tools with wafer revisiting
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net modeling and cycletime analysis of dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern.-Part A: Syst. Humans, vol. 43, no. 1, pp. 196-207, 2013.
    • (2013) IEEE Trans. Syst., Man, Cybern.-Part A: Syst. Humans , vol.43 , Issue.1 , pp. 196-207
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 24
    • 84873384586 scopus 로고    scopus 로고
    • A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
    • Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, 2013.
    • (2013) IEEE Trans. Semicond. Manuf. , vol.26 , Issue.1 , pp. 100-110
    • Qiao, Y.1    Wu, N.2    Zhou, M.3
  • 25
    • 43849104454 scopus 로고    scopus 로고
    • Cyclic scheduling for F.M.S.: Modeling and evolutionary solving approach
    • T.Hsu, O.Korbaa, R.Dupas, andG. Goncalves, "Cyclic scheduling for F.M.S.: Modeling and evolutionary solving approach," Eur. J. Oper. Res., vol. 191, no. 2, pp. 464-484, 2008.
    • (2008) Eur. J. Oper. Res. , vol.191 , Issue.2 , pp. 464-484
    • Hsu, T.1    Korbaa, O.2    Dupas, R.3    Goncalves, G.4
  • 26
    • 5144220415 scopus 로고    scopus 로고
    • A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints
    • G. Cavory, R.Dupas, andG.Goncalves, "A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints," Eur. J. Oper. Res., vol. 161, no. 1, pp. 73-85, 2005.
    • (2005) Eur. J. Oper. Res. , vol.161 , Issue.1 , pp. 73-85
    • Cavory, G.1    Dupas, R.2    Goncalves, G.3
  • 28
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, no. 3, pp. 445-470, 2007.
    • (2007) OR Spectrum , vol.29 , Issue.3 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 30
    • 0019058848 scopus 로고
    • Performance evaluation of asynchronous concurrent systems using Petri nets
    • C. V. Ramamoorthy and G. S. Ho, "Performance evaluation of asynchronous concurrent systems using Petri nets," IEEE Trans. Softw. Eng., vol. SE-6, no. 5, pp. 440-449, 1980.
    • (1980) IEEE Trans. Softw. Eng. , vol.SE-6 , Issue.5 , pp. 440-449
    • Ramamoorthy, C.V.1    Ho, G.S.2
  • 31
    • 0024479894 scopus 로고
    • Performance evaluation of job-shop systems using timed event-graphs
    • H. Hillion and J.-M. Proth, "Performance evaluation of job-shop systems using timed event-graphs," IEEE Trans. Autom. Control, vol. 34, no. 1, pp. 3-9, 1989.
    • (1989) IEEE Trans. Autom. Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.1    Proth, J.-M.2
  • 32
    • 0003059012 scopus 로고
    • Modeling scheduling problems with timed Petri nets
    • J. Carlier, P. Chretienne, and C. Girault, "Modeling scheduling problems with timed Petri nets," Advances in Petri Nets, vol. 188, pp. 62-82, 1985.
    • (1985) Advances in Petri Nets , vol.188 , pp. 62-82
    • Carlier, J.1    Chretienne, P.2    Girault, C.3
  • 34
    • 3242695721 scopus 로고    scopus 로고
    • Petri net based scheduling
    • W. M. P. van der Aalst, "Petri net based scheduling," OR Spectrum, vol. 18, no. 4, pp. 219-229, 1996.
    • (1996) OR Spectrum , vol.18 , Issue.4 , pp. 219-229
    • Van Der Aalst, W.M.P.1
  • 35
    • 84880234285 scopus 로고    scopus 로고
    • Modelling and simulation of automated manufacturing systems for evaluation of complex schedules
    • C. Kim and T.-E. Lee, "Modelling and simulation of automated manufacturing systems for evaluation of complex schedules," Int. J. Prod. Res., vol. 51, no. 12, pp. 3734-3747, 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3734-3747
    • Kim, C.1    Lee, T.-E.2
  • 36
    • 84871811802 scopus 로고    scopus 로고
    • Scheduling cluster tools with ready time constraints for consecutive small lots
    • Jan
    • H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 145-159
    • Kim, H.-J.1    Lee, J.-H.2    Jung, C.3    Lee, T.-E.4
  • 39
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A tutorial
    • R. Zurawski and M. Zhou, "Petri nets and industrial applications: A tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.2
  • 41
    • 45149097246 scopus 로고    scopus 로고
    • Token delays and generalized workload balancing for timed event graphs with application to cluster tool operation
    • Shanghai
    • T.-E. Lee, P. Sreenivas, and H.-Y. Lee, "Token delays and generalized workload balancing for timed event graphs with application to cluster tool operation," in Proc. IEEE Int. Conf. Autom. Sci. Eng., Shanghai, 2006, pp. 93-99.
    • (2006) Proc. IEEE Int. Conf. Autom. Sci. Eng. , pp. 93-99
    • Lee, T.-E.1    Sreenivas, P.2    Lee, H.-Y.3
  • 42
    • 0035816116 scopus 로고    scopus 로고
    • Cycles and permutations in robotic cells
    • N. Brauner and G. Finke, "Cycles and permutations in robotic cells," Math. Comput. Modeling, vol. 34, no. 5-6, pp. 565-591, 2001.
    • (2001) Math. Comput. Modeling , vol.34 , Issue.5-6 , pp. 565-591
    • Brauner, N.1    Finke, G.2
  • 44
    • 12844262250 scopus 로고    scopus 로고
    • Comments on timed Petri nets in modeling and analysis of cluster tools
    • Apr
    • M. Jeng, "Comments on timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 1, pp. 92-93, Apr. 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.1 , pp. 92-93
    • Jeng, M.1
  • 46
    • 0004785206 scopus 로고
    • Parametric shortest path algorithms with an application to cyclic staffing
    • R. M. Karp and J. B. Orlin, "Parametric shortest path algorithms with an application to cyclic staffing," Discrete Appl. Math., vol. 3, no. 1, pp. 37-45, 1981.
    • (1981) Discrete Appl. Math. , vol.3 , Issue.1 , pp. 37-45
    • Karp, R.M.1    Orlin, J.B.2
  • 47
    • 84880197775 scopus 로고    scopus 로고
    • Scheduling dual-armed cluster tools with cleaning processes
    • H. Kim, H.-J. Kim, J.-H. Lee, and T.-E. Lee, "Scheduling dual-armed cluster tools with cleaning processes," Int. J. Prod. Res., vol. 51, no. 12, pp. 3671-3687, 2013.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.12 , pp. 3671-3687
    • Kim, H.1    Kim, H.-J.2    Lee, J.-H.3    Lee, T.-E.4
  • 48
    • 84887923282 scopus 로고    scopus 로고
    • Scheduling lot switching operations for cluster tools
    • Nov
    • J.-H. Lee, H.-J. Kim, and T.-E. Lee, "Scheduling lot switching operations for cluster tools," IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 592-601, Nov. 2013, DOI: 10.1109/TASE.2013.2255037.
    • (2013) IEEE Trans. Semicond. Manuf. , vol.26 , Issue.4 , pp. 592-601
    • Lee, J.-H.1    Kim, H.-J.2    Lee, T.-E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.