-
1
-
-
0002591492
-
Cyclic scheduling on parallel processors: An overview
-
P. Chrétienne, E. G. Coffman, J. K. Lenstra, and Z. Liu, Eds. New York, NY, USA: Wiley
-
C. Hanen and A. Munier, "Cyclic scheduling on parallel processors: An overview," in Scheduling Theory and Its Applications, P. Chrétienne, E. G. Coffman, J. K. Lenstra, and Z. Liu, Eds. New York, NY, USA: Wiley, 1994, pp. 193-226.
-
(1994)
Scheduling Theory and Its Applications
, pp. 193-226
-
-
Hanen, C.1
Munier, A.2
-
2
-
-
77955700913
-
Complexity of cyclic scheduling problems: A state-of-the-art survey
-
E. Levner,V.Kats, D. A.L. de Pablo, andT.C.E.Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey," Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.2
, pp. 352-361
-
-
Levner, E.1
Kats, V.2
De Pablo, D.A.L.3
Cheng, T.C.E.4
-
3
-
-
33645433061
-
-
New York,NY,USA: Springer
-
M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarajah, Throughput Optimization in Robotic Cells. New York,NY,USA: Springer, 2007.
-
(2007)
Throughput Optimization in Robotic Cells
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
4
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
N. G. Hall, H. Kamoun, and C. Sriskandarajah, "Scheduling in robotic cells: Classification, two and three machine cells," Oper. Res., vol. 45, no. 3, pp. 421-439, 1997.
-
(1997)
Oper. Res.
, vol.45
, Issue.3
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
5
-
-
84920741511
-
Stable earliest schedule for cyclic job shops: A linear system approach
-
T.-E. Lee, "Stable earliest schedule for cyclic job shops: A linear system approach," Int. J. Flexible Manuf. Syst., vol. 17, no. 5, pp. 562-575, 2001.
-
(2001)
Int. J. Flexible Manuf. Syst.
, vol.17
, Issue.5
, pp. 562-575
-
-
Lee, T.-E.1
-
6
-
-
0000136120
-
A parametric critical path problem and an application for cyclic scheduling
-
E. V. Levner and V. Kats, "A parametric critical path problem and an application for cyclic scheduling," Discrete Appl. Math., vol. 87, no. 1, pp. 149-158, 1998.
-
(1998)
Discrete Appl. Math.
, vol.87
, Issue.1
, pp. 149-158
-
-
Levner, E.V.1
Kats, V.2
-
7
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
8
-
-
33646717079
-
Scheduling single-armed cluster tools with reentrant wafer flows
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
9
-
-
54949132214
-
Optimal scheduling of dual-armed cluster tools without swap restriction
-
Washington, DC, USA
-
J.-H. Paek and T.-E. Lee, "Optimal scheduling of dual-armed cluster tools without swap restriction," in Proc. IEEE Conf. Autom. Sci.,Washington, DC, USA, 2008, pp. 103-108.
-
(2008)
Proc. IEEE Conf. Autom. Sci.
, pp. 103-108
-
-
Paek, J.-H.1
Lee, T.-E.2
-
10
-
-
84860664318
-
An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems
-
C. Jung and T.-E. Lee, "An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, 2012.
-
(2012)
IEEE Trans. Semicond. Manuf.
, vol.25
, Issue.2
, pp. 186-199
-
-
Jung, C.1
Lee, T.-E.2
-
11
-
-
0029486579
-
Petri net scheduling of FMS using branch and boundmethod
-
Orlando
-
M. Zhou,H.-S. Chiu, and H.Xiong, "Petri net scheduling of FMS using branch and boundmethod," in Proc. IEEE Conf. Ind. Electron., Control and Instrumentation, Orlando, 1995, pp. 211-216.
-
(1995)
Proc. IEEE Conf. Ind. Electron., Control and Instrumentation
, pp. 211-216
-
-
Zhou, M.1
Chiu, H.-S.2
Xiong, H.3
-
12
-
-
78651080378
-
Productivity improvement from using machine buffers in dual-gripper cluster tools
-
Jan
-
N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 29-41
-
-
Geismar, N.1
Dawande, M.2
Sriskandarajah, C.3
-
13
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.4
-
14
-
-
82455167620
-
Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy
-
Shanghai
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy," in Proc. IEEE Int. Conf. Robot. Autom., Shanghai, 2011, pp. 5499-5504.
-
(2011)
Proc. IEEE Int. Conf. Robot. Autom.
, pp. 5499-5504
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
15
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan
-
N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.B.3
Zhou, M.C.4
-
16
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr
-
N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Autom. Sci. Eng.
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.Q.1
Zhou, M.C.2
-
17
-
-
76849088211
-
Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
-
N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.Q.1
Zhou, M.C.2
-
19
-
-
84859753478
-
Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
-
Apr
-
N. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 446-454
-
-
Wu, N.1
Zhou, M.2
-
20
-
-
84855355646
-
Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
-
Jan
-
N. Wu and M. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 203-209
-
-
Wu, N.1
Zhou, M.2
-
21
-
-
84863456306
-
Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
-
Jul
-
Y. Qiao, N. Wu, and M. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.3
, pp. 564-577
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
22
-
-
84864687325
-
Petri net modeling and wafer sojourn time analysis of single-arm cluster toolswith residency time constraints and activity time variation
-
Y. Qiao, N. Wu, and M. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster toolswith residency time constraints and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-446, 2012.
-
(2012)
IEEE Trans. Semicond. Manuf.
, vol.25
, Issue.3
, pp. 432-446
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
23
-
-
84887067395
-
Petri net modeling and cycletime analysis of dual-arm cluster tools with wafer revisiting
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net modeling and cycletime analysis of dual-arm cluster tools with wafer revisiting," IEEE Trans. Syst., Man, Cybern.-Part A: Syst. Humans, vol. 43, no. 1, pp. 196-207, 2013.
-
(2013)
IEEE Trans. Syst., Man, Cybern.-Part A: Syst. Humans
, vol.43
, Issue.1
, pp. 196-207
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
24
-
-
84873384586
-
A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
-
Y. Qiao, N. Wu, and M. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, 2013.
-
(2013)
IEEE Trans. Semicond. Manuf.
, vol.26
, Issue.1
, pp. 100-110
-
-
Qiao, Y.1
Wu, N.2
Zhou, M.3
-
25
-
-
43849104454
-
Cyclic scheduling for F.M.S.: Modeling and evolutionary solving approach
-
T.Hsu, O.Korbaa, R.Dupas, andG. Goncalves, "Cyclic scheduling for F.M.S.: Modeling and evolutionary solving approach," Eur. J. Oper. Res., vol. 191, no. 2, pp. 464-484, 2008.
-
(2008)
Eur. J. Oper. Res.
, vol.191
, Issue.2
, pp. 464-484
-
-
Hsu, T.1
Korbaa, O.2
Dupas, R.3
Goncalves, G.4
-
26
-
-
5144220415
-
A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints
-
G. Cavory, R.Dupas, andG.Goncalves, "A genetic approach to solving the problem of cyclic job shop scheduling with linear constraints," Eur. J. Oper. Res., vol. 161, no. 1, pp. 73-85, 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.161
, Issue.1
, pp. 73-85
-
-
Cavory, G.1
Dupas, R.2
Goncalves, G.3
-
27
-
-
33845722194
-
Formal approach of FMS cyclic scheduling
-
B. Trouillet, O. Korbaa, and J.-C. Gentina, "Formal approach of FMS cyclic scheduling," IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev., vol. 37, no. 1, pp. 126-137, 2007.
-
(2007)
IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev.
, vol.37
, Issue.1
, pp. 126-137
-
-
Trouillet, B.1
Korbaa, O.2
Gentina, J.-C.3
-
28
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, no. 3, pp. 445-470, 2007.
-
(2007)
OR Spectrum
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
29
-
-
0029182871
-
FMS scheduling using Petri netmodeling and a branch&bound search
-
Pittsburgh
-
S. Lloyd,H.Yu, and N. Konstas, "FMS scheduling using Petri netmodeling and a branch&bound search," inProc. IEEE Int. Symp.Assembly and Task Planning, Pittsburgh, 1995, pp. 141-146.
-
(1995)
InProc. IEEE Int. Symp.Assembly and Task Planning
, pp. 141-146
-
-
Lloyd, S.1
Yu, H.2
Konstas, N.3
-
30
-
-
0019058848
-
Performance evaluation of asynchronous concurrent systems using Petri nets
-
C. V. Ramamoorthy and G. S. Ho, "Performance evaluation of asynchronous concurrent systems using Petri nets," IEEE Trans. Softw. Eng., vol. SE-6, no. 5, pp. 440-449, 1980.
-
(1980)
IEEE Trans. Softw. Eng.
, vol.SE-6
, Issue.5
, pp. 440-449
-
-
Ramamoorthy, C.V.1
Ho, G.S.2
-
31
-
-
0024479894
-
Performance evaluation of job-shop systems using timed event-graphs
-
H. Hillion and J.-M. Proth, "Performance evaluation of job-shop systems using timed event-graphs," IEEE Trans. Autom. Control, vol. 34, no. 1, pp. 3-9, 1989.
-
(1989)
IEEE Trans. Autom. Control
, vol.34
, Issue.1
, pp. 3-9
-
-
Hillion, H.1
Proth, J.-M.2
-
32
-
-
0003059012
-
Modeling scheduling problems with timed Petri nets
-
J. Carlier, P. Chretienne, and C. Girault, "Modeling scheduling problems with timed Petri nets," Advances in Petri Nets, vol. 188, pp. 62-82, 1985.
-
(1985)
Advances in Petri Nets
, vol.188
, pp. 62-82
-
-
Carlier, J.1
Chretienne, P.2
Girault, C.3
-
34
-
-
3242695721
-
Petri net based scheduling
-
W. M. P. van der Aalst, "Petri net based scheduling," OR Spectrum, vol. 18, no. 4, pp. 219-229, 1996.
-
(1996)
OR Spectrum
, vol.18
, Issue.4
, pp. 219-229
-
-
Van Der Aalst, W.M.P.1
-
35
-
-
84880234285
-
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules
-
C. Kim and T.-E. Lee, "Modelling and simulation of automated manufacturing systems for evaluation of complex schedules," Int. J. Prod. Res., vol. 51, no. 12, pp. 3734-3747, 2013.
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.12
, pp. 3734-3747
-
-
Kim, C.1
Lee, T.-E.2
-
36
-
-
84871811802
-
Scheduling cluster tools with ready time constraints for consecutive small lots
-
Jan
-
H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
-
(2013)
IEEE Trans. Autom. Sci. Eng.
, vol.10
, Issue.1
, pp. 145-159
-
-
Kim, H.-J.1
Lee, J.-H.2
Jung, C.3
Lee, T.-E.4
-
39
-
-
0028714917
-
Petri nets and industrial applications: A tutorial
-
R. Zurawski and M. Zhou, "Petri nets and industrial applications: A tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, 1994.
-
(1994)
IEEE Trans. Ind. Electron.
, vol.41
, Issue.6
, pp. 567-583
-
-
Zurawski, R.1
Zhou, M.2
-
40
-
-
0003925028
-
-
New York, NY, USA: Wiley
-
F. Baccelli, G. Cohen, G. J. Olsder, and J.-P. Quadrat, Synchronization and Linerity. New York, NY, USA: Wiley, 1992.
-
(1992)
Synchronization and Linerity
-
-
Baccelli, F.1
Cohen, G.2
Olsder, G.J.3
Quadrat, J.-P.4
-
41
-
-
45149097246
-
Token delays and generalized workload balancing for timed event graphs with application to cluster tool operation
-
Shanghai
-
T.-E. Lee, P. Sreenivas, and H.-Y. Lee, "Token delays and generalized workload balancing for timed event graphs with application to cluster tool operation," in Proc. IEEE Int. Conf. Autom. Sci. Eng., Shanghai, 2006, pp. 93-99.
-
(2006)
Proc. IEEE Int. Conf. Autom. Sci. Eng.
, pp. 93-99
-
-
Lee, T.-E.1
Sreenivas, P.2
Lee, H.-Y.3
-
42
-
-
0035816116
-
Cycles and permutations in robotic cells
-
N. Brauner and G. Finke, "Cycles and permutations in robotic cells," Math. Comput. Modeling, vol. 34, no. 5-6, pp. 565-591, 2001.
-
(2001)
Math. Comput. Modeling
, vol.34
, Issue.5-6
, pp. 565-591
-
-
Brauner, N.1
Finke, G.2
-
43
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
S. P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, andW. Kubiak, "Sequencing of parts and robot moves in a robotic cell," Int. J. Flexible Manuf. Syst., vol. 4, no. 3-4, pp. 331-358, 1992.
-
(1992)
Int. J. Flexible Manuf. Syst.
, vol.4
, Issue.3-4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
44
-
-
12844262250
-
Comments on timed Petri nets in modeling and analysis of cluster tools
-
Apr
-
M. Jeng, "Comments on timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 1, pp. 92-93, Apr. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, Issue.1
, pp. 92-93
-
-
Jeng, M.1
-
46
-
-
0004785206
-
Parametric shortest path algorithms with an application to cyclic staffing
-
R. M. Karp and J. B. Orlin, "Parametric shortest path algorithms with an application to cyclic staffing," Discrete Appl. Math., vol. 3, no. 1, pp. 37-45, 1981.
-
(1981)
Discrete Appl. Math.
, vol.3
, Issue.1
, pp. 37-45
-
-
Karp, R.M.1
Orlin, J.B.2
-
47
-
-
84880197775
-
Scheduling dual-armed cluster tools with cleaning processes
-
H. Kim, H.-J. Kim, J.-H. Lee, and T.-E. Lee, "Scheduling dual-armed cluster tools with cleaning processes," Int. J. Prod. Res., vol. 51, no. 12, pp. 3671-3687, 2013.
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.12
, pp. 3671-3687
-
-
Kim, H.1
Kim, H.-J.2
Lee, J.-H.3
Lee, T.-E.4
-
48
-
-
84887923282
-
Scheduling lot switching operations for cluster tools
-
Nov
-
J.-H. Lee, H.-J. Kim, and T.-E. Lee, "Scheduling lot switching operations for cluster tools," IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 592-601, Nov. 2013, DOI: 10.1109/TASE.2013.2255037.
-
(2013)
IEEE Trans. Semicond. Manuf.
, vol.26
, Issue.4
, pp. 592-601
-
-
Lee, J.-H.1
Kim, H.-J.2
Lee, T.-E.3
|