메뉴 건너뛰기




Volumn 10, Issue 1, 2013, Pages 145-159

Scheduling cluster tools with ready time constraints for consecutive small lots

Author keywords

Cluster tool; noncyclic scheduling; Petri net; ready time constraints; small lot production

Indexed keywords

300 MM WAFERS; APPROXIMATION METHODS; BRANCH AND BOUNDS; CLUSTER TOOL; CYCLIC SCHEDULING; CYCLIC SEQUENCES; DISCRETE EVENT DYNAMIC SYSTEMS; LOT SIZE; MAKESPAN; MATHEMATICAL METHOD; MIXED INTEGER PROGRAMMING MODEL; OPTIMAL SCHEDULE; PETRI NET MODELS; PROCESS STEPS; SCHEDULING PROBLEM; SEMICONDUCTOR MANUFACTURING INDUSTRY; TIME CONSTRAINTS; WORK CYCLE;

EID: 84871811802     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2012.2220355     Document Type: Article
Times cited : (98)

References (39)
  • 1
    • 60749114750 scopus 로고    scopus 로고
    • A review of scheduling theory and methods for semiconductor manufacturing cluster tools
    • Miami, FL
    • T.-E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tools, " in Proc. Winter Simulation Conf., Miami, FL, 2008, pp. 2127-2135.
    • (2008) Proc. Winter Simulation Conf. , pp. 2127-2135
    • Lee, T.-E.1
  • 2
    • 78149442188 scopus 로고    scopus 로고
    • An open scheduling architecture for cluster tools
    • Toronto, ON, Canada
    • J.-H. Lee and T.-E. Lee, "An open scheduling architecture for cluster tools, " in Proc. IEEE Conf. Autom. Sci. Eng., Toronto, ON, Canada, 2010, pp. 420-425.
    • (2010) Proc. IEEE Conf. Autom. Sci. Eng. , pp. 420-425
    • Lee, J.-H.1    Lee, T.-E.2
  • 3
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 4
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis
    • Jan.
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, Part I: Two-cluster analysis, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 5
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations
    • Jan.
    • W. K. V. Chan, S. Ding, J. Yi, andD. Z. Song, "Optimal scheduling of multicluster tools with constant robot moving times, Part II: Tree-like topology configurations, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 17-28, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.K.V.1    Ding, S.2    Yi, J.3    Song, D.Z.4
  • 6
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets
    • Aug
    • W. M. Zuberek, "Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets, " IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
    • (2004) IEEE Trans. Semicond. Manuf , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1
  • 7
    • 0031276238 scopus 로고    scopus 로고
    • A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • PII S0894650797075519
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots, " IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997. (Pubitemid 127763010)
    • (1997) IEEE Transactions on Semiconductor Manufacturing , vol.10 , Issue.4 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 8
    • 77955321056 scopus 로고    scopus 로고
    • Colored timed Petri nets for modeling and analysis of cluster tools
    • N. Q. Wu and M. C. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools, " Asian J. Control, vol. 12, no. 3, pp. 253-266, 2010.
    • (2010) Asian J. Control , vol.12 , Issue.3 , pp. 253-266
    • Wu, N.Q.1    Zhou, M.C.2
  • 9
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • DOI 10.1109/TSM.2006.879414, 1668233
    • S. Ding, J. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach, " IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006. (Pubitemid 44249890)
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.T.3
  • 10
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach
    • DOI 10.1109/TASE.2007.906678, 4358085
    • J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008. (Pubitemid 351506277)
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.T.4
  • 11
    • 78651080378 scopus 로고    scopus 로고
    • Productivity improvement from using machine buffers in dual-gripper cluster tools
    • Jan.
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools, " IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng , vol.8 , Issue.1 , pp. 29-41
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 13
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
    • Jul
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net, " IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 14
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr.
    • N. Wu andM. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis, " IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.1    Zhou, M.C.2
  • 15
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • May
    • N. Wu, C. Chu, F. Chu, and M. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints, " IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
    • (2008) IEEE Trans. Semicond. Manuf , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.4
  • 16
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • Feb.
    • N. Q. Wu andM. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
    • (2010) IEEE Trans. Semicond. Manuf , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.Q.1    Zhou, M.C.2
  • 17
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan.
    • N. Q. Wu andM. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.Q.1    Zhou, M.C.2
  • 18
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • DOI 10.1109/TASE.2005.851236
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints, " IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Apr. 2005. (Pubitemid 41560387)
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 19
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr.
    • N. Q. Wu and M. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets, " IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.Q.1    Zhou, M.2
  • 20
    • 77649308311 scopus 로고    scopus 로고
    • Throughput optimization in dual-gripper interval robotic cells
    • M. W. Dawande, H. N. Geismar, M. Pinedo, and C. Sriskandarajah, "Throughput optimization in dual-gripper interval robotic cells, " IIE Trans., vol. 42, no. 1, pp. 1-15, 2010.
    • (2010) IIE Trans , vol.42 , Issue.1 , pp. 1-15
    • Dawande, M.W.1    Geismar, H.N.2    Pinedo, M.3    Sriskandarajah, C.4
  • 21
    • 28244489538 scopus 로고    scopus 로고
    • Dominance of cyclic solutions and challenges in the scheduling of robotic cells
    • DOI 10.1137/S003614450444138X
    • M. W. Dawande, H. N. Geismar, and S. P. Sethi, "Dominance of cyclic solutions and challenges in the scheduling of robotic cells, " SIAMRev., vol. 47, no. 4, pp. 709-721, 2005. (Pubitemid 41701416)
    • (2005) SIAM Review , vol.47 , Issue.4 , pp. 709-721
    • Dawande, M.W.1    Geismar, H.N.2    Sethi, S.P.3
  • 23
    • 0034367676 scopus 로고    scopus 로고
    • Cyclic scheduling in robotic flowshops
    • Y. Crama, V. Kats, J. van de Klundert, and E. Levner, "Cyclic scheduling in robotic flowshops, " Ann. Oper. Res., vol. 96, no. 1-4, pp. 97-124, 2000.
    • (2000) Ann. Oper. Res , vol.96 , Issue.1-4 , pp. 97-124
    • Crama, Y.1    Kats, V.2    Klundert De J.Van3    Levner, E.4
  • 24
    • 56349083345 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
    • V. Kats and E. Levner, "A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case, " Discrete Appl. Math., vol. 157, no. 2, pp. 339-355, 2009.
    • (2009) Discrete Appl. Math , vol.157 , Issue.2 , pp. 339-355
    • Kats, V.1    Levner, E.2
  • 25
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines, " OR Spectrum, vol. 29, no. 3, pp. 445-470, 2007.
    • (2007) OR Spectrum , vol.29 , Issue.3 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 26
    • 74549120245 scopus 로고    scopus 로고
    • Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times
    • A. Che, P. Yan, N. Yang, and C. Chu, "Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times, " Int. J. Prod. Res., vol. 48, no. 5, pp. 1225-1243, 2010.
    • (2010) Int. J. Prod. Res , vol.48 , Issue.5 , pp. 1225-1243
    • Che, A.1    Yan, P.2    Yang, N.3    Chu, C.4
  • 27
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • DOI 10.1109/70.964658, PII S1042296X01094630
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools, " IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, 2001. (Pubitemid 33137773)
    • (2001) IEEE Transactions on Robotics and Automation , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.M.1
  • 28
    • 85023501284 scopus 로고    scopus 로고
    • Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation
    • T.-K. Kim, C. Jung, and T.-E. Lee, "Scheduling start-up and closedown periods of dual-armed cluster tools with wafer delay regulation, " Int. J. Prod. Res., vol. 50, no. 10, pp. 2785-2795, 2012.
    • (2012) Int. J. Prod. Res , vol.50 , Issue.10 , pp. 2785-2795
    • Kim, T.-K.1    Jung, C.2    Lee, T.-E.3
  • 30
    • 82455168186 scopus 로고    scopus 로고
    • Scheduling of cluster tools with ready time constraints for small lot production
    • H.-J. Kim and T.-E. Lee, "Scheduling of cluster tools with ready time constraints for small lot production, " in Proc. IEEE Conf. Autom. Sci. Eng., Trieste, 2011, pp. 96-101.
    • (2011) Proc IEEE Conf. Autom. Sci. Eng., Trieste , pp. 96-101
    • Kim, H.-J.1    Lee, T.-E.2
  • 32
    • 0033891784 scopus 로고    scopus 로고
    • Stable earliest starting schedules for cyclic job shops: A linear system approach
    • DOI 10.1023/A:1008123115577
    • T.-E. Lee, "Stable earliest starting schedules for cyclic job shops: A linear system approach, " Int. J. Flexible Manuf. Syst., vol. 12, no. 1, pp. 59-80, 2000. (Pubitemid 30573771)
    • (2000) International Journal of Flexible Manufacturing Systems , vol.12 , Issue.1 , pp. 59-80
    • Lee, T.-E.1
  • 33
    • 82455214076 scopus 로고    scopus 로고
    • M. S. thesis, Dept. Ind. Syst. Eng., Korea Advanced Institute of Science and Technology, Daejeon, Korea
    • W.-S. Choi, "Scheduling of dual-armed cluster tools with process time variation, "M. S. thesis, Dept. Ind. Syst. Eng., Korea Advanced Institute of Science and Technology, Daejeon, Korea, 2010.
    • (2010) Scheduling of Dual-armed Cluster Tools with Process Time Variation
    • Choi, W.-S.1
  • 35
    • 0028378348 scopus 로고
    • Petri nets for modeling of dynamic systems: A survey
    • DOI 10.1016/0005-1098(94)90024-8
    • R. David and H. Alla, "Petri nets for modeling of dynamic systems-a survey, " Automatica, vol. 30, no. 2, pp. 175-202, 1994. (Pubitemid 124007981)
    • (1994) Automatica , vol.30 , Issue.2 , pp. 175-202
    • David, R.1    Alla, H.2
  • 36
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A tutorial
    • R. Zurawski and M. C. Zhou, "Petri nets and industrial applications: A tutorial, " IEEE Trans. Ind. Electronics, vol. 41, no. 6, pp. 567-583, 1994.
    • (1994) IEEE Trans. Ind. Electronics , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.C.2
  • 37
    • 84860664318 scopus 로고    scopus 로고
    • An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems
    • May
    • C. Jung and T.-E. Lee, "An efficientmixed integer programmingmodel based on timed Petri nets for diverse complex cluster tool scheduling problems, " IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, May 2012.
    • (2012) IEEE Trans. Semicond. Manuf , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 39
    • 84871291726 scopus 로고    scopus 로고
    • Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems
    • Roma
    • C. Kim and T.-E. Lee, "Modeling and simulation of Petri nets for complex scheduling rules of automated manufacturing systems, " in Proc. Eur. Modeling and Simulation Symp., Roma, 2011, pp. 319-324.
    • (2011) Proc. Eur. Modeling and Simulation Symp. , pp. 319-324
    • Kim, C.1    Lee, T.-E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.