메뉴 건너뛰기




Volumn 8, Issue 1, 2011, Pages 42-55

Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes

Author keywords

Cluster tools; optimization; Petri nets (PNs); scheduling; semiconductor fabrication

Indexed keywords

DEPOSITION; OPTIMIZATION; PETRI NETS; SCHEDULING; SILICON WAFERS; TOOLS;

EID: 85027957575     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2010.2046736     Document Type: Article
Times cited : (141)

References (38)
  • 1
  • 2
    • 49749086485 scopus 로고    scopus 로고
    • Identical part production in cyclic robotic cells: Concepts, overview and open questions
    • N. Brauner, "Identical part production in cyclic robotic cells: Concepts, overview and open questions," Discrete Appl. Math., vol. 156, pp. 2480-2492, 2008.
    • (2008) Discrete Appl. Math. , vol.156 , pp. 2480-2492
    • Brauner, N.1
  • 3
    • 33747465464 scopus 로고
    • Coping with the high cost of wafer fabs
    • P. Burggraaf, "Coping with the high cost of wafer fabs," Semiconduct. Int., vol. 38, pp. 45-50, 1995.
    • (1995) Semiconduct. Int. , vol.38 , pp. 45-50
    • Burggraaf, P.1
  • 4
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multi-cluster tools with constant robot moving times, Part I: Two-cluster analysis,"
    • to be published
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multi-cluster tools with constant robot moving times, Part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., 2010, to be published.
    • (2010) IEEE Trans. Autom. Sci. Eng.
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 5
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations,"
    • to be published
    • W. K. V. Chan, S. Ding, J. Yi, and D. Song, "Optimal scheduling of multi-cluster tools with constant robot moving times, Part II: Tree-like topology configurations," IEEE Trans. Autom. Sci. Eng., 2010, to be published.
    • (2010) IEEE Trans. Autom. Sci. Eng.
    • Chan, W.K.V.1    Ding, S.2    Yi, J.3    Song, D.4
  • 7
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • Y. Crama and J. van de Klundert, "Cyclic scheduling of identical parts in a robotic cell," Oper. Res., vol. 45, pp. 952-965, 1997.
    • (1997) Oper. Res. , vol.45 , pp. 952-965
    • Crama, Y.1    Klundert De J.Van2
  • 8
    • 77649308311 scopus 로고    scopus 로고
    • Throughput optimization in dual-gripper interval robotic cells
    • M. Dawande, N. Geismar, M. Pinedo, and C. Sriskandarajah, "Throughput optimization in dual-gripper interval robotic cells," IIE Trans., vol. 42, no. 1, pp. 1-15, 2010.
    • (2010) IIE Trans. , vol.42 , Issue.1 , pp. 1-15
    • Dawande, M.1    Geismar, N.2    Pinedo, M.3    Sriskandarajah, C.4
  • 10
    • 0036769403 scopus 로고    scopus 로고
    • On throughput maximization in constant travel-time robotic cells
    • M. Dawande, C. Sriskandarajah, and C. S. Sethi, "On throughput maximization in constant travel-time robotic cells," Manuf. Serv. Oper. Manage., vol. 4, no. 4, pp. 296-312, 2002.
    • (2002) Manuf. Serv. Oper. Manage. , vol.4 , Issue.4 , pp. 296-312
    • Dawande, M.1    Sriskandarajah, C.2    Sethi, C.S.3
  • 11
    • 33747443542 scopus 로고    scopus 로고
    • Scheduling multi-cluster tools: An integrated event graph and network model approach
    • S. Ding, J. Yi, and M. Zhang, "Scheduling multi-cluster tools: An integrated event graph and network model approach," IEEE Trans. Semi-cond. Manuf., vol. 19, no. 3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semi-cond. Manuf. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.3
  • 13
    • 54349090109 scopus 로고    scopus 로고
    • Approximations to optimal A'-unit cycles for single-and dual-gripper robotic cells
    • H. N. Geismar, L. M. A. Chan, M. Dawande, and C. Sriskandarajah, "Approximations to optimal A'-unit cycles for single-and dual-gripper robotic cells," Prod. Oper. Manage., vol. 17, no. 5, pp. 551-563, 2008.
    • (2008) Prod. Oper. Manage. , vol.17 , Issue.5 , pp. 551-563
    • Geismar, H.N.1    Chan, L.M.A.2    Dawande, M.3    Sriskandarajah, C.4
  • 14
    • 33746120814 scopus 로고    scopus 로고
    • Throughput optimization in constant travel-time dual-gripper robotic cells with parallel machines
    • H. N. Geismar, M. Dawande, and C. Sriskandarajah, "Throughput optimization in constant travel-time dual-gripper robotic cells with parallel machines," Prod. Oper. Manage., vol. 15, pp. 311-328, 2006.
    • (2006) Prod. Oper. Manage. , vol.15 , pp. 311-328
    • Geismar, H.N.1    Dawande, M.2    Sriskandarajah, C.3
  • 16
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of timed-constrained dual-armed cluster tools,"
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf, vol. 16, no. 3, pp. 521-534, 2003.
    • (2003) IEEE Trans. Semicond. Manuf , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 17
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net,"
    • Jul.
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 18
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-arm cluster tools with reentrant wafer flows,"
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-arm cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf, vol. 19, no. 2, pp. 226-240, 2006.
    • (2006) IEEE Trans. Semicond. Manuf , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 19
    • 33646731658 scopus 로고    scopus 로고
    • Workload balancing and scheduling of a single-amred cluster tool
    • Gold Coast, Australia
    • T.-E. Lee, H.-Y. Lee, and Y.-H. Shin, "Workload balancing and scheduling of a single-amred cluster tool," in Proc. 5th APIEMS Conf, Gold Coast, Australia, 2004, pp. 1-15.
    • (2004) Proc. 5th APIEMS Conf , pp. 1-15
    • Lee, T.-E.1    Lee, H.-Y.2    Shin, Y.-H.3
  • 20
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • L. Lei and T. J. Wang, "Determining optimal cyclic hoist schedules in a single-hoist electroplating line," IIE Trans., vol. 26, no. 2, pp. 25-33, 1994.
    • (1994) IIE Trans. , vol.26 , Issue.2 , pp. 25-33
    • Lei, L.1    Wang, T.J.2
  • 22
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • T. Murata, "Petri nets: Properties, analysis and applications," Proc. IEEE, vol. 77, no. 4, pp. 541-580, 1989.
    • (1989) Proc. IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 24
    • 0030214772 scopus 로고    scopus 로고
    • Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput,"
    • T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput," IEEE Trans. Semi-cond. Manuf., vol. 9, pp. 384-400, 1996.
    • (1996) IEEE Trans. Semi-cond. Manuf. , vol.9 , pp. 384-400
    • Perkinson, T.L.1    Gyurcsik, R.S.2    MacLarty, P.K.3
  • 25
    • 0035357074 scopus 로고    scopus 로고
    • Scheduling in dual-gripper robotic cells for productivity gains,"
    • S. Sethi, J. Sidney, and C. Sriskandarajah, "Scheduling in dual-gripper robotic cells for productivity gains," IEEE Trans. Robot. Autom., vol. 17, pp. 324-341, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , pp. 324-341
    • Sethi, S.1    Sidney, J.2    Sriskandarajah, C.3
  • 27
    • 0035334186 scopus 로고    scopus 로고
    • Modeling and implementing a real-time scheduler for dual-armed cluster tools
    • Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Industry, vol. 45, no. 1, pp. 13-27, 2001.
    • (2001) Comput. Industry , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4
  • 28
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems,"
    • Q. Su and F. Chen, "Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Autom., vol. 12, pp. 22-30, 1996.
    • (1996) IEEE Trans. Robot. Autom. , vol.12 , pp. 22-30
    • Su, Q.1    Chen, F.2
  • 29
    • 0031276238 scopus 로고    scopus 로고
    • A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots,"
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, pp. 418-424, 1997.
    • (1997) IEEE Trans. Semicond. Manuf. , vol.10 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 30
    • 0032630279 scopus 로고    scopus 로고
    • Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model,"
    • May
    • N. Q. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model," IEEE Trans. Syst., Man, Cybern., vol. 29, no. 2, pt. Part C, pp. 192-204, May 1999.
    • (1999) IEEE Trans. Syst., Man, Cybern. , vol.29 , Issue.2 PART. PART C , pp. 192-204
    • Wu, N.Q.1
  • 31
    • 0035485815 scopus 로고    scopus 로고
    • Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model,"
    • N. Q. Wu and M. C. Zhou, "Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems based on a Petri net model," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 658-669, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 658-669
    • Wu, N.Q.1    Zhou, M.C.2
  • 32
    • 1942518458 scopus 로고    scopus 로고
    • Modeling and deadlock control of automated guided vehicle systems,"
    • N. Q. Wu and M. C. Zhou, "Modeling and deadlock control of automated guided vehicle systems," IEEE/ASME Trans. Mech., vol. 9, no. 1, pp. 50-57, 2004.
    • (2004) IEEE/ASME Trans. Mech. , vol.9 , Issue.1 , pp. 50-57
    • Wu, N.Q.1    Zhou, M.C.2
  • 33
    • 29144513578 scopus 로고    scopus 로고
    • Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles,"
    • N. Q. Wu and M. C. Zhou, "Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles," IEEE Trans. Syst., Man, Cybern., vol. 35, no. 6, pt. Part B, pp. 1193-1202, 2005.
    • (2005) IEEE Trans. Syst., Man, Cybern. , vol.35 , Issue.6 PART. PART B , pp. 1193-1202
    • Wu, N.Q.1    Zhou, M.C.2
  • 34
    • 41149096280 scopus 로고    scopus 로고
    • Resource-oriented Petri net for deadlock avoidance in flexible assembly systems,"
    • Man, Cybern.: Part A Jan.
    • N. Wu, M. C. Zhou, and Z. Li, "Resource-oriented Petri net for deadlock avoidance in flexible assembly systems," IEEE Trans. Syst., Man, Cybern.: Part A, vol. 38, no. 1, pp. 56-69, Jan. 2008.
    • (2008) IEEE Trans. Syst. , vol.38 , Issue.1 , pp. 56-69
    • Wu, N.1    Zhou, M.C.2    Li, Z.3
  • 35
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach,"
    • Apr.
    • J. Yi, S. Ding, D. Song, and M. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.4
  • 37
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.M.1
  • 38
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting-Modeling and analysis using timed Petri nets
    • W. M. Zuberek, "Cluster tools with chamber revisiting-Modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, 2004.
    • (2004) IEEE Trans. Semicond. Manuf. , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.