메뉴 건너뛰기




Volumn , Issue , 2012, Pages 1779-1784

A Petri net-based modeling and scheduling with a branch and bound algorithm

Author keywords

branch and bound algorithm; non cyclic scheduling; timed Petri net

Indexed keywords

AUTOMATED MANUFACTURING SYSTEMS; BRANCH AND BOUNDS; BRANCH-AND-BOUND ALGORITHMS; DISCRETE EVENT DYNAMIC SYSTEMS; FIRING CYCLE; JOB SHOP; LOWER BOUNDS; PETRI NET MODELS; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; SCHEDULING CONSTRAINTS; SCHEDULING PROBLEM; SOLUTION METHODS; SYSTEM SCHEDULING; TIMED PETRI NET; TIMED PETRI NETS;

EID: 84872420336     PISSN: 1062922X     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICSMC.2012.6377995     Document Type: Conference Paper
Times cited : (8)

References (27)
  • 1
    • 3242695721 scopus 로고    scopus 로고
    • Petri net based scheduling
    • W. M. P. van der Aalst, "Petri net based scheduling," OR Specturm, vol. 18, no. 4, pp. 219-229, 1996.
    • (1996) OR Specturm , vol.18 , Issue.4 , pp. 219-229
    • Van Der Aalst, W.M.P.1
  • 2
    • 0030190585 scopus 로고    scopus 로고
    • Business process redesign: A Petri net based approach
    • W. M. P. van der Aalst and K. M. van Hee, "Business process redesign: a Petri net based approach," Computers in Industry, vol. 29, no. 1-2, pp. 15-26, 1996.
    • (1996) Computers in Industry , vol.29 , Issue.1-2 , pp. 15-26
    • Van Der Aalst, W.M.P.1    Van Hee, K.M.2
  • 3
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A petri net approach
    • PII S089465079805876X
    • M. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: a Petri net approach," IEEE Transactions on Semiconductor Manufacturing, vol. 11, no. 3, pp. 333-357, 1998. (Pubitemid 128742374)
    • (1998) IEEE Transactions on Semiconductor Manufacturing , vol.11 , Issue.3 , pp. 333-357
    • Zhou, M.1    Jeng, M.D.2
  • 4
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Wu, C. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Transactions on Semiconductor Manufacturing, vol. 21, no. 2, pp. 224-237, 2008.
    • (2008) IEEE Transactions on Semiconductor Manufacturing , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1    Chu, C.2    Chu, F.3    Zhou, M.C.4
  • 5
    • 84860664318 scopus 로고    scopus 로고
    • An eficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
    • C. Jung and T.-E. Lee, "An eficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Transactions on Semiconductor Manufacturing, vol. 25, no. 2, pp. 186-199, 2012.
    • (2012) IEEE Transactions on Semiconductor Manufacturing , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 7
    • 0028727015 scopus 로고
    • A Petri net based approach to modeling and scheduling for an FMS and a case study
    • T.-H. Sun, C.-W. Cheng, and L.-C. Fu, "A Petri net based approach to modeling and scheduling for an FMS and a case study," IEEE Transactions on Industrial Electronics, vol. 41, no. 6, pp. 593-601, 1994.
    • (1994) IEEE Transactions on Industrial Electronics , vol.41 , Issue.6 , pp. 593-601
    • Sun, T.-H.1    Cheng, C.-W.2    Fu, L.-C.3
  • 8
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using Petri nets and heuristic search
    • D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri nets and heuristic search," IEEE Transactions on Robotics and Automation, vol. 10, no. 2, pp. 123-132, 1994.
    • (1994) IEEE Transactions on Robotics and Automation , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 9
    • 33846121916 scopus 로고    scopus 로고
    • FMS scheduling based on timed Petri Net model and reactive graph search
    • DOI 10.1016/j.apm.2006.10.023, PII S0307904X06002745
    • Y. W. Kim, T. Suzuki, and T. Narikiyo, " FMS scheduling based on timed Petri net model and reactive graph search," Applied Mathematical Modelling, vol. 31, no. 6, pp. 955-970, 2007. (Pubitemid 46076082)
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.6 , pp. 955-970
    • Kim, Y.W.1    Suzuki, T.2    Narikiyo, T.3
  • 10
    • 0032000111 scopus 로고    scopus 로고
    • Use of Petri nets for resource allocation in projects
    • A. Kumar and L. S. Ganesh, "Use of Petri nets for resource allocation in projects," IEEE Transactions on Engineering Management, vol. 45, no. 1, pp. 49-56, 1998.
    • (1998) IEEE Transactions on Engineering Management , vol.45 , Issue.1 , pp. 49-56
    • Kumar, A.1    Ganesh, L.S.2
  • 12
    • 0034813379 scopus 로고    scopus 로고
    • Application of Petri nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling
    • DOI 10.1007/s001700170184
    • J. P. Reddy, S. Kumanan, and O. V. K. Chetty, "Application of Petri nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling," International Journal of Manufacturing Technology, vol. 17, no. 4, pp. 305-314, 2001. (Pubitemid 32914811)
    • (2001) International Journal of Advanced Manufacturing Technology , vol.17 , Issue.4 , pp. 305-314
    • Prashant, R.J.1    Kumanan, S.2    Krishnaiah, C.O.V.3
  • 13
    • 0033750427 scopus 로고    scopus 로고
    • A Petri net model for integrated process and job shop production planning
    • T. Kis, D. Kiritsis, and P. Xirouchakis, "A Petri net model for integrated process and job shop production planning," Journal of Intelligent Manufacturing, vol. 11, no. 2, pp. 191-207, 2000.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.2 , pp. 191-207
    • Kis, T.1    Kiritsis, D.2    Xirouchakis, P.3
  • 14
    • 0024479894 scopus 로고
    • Performance evaluation of job-shop systems using timed event-graphs
    • H. P. Hillion and J.-M. Proth, "Performance evaluation of job-shop systems using timed event-graphs," IEEE Transactions on Automatic Control, vol. 34, no. 1, pp. 3-9, 1989.
    • (1989) IEEE Transactions on Automatic Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.P.1    Proth, J.-M.2
  • 15
  • 17
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and application
    • T. Murata, "Petri nets: properties, analysis and application," in Proceedings of the IEEE, vol. 77, no. 4, pp. 541-580, 1989.
    • (1989) Proceedings of the IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 18
    • 0028378348 scopus 로고
    • Petri nets for modeling of dynamic systems: A survey
    • DOI 10.1016/0005-1098(94)90024-8
    • R. Divid and H. Alla, "Petri nets for modeling of dynamic systems- a survey," Automatica, vol. 30, no. 2, pp. 175-202, 1994. (Pubitemid 124007981)
    • (1994) Automatica , vol.30 , Issue.2 , pp. 175-202
    • David, R.1    Alla, H.2
  • 19
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A tutorial
    • R. Zurawski and M. Zhou, "Petri nets and industrial applications: a tutorial," IEEE Transactions on Industrial Electronics, vol. 41, no. 6, pp. 567-583, 1994.
    • (1994) IEEE Transactions on Industrial Electronics , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.2
  • 20
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • S. Hartmann and D. Briskorn, "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, vol. 207, no. 1, pp. 1-14, 2010.
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 22
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for time window constraints
    • DOI 10.1109/TASE.2005.851236
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Transactions on Automation Science and Engineering, vol. 2, no. 4, pp. 319-332, 2005. (Pubitemid 41560387)
    • (2005) IEEE Transactions on Automation Science and Engineering , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 23
    • 84872373106 scopus 로고    scopus 로고
    • Modeling and Simulation of Automated Manufacturing Systems for Evaluation of Complex Schedules
    • submitted for publication
    • C. Kim and T.-E. Lee, "Modeling and Simulation of Automated Manufacturing Systems for Evaluation of Complex Schedules," International Journal of Production Research, submitted for publication.
    • International Journal of Production Research
    • Kim, C.1    Lee, T.-E.2
  • 25
  • 26
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • E. Demeulemeester and W. Herroelen, "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem," Management Science, vol. 38, no. 12, pp. 1803-1818, 1992.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 27
    • 0037508562 scopus 로고    scopus 로고
    • A new eficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version
    • K. Bouleimen and H. Lecocq, "A new eficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version," European Journal of Operational Research, vol. 149, no. 2, pp. 268-281, 2003.
    • (2003) European Journal of Operational Research , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.