-
1
-
-
3242695721
-
Petri net based scheduling
-
W. M. P. van der Aalst, "Petri net based scheduling," OR Specturm, vol. 18, no. 4, pp. 219-229, 1996.
-
(1996)
OR Specturm
, vol.18
, Issue.4
, pp. 219-229
-
-
Van Der Aalst, W.M.P.1
-
2
-
-
0030190585
-
Business process redesign: A Petri net based approach
-
W. M. P. van der Aalst and K. M. van Hee, "Business process redesign: a Petri net based approach," Computers in Industry, vol. 29, no. 1-2, pp. 15-26, 1996.
-
(1996)
Computers in Industry
, vol.29
, Issue.1-2
, pp. 15-26
-
-
Van Der Aalst, W.M.P.1
Van Hee, K.M.2
-
3
-
-
0032141060
-
Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A petri net approach
-
PII S089465079805876X
-
M. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: a Petri net approach," IEEE Transactions on Semiconductor Manufacturing, vol. 11, no. 3, pp. 333-357, 1998. (Pubitemid 128742374)
-
(1998)
IEEE Transactions on Semiconductor Manufacturing
, vol.11
, Issue.3
, pp. 333-357
-
-
Zhou, M.1
Jeng, M.D.2
-
4
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
N. Wu, C. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Transactions on Semiconductor Manufacturing, vol. 21, no. 2, pp. 224-237, 2008.
-
(2008)
IEEE Transactions on Semiconductor Manufacturing
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.1
Chu, C.2
Chu, F.3
Zhou, M.C.4
-
5
-
-
84860664318
-
An eficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
-
C. Jung and T.-E. Lee, "An eficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Transactions on Semiconductor Manufacturing, vol. 25, no. 2, pp. 186-199, 2012.
-
(2012)
IEEE Transactions on Semiconductor Manufacturing
, vol.25
, Issue.2
, pp. 186-199
-
-
Jung, C.1
Lee, T.-E.2
-
6
-
-
84872397961
-
Scheduling cluster tools with ready time constraints for consecutive small lots
-
to appear
-
H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Transactions on Automation Science and Engineering, to appear.
-
IEEE Transactions on Automation Science and Engineering
-
-
Kim, H.-J.1
Lee, J.-H.2
Jung, C.3
Lee, T.-E.4
-
7
-
-
0028727015
-
A Petri net based approach to modeling and scheduling for an FMS and a case study
-
T.-H. Sun, C.-W. Cheng, and L.-C. Fu, "A Petri net based approach to modeling and scheduling for an FMS and a case study," IEEE Transactions on Industrial Electronics, vol. 41, no. 6, pp. 593-601, 1994.
-
(1994)
IEEE Transactions on Industrial Electronics
, vol.41
, Issue.6
, pp. 593-601
-
-
Sun, T.-H.1
Cheng, C.-W.2
Fu, L.-C.3
-
8
-
-
0028413979
-
Scheduling flexible manufacturing systems using Petri nets and heuristic search
-
D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using Petri nets and heuristic search," IEEE Transactions on Robotics and Automation, vol. 10, no. 2, pp. 123-132, 1994.
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
9
-
-
33846121916
-
FMS scheduling based on timed Petri Net model and reactive graph search
-
DOI 10.1016/j.apm.2006.10.023, PII S0307904X06002745
-
Y. W. Kim, T. Suzuki, and T. Narikiyo, " FMS scheduling based on timed Petri net model and reactive graph search," Applied Mathematical Modelling, vol. 31, no. 6, pp. 955-970, 2007. (Pubitemid 46076082)
-
(2007)
Applied Mathematical Modelling
, vol.31
, Issue.6
, pp. 955-970
-
-
Kim, Y.W.1
Suzuki, T.2
Narikiyo, T.3
-
10
-
-
0032000111
-
Use of Petri nets for resource allocation in projects
-
A. Kumar and L. S. Ganesh, "Use of Petri nets for resource allocation in projects," IEEE Transactions on Engineering Management, vol. 45, no. 1, pp. 49-56, 1998.
-
(1998)
IEEE Transactions on Engineering Management
, vol.45
, Issue.1
, pp. 49-56
-
-
Kumar, A.1
Ganesh, L.S.2
-
11
-
-
43249109612
-
A Petri net approach to support resource assignment in project management
-
DOI 10.1109/TSMCA.2008.918632
-
Y.-L Chen, P.-Y. Hsu, and Y.-B. Chang, "A Petri net approach to support resource assignment in project management," IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, vol. 38, no. 3, pp. 564-574, 2008. (Pubitemid 351649888)
-
(2008)
IEEE Transactions on Systems, Man, and Cybernetics Part A:Systems and Humans
, vol.38
, Issue.3
, pp. 564-574
-
-
Chen, Y.-L.1
Hsu, P.-Y.2
Chang, Y.-B.3
-
12
-
-
0034813379
-
Application of Petri nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling
-
DOI 10.1007/s001700170184
-
J. P. Reddy, S. Kumanan, and O. V. K. Chetty, "Application of Petri nets and a genetic algorithm to multi-mode multi-resource constrained project scheduling," International Journal of Manufacturing Technology, vol. 17, no. 4, pp. 305-314, 2001. (Pubitemid 32914811)
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.17
, Issue.4
, pp. 305-314
-
-
Prashant, R.J.1
Kumanan, S.2
Krishnaiah, C.O.V.3
-
13
-
-
0033750427
-
A Petri net model for integrated process and job shop production planning
-
T. Kis, D. Kiritsis, and P. Xirouchakis, "A Petri net model for integrated process and job shop production planning," Journal of Intelligent Manufacturing, vol. 11, no. 2, pp. 191-207, 2000.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.2
, pp. 191-207
-
-
Kis, T.1
Kiritsis, D.2
Xirouchakis, P.3
-
14
-
-
0024479894
-
Performance evaluation of job-shop systems using timed event-graphs
-
H. P. Hillion and J.-M. Proth, "Performance evaluation of job-shop systems using timed event-graphs," IEEE Transactions on Automatic Control, vol. 34, no. 1, pp. 3-9, 1989.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, Issue.1
, pp. 3-9
-
-
Hillion, H.P.1
Proth, J.-M.2
-
15
-
-
82455215680
-
-
Ph.D. dissertation, Dept. Industrial and Systems Engineering, Korea Advanced Institute of Science and Technology, Daejeon, Republic of Korea
-
C. Jung, "Cyclic Scheduling of Timed Petri Nets: Behavior, Optimization, and Application to Cluster Tools," Ph.D. dissertation, Dept. Industrial and Systems Engineering, Korea Advanced Institute of Science and Technology, Daejeon, Republic of Korea, 2010.
-
(2010)
Cyclic Scheduling of Timed Petri Nets: Behavior, Optimization, and Application to Cluster Tools
-
-
Jung, C.1
-
16
-
-
0029486579
-
Petri net scheduling of FMS using branch and bound method
-
M. Zhou, H.-S. Chiu, and H. Xiong, "Petri net scheduling of FMS using branch and bound method," in Proceedings of the 1995 IEEE IECON 21 st International Conference on Industrial Electronics, Control, and Instrumentation, Orlando, 1995, pp. 211-216.
-
Proceedings of the 1995 IEEE IECON 21 St International Conference on Industrial Electronics, Control, and Instrumentation, Orlando, 1995
, pp. 211-216
-
-
Zhou, M.1
Chiu, H.-S.2
Xiong, H.3
-
17
-
-
0024645936
-
Petri nets: Properties, analysis and application
-
T. Murata, "Petri nets: properties, analysis and application," in Proceedings of the IEEE, vol. 77, no. 4, pp. 541-580, 1989.
-
(1989)
Proceedings of the IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
18
-
-
0028378348
-
Petri nets for modeling of dynamic systems: A survey
-
DOI 10.1016/0005-1098(94)90024-8
-
R. Divid and H. Alla, "Petri nets for modeling of dynamic systems- a survey," Automatica, vol. 30, no. 2, pp. 175-202, 1994. (Pubitemid 124007981)
-
(1994)
Automatica
, vol.30
, Issue.2
, pp. 175-202
-
-
David, R.1
Alla, H.2
-
19
-
-
0028714917
-
Petri nets and industrial applications: A tutorial
-
R. Zurawski and M. Zhou, "Petri nets and industrial applications: a tutorial," IEEE Transactions on Industrial Electronics, vol. 41, no. 6, pp. 567-583, 1994.
-
(1994)
IEEE Transactions on Industrial Electronics
, vol.41
, Issue.6
, pp. 567-583
-
-
Zurawski, R.1
Zhou, M.2
-
20
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
S. Hartmann and D. Briskorn, "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, vol. 207, no. 1, pp. 1-14, 2010.
-
(2010)
European Journal of Operational Research
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
21
-
-
84892234592
-
-
New York: Springer
-
M. L. Pinedo, Scheduling theory, algorithms, and systems, New York: Springer, 2008, pp. 35-106.
-
(2008)
Scheduling Theory, Algorithms, and Systems
, pp. 35-106
-
-
Pinedo, M.L.1
-
22
-
-
27644434964
-
An extended event graph with negative places and tokens for time window constraints
-
DOI 10.1109/TASE.2005.851236
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Transactions on Automation Science and Engineering, vol. 2, no. 4, pp. 319-332, 2005. (Pubitemid 41560387)
-
(2005)
IEEE Transactions on Automation Science and Engineering
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
23
-
-
84872373106
-
Modeling and Simulation of Automated Manufacturing Systems for Evaluation of Complex Schedules
-
submitted for publication
-
C. Kim and T.-E. Lee, "Modeling and Simulation of Automated Manufacturing Systems for Evaluation of Complex Schedules," International Journal of Production Research, submitted for publication.
-
International Journal of Production Research
-
-
Kim, C.1
Lee, T.-E.2
-
24
-
-
35248854880
-
The Petri net markup language: Concepts, technology, and tools
-
J. Billington et al., "The Petri net markup language: concepts, technology, and tools," in Proceedings of International Conference on Applications and Theory of Petri nets, vol. 2679, 2003, pp. 483-505.
-
(2003)
Proceedings of International Conference on Applications and Theory of Petri Nets
, vol.2679
, pp. 483-505
-
-
Billington, J.1
-
25
-
-
0020178733
-
The one-machine sequencing problem
-
J. Carlier, "The one-machine sequencing problem," European Journal of Operational Research, vol. 11, no. 1, pp. 42-47, 1982.
-
(1982)
European Journal of Operational Research
, vol.11
, Issue.1
, pp. 42-47
-
-
Carlier, J.1
-
26
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
E. Demeulemeester and W. Herroelen, "A branch-and-bound procedure for the multiple resource-constrained project scheduling problem," Management Science, vol. 38, no. 12, pp. 1803-1818, 1992.
-
(1992)
Management Science
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
27
-
-
0037508562
-
A new eficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version
-
K. Bouleimen and H. Lecocq, "A new eficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version," European Journal of Operational Research, vol. 149, no. 2, pp. 268-281, 2003.
-
(2003)
European Journal of Operational Research
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
|