메뉴 건너뛰기




Volumn 51, Issue 12, 2013, Pages 3734-3747

Modelling and simulation of automated manufacturing systems for evaluation of complex schedules

Author keywords

automated manufacturing systems; discrete event simulation; Petri net simulation; Petri nets; scheduling

Indexed keywords

AUTOMATED MANUFACTURING SYSTEMS; CONFLICT RESOLUTION; DECISION FUNCTIONS; MATHEMATICAL APPROACH; MODELLING AND SIMULATIONS; MULTI-CLUSTER TOOLS; PARALLEL SIMULATIONS; SEMICONDUCTOR MANUFACTURING;

EID: 84880234285     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.765071     Document Type: Article
Times cited : (14)

References (41)
  • 3
    • 84880191829 scopus 로고    scopus 로고
    • Hoist scheduling problem
    • London: LSTE
    • Bloch, C., et al., 2010. "Hoist Scheduling Problem." In: Production Scheduling. London: LSTE
    • (2010) Production Scheduling
    • Bloch, C.1
  • 7
    • 78651094962 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part II: Tree-like topology configurations
    • Chan, W. K. V., et al. 2011. "Optimal Scheduling of Multicluster Tools with Constant Robot Moving times, Part II: Tree-like Topology Configurations." IEEE Transactions on Automation Science and Engineering 8 (1): 17-28
    • (2011) IEEE Transactions on Automation Science and Engineering , vol.8 , Issue.1 , pp. 17-28
    • Chan, W.K.V.1
  • 8
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
    • Chan, W. K. V., et al. 2011. "Optimal Scheduling of Multicluster Tools with Constant Robot Moving times, Part I: Two-Cluster Analysis." IEEE Transactions on Automation Science and Engineering 8 (1): 5-16
    • (2011) IEEE Transactions on Automation Science and Engineering , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1
  • 9
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • Che, A., and C. Chu. 2007. "Cyclic Hoist Scheduling in Large Real-Life Electroplating Lines." OR Spectrum 29 (3): 445-470
    • (2007) OR Spectrum , vol.29 , Issue.3 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 12
    • 0032629744 scopus 로고    scopus 로고
    • Adaptive time warp simulation of timed petri nets
    • Ferscha, A. 1999. "Adaptive Time Warp Simulation of Timed Petri Nets." IEEE Transactions on Software Engineering 25 (2): 237-257
    • (1999) IEEE Transactions on Software Engineering , vol.25 , Issue.2 , pp. 237-257
    • Ferscha, A.1
  • 13
    • 0009342508 scopus 로고    scopus 로고
    • Efficient discrete-event simulation of colored petri nets
    • Gaeta, R. 1996. "Efficient Discrete-Event Simulation of Colored Petri Nets." IEEE Transactions on Software Engineering 22 (9): 629-639
    • (1996) IEEE Transactions on Software Engineering , vol.22 , Issue.9 , pp. 629-639
    • Gaeta, R.1
  • 16
    • 0022597975 scopus 로고
    • Applications of petri net based models in the modelling and analysis of flexible manufacturing systems
    • Institute of Electrical and Electronics Engineers
    • Kamath, M., and N. Viswanadham. 1986. "Applications of Petri Net Based Models in the Modelling and Analysis of Flexible Manufacturing Systems." In: Proceedings of the 1986 IEEE International Conference on Robotics and Automation. Institute of Electrical and Electronics Engineers, 312-317
    • (1986) Proceedings of the 1986 IEEE International Conference on Robotics and Automation , pp. 312-317
    • Kamath, M.1    Viswanadham, N.2
  • 17
    • 0030397967 scopus 로고    scopus 로고
    • A framework for rare event simulation of stochastic petri nets using restart
    • Kelling, C. 1996. "A Framework for Rare Event Simulation of Stochastic Petri Nets Using RESTART." In: Proceedings of the 1996 Winter Simulation Conference, 317-324
    • (1996) Proceedings of the 1996 Winter Simulation Conference , pp. 317-324
    • Kelling, C.1
  • 18
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended petri net
    • Kim, J.-H., and T.-E. Lee. 2008. "Schedulability Analysis of Time-Constrained Cluster Tools with Bounded Time Variation by an Extended Petri Net." IEEE Transactions on Automation Science and Engineering 5 (3): 490-503
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 19
    • 84871291726 scopus 로고    scopus 로고
    • Modeling and simulation of petri nets for complex scheduling rules of automated manufacturing systems
    • Kim, C., and T.-E. Lee. 2011. "Modeling and Simulation of Petri Nets for Complex Scheduling Rules of Automated Manufacturing Systems." In: Proceedings of the 23rd European Modeling & Simulation, Symposium, 319-324
    • (2011) Proceedings of the 23rd European Modeling & Simulation, Symposium , pp. 319-324
    • Kim, C.1    Lee, T.-E.2
  • 20
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-Armed cluster tools
    • Kim, J.-H., et al. 2003. "Scheduling Analysis of Time-Constrained Dual-Armed Cluster Tools." IEEE Transactions on Semiconductor Manufacturing 16 (3): 521-534
    • (2003) IEEE Transactions on Semiconductor Manufacturing , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1
  • 21
    • 33144488632 scopus 로고    scopus 로고
    • SimQPN - A tool and methodology for analyzing queueing petri net models by means of simulation
    • Kounev, S., and A. Buchmann. 2006. "SimQPN - A Tool and Methodology for Analyzing Queueing Petri Net Models by Means of Simulation." Performance Evaluation 63 (4/5): 364-394
    • (2006) Performance Evaluation , vol.63 , Issue.4-5 , pp. 364-394
    • Kounev, S.1    Buchmann, A.2
  • 22
    • 60749114750 scopus 로고    scopus 로고
    • A review of scheduling theory and methods for semiconductor manufacturing cluster tools
    • Lee, T.-E. 2008. "A review of Scheduling Theory and Methods for Semiconductor Manufacturing Cluster Tools." In: Proceedings of the 2008 Winter Simulation Conference, 2127-2135
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2127-2135
    • Lee, T.-E.1
  • 25
    • 0024645936 scopus 로고
    • Petri nets: Properties, analysis and applications
    • Murata, T. 1989. "Petri Nets: Properties, Analysis and Applications." Proceedings of the IEEE 77 (4): 541-580
    • (1989) Proceedings of the IEEE , vol.77 , Issue.4 , pp. 541-580
    • Murata, T.1
  • 27
    • 60749115904 scopus 로고    scopus 로고
    • Simulation based planning and scheduling system for TFT-LCD Fab
    • Park, B. C. et al. 2008. "Simulation Based Planning and Scheduling System for TFT-LCD Fab." In: Proceedings of the 2008 Winter Simulation Conference, 2271-2276
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2271-2276
    • Park, B.C.1
  • 29
    • 0020848261 scopus 로고
    • Simulation modeling with event graphs
    • Schruben, L. 1983. "Simulation Modeling with Event Graphs." Communications of the ACM 26 (11): 957-963
    • (1983) Communications of the ACM , vol.26 , Issue.11 , pp. 957-963
    • Schruben, L.1
  • 30
    • 13644282519 scopus 로고    scopus 로고
    • Scheduling with production family set-up times: An application in TFT LCD manufacturing
    • Shin, H. J., and V. J. Leon. 2004. "Scheduling with Production Family Set-up times: An Application in TFT LCD Manufacturing." International Journal of Production Research 42 (20): 4235-4248
    • (2004) International Journal of Production Research , vol.42 , Issue.20 , pp. 4235-4248
    • Shin, H.J.1    Leon, V.J.2
  • 31
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
    • Subaï, C., P. Baptiste, and E. Niel. 2006. "Scheduling Issues for Environmentally Responsible Manufacturing: The Case of Hoist Scheduling in an Electroplating Line." International Journal of Production Economics 99 (1/2): 74-87
    • (2006) International Journal of Production Economics , vol.99 , Issue.1-2 , pp. 74-87
    • Subaï, C.1    Baptiste, P.2    Niel, E.3
  • 33
    • 0025671258 scopus 로고
    • Deadlock Prevention and Deadlock Avoidance in Flexible Manufacturing Systems Using Petri Net Models
    • Viswanadham, N., Y. Narahari, and T. L. Johnson. 1990. "Deadlock Prevention and Deadlock Avoidance in Flexible Manufacturing Systems Using Petri Net Models." IEEE Transactions on Robotics and Automation 6 (6): 13-723
    • (1990) IEEE Transactions on Robotics and Automation , vol.6 , Issue.6 , pp. 13-723
    • Viswanadham, N.1    Narahari, Y.2    Johnson, T.L.3
  • 35
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-Arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Wu, N., and M. C. Zhou. 2010. "A Closed-Form Solution for Schedulability and Optimal Scheduling of Dual-Arm Cluster Tools with Wafer Residency Time Constraint Based on Steady Schedule Analysis." IEEE Transactions on Automation Science and Engineering 7 (2): 303-315
    • (2010) IEEE Transactions on Automation Science and Engineering , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.1    Zhou, M.C.2
  • 36
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-Arm cluster tools with residency time constraint and activity time variation
    • Wu, N., and M. C. Zhou. 2010. "Analysis of Wafer Sojourn Time in Dual-Arm Cluster Tools with Residency Time Constraint and Activity Time Variation." IEEE Transactions on Semiconductor Manufacturing 23 (1): 53-64
    • (2010) IEEE Transactions on Semiconductor Manufacturing , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.1    Zhou, M.C.2
  • 37
    • 43849109024 scopus 로고    scopus 로고
    • A petri net method for schedulability and scheduling problems in single-Arm cluster tools with wafer residency time constraints
    • Wu, N., et al. 2008. "A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools with Wafer Residency Time Constraints." IEEE Transactions on Semiconductor Manufacturing 21 (2): 224-237
    • (2008) IEEE Transactions on Semiconductor Manufacturing , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.1
  • 38
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-Arm cluster tools with reentrant atomic layer deposition processes
    • Wu, N., et al. 2011. "Petri Net-Based Scheduling of Single-Arm Cluster Tools with Reentrant Atomic Layer Deposition Processes." IEEE Transactions on Automation Science and Engineering 8 (1): 42-55
    • (2011) IEEE Transactions on Automation Science and Engineering , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.1
  • 40
    • 0003752753 scopus 로고    scopus 로고
    • Modeling, simulation, and control of flexible manufacturing systems: A petri net approach
    • Zhou, M. C., and K. Venkatesh. 1998. Modeling, Simulation, and Control of Flexible Manufacturing Systems: A Petri Net Approach. Singapore: World Scientific
    • (1998) Singapore: World Scientific
    • Zhou, M.C.1    Venkatesh, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.