-
1
-
-
31644451948
-
Job shop scheduling techniques in semiconductor manufacturing
-
A. K. Gupta and A. I. Sivakumar, "Job shop scheduling techniques in semiconductor manufacturing," Int. J. Adv. Manuf. Technol., no. 27, pp. 1163-1169, 2006.
-
(2006)
Int. J. Adv. Manuf. Technol.
, Issue.27
, pp. 1163-1169
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
2
-
-
0002591492
-
Cyclic scheduling on parallel processors: An overview
-
New York: Wiley
-
C. Hanen and A. Munier, "Cyclic scheduling on parallel processors: An overview," in Scheduling Theory and Its Applications. New York: Wiley, 1994, pp. 193-226.
-
(1994)
Scheduling Theory and Its Applications
, pp. 193-226
-
-
Hanen, C.1
Munier, A.2
-
3
-
-
77955700913
-
Complexity of cyclic scheduling problems: A state-of-the-art survey
-
E. Levner, V. Kats, D. A. L. de Pablo, and T. C. E. Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey," Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.2
, pp. 352-361
-
-
Levner, E.1
Kats, V.2
De Pablo, D.A.L.3
Cheng, T.C.E.4
-
4
-
-
60749114750
-
A review of scheduling theory and methods for semiconductor manufacturing cluster tool
-
T.-E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tool," in Proc. 2008 Winter Simulation Conf., 2008, pp. 2127-2135.
-
Proc. 2008 Winter Simulation Conf., 2008
, pp. 2127-2135
-
-
Lee, T.-E.1
-
5
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
Aug.
-
T. L. Perkinson, P. K. McLarty, R. S. Gyurcsik, and R. K. Cavin, III, "Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semiconductor Manuf., vol. 7, no. 3, pp. 369-373, Aug. 1994.
-
(1994)
IEEE Trans. Semiconductor Manuf.
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.L.1
McLarty, P.K.2
Gyurcsik, R.S.3
Cavin III, R.K.4
-
6
-
-
0033348174
-
Real-time scheduling of wafer fabrication with multiple product types
-
H. Yoon and D. Lee, "Real-time scheduling of wafer fabrication with multiple product types," in Proc. IEEE Syst., Manuf. Cybern. Conf., Tokyo, Japan, 1999, pp. 835-840.
-
Proc. IEEE Syst., Manuf. Cybern. Conf., Tokyo, Japan, 1999
, pp. 835-840
-
-
Yoon, H.1
Lee, D.2
-
7
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
Apr.
-
J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
-
8
-
-
76849088211
-
Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
-
N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semiconductor Manuf., vol. 23, no. 1, pp. 53-64, 2010.
-
(2010)
IEEE Trans. Semiconductor Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.Q.1
Zhou, M.C.2
-
9
-
-
28244489538
-
Dominance of cyclic solutions and challenges in scheduling of robotic cells
-
M. W. Dawande and H. N. Geismar, "Dominance of cyclic solutions and challenges in scheduling of robotic cells," SIAM Review, vol. 47, no. 4, pp. 709-721, 2005.
-
(2005)
SIAM Review
, vol.47
, Issue.4
, pp. 709-721
-
-
Dawande, M.W.1
Geismar, H.N.2
-
10
-
-
78651098378
-
Optimal scheduling of multicluster tools with constant robot movement times, Part I: Two-cluster analysis
-
W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot movement times, Part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
11
-
-
9644308134
-
Approximation algorithms for k-unit cyclic solutions in robotic cells
-
N. H. Geismar, M. Dawande, and C. Sriskandarajah, "Approximation algorithms for k-unit cyclic solutions in robotic cells," Eur. J. Oper. Res., vol. 162, no. 2, pp. 291-309, 2005.
-
(2005)
Eur. J. Oper. Res.
, vol.162
, Issue.2
, pp. 291-309
-
-
Geismar, N.H.1
Dawande, M.2
Sriskandarajah, C.3
-
12
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.1
Chu, F.2
Chu, C.3
Zhou, M.4
-
13
-
-
84855355646
-
Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
-
Jan.
-
N. Q. Wu and M. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 203-209
-
-
Wu, N.Q.1
Zhou, M.C.2
-
14
-
-
84859753478
-
Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
-
Apr.
-
N. Q. Wu and M. C. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 446-454
-
-
Wu, N.Q.1
Zhou, M.C.2
-
15
-
-
77951134106
-
Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models
-
I. G. Drobouchevitch, N. H. Geismar, and C. Sriskandarajah, "Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models," Eur. Oper. Res., vol. 206, no. 3, pp. 623-633, 2010.
-
(2010)
Eur. Oper. Res.
, vol.206
, Issue.3
, pp. 623-633
-
-
Drobouchevitch, I.G.1
Geismar, N.H.2
Sriskandarajah, C.3
-
16
-
-
84855960719
-
Scheduling robotic cells served by a dual-arm robot
-
N. Geismar, U. V. Manoj, A. Sethi, and S. Chelliah, "Scheduling robotic cells served by a dual-arm robot," IIE Trans., vol. 44, no. 3, pp. 230-248, 2012.
-
(2012)
IIE Trans.
, vol.44
, Issue.3
, pp. 230-248
-
-
Geismar, N.1
Manoj, U.V.2
Sethi, A.3
Chelliah, S.4
-
17
-
-
77956689709
-
A branch and bound algorithm for optimal cyclic scheduling in a robot cell with processing time windows
-
P. Yan, C. Chu, N. Yang, and A. Che, "A branch and bound algorithm for optimal cyclic scheduling in a robot cell with processing time windows," Int. J. Prod. Res., vol. 48, no. 21, pp. 6461-6480, 2010.
-
(2010)
Int. J. Prod. Res.
, vol.48
, Issue.21
, pp. 6461-6480
-
-
Yan, P.1
Chu, C.2
Yang, N.3
Che, A.4
-
18
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
E. W. Davis and G. E. Heidorn, "An algorithm for optimal project scheduling under multiple resource constraints," Manage. Sci., vol. 17, no. 12, pp. B803-B816, 1971.
-
(1971)
Manage. Sci.
, vol.17
, Issue.12
-
-
Davis, E.W.1
Heidorn, G.E.2
-
19
-
-
78651080378
-
Productivity improvement from using machine buffers in dual-gripper cluster tools
-
Jan.
-
N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 29-41
-
-
Geismar, N.1
Dawande, M.2
Sriskandarajah, C.3
-
20
-
-
4043145060
-
Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
-
N. H. Geismar, M. Dawande, and C. Sriskandarajah, "Robotic cells with parallel machines: Throughput maximization in constant travel-time cells," J. Scheduling, vol. 7, no. 5, pp. 375-395, 2004.
-
(2004)
J. Scheduling
, vol.7
, Issue.5
, pp. 375-395
-
-
Geismar, N.H.1
Dawande, M.2
Sriskandarajah, C.3
-
21
-
-
82455168186
-
Scheduling of cluster tools with ready time constraints for small lot production
-
H. Kim and T.-E. Lee, "Scheduling of cluster tools with ready time constraints for small lot production," in Proc. 7th IEEE Conf. Autom. Sci. Eng., Trieste, 2011, pp. 96-101.
-
Proc. 7th IEEE Conf. Autom. Sci. Eng., Trieste, 2011
, pp. 96-101
-
-
Kim, H.1
Lee, T.-E.2
-
22
-
-
0021520669
-
An overview of techniques for solving multiobjective mathematical programs
-
Nov.
-
G. W. Evans, "An overview of techniques for solving multiobjective mathematical programs," Manage. Sci., vol. 30, no. 11, pp. 1268-1282, Nov. 1984.
-
(1984)
Manage. Sci.
, vol.30
, Issue.11
, pp. 1268-1282
-
-
Evans, G.W.1
-
23
-
-
2442535151
-
Survey of multi-objective optimization methods for engineering
-
Mar.
-
R. Marler and J. Arora, "Survey of multi-objective optimization methods for engineering," Structural and Multidisciplinary Opt., vol. 26, no. 6, pp. 369-395, Mar. 2004.
-
(2004)
Structural and Multidisciplinary Opt.
, vol.26
, Issue.6
, pp. 369-395
-
-
Marler, R.1
Arora, J.2
-
25
-
-
0003958368
-
-
Transl.: Milan: Societa Editrice Libraria
-
1906 Transl.: Manuale di Economia Politica. Milan: Societa Editrice Libraria.
-
(1906)
Manuale di Economia Politica
-
-
-
29
-
-
0021430238
-
On a multicriteria shortest path problem
-
E. Q. V. Martins, "On a multicriteria shortest path problem," Eur. Oper. Res., vol. 16, no. 2, pp. 236-245, 1984.
-
(1984)
Eur. Oper. Res.
, vol.16
, Issue.2
, pp. 236-245
-
-
Martins, E.Q.V.1
-
30
-
-
38249004651
-
Time dependency in multiple objective dynamic programming
-
M. M. Kostreva and M. M. Wiecek, "Time dependency in multiple objective dynamic programming," J. Math. Anal. Appl., vol. 173, no. 1, pp. 289-307, 1993.
-
(1993)
J. Math. Anal. Appl.
, vol.173
, Issue.1
, pp. 289-307
-
-
Kostreva, M.M.1
Wiecek, M.M.2
-
31
-
-
85012688561
-
-
Princeton, NJ: Princeton Univ. Press
-
R. E. Bellman, Dynamic Programming. Princeton, NJ: Princeton Univ. Press, 1957.
-
(1957)
Dynamic Programming
-
-
Bellman, R.E.1
-
32
-
-
34147120474
-
A note on two problems in connexion with graphs
-
E. W. Dijkstra, "A note on two problems in connexion with graphs," Numerische Mathematik, vol. 1, no. 1, pp. 269-271, 1959.
-
(1959)
Numerische Mathematik
, vol.1
, Issue.1
, pp. 269-271
-
-
Dijkstra, E.W.1
-
33
-
-
0035527944
-
Label correcting methods to solve multicriteria shortest path problem
-
E. Guerriero and R. Musmanno, "Label correcting methods to solve multicriteria shortest path problem," J. Opt. Theory Optim., vol. 111, no. 3, pp. 589-613, 2001.
-
(2001)
J. Opt. Theory Optim.
, vol.111
, Issue.3
, pp. 589-613
-
-
Guerriero, E.1
Musmanno, R.2
-
34
-
-
0019044342
-
Note on multiple objective dynamic programming
-
H. G. Daellenbach and C. A. De Kluyver, "Note on multiple objective dynamic programming," J. Oper. Res. Soc., vol. 31, no. 7, pp. 591-594, 1980.
-
(1980)
J. Oper. Res. Soc.
, vol.31
, Issue.7
, pp. 591-594
-
-
Daellenbach, H.G.1
De Kluyver, C.A.2
-
35
-
-
33646717079
-
Scheduling single-armed cluster tools with re-entrant wafer flows
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with re-entrant wafer flows," IEEE Trans. .Semiconductor Manuf., vol. 19, no. 2, pp. 226-240, 2006.
-
(2006)
IEEE Trans..Semiconductor Manuf.
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
36
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on the throughput
-
T. L. Perkinson, S. R. Gyurcsik, and P. K. McLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on the throughput," IEEE Trans. Semiconductor Manuf., vol. 9, no. 3, pp. 384-400, 1996.
-
(1996)
IEEE Trans. Semiconductor Manuf.
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, S.R.2
McLarty, P.K.3
-
37
-
-
4344571843
-
Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets
-
W. M. Zuberek, "Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets," IEEE Trans. Semiconductor Manuf., vol. 17, no. 3, pp. 333-344, 2004.
-
(2004)
IEEE Trans. Semiconductor Manuf.
, vol.17
, Issue.3
, pp. 333-344
-
-
Zuberek, W.M.1
-
39
-
-
85051927925
-
Near admissible algorithms for multiobjective search
-
P. Perny and O. Spanjaard, "Near admissible algorithms for multiobjective search," in Proc. 18th Eur. Conf. Artif. Intell., Amsterdam, The Netherlands, 2008, pp. 490-494.
-
Proc. 18th Eur. Conf. Artif. Intell., Amsterdam, the Netherlands, 2008
, pp. 490-494
-
-
Perny, P.1
Spanjaard, O.2
-
41
-
-
84892595960
-
-
Ph.D. dissertation, Dept. Ind. Syst. Eng., KAIST, Daejeon, Korea
-
C. Jung, "An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," Ph.D. dissertation, Dept. Ind. Syst. Eng., KAIST, Daejeon, Korea, 2010.
-
(2010)
An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems
-
-
Jung, C.1
-
42
-
-
77955460230
-
Applications of multi-objective evolutionary algorithms to cluster tool scheduling
-
J.-Y. Tzeng, T.-K. Liu, and J.-H. Chou, "Applications of multi-objective evolutionary algorithms to cluster tool scheduling," in Proc. 1st Int. Conf. Innovative Comput., Inf. Control, Beijing, China, 2006, pp. 531-534.
-
Proc. 1st Int. Conf. Innovative Comput., Inf. Control, Beijing, China, 2006
, pp. 531-534
-
-
Tzeng, J.-Y.1
Liu, T.-K.2
Chou, J.-H.3
-
43
-
-
78650745824
-
Pareto shortest paths is often feasible in practice
-
Berlin, Germany: Springer-Verlag
-
M. Müller-Hannemann and K. Weihe, "Pareto shortest paths is often feasible in practice," in Lecture Notes in Computer Science. Berlin, Germany: Springer-Verlag, 2001, pp. 184-197.
-
(2001)
Lecture Notes in Computer Science
, pp. 184-197
-
-
Müller-Hannemann, M.1
Weihe, K.2
-
44
-
-
0032136168
-
Modeling and performance analysis of cluster tools using Petri nets
-
R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Trans. Semiconductor Manuf., vol. 11, no. 3, pp. 394-403, 1998.
-
(1998)
IEEE Trans. Semiconductor Manuf.
, vol.11
, Issue.3
, pp. 394-403
-
-
Srinivasan, R.S.1
|