메뉴 건너뛰기




Volumn 10, Issue 3, 2013, Pages 699-710

Noncyclic scheduling for timed discrete-event systems with application to single-armed cluster tools using pareto-optimal optimization

Author keywords

Cluster tool; Dynamic programming; Multiobjective; Noncyclic; Scheduling; State dependent

Indexed keywords

CLUSTER TOOL; MULTI OBJECTIVE; MULTI-OBJECTIVE PROBLEM; MULTI-OBJECTIVE SHORTEST PATH PROBLEMS; NONCYCLIC; PARETO OPTIMAL SOLUTIONS; SEMICONDUCTOR MANUFACTURING; STATE-DEPENDENT;

EID: 84892570718     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2012.2217128     Document Type: Article
Times cited : (55)

References (44)
  • 1
    • 31644451948 scopus 로고    scopus 로고
    • Job shop scheduling techniques in semiconductor manufacturing
    • A. K. Gupta and A. I. Sivakumar, "Job shop scheduling techniques in semiconductor manufacturing," Int. J. Adv. Manuf. Technol., no. 27, pp. 1163-1169, 2006.
    • (2006) Int. J. Adv. Manuf. Technol. , Issue.27 , pp. 1163-1169
    • Gupta, A.K.1    Sivakumar, A.I.2
  • 2
    • 0002591492 scopus 로고
    • Cyclic scheduling on parallel processors: An overview
    • New York: Wiley
    • C. Hanen and A. Munier, "Cyclic scheduling on parallel processors: An overview," in Scheduling Theory and Its Applications. New York: Wiley, 1994, pp. 193-226.
    • (1994) Scheduling Theory and Its Applications , pp. 193-226
    • Hanen, C.1    Munier, A.2
  • 3
    • 77955700913 scopus 로고    scopus 로고
    • Complexity of cyclic scheduling problems: A state-of-the-art survey
    • E. Levner, V. Kats, D. A. L. de Pablo, and T. C. E. Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey," Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
    • (2010) Comput. Ind. Eng. , vol.59 , Issue.2 , pp. 352-361
    • Levner, E.1    Kats, V.2    De Pablo, D.A.L.3    Cheng, T.C.E.4
  • 4
    • 60749114750 scopus 로고    scopus 로고
    • A review of scheduling theory and methods for semiconductor manufacturing cluster tool
    • T.-E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tool," in Proc. 2008 Winter Simulation Conf., 2008, pp. 2127-2135.
    • Proc. 2008 Winter Simulation Conf., 2008 , pp. 2127-2135
    • Lee, T.-E.1
  • 7
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
    • Apr.
    • J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.T.4
  • 8
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semiconductor Manuf., vol. 23, no. 1, pp. 53-64, 2010.
    • (2010) IEEE Trans. Semiconductor Manuf. , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.Q.1    Zhou, M.C.2
  • 9
    • 28244489538 scopus 로고    scopus 로고
    • Dominance of cyclic solutions and challenges in scheduling of robotic cells
    • M. W. Dawande and H. N. Geismar, "Dominance of cyclic solutions and challenges in scheduling of robotic cells," SIAM Review, vol. 47, no. 4, pp. 709-721, 2005.
    • (2005) SIAM Review , vol.47 , Issue.4 , pp. 709-721
    • Dawande, M.W.1    Geismar, H.N.2
  • 10
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot movement times, Part I: Two-cluster analysis
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot movement times, Part I: Two-cluster analysis," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 11
    • 9644308134 scopus 로고    scopus 로고
    • Approximation algorithms for k-unit cyclic solutions in robotic cells
    • N. H. Geismar, M. Dawande, and C. Sriskandarajah, "Approximation algorithms for k-unit cyclic solutions in robotic cells," Eur. J. Oper. Res., vol. 162, no. 2, pp. 291-309, 2005.
    • (2005) Eur. J. Oper. Res. , vol.162 , Issue.2 , pp. 291-309
    • Geismar, N.H.1    Dawande, M.2    Sriskandarajah, C.3
  • 12
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan.
    • N. Wu, F. Chu, C. Chu, and M. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.1    Chu, F.2    Chu, C.3    Zhou, M.4
  • 13
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan.
    • N. Q. Wu and M. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.Q.1    Zhou, M.C.2
  • 14
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr.
    • N. Q. Wu and M. C. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.Q.1    Zhou, M.C.2
  • 15
    • 77951134106 scopus 로고    scopus 로고
    • Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models
    • I. G. Drobouchevitch, N. H. Geismar, and C. Sriskandarajah, "Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models," Eur. Oper. Res., vol. 206, no. 3, pp. 623-633, 2010.
    • (2010) Eur. Oper. Res. , vol.206 , Issue.3 , pp. 623-633
    • Drobouchevitch, I.G.1    Geismar, N.H.2    Sriskandarajah, C.3
  • 16
    • 84855960719 scopus 로고    scopus 로고
    • Scheduling robotic cells served by a dual-arm robot
    • N. Geismar, U. V. Manoj, A. Sethi, and S. Chelliah, "Scheduling robotic cells served by a dual-arm robot," IIE Trans., vol. 44, no. 3, pp. 230-248, 2012.
    • (2012) IIE Trans. , vol.44 , Issue.3 , pp. 230-248
    • Geismar, N.1    Manoj, U.V.2    Sethi, A.3    Chelliah, S.4
  • 17
    • 77956689709 scopus 로고    scopus 로고
    • A branch and bound algorithm for optimal cyclic scheduling in a robot cell with processing time windows
    • P. Yan, C. Chu, N. Yang, and A. Che, "A branch and bound algorithm for optimal cyclic scheduling in a robot cell with processing time windows," Int. J. Prod. Res., vol. 48, no. 21, pp. 6461-6480, 2010.
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.21 , pp. 6461-6480
    • Yan, P.1    Chu, C.2    Yang, N.3    Che, A.4
  • 18
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • E. W. Davis and G. E. Heidorn, "An algorithm for optimal project scheduling under multiple resource constraints," Manage. Sci., vol. 17, no. 12, pp. B803-B816, 1971.
    • (1971) Manage. Sci. , vol.17 , Issue.12
    • Davis, E.W.1    Heidorn, G.E.2
  • 19
    • 78651080378 scopus 로고    scopus 로고
    • Productivity improvement from using machine buffers in dual-gripper cluster tools
    • Jan.
    • N. Geismar, M. Dawande, and C. Sriskandarajah, "Productivity improvement from using machine buffers in dual-gripper cluster tools," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 29-41, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 29-41
    • Geismar, N.1    Dawande, M.2    Sriskandarajah, C.3
  • 20
    • 4043145060 scopus 로고    scopus 로고
    • Robotic cells with parallel machines: Throughput maximization in constant travel-time cells
    • N. H. Geismar, M. Dawande, and C. Sriskandarajah, "Robotic cells with parallel machines: Throughput maximization in constant travel-time cells," J. Scheduling, vol. 7, no. 5, pp. 375-395, 2004.
    • (2004) J. Scheduling , vol.7 , Issue.5 , pp. 375-395
    • Geismar, N.H.1    Dawande, M.2    Sriskandarajah, C.3
  • 21
    • 82455168186 scopus 로고    scopus 로고
    • Scheduling of cluster tools with ready time constraints for small lot production
    • H. Kim and T.-E. Lee, "Scheduling of cluster tools with ready time constraints for small lot production," in Proc. 7th IEEE Conf. Autom. Sci. Eng., Trieste, 2011, pp. 96-101.
    • Proc. 7th IEEE Conf. Autom. Sci. Eng., Trieste, 2011 , pp. 96-101
    • Kim, H.1    Lee, T.-E.2
  • 22
    • 0021520669 scopus 로고
    • An overview of techniques for solving multiobjective mathematical programs
    • Nov.
    • G. W. Evans, "An overview of techniques for solving multiobjective mathematical programs," Manage. Sci., vol. 30, no. 11, pp. 1268-1282, Nov. 1984.
    • (1984) Manage. Sci. , vol.30 , Issue.11 , pp. 1268-1282
    • Evans, G.W.1
  • 23
    • 2442535151 scopus 로고    scopus 로고
    • Survey of multi-objective optimization methods for engineering
    • Mar.
    • R. Marler and J. Arora, "Survey of multi-objective optimization methods for engineering," Structural and Multidisciplinary Opt., vol. 26, no. 6, pp. 369-395, Mar. 2004.
    • (2004) Structural and Multidisciplinary Opt. , vol.26 , Issue.6 , pp. 369-395
    • Marler, R.1    Arora, J.2
  • 25
    • 0003958368 scopus 로고
    • Transl.: Milan: Societa Editrice Libraria
    • 1906 Transl.: Manuale di Economia Politica. Milan: Societa Editrice Libraria.
    • (1906) Manuale di Economia Politica
  • 29
    • 0021430238 scopus 로고
    • On a multicriteria shortest path problem
    • E. Q. V. Martins, "On a multicriteria shortest path problem," Eur. Oper. Res., vol. 16, no. 2, pp. 236-245, 1984.
    • (1984) Eur. Oper. Res. , vol.16 , Issue.2 , pp. 236-245
    • Martins, E.Q.V.1
  • 30
    • 38249004651 scopus 로고
    • Time dependency in multiple objective dynamic programming
    • M. M. Kostreva and M. M. Wiecek, "Time dependency in multiple objective dynamic programming," J. Math. Anal. Appl., vol. 173, no. 1, pp. 289-307, 1993.
    • (1993) J. Math. Anal. Appl. , vol.173 , Issue.1 , pp. 289-307
    • Kostreva, M.M.1    Wiecek, M.M.2
  • 31
    • 85012688561 scopus 로고
    • Princeton, NJ: Princeton Univ. Press
    • R. E. Bellman, Dynamic Programming. Princeton, NJ: Princeton Univ. Press, 1957.
    • (1957) Dynamic Programming
    • Bellman, R.E.1
  • 32
    • 34147120474 scopus 로고
    • A note on two problems in connexion with graphs
    • E. W. Dijkstra, "A note on two problems in connexion with graphs," Numerische Mathematik, vol. 1, no. 1, pp. 269-271, 1959.
    • (1959) Numerische Mathematik , vol.1 , Issue.1 , pp. 269-271
    • Dijkstra, E.W.1
  • 33
    • 0035527944 scopus 로고    scopus 로고
    • Label correcting methods to solve multicriteria shortest path problem
    • E. Guerriero and R. Musmanno, "Label correcting methods to solve multicriteria shortest path problem," J. Opt. Theory Optim., vol. 111, no. 3, pp. 589-613, 2001.
    • (2001) J. Opt. Theory Optim. , vol.111 , Issue.3 , pp. 589-613
    • Guerriero, E.1    Musmanno, R.2
  • 34
    • 0019044342 scopus 로고
    • Note on multiple objective dynamic programming
    • H. G. Daellenbach and C. A. De Kluyver, "Note on multiple objective dynamic programming," J. Oper. Res. Soc., vol. 31, no. 7, pp. 591-594, 1980.
    • (1980) J. Oper. Res. Soc. , vol.31 , Issue.7 , pp. 591-594
    • Daellenbach, H.G.1    De Kluyver, C.A.2
  • 35
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-armed cluster tools with re-entrant wafer flows
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with re-entrant wafer flows," IEEE Trans. .Semiconductor Manuf., vol. 19, no. 2, pp. 226-240, 2006.
    • (2006) IEEE Trans..Semiconductor Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 36
    • 0030214772 scopus 로고    scopus 로고
    • Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on the throughput
    • T. L. Perkinson, S. R. Gyurcsik, and P. K. McLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on the throughput," IEEE Trans. Semiconductor Manuf., vol. 9, no. 3, pp. 384-400, 1996.
    • (1996) IEEE Trans. Semiconductor Manuf. , vol.9 , Issue.3 , pp. 384-400
    • Perkinson, T.L.1    Gyurcsik, S.R.2    McLarty, P.K.3
  • 37
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets
    • W. M. Zuberek, "Cluster tools with chamber revisiting: Modeling and analysis using timed Petri nets," IEEE Trans. Semiconductor Manuf., vol. 17, no. 3, pp. 333-344, 2004.
    • (2004) IEEE Trans. Semiconductor Manuf. , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1
  • 43
    • 78650745824 scopus 로고    scopus 로고
    • Pareto shortest paths is often feasible in practice
    • Berlin, Germany: Springer-Verlag
    • M. Müller-Hannemann and K. Weihe, "Pareto shortest paths is often feasible in practice," in Lecture Notes in Computer Science. Berlin, Germany: Springer-Verlag, 2001, pp. 184-197.
    • (2001) Lecture Notes in Computer Science , pp. 184-197
    • Müller-Hannemann, M.1    Weihe, K.2
  • 44
    • 0032136168 scopus 로고    scopus 로고
    • Modeling and performance analysis of cluster tools using Petri nets
    • R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Trans. Semiconductor Manuf., vol. 11, no. 3, pp. 394-403, 1998.
    • (1998) IEEE Trans. Semiconductor Manuf. , vol.11 , Issue.3 , pp. 394-403
    • Srinivasan, R.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.