메뉴 건너뛰기




Volumn 16, Issue 3, 2003, Pages 521-534

Scheduling analysis of time-constrained dual-armed cluster tools

Author keywords

Cluster tool; Scheduling; Swap; Time constraint

Indexed keywords

CHEMICAL VAPOR DEPOSITION; GASES; INDUSTRIAL ROBOTS; PRODUCTION ENGINEERING; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0041384559     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2003.815203     Document Type: Article
Times cited : (280)

References (24)
  • 2
    • 0025510962 scopus 로고
    • Statistical equipment modeling for VLSI manufacturing: An application for LPCVD
    • Nov.
    • K.-K. Lin and C. J. Spanos, "Statistical equipment modeling for VLSI manufacturing: An application for LPCVD," IEEE Trans. Semiconduct. Manufact., vol. 3, pp. 216-229, Nov. 1990.
    • (1990) IEEE Trans. Semiconduct. Manufact. , vol.3 , pp. 216-229
    • Lin, K.-K.1    Spanos, C.J.2
  • 4
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • Oct.
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Automat., vol. 17, pp. 609-618, Oct. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 5
    • 0031276238 scopus 로고    scopus 로고
    • A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • Nov.
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semiconduct. Manufact., vol. 10, pp. 418-424, Nov. 1997.
    • (1997) IEEE Trans. Semiconduct. Manufact. , vol.10 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 6
    • 0031173543 scopus 로고    scopus 로고
    • Optimizing cluster tool throughput
    • July
    • R. A. Hendrickson, "Optimizing cluster tool throughput," Solid State Technol., pp. 217-222, July 1997.
    • (1997) Solid State Technol. , pp. 217-222
    • Hendrickson, R.A.1
  • 7
    • 0033891784 scopus 로고    scopus 로고
    • Stable earliest starting schedules for periodic job shops: A linear system approach
    • T.-E. Lee, "Stable earliest starting schedules for periodic job shops: A linear system approach," Int. J. Flexible Manufacturing Systems, vol. 12, no. 1, pp. 59-80, 2000.
    • (2000) Int. J. Flexible Manufacturing Systems , vol.12 , Issue.1 , pp. 59-80
    • Lee, T.-E.1
  • 8
    • 33745966020 scopus 로고    scopus 로고
    • An extended event graph with negative places and negative tokens for time window constraints
    • T.-E. Lee, J.-W. Seo, and S.-H. Park, "An extended event graph with negative places and negative tokens for time window constraints," in Proc 7th Workshop Discrete Event Systems, 2002, pp. 91-96.
    • Proc 7th Workshop Discrete Event Systems, 2002 , pp. 91-96
    • Lee, T.-E.1    Seo, J.-W.2    Park, S.-H.3
  • 9
    • 0036820026 scopus 로고    scopus 로고
    • Steady state analysis of cyclic job shops with overtaking
    • J.-W. Seo and T.-E. Lee, "Steady state analysis of cyclic job shops with overtaking," Int. J. Flexible Manufact. Syst., vol. 14, no. 4, pp. 291-318, 2002.
    • (2002) Int. J. Flexible Manufact. Syst. , vol.14 , Issue.4 , pp. 291-318
    • Seo, J.-W.1    Lee, T.-E.2
  • 10
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • Feb.
    • H. Chen, C. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Automat., vol. 14, pp. 144-152, Feb. 1998.
    • (1998) IEEE Trans. Robot. Automat. , vol.14 , pp. 144-152
    • Chen, H.1    Chu, C.2    Proth, J.-M.3
  • 11
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
    • Feb.
    • Q. Su and F. F. Chen, "Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Automat., vol. 12, pp. 22-30, Feb. 1996.
    • (1996) IEEE Trans. Robot. Automat. , vol.12 , pp. 22-30
    • Su, Q.1    Chen, F.F.2
  • 14
    • 0026392461 scopus 로고    scopus 로고
    • A Petri net with negative tokens and its application to automated reasoning
    • T. Murata and H. Yamauchi, "A Petri net with negative tokens and its application to automated reasoning," in Proc. 33rd Midwest Symp. CAS, Aug. 1990, pp. 762-765.
    • Proc. 33rd Midwest Symp. CAS, Aug. 1990 , pp. 762-765
    • Murata, T.1    Yamauchi, H.2
  • 17
    • 0032136168 scopus 로고    scopus 로고
    • Modeling and performance analysis of cluster tools using Petri nets
    • Aug.
    • R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Thans. Semiconduct. Manufact., vol. 11, pp. 394-403, Aug. 1998.
    • (1998) IEEE Thans. Semiconduct. Manufact. , vol.11 , pp. 394-403
    • Srinivasan, R.S.1
  • 18
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct.
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Thans. Robot. Automat., vol. 17, pp. 562-575, Oct. 2001.
    • (2001) IEEE Thans. Robot. Automat. , vol.17 , pp. 562-575
    • Zuberek, W.M.1
  • 20
    • 0005861308 scopus 로고    scopus 로고
    • P-Time Petri nets for manufacturing systems with staying time constraints
    • S. Calvez, P. Aygalinc, and W. Khansa, "P-Time Petri nets for manufacturing systems with staying time constraints," in Proc. IFAC CIS'97 Conf., May 1997, pp. 495-500.
    • Proc. IFAC CIS'97 Conf., May 1997 , pp. 495-500
    • Calvez, S.1    Aygalinc, P.2    Khansa, W.3
  • 24
    • 0035334186 scopus 로고    scopus 로고
    • Modeling and implementating a real-time scheduler for dual-armed cluster tools
    • Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementating a real-time scheduler for dual-armed cluster tools," Comput. in Industry, vol. 45, no. 1, pp. 13-27, 2001.
    • (2001) Comput. in Industry , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.