-
2
-
-
0025510962
-
Statistical equipment modeling for VLSI manufacturing: An application for LPCVD
-
Nov.
-
K.-K. Lin and C. J. Spanos, "Statistical equipment modeling for VLSI manufacturing: An application for LPCVD," IEEE Trans. Semiconduct. Manufact., vol. 3, pp. 216-229, Nov. 1990.
-
(1990)
IEEE Trans. Semiconduct. Manufact.
, vol.3
, pp. 216-229
-
-
Lin, K.-K.1
Spanos, C.J.2
-
3
-
-
0026679382
-
Single-wafer integrated semiconductor device processing
-
Jan.
-
M. M. Moslehi, R. A. Chapman, M. Wong, A. Paranjpe, H. N. Najm, J. Kuehne, R. L. Yeakley, and C. J. Davis, "Single-wafer integrated semiconductor device processing," IEEE Trans. Electron Devices, vol. 39, pp. 4-32, Jan. 1992.
-
(1992)
IEEE Trans. Electron Devices
, vol.39
, pp. 4-32
-
-
Moslehi, M.M.1
Chapman, R.A.2
Wong, M.3
Paranjpe, A.4
Najm, H.N.5
Kuehne, J.6
Yeakley, R.L.7
Davis, C.J.8
-
4
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Automat., vol. 17, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
5
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov.
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semiconduct. Manufact., vol. 10, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semiconduct. Manufact.
, vol.10
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
6
-
-
0031173543
-
Optimizing cluster tool throughput
-
July
-
R. A. Hendrickson, "Optimizing cluster tool throughput," Solid State Technol., pp. 217-222, July 1997.
-
(1997)
Solid State Technol.
, pp. 217-222
-
-
Hendrickson, R.A.1
-
7
-
-
0033891784
-
Stable earliest starting schedules for periodic job shops: A linear system approach
-
T.-E. Lee, "Stable earliest starting schedules for periodic job shops: A linear system approach," Int. J. Flexible Manufacturing Systems, vol. 12, no. 1, pp. 59-80, 2000.
-
(2000)
Int. J. Flexible Manufacturing Systems
, vol.12
, Issue.1
, pp. 59-80
-
-
Lee, T.-E.1
-
8
-
-
33745966020
-
An extended event graph with negative places and negative tokens for time window constraints
-
T.-E. Lee, J.-W. Seo, and S.-H. Park, "An extended event graph with negative places and negative tokens for time window constraints," in Proc 7th Workshop Discrete Event Systems, 2002, pp. 91-96.
-
Proc 7th Workshop Discrete Event Systems, 2002
, pp. 91-96
-
-
Lee, T.-E.1
Seo, J.-W.2
Park, S.-H.3
-
9
-
-
0036820026
-
Steady state analysis of cyclic job shops with overtaking
-
J.-W. Seo and T.-E. Lee, "Steady state analysis of cyclic job shops with overtaking," Int. J. Flexible Manufact. Syst., vol. 14, no. 4, pp. 291-318, 2002.
-
(2002)
Int. J. Flexible Manufact. Syst.
, vol.14
, Issue.4
, pp. 291-318
-
-
Seo, J.-W.1
Lee, T.-E.2
-
10
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
Feb.
-
H. Chen, C. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Automat., vol. 14, pp. 144-152, Feb. 1998.
-
(1998)
IEEE Trans. Robot. Automat.
, vol.14
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.-M.3
-
11
-
-
0030086424
-
Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
-
Feb.
-
Q. Su and F. F. Chen, "Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Automat., vol. 12, pp. 22-30, Feb. 1996.
-
(1996)
IEEE Trans. Robot. Automat.
, vol.12
, pp. 22-30
-
-
Su, Q.1
Chen, F.F.2
-
12
-
-
0032258774
-
P-time petri nets and the hoist scheduling problem
-
S. Collart-Dutilleul and J.-P. Denat, "P-Time Petri nets and the hoist scheduling problem," in Proc. IEEE Conf. Systems, Man, Cybernetics, 1998, pp. 558-563.
-
Proc. IEEE Conf. Systems, Man, Cybernetics, 1998
, pp. 558-563
-
-
Collart-Dutilleul, S.1
Denat, J.-P.2
-
14
-
-
0026392461
-
A Petri net with negative tokens and its application to automated reasoning
-
T. Murata and H. Yamauchi, "A Petri net with negative tokens and its application to automated reasoning," in Proc. 33rd Midwest Symp. CAS, Aug. 1990, pp. 762-765.
-
Proc. 33rd Midwest Symp. CAS, Aug. 1990
, pp. 762-765
-
-
Murata, T.1
Yamauchi, H.2
-
17
-
-
0032136168
-
Modeling and performance analysis of cluster tools using Petri nets
-
Aug.
-
R. S. Srinivasan, "Modeling and performance analysis of cluster tools using Petri nets," IEEE Thans. Semiconduct. Manufact., vol. 11, pp. 394-403, Aug. 1998.
-
(1998)
IEEE Thans. Semiconduct. Manufact.
, vol.11
, pp. 394-403
-
-
Srinivasan, R.S.1
-
18
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct.
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Thans. Robot. Automat., vol. 17, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Thans. Robot. Automat.
, vol.17
, pp. 562-575
-
-
Zuberek, W.M.1
-
19
-
-
0142211551
-
Structural analysis of p-time Petri nets
-
W. Khansa, P. Aygaling, and J.-P. Denat, "Structural analysis of p-time Petri nets," in Proc. CESA'96 Imacs Multiconference IEEE-SMC, July 1996, pp. 127-136.
-
Proc. CESA'96 Imacs Multiconference IEEE-SMC, July 1996
, pp. 127-136
-
-
Khansa, W.1
Aygaling, P.2
Denat, J.-P.3
-
20
-
-
0005861308
-
P-Time Petri nets for manufacturing systems with staying time constraints
-
S. Calvez, P. Aygalinc, and W. Khansa, "P-Time Petri nets for manufacturing systems with staying time constraints," in Proc. IFAC CIS'97 Conf., May 1997, pp. 495-500.
-
Proc. IFAC CIS'97 Conf., May 1997
, pp. 495-500
-
-
Calvez, S.1
Aygalinc, P.2
Khansa, W.3
-
21
-
-
0042959690
-
P-Time Petri nets for manufacturing systems
-
K. Wael, D. Jean-Paul, and C. D. Simon, "P-Time Petri nets for manufacturing systems," in Proc. IEE Int. Workshop Discrete Event System, 1996, pp. 94-102.
-
Proc. IEE Int. Workshop Discrete Event System, 1996
, pp. 94-102
-
-
Wael, K.1
Jean-Paul, D.2
Simon, C.D.3
-
24
-
-
0035334186
-
Modeling and implementating a real-time scheduler for dual-armed cluster tools
-
Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementating a real-time scheduler for dual-armed cluster tools," Comput. in Industry, vol. 45, no. 1, pp. 13-27, 2001.
-
(2001)
Comput. in Industry
, vol.45
, Issue.1
, pp. 13-27
-
-
Shin, Y.-H.1
Lee, T.-E.2
Kim, J.-H.3
Lee, H.-Y.4
|