메뉴 건너뛰기




Volumn 23, Issue 1, 2010, Pages 53-64

Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation

Author keywords

Automated manufacturing systems; Cluster tool; Discrete event systems; Modeling and analysis; Petri net; Schedulability analysis; Scheduling

Indexed keywords

ACTIVITY TIME; AUTOMATED MANUFACTURING SYSTEMS; CLUSTER TOOL; DISCRETE EVENT SYSTEMS; FEASIBLE SCHEDULE; KNOW-HOW; ON-WAFER; OPERATIONAL ARCHITECTURE; PETRI NET MODELS; PN MODELS; PROCESSING MODULES; SCHEDULABILITY ANALYSIS; SOJOURN TIME; STEADY-STATE SCHEDULING; TIME CONSTRAINTS; UPPER BOUND;

EID: 76849088211     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2009.2039243     Document Type: Article
Times cited : (86)

References (27)
  • 1
  • 2
    • 33747465464 scopus 로고
    • Coping with the high cost of wafer fabs
    • P. Burggraaf, "Coping with the high cost of wafer fabs," Semicond. Int., vol.38, pp. 45-50, 1995.
    • (1995) Semicond. Int. , vol.38 , pp. 45-50
    • Burggraaf, P.1
  • 3
    • 33747443542 scopus 로고    scopus 로고
    • Multicluster tools scheduling: An integrated event graph and network model approach
    • S. W. Ding, J. G. Yi, and M. T. Zhang, "Multicluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol.19, no.3, pp. 339-351, 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.W.1    Yi, J.G.2    Zhang, M.T.3
  • 6
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of timed-constrained dual-armed cluster tools
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol.16, no.3, pp. 521-534, 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 7
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended petri net
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended petri net," IEEE Trans. Autom. Sci. Eng., vol.5, no.3, pp. 490-503, 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 8
    • 34447329563 scopus 로고    scopus 로고
    • Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300 mm semiconductor manufacturing
    • Jul.
    • D.-Y. Liao, M. D. Jeng, and M. C. Zhou, "Petri net modeling and Lagrangian relaxation approach to vehicle scheduling in 300 mm semiconductor manufacturing," IEEE Trans. Syst., Man, Cybern. Part C, vol.37, no.4, pp. 504-516, Jul. 2007.
    • (2007) IEEE Trans. Syst., Man, Cybern. Part C , vol.37 , Issue.4 , pp. 504-516
    • Liao, D.-Y.1    Jeng, M.D.2    Zhou, M.C.3
  • 10
    • 0030214772 scopus 로고    scopus 로고
    • Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput
    • T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput," IEEE Trans. Semicond. Manuf., vol.9, pp. 384-400, 1996.
    • (1996) IEEE Trans. Semicond. Manuf. , vol.9 , pp. 384-400
    • Perkinson, T.L.1    Gyurcsik, R.S.2    MacLarty, P.K.3
  • 12
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol.17, pp. 609-618, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 13
    • 0035334186 scopus 로고    scopus 로고
    • Modeling and implementing a real-time scheduler for dual-armed cluster tools
    • Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol.45, no.1, pp. 13-27, 2001.
    • (2001) Comput. Ind. , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4
  • 14
    • 0031276238 scopus 로고    scopus 로고
    • A steadystate throughput analysis of cluster tools: Dual-blade versus singleblade robots
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steadystate throughput analysis of cluster tools: Dual-blade versus singleblade robots," IEEE Trans. Semicond. Manuf., vol.10, pp. 418-424, 1997.
    • (1997) IEEE Trans. Semicond. Manuf. , vol.10 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 15
    • 0032630279 scopus 로고    scopus 로고
    • Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model
    • N. Q. Wu, "Necessary and sufficient conditions for deadlock-free operation in flexible manufacturing systems using a colored Petri net model," IEEE Trans. Syst., Man, Cybern. C, vol.29, no.2, pp. 192-204, 1999.
    • (1999) IEEE Trans. Syst., Man, Cybern. C , vol.29 , Issue.2 , pp. 192-204
    • Wu, N.Q.1
  • 16
    • 0035485815 scopus 로고    scopus 로고
    • Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems
    • N. Q. Wu and M. C. Zhou, "Avoiding deadlock and reducing starvation and blocking in automated manufacturing systems," IEEE Trans. Robot. Autom., vol.17, no.5, pp. 657-668, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 657-668
    • Wu, N.Q.1    Zhou, M.C.2
  • 17
    • 1942518458 scopus 로고    scopus 로고
    • Modeling and deadlock control of automated guided vehicle systems
    • N. Q. Wu and M. C. Zhou, "Modeling and deadlock control of automated guided vehicle systems," IEEE/ASME Trans. Mechatronics, vol.9, no.1, pp. 50-57, 2004.
    • (2004) IEEE/ASME Trans. Mechatronics , vol.9 , Issue.1 , pp. 50-57
    • Wu, N.Q.1    Zhou, M.C.2
  • 18
    • 29144513578 scopus 로고    scopus 로고
    • Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles
    • N. Q. Wu and M. C. Zhou, "Modeling and deadlock avoidance of automated manufacturing systems with multiple automated guided vehicles," IEEE Trans. Syst., Man, Cybern. B, vol.35, no.6, pp. 1193-1202, 2005.
    • (2005) IEEE Trans. Syst., Man, Cybern. B , vol.35 , Issue.6 , pp. 1193-1202
    • Wu, N.Q.1    Zhou, M.C.2
  • 19
    • 45149087576 scopus 로고    scopus 로고
    • Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net
    • Shanghai, China, Oct. 7-10
    • N. Q.Wu and M. C. Zhou, "Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net," in Proc. 2006 IEEE Conf. Autom. Sci. Eng., Shanghai, China, Oct. 7-10, 2006, pp. 85-90.
    • (2006) Proc. 2006 IEEE Conf. Autom. Sci. Eng. , pp. 85-90
    • Wu, N.Q.1    Zhou, M.C.2
  • 20
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol.21, no.2, pp. 224-237, 2008.
    • (2008) IEEE Trans. Semicond. Manuf. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.Q.1    Chu, C.B.2    Chu, F.3    Zhou, M.C.4
  • 21
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • to be published
    • N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., to be published.
    • IEEE Trans. Autom. Sci. Eng.
    • Wu, N.Q.1    Zhou, M.C.2
  • 22
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach
    • J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multicluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol.5, no.2, pp. 321-336, 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Song, D.3    Zhang, M.T.4
  • 23
    • 0026204001 scopus 로고
    • Parallel and sequential mutual exclusions for Petri net modeling of manufacturing systems with shared resources
    • M. Zhou and F. DiCesare, "Parallel and sequential mutual exclusions for Petri net modeling of manufacturing systems with shared resources," IEEE Trans. Robot. Autom., vol.7, no.4, pp. 515-527, 1991.
    • (1991) IEEE Trans. Robot. Autom. , vol.7 , Issue.4 , pp. 515-527
    • Zhou, M.1    Dicesare, F.2
  • 24
    • 0026882077 scopus 로고
    • A hybrid methodology for synthesis of petri nets for manufacturing systems
    • M. C. Zhou, F. DiCesare, and A. Desrochers, "A hybrid methodology for synthesis of petri nets for manufacturing systems," IEEE Trans. Robot. Autom., vol.8, pp. 350-361, 1992.
    • (1992) IEEE Trans. Robot. Autom. , vol.8 , pp. 350-361
    • Zhou, M.C.1    Dicesare, F.2    Desrochers, A.3
  • 25
    • 0032141060 scopus 로고    scopus 로고
    • Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems:A Petri net approach
    • M. C. Zhou and M. D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems:A Petri net approach," IEEE Trans. Semicond. Manuf., vol.11, no.3, pp. 333-357, 1998.
    • (1998) IEEE Trans. Semicond. Manuf. , vol.11 , Issue.3 , pp. 333-357
    • Zhou, M.C.1    Jeng, M.D.2
  • 27
    • 0035485301 scopus 로고    scopus 로고
    • Timed petri nets in modeling and analysis of cluster tools
    • W. M. Zuberek, "Timed petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol.17, no.5, pp. 562-575, 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.