-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
A. Agnetis, "Scheduling no-wait robotic cells with two and three machines," Eur. J. Oper. Res., vol. 123, pp. 303-314, 2000.
-
(2000)
Eur. J. Oper. Res.
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing,"
-
E. Akçali, K. Nemoto, and R. Uzsoy, "Cycle-time improvements for photolithography process in semiconductor manufacturing," IEEE Trans. Semiconductor Manuf., vol. 14, pp. 48-56, 2001.
-
(2001)
IEEE Trans. Semiconductor Manuf.
, vol.14
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
5
-
-
78651083808
-
-
Aug. 16, 2009. [Online]. Available
-
bnet Aug. 16, 2009. [Online]. Available: http://findarticles.com/p/arti- cles/mi-m0EKF/is-24-48/ai-87145967/
-
Bnet
-
-
-
6
-
-
49749086485
-
Identical part production in cyclic robotic cells: Concepts, overview and open questions
-
N. Brauner, "Identical part production in cyclic robotic cells: Concepts, overview and open questions," Discrete Appl. Math., vol. 156, pp. 2480-2492, 2008.
-
(2008)
Discrete Appl. Math.
, vol.156
, pp. 2480-2492
-
-
Brauner, N.1
-
7
-
-
0002804434
-
On a conjecture about robotic cells: New simplified proof for the three-machine case
-
N. Brauner and G. Finke, "On a conjecture about robotic cells: New simplified proof for the three-machine case," Inf. Syst. Oper. Res., vol. 37, no. 1, pp. 20-36, 1999.
-
(1999)
Inf. Syst. Oper. Res.
, vol.37
, Issue.1
, pp. 20-36
-
-
Brauner, N.1
Finke, G.2
-
8
-
-
3543073493
-
Complexity of one-cycle robotic flow shops
-
N. Brauner, G. Finke, and W. Kubiak, "Complexity of one-cycle robotic flow shops," J. Scheduling, vol. 6, no. 4, pp. 355-371, 2003.
-
(2003)
J. Scheduling
, vol.6
, Issue.4
, pp. 355-371
-
-
Brauner, N.1
Finke, G.2
Kubiak, W.3
-
9
-
-
28244467803
-
Optimal cyclic production in robotic flow shops with buffer
-
France, Tech. Rep. RR982-I
-
N. Brauner, G. Finke, and C. Gueguen, "Optimal cyclic production in robotic flow shops with buffer," Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France, Tech. Rep. RR982-I, 1997.
-
(1997)
Laboratoire LEIBNIZ, Institut IMAG, Grenoble
-
-
Brauner, N.1
Finke, G.2
Gueguen, C.3
-
10
-
-
17644374193
-
Multi-degree cyclic scheduling of two robots in a no-wait flowshop,"
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a no-wait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, pp. 173-183, 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, pp. 173-183
-
-
Che, A.1
Chu, C.2
-
11
-
-
67349222218
-
Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," Eur. J. Oper. Res., vol. 199, pp. 77-88, 2009.
-
(2009)
Eur. J. Oper. Res.
, vol.199
, pp. 77-88
-
-
Che, A.1
Chu, C.2
-
12
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times,"
-
A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Autom., vol. 18, pp. 69-80, 2002.
-
(2002)
IEEE Trans. Robot. Autom.
, vol.18
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
13
-
-
0037448766
-
A polynomial algorithm for 2-degree cyclic robot scheduling
-
A. Che, C. Chu, and E. Levner, "A polynomial algorithm for 2-degree cyclic robot scheduling," Eur. J. Oper. Res., vol. 145, pp. 31-44, 2003.
-
(2003)
Eur. J. Oper. Res.
, vol.145
, pp. 31-44
-
-
Che, A.1
Chu, C.2
Levner, E.3
-
14
-
-
0032000755
-
Cyclic scheduling with time window constraints,"
-
H. Chen, C. Chu, and J. Proth, "Cyclic scheduling with time window constraints," IEEE Trans. Robot. Autom., vol. 14, pp. 144-152, 1998.
-
(1998)
IEEE Trans. Robot. Autom.
, vol.14
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.3
-
15
-
-
33745207776
-
A faster polynomial algorithm for 2-cyclic robotic scheduling
-
C. Chu, "A faster polynomial algorithm for 2-cyclic robotic scheduling," J. Scheduling, vol. 9, pp. 453-468, 2006.
-
(2006)
J. Scheduling
, vol.9
, pp. 453-468
-
-
Chu, C.1
-
16
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
Y. Crama, V. Kats, J. van de Klundert, and E. Levner, "Cyclic scheduling in robotic flowshops," Ann. Oper. Res.: Math. Ind. Syst., vol. 96, pp. 97-124, 2000.
-
(2000)
Ann. Oper. Res.: Math. Ind. Syst.
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
Klundert De J.Van3
Levner, E.4
-
17
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama and J. van de Klundert, "Cyclic scheduling of identical parts in a robotic cell," Oper. Res., vol. 45, pp. 952-965, 1997.
-
(1997)
Oper. Res.
, vol.45
, pp. 952-965
-
-
Crama, Y.1
Klundert De J.Van2
-
18
-
-
77649308311
-
Throughput optimization in dual gripper interval robotic cells
-
M. Dawande, H. N. Geismar, M. Pinedo, and C. Sriskandarajah, "Throughput optimization in dual gripper interval robotic cells," IIE Trans., vol. 42, no. 1, pp. 1-15, 2010.
-
(2010)
IIE Trans.
, vol.42
, Issue.1
, pp. 1-15
-
-
Dawande, M.1
Geismar, H.N.2
Pinedo, M.3
Sriskandarajah, C.4
-
20
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, H. N. Geismar, S. P. Sethi, and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: Recent developments," J. Scheduling, vol. 8, pp. 387-426, 2005.
-
(2005)
J. Scheduling
, vol.8
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
21
-
-
0036769403
-
Throughput optimization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah, and S. P. Sethi, "Throughput optimization in constant travel-time robotic cells," Manuf. Service Oper. Manage., vol. 4, pp. 296-312, 2002.
-
(2002)
Manuf. Service Oper. Manage.
, vol.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.P.3
-
22
-
-
33747443542
-
Scheduling multi-cluster tools: An integrated event graph and network model approach,"
-
S. Ding, J. Yi, and M. T. Zhang, "Scheduling multi-cluster tools: An integrated event graph and network model approach," IEEE Trans. Semiconductor Manuf., vol. 19, no. 3, pp. 339-351, 2006.
-
(2006)
IEEE Trans. Semiconductor Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
23
-
-
78651095615
-
Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models working paper
-
TX: Univ. Texas at Dallas
-
I. G. Drobouchevitch, H. N. Geismar, and C. Sriskandarajah, Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models, working paper. Richardson, TX: Univ. Texas at Dallas, 2008.
-
(2008)
Richardson
-
-
Drobouchevitch, I.G.1
Geismar, H.N.2
Sriskandarajah, C.3
-
24
-
-
28244447024
-
Scheduling dual-gripper robot cells: One-unit cycles
-
I. G. Drobouchevitch, S. P. Sethi, and C. Sriskandarajah, "Scheduling dual-gripper robot cells: One-unit cycles," Eur. J. Oper. Res., vol. 171, pp. 598-631, 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.171
, pp. 598-631
-
-
Drobouchevitch, I.G.1
Sethi, S.P.2
Sriskandarajah, C.3
-
25
-
-
23944501918
-
Scheduling multiple parts in two-machine dual-gripper robotic cells: Heuristic algorithm and performance guarantee
-
I. G. Drobouchevitch, S. P. Sethi, J. B. Sidney, and C. Sriskandarajah, "Scheduling multiple parts in two-machine dual-gripper robotic cells: Heuristic algorithm and performance guarantee," Int. J. Oper. Quantitative Manage., vol. 10, pp. 297-314, 2004.
-
(2004)
Int. J. Oper. Quantitative Manage.
, vol.10
, pp. 297-314
-
-
Drobouchevitch, I.G.1
Sethi, S.P.2
Sidney, J.B.3
Sriskandarajah, C.4
-
26
-
-
78651061287
-
-
Aug. 19, 2009 [Online]. Available
-
FSI International, Inc., Aug. 19, 2009 [Online]. Available: http://www.fsi-intl.com/index.php/index.php/applications-and-prod-ucts/ orion-single-wafer-cleaning-cluster
-
FSI International Inc.
-
-
-
27
-
-
30844461467
-
Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots
-
G. Galante and G. Passannanti, "Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots," Int. J. Prod. Res., vol. 44, no. 4, pp. 639-652, 2006.
-
(2006)
Int. J. Prod. Res.
, vol.44
, Issue.4
, pp. 639-652
-
-
Galante, G.1
Passannanti, G.2
-
28
-
-
55049140842
-
Robotic cells with parallel machines and multiple dual gripper robots: A comparative overview
-
H. N. Geismar, M. Pinedo, and C. Sriskandarajah, "Robotic cells with parallel machines and multiple dual gripper robots: A comparative overview," IIE Trans., vol. 40, no. 12, pp. 1211-1227, 2008a.
-
(2008)
IIE Trans.
, vol.40
, Issue.12
, pp. 1211-1227
-
-
Geismar, H.N.1
Pinedo, M.2
Sriskandarajah, C.3
-
29
-
-
54349090109
-
Approximations to optimal A'-unit cycles for single-gripper and dual-gripper robotic cells
-
H. N. Geismar, L. M. A. Chan, M. Dawande, and C. Sriskandarajah, "Approximations to optimal A'-unit cycles for single-gripper and dual-gripper robotic cells," Prod. Oper. Manage., vol. 17, no. 5, pp. 551-563, 2008b.
-
(2008)
Prod. Oper. Manage.
, vol.17
, Issue.5
, pp. 551-563
-
-
Geismar, H.N.1
Chan, L.M.A.2
Dawande, M.3
Sriskandarajah, C.4
-
30
-
-
33746120814
-
Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines
-
H. N. Geismar, M. Dawande, and C. Sriskandarajah, "Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines," Prod. Oper. Manage., vol. 15, no. 2, pp. 311-328, 2006.
-
(2006)
Prod. Oper. Manage.
, vol.15
, Issue.2
, pp. 311-328
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
31
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots,"
-
H. N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots," IEEE Trans. Autom. Sci. Eng., vol. 1, no. 1, pp. 84-89, 2004.
-
(2004)
IEEE Trans. Autom. Sci. Eng.
, vol.1
, Issue.1
, pp. 84-89
-
-
Geismar, H.N.1
Sriskandarajah, C.2
Ramanan, N.3
-
33
-
-
85215356632
-
Operations research techniques for robotic systems
-
S. Y. Nof, Ed. New York: Wiley
-
N. G. Hall, "Operations research techniques for robotic systems," in Handbook of Industrial Robotics, S. Y. Nof, Ed. New York: Wiley, 1999, vol. II, pp. 543-577.
-
(1999)
Handbook of Industrial Robotics
, vol.2
, pp. 543-577
-
-
Hall, N.G.1
-
34
-
-
0031142587
-
Scheduling in robotic cells: Classification, two-and three-machine cells
-
N. G. Hall, H. Kamoun, and C. Sriskandarajah, "Scheduling in robotic cells: Classification, two-and three-machine cells," Oper. Res., vol. 45, pp. 421-439, 1997.
-
(1997)
Oper. Res.
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
35
-
-
0002868454
-
Scheduling in robotic cells: Complexity and steady state analysis
-
N. G. Hall, H. Kamoun, and C. Sriskandarajah, "Scheduling in robotic cells: Complexity and steady state analysis," Eur. J. Oper. Res., vol. 109, pp. 43-63, 1998.
-
(1998)
Eur. J. Oper. Res.
, vol.109
, pp. 43-63
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
36
-
-
0033727025
-
Evaluating the impact of process changes on cluster tool performance,"
-
J. Herrmann, N. Chandrasekaran, B. Conaghan, M. Nguyen, G. Rubloff, and R. Shi, "Evaluating the impact of process changes on cluster tool performance," IEEE Trans. Semiconductor Manuf., vol. 13, pp. 181-192, 2003.
-
(2003)
IEEE Trans. Semiconductor Manuf.
, vol.13
, pp. 181-192
-
-
Herrmann, J.1
Chandrasekaran, N.2
Conaghan, B.3
Nguyen, M.4
Rubloff, G.5
Shi, R.6
-
37
-
-
78651060733
-
-
Aug. 20, 2009. [Online]. Available
-
ICKnowledge Aug. 20, 2009. [Online]. Available: http://www.ic-knowledge. com/economics/wafer-costs.html
-
ICKnowledge
-
-
-
38
-
-
0033312656
-
Scheduling in robotic cells: Heuristics and cell design
-
H. Kamoun, N. G. Hall, and C. Sriskandarajah, "Scheduling in robotic cells: Heuristics and cell design," Oper. Res., vol. 47, pp. 821-835, 1999.
-
(1999)
Oper. Res.
, vol.47
, pp. 821-835
-
-
Kamoun, H.1
Hall, N.G.2
Sriskandarajah, C.3
-
39
-
-
0345757595
-
Cycle scheduling in a robotic production line
-
V. Kats and E. Levner, "Cycle scheduling in a robotic production line," J. Scheduling, vol. 5, pp. 23-41, 2002.
-
(2002)
J. Scheduling
, vol.5
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
40
-
-
56349083345
-
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case
-
V. Kats and E. Levner, "A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case," Discrete Appl. Math., vol. 157, pp. 339-355, 2009.
-
(2009)
Discrete Appl. Math.
, vol.157
, pp. 339-355
-
-
Kats, V.1
Levner, E.2
-
41
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a Sieve method,"
-
V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a Sieve method," IEEE Trans. Robot. Autom., vol. 15, pp. 704-713, 1999.
-
(1999)
IEEE Trans. Robot. Autom.
, vol.15
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Meyzin, L.3
-
42
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools,"
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semiconductor Manuf., vol. 16, pp. 521-534, 2003.
-
(2003)
IEEE Trans. Semiconductor Manuf.
, vol.16
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
43
-
-
84878741057
-
-
Aug. 22, 2009. [Online]. Available
-
Lawrence Berkeley National Laboratory, Aug. 22, 2009. [Online]. Available: http://www.lbl.gov/~gilg/davidstuff/pixelmech/pix-mech-wbs/ ~PixelElectronicsProduction.doc
-
Lawrence Berkeley National Laboratory
-
-
-
44
-
-
0031492360
-
Current trends in deterministic scheduling
-
C.-Y. Lee, L. Lei, and M. Pinedo, "Current trends in deterministic scheduling," Ann. Oper. Res., vol. 70, pp. 1-41, 1997. (Pubitemid 127429147)
-
(1997)
Annals of Operations Research
, vol.70
, pp. 1-41
-
-
Lee, C.-Y.1
Lei, L.2
Pinedo, M.3
-
45
-
-
60749114750
-
A review of scheduling theory and methods for semiconductor manufacturing cluster tools
-
Eds.
-
T.-E. Lee, S. J. Mason, R. R. Hill, L. Mönch, O. Rose, T. Jefferson, and J. W. Fowler, Eds., "A review of scheduling theory and methods for semiconductor manufacturing cluster tools," in Proc. 2008 Winter Simulation Conf., 2008, pp. 2127-2135.
-
(2008)
Proc. 2008 Winter Simulation Conf.
, pp. 2127-2135
-
-
Lee, T.-E.1
Mason, S.J.2
Hill, R.R.3
Mönch, L.4
Rose, O.5
Jefferson, T.6
Fowler, J.W.7
-
46
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
L. Lei and T.-J. Wang, "Determining optimal cyclic hoist schedules in a single-hoist electroplating line," IIE Trans., vol. 26, pp. 25-33, 1994.
-
(1994)
IIE Trans.
, vol.26
, pp. 25-33
-
-
Lei, L.1
Wang, T.-J.2
-
47
-
-
0031095268
-
An improved algorithm for cyclic flowshop scheduling in a robotic cell
-
PII S037722179600272X
-
E. Levner, V. Kats, and V. E. Levit, "An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell," Eur. J. Oper. Res., vol. 97, pp. 500-508, 1997. (Pubitemid 127418514)
-
(1997)
European Journal of Operational Research
, vol.97
, Issue.3
, pp. 500-508
-
-
Levner, E.1
Kats, V.2
Levit, V.E.3
-
48
-
-
0030396562
-
Sequencing of robot activities and parts in two-machine robotic cells
-
R. Logendran and C. Sriskandarajah, "Sequencing of robot activities and parts in two-machine robotic cells," Int. J. Prod. Res., vol. 34, pp. 3447-3463, 1996.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 3447-3463
-
-
Logendran, R.1
Sriskandarajah, C.2
-
51
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput,"
-
T. Perkinson, P. McLarty, R. Gyurcsik, and R. Cavin, "Single-wafer cluster tool performance: An analysis of throughput," IEEE Trans. Semiconductor Manuf., vol. 7, pp. 369-373, 1994.
-
(1994)
IEEE Trans. Semiconductor Manuf.
, vol.7
, pp. 369-373
-
-
Perkinson, T.1
McLarty, P.2
Gyurcsik, R.3
Cavin, R.4
-
52
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
T. Perkinson, R. Gyurcsik, and P. McLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput," IEEE Trans. Semiconductor Manuf., vol. 9, pp. 384-400, 1996.
-
(1996)
IEEE Trans. Semiconductor Manuf.
, vol.9
, pp. 384-400
-
-
Perkinson, T.1
Gyurcsik, R.2
McLarty, P.3
-
53
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
DOI 10.1109/70.964662, PII S1042296X01094666
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Autom., vol. 17, pp. 609-618, 2001. (Pubitemid 33137777)
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
54
-
-
0036691245
-
Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints,"
-
S. Rostami and B. Hamidzadeh, "Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints," IEEE Trans. Semiconductor Manuf., vol. 15, pp. 341-349, 2002.
-
(2002)
IEEE Trans. Semiconductor Manuf.
, vol.15
, pp. 341-349
-
-
Rostami, S.1
Hamidzadeh, B.2
-
55
-
-
0035357074
-
Scheduling in dual gripper robotic cells for productivity gains,"
-
S. P. Sethi, J. B. Sidney, and C. Sriskandarajah, "Scheduling in dual gripper robotic cells for productivity gains," IEEE Trans. Robot. Autom., vol. 17, pp. 324-341, 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, pp. 324-341
-
-
Sethi, S.P.1
Sidney, J.B.2
Sriskandarajah, C.3
-
56
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
S. P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, and W. Kubiak, "Sequencing of parts and robot moves in a robotic cell," Int. J. Flexible Manuf. Syst., vol. 4, pp. 331-358, 1992.
-
(1992)
Int. J. Flexible Manuf. Syst.
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
57
-
-
0035334186
-
Modeling and implementing a real-time scheduler for dual-armed cluster tools
-
Y. Shin, T. Lee, J. Kim, and H. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol. 45, pp. 13-27, 2001.
-
(2001)
Comput. Ind.
, vol.45
, pp. 13-27
-
-
Shin, Y.1
Lee, T.2
Kim, J.3
Lee, H.4
-
58
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual-gripper robot
-
C. Sriskandarajah, I. G. Drobouchevitch, S. P. Sethi, and R. Chan-drasekaran, "Scheduling multiple parts in a robotic cell served by a dual-gripper robot," Oper. Res., vol. 52, pp. 65-82, 2004.
-
(2004)
Oper. Res.
, vol.52
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.G.2
Sethi, S.P.3
Chan-Drasekaran, R.4
-
59
-
-
0032391968
-
Scheduling large robotic cells without buffers
-
C. Sriskandarajah, N. G. Hall, and H. Kamoun, "Scheduling large robotic cells without buffers," Ann. Oper. Res., vol. 76, pp. 287-321, 1998. (Pubitemid 128405207)
-
(1998)
Annals of Operations Research
, vol.76
, pp. 287-321
-
-
Sriskandarajah, C.1
Hall, N.G.2
Kamoun, H.3
-
60
-
-
0030086424
-
Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems,"
-
Q. Su and F. F. Chen, "Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems," IEEE Trans. Robot. Autom., vol. 12, pp. 22-30, 1996.
-
(1996)
IEEE Trans. Robot. Autom.
, vol.12
, pp. 22-30
-
-
Su, Q.1
Chen, F.F.2
-
61
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-Blade versus single-blade robots,"
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady-state throughput analysis of cluster tools: Dual-Blade versus single-blade robots," IEEE Trans. Semiconductor Manuf., vol. 10, pp. 418-424, 1997.
-
(1997)
IEEE Trans. Semiconductor Manuf.
, vol.10
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
62
-
-
0030212052
-
Simple performance models for integrated processing tools,"
-
S.Wood, "Simple performance models for integrated processing tools," IEEE Trans. Semiconductor Manuf., vol. 9, pp. 320-328, 1996.
-
(1996)
IEEE Trans. Semiconductor Manuf.
, vol.9
, pp. 320-328
-
-
Wood, S.1
-
63
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems insingle-arm cluster tools with wafer residency time constraints,"
-
N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems insingle-arm cluster tools with wafer residency time constraints," IEEE Trans. Semiconductor Manuf., vol. 21, pp. 224-237, 2008.
-
(2008)
IEEE Trans. Semiconductor Manuf.
, vol.21
, pp. 224-237
-
-
Wu, N.Q.1
Chu, C.B.2
Chu, F.3
Zhou, M.C.4
-
64
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach,"
-
J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
|