-
2
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot. Automat., vol. 17, no. 5, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
3
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
Aug.
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
4
-
-
45149087576
-
Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net
-
Oct.
-
N. Wu and M. C. Zhou, "Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net," in Proc. IEEE Int. Conf. Automat. Sci. Eng., Oct. 2006, pp. 87-92.
-
(2006)
Proc. IEEE Int. Conf. Automat. Sci. Eng.
, pp. 87-92
-
-
Wu, N.1
Zhou, M.C.2
-
5
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
May
-
F. C. N. Q. Wu, C. B. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Q. Wu, F.C.N.1
Chu, C.B.2
Zhou, M.C.3
-
6
-
-
76849088211
-
Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
-
Feb.
-
N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.Q.1
Zhou, M.C.2
-
7
-
-
60749114750
-
A review of scheduling theory and methods for semiconductor manufacturing cluster tools
-
T.-E. Lee, "A review of scheduling theory and methods for semiconductor manufacturing cluster tools," in Proc. Winter Simul. Conf., 2008, pp. 2127-2135.
-
(2008)
Proc. Winter Simul. Conf.
, pp. 2127-2135
-
-
Lee, T.-E.1
-
8
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput
-
Aug.
-
T. L. Perkinson, R. S. Gyurcsik, and P. K. MacLarty, "Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitations sequences on throughput," IEEE Trans. Semicond. Manuf., vol. 9, no. 3, pp. 384-400, Aug. 1996.
-
(1996)
IEEE Trans. Semicond. Manuf.
, vol.9
, Issue.3
, pp. 384-400
-
-
Perkinson, T.L.1
Gyurcsik, R.S.2
MacLarty, P.K.3
-
9
-
-
0031276238
-
A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov.
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steadystate throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semicond. Manuf.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
10
-
-
33845722194
-
Formal approach of FMS cyclic scheduling
-
Jan.
-
B. Trouillet and O. Korbaa, "Formal approach of FMS cyclic scheduling," IEEE Trans. Syst. Man Cybern. Part C, vol. 37, no. 1, pp. 126-137, Jan. 2007.
-
(2007)
IEEE Trans. Syst. Man Cybern. Part C
, vol.37
, Issue.1
, pp. 126-137
-
-
Trouillet, B.1
Korbaa, O.2
-
11
-
-
77955700913
-
Complexity of cyclic scheduling problems: A state-of-The-art survey
-
E. Levner, V. Kats, D. A. L. de Pablo, and T. C. E. Cheng, "Complexity of cyclic scheduling problems: A state-of-the-art survey," Comput. Ind. Eng., vol. 59, no. 2, pp. 352-361, 2010.
-
(2010)
Comput. Ind. Eng.
, vol.59
, Issue.2
, pp. 352-361
-
-
Levner, E.1
Kats, V.2
De Pablo, D.A.L.3
Cheng, T.C.E.4
-
12
-
-
28244489538
-
Dominance of cyclic solutions and some open problems in scheduling bufferless robotic cells
-
M. Dawande, H. N. Geismar, and S. P. Sethi, "Dominance of cyclic solutions and some open problems in scheduling bufferless robotic cells," SIAM Rev., vol. 47, no. 4, pp. 709-721, 2005.
-
(2005)
SIAM Rev.
, vol.47
, Issue.4
, pp. 709-721
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
-
13
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah, and S. P. Sethi, "On throughput maximization in constant travel-time robotic cells," Manuf. Service Oper. Manage., vol. 4, no. 4, pp. 296-312, 2002.
-
(2002)
Manuf. Service Oper. Manage.
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.P.3
-
14
-
-
28244447024
-
Scheduling dual-gripper robotic cells: 1-unit cycles
-
I. G. Drobouchevitch, S. P. Sethi, and C. Sriskandarajah, "Scheduling dual-gripper robotic cells: 1-unit cycles," Eur. J. Oper. Res., vol. 171, no. 2, pp. 598-631, 2006.
-
(2006)
Eur. J. Oper. Res.
, vol.171
, Issue.2
, pp. 598-631
-
-
Drobouchevitch, I.G.1
Sethi, S.P.2
Sriskandarajah, C.3
-
15
-
-
33746120814
-
Throughput optimization in constant travel-time dual-gripper robotic cells with parallel machines
-
Jun.
-
H. N. Geismar, M. Dawande, and C. Sriskandarajah, "Throughput optimization in constant travel-time dual-gripper robotic cells with parallel machines," Prod. Oper. Manage., vol. 15, no. 2, pp. 311-328, Jun. 2006.
-
(2006)
Prod. Oper. Manage.
, vol.15
, Issue.2
, pp. 311-328
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
17
-
-
77955321056
-
Colored timed Petri nets for modeling and analysis of cluster tools
-
N. Q. Wu and M. C. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools," Asian J. Control, vol. 12, no. 3, pp. 253-266, 2010.
-
(2010)
Asian J. Control
, vol.12
, Issue.3
, pp. 253-266
-
-
Wu, N.Q.1
Zhou, M.C.2
-
18
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct.
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Automat., vol. 17, no. 5, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
19
-
-
33646717079
-
Scheduling single-armed cluster tools with reentrant wafer flows
-
May
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-armed cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
20
-
-
33847040478
-
Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots
-
H.-Y. Lee, T.-E. Lee, and S.-J. Lee, "Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots," Int. J. Prod. Res., vol. 45, no. 3, pp. 487-507, 2007.
-
(2007)
Int. J. Prod. Res.
, vol.45
, Issue.3
, pp. 487-507
-
-
Lee, H.-Y.1
Lee, T.-E.2
Lee, S.-J.3
-
21
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
C. B. C. N. Q. Wu, F. Chu, and M. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Automat. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Automat. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
N.Q. Wu, C.B.C.1
Chu, F.2
Zhou, M.C.3
-
22
-
-
82455167620
-
Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy
-
May
-
C. B. C. N. Q. Wu, F. Chu, and M. C. Zhou, "Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy," in Proc. IEEE Int. Conf. Robot. Automat., May 2011, pp. 5499-5504.
-
(2011)
Proc. IEEE Int. Conf. Robot. Automat.
, pp. 5499-5504
-
-
N.Q. Wu, C.B.C.1
Chu, F.2
Zhou, M.C.3
-
23
-
-
54949137369
-
An efficient scheduling method based on an assignment model for robotized cluster tools
-
Aug.
-
C. Jung and T.-E. Lee, "An efficient scheduling method based on an assignment model for robotized cluster tools," in Proc. IEEE Conf. Automat. Sci. Eng., Aug. 2008, pp. 79-84.
-
(2008)
Proc. IEEE Conf. Automat. Sci. Eng.
, pp. 79-84
-
-
Jung, C.1
Lee, T.-E.2
-
24
-
-
54949132214
-
Optimal scheduling of dual-armed cluster tools without swap restriction
-
Aug.
-
J.-H. Paek and T.-E. Lee, "Optimal scheduling of dual-armed cluster tools without swap restriction," in Proc. IEEE Conf. Automat. Sci. Eng., Aug. 2008, pp. 103-108.
-
(2008)
Proc. IEEE Conf. Automat. Sci. Eng.
, pp. 103-108
-
-
Paek, J.-H.1
Lee, T.-E.2
-
25
-
-
33747443542
-
Multi-cluster tools scheduling: An integrated event graph and network model approach
-
Aug.
-
S. Ding, J. Yi, and M. T. Zhang, "Multi-cluster tools scheduling: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
26
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
Aug.
-
J. Yi, S. Ding, D. Song, and M. T. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Automat. Sci. Eng., vol. 5, no. 2, pp. 321-336, Aug. 2008.
-
(2008)
IEEE Trans. Automat. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
-
27
-
-
77957874918
-
A transient state analysis of dual-armed cluster-tools with wafer delay constraints
-
T.-K. Kim and T.-E. Lee, "A transient state analysis of dual-armed cluster-tools with wafer delay constraints," in Proc. Int. Conf. Modeling Anal. Semicond. Manuf., 2005, pp. 89-96.
-
(2005)
Proc. Int. Conf. Modeling Anal. Semicond. Manuf.
, pp. 89-96
-
-
Kim, T.-K.1
Lee, T.-E.2
-
29
-
-
27644434964
-
An extended event graph with negative places and tokens for time window constraints
-
Oct.
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for time window constraints," IEEE Trans. Automat. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
-
(2005)
IEEE Trans. Automat. Sci. Eng.
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
31
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
N. G. Hall, H. Kamoun, and C. Sriskandarajah, "Scheduling in robotic cells: Classification, two and three machine cells," Oper. Res., vol. 45, no. 3, pp. 421-439, 1997.
-
(1997)
Oper. Res.
, vol.45
, Issue.3
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
32
-
-
0024645936
-
Petri nets: Properties, analysis and applications
-
Apr.
-
T. Murata, "Petri nets: Properties, analysis and applications," Proc. IEEE, vol. 77, no. 4, pp. 541-585, Apr. 1989.
-
(1989)
Proc. IEEE
, vol.77
, Issue.4
, pp. 541-585
-
-
Murata, T.1
-
35
-
-
0003838512
-
-
Fachbereich 3 Math., Tech. Univ. Berlin, Berlin, Germany, Tech. Rep.
-
M. Queyranne and A. Schulz, "Polyhedral approaches to machine scheduling," Fachbereich 3 Math., Tech. Univ. Berlin, Berlin, Germany, Tech. Rep. 408, 1994.
-
(1994)
Polyhedral Approaches to Machine Scheduling
, vol.408
-
-
Queyranne, M.1
Schulz, A.2
|