-
1
-
-
78651098378
-
Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
-
Jan.
-
W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis,"IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
2
-
-
17644374193
-
Multi-degree cyclic scheduling of two robots in a no-wait flowshop
-
Apr.
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a no-wait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 2, pp. 173-183, Apr. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, Issue.2
, pp. 173-183
-
-
Che, A.1
Chu, C.2
-
3
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectr., vol. 29, no. 3, pp. 445-470, 2007.
-
(2007)
OR Spectr.
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
4
-
-
67349222218
-
Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
-
A. Che and C. Chu, "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," Eur. J. Oper. Res., vol. 199, no. 1, pp. 77-88, 2009.
-
(2009)
Eur. J. Oper. Res.
, vol.199
, Issue.1
, pp. 77-88
-
-
Che, A.1
Chu, C.2
-
5
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
Feb.
-
H. X. Chen, C. B. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Autom., vol. 14, no. 1, pp. 291-318, Feb. 1998.
-
(1998)
IEEE Trans. Robot. Autom.
, vol.14
, Issue.1
, pp. 291-318
-
-
Chen, H.X.1
Chu, C.B.2
Proth, J.-M.3
-
6
-
-
33747443542
-
Scheduling multi-cluster tools: An integrated event graph and network model approach
-
Aug.
-
S. Ding, J. Yi, and M. Zhang, "Scheduling multi-cluster tools: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.3
-
7
-
-
84860664318
-
An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
-
May
-
C. Jung and T.-E. Lee, "An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, May 2012.
-
(2012)
IEEE Trans. Semicond. Manuf.
, vol.25
, Issue.2
, pp. 186-199
-
-
Jung, C.1
Lee, T.-E.2
-
8
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
Aug.
-
V. Kats, E. Levner, and L. Mayzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol. 15, no. 4, pp. 704-713, Aug. 1999.
-
(1999)
IEEE Trans. Robot. Autom.
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Mayzin, L.3
-
9
-
-
0344013491
-
Schedule stabilization and robust timing control for timed-constrained cluster tools
-
J.-H. Kim and T.-E. Lee, "Schedule stabilization and robust timing control for timed-constrained cluster tools," in Proc. IEEE Int. Conf. Robot. Autom., Taipei, Taiwan, Sep. 2003, pp. 1039-1044.
-
Proc. IEEE Int. Conf. Robot. Autom., Taipei, Taiwan, Sep. 2003
, pp. 1039-1044
-
-
Kim, J.-H.1
Lee, T.-E.2
-
10
-
-
46849094532
-
Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net
-
Jul.
-
J.-H. Kim and T.-E. Lee, "Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net,"IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.3
, pp. 490-503
-
-
Kim, J.-H.1
Lee, T.-E.2
-
11
-
-
84871811802
-
Scheduling cluster tools with ready time constraints for consecutive small lots
-
Jan.
-
H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
-
(2013)
IEEE Trans. Autom. Sci. Eng.
, vol.10
, Issue.1
, pp. 145-159
-
-
Kim, H.-J.1
Lee, J.-H.2
Jung, C.3
Lee, T.-E.4
-
12
-
-
0041384559
-
Scheduling analysis of timed-constrained dual-armed cluster tools
-
Aug.
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
13
-
-
33646717079
-
Scheduling single-arm cluster tools with reentrant wafer flows
-
May
-
H.-Y. Lee and T.-E. Lee, "Scheduling single-arm cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.2
, pp. 226-240
-
-
Lee, H.-Y.1
Lee, T.-E.2
-
14
-
-
33646731658
-
Workload balancing and scheduling of a single-armed cluster tool
-
th Asia Pac. Ind. Eng. Manage. Syst. Conf., Gold Coast, QLD, Australia, 2004, pp. 1-15.
-
Proc. 5th Asia Pac. Ind. Eng. Manage. Syst. Conf., Gold Coast, QLD, Australia, 2004
, pp. 1-15
-
-
Lee, T.-E.1
Lee, H.-Y.2
Shin, Y.-H.3
-
15
-
-
27644434964
-
An extended event graph with negative places and tokens for timed window constraints
-
Oct.
-
T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for timed window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
-
(2005)
IEEE Trans. Autom. Sci. Eng.
, vol.2
, Issue.4
, pp. 319-332
-
-
Lee, T.-E.1
Park, S.-H.2
-
16
-
-
0038291984
-
Systems of multiple cluster toolsconfiguration, reliability, and performance
-
May
-
M.-J. Lopez and S.-C. Wood, "Systems of multiple cluster toolsconfiguration, reliability, and performance," IEEE Trans. Semicond. Manuf., vol. 16, no. 2, pp. 170-178, May 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.2
, pp. 170-178
-
-
Lopez, M.-J.1
Wood, S.-C.2
-
17
-
-
84863106136
-
Real-time control policy for single-arm cluster tools with residency time constraints and activity time variation by using Petri net
-
th IEEE Int. Conf. Netw. Sens. Control, Beijing, China, Apr. 2012, pp. 34-39.
-
Proc. 9th IEEE Int. Conf. Netw. Sens. Control, Beijing, China, Apr. 2012
, pp. 34-39
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
18
-
-
84864687325
-
Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraint and activity time variation
-
Aug.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-436, Aug. 2012.
-
(2012)
IEEE Trans. Semicond. Manuf.
, vol.25
, Issue.3
, pp. 432-436
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
19
-
-
84863456306
-
Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
-
Jul.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.3
, pp. 564-577
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
20
-
-
84873384586
-
A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
-
Feb.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
-
(2013)
IEEE Trans. Semicond. Manuf.
, vol.26
, Issue.1
, pp. 100-110
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
21
-
-
84898440364
-
Scheduling of dual-arm cluster tools with wafer revisiting and residency time constraints
-
Feb.
-
Y. Qiao, N. Q. Wu, and M. C. Zhou, "Scheduling of dual-arm cluster tools with wafer revisiting and residency time constraints," IEEE Trans. Ind. Informat., vol. 10, no. 1, pp. 286-300, Feb. 2014.
-
(2014)
IEEE Trans. Ind. Informat.
, vol.10
, Issue.1
, pp. 286-300
-
-
Qiao, Y.1
Wu, N.Q.2
Zhou, M.C.3
-
22
-
-
84911144597
-
Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times
-
to be published
-
Y. Qiao, N. Q. Wu, Q. H. Zhu, and L. P. Bai, "Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times," Comput. Oper. Res., to be published.
-
Comput. Oper. Res.
-
-
Qiao, Y.1
Wu, N.Q.2
Zhu, Q.H.3
Bai, L.P.4
-
23
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints,"IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
24
-
-
0035334186
-
Modeling and implementing a real-time scheduler for dual-armed cluster tools
-
May
-
Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol. 45, no. 1, pp. 13-27, May 2001.
-
(2001)
Comput. Ind.
, vol.45
, Issue.1
, pp. 13-27
-
-
Shin, Y.-H.1
Lee, T.-E.2
Kim, J.-H.3
Lee, H.-Y.4
-
25
-
-
0031276238
-
A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Nov.
-
S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
-
(1997)
IEEE Trans. Semicond. Manuf.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
26
-
-
43849109024
-
A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
-
May
-
N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
-
(2008)
IEEE Trans. Semicond. Manuf.
, vol.21
, Issue.2
, pp. 224-237
-
-
Wu, N.Q.1
Chu, C.B.2
Chu, F.3
Zhou, M.C.4
-
27
-
-
54949093664
-
Petri net modeling and real-time control of dual-arm cluster tools with residency time constraint and activity time variations
-
th IEEE Conf. Autom. Sci. Eng., Washington, DC, USA, Aug. 2008, pp. 109-114.
-
Proc. 4th IEEE Conf. Autom. Sci. Eng., Washington, DC, USA, Aug. 2008
, pp. 109-114
-
-
Wu, N.Q.1
Zhou, M.C.2
Peng, S.S.3
Chu, F.4
Chu, C.B.5
-
28
-
-
85027957575
-
Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
-
Jan.
-
N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
-
(2011)
IEEE Trans. Autom. Sci. Eng.
, vol.8
, Issue.1
, pp. 42-55
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.B.3
Zhou, M.C.4
-
29
-
-
84887067395
-
Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting
-
Jan.
-
N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting,"IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
-
(2013)
IEEE Trans. Syst., Man Cybern., Syst.
, vol.43
, Issue.1
, pp. 196-207
-
-
Wu, N.Q.1
Chu, F.2
Chu, C.B.3
Zhou, M.C.4
-
30
-
-
77955321056
-
Colored timed Petri nets for modeling and analysis of cluster tools
-
N. Q. Wu and M. C. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools," Asian J. Control, vol. 12, no. 3, pp. 253-266, 2010.
-
(2010)
Asian J. Control
, vol.12
, Issue.3
, pp. 253-266
-
-
Wu, N.Q.1
Zhou, M.C.2
-
31
-
-
77950864273
-
A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
-
Apr.
-
N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
-
(2010)
IEEE Trans. Autom. Sci. Eng.
, vol.7
, Issue.2
, pp. 303-315
-
-
Wu, N.Q.1
Zhou, M.C.2
-
32
-
-
76849088211
-
Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
-
Feb.
-
N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation,"IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
-
(2010)
IEEE Trans. Semicond. Manuf.
, vol.23
, Issue.1
, pp. 53-64
-
-
Wu, N.Q.1
Zhou, M.C.2
-
33
-
-
84855355646
-
Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
-
Jan.
-
N. Q. Wu and M. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.1
, pp. 203-209
-
-
Wu, N.Q.1
Zhou, M.C.2
-
34
-
-
84859753478
-
Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
-
Apr.
-
N. Q. Wu and M. C. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 446-454
-
-
Wu, N.Q.1
Zhou, M.C.2
-
35
-
-
84887074610
-
A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting
-
Sep.
-
N. Q. Wu, M. C. Zhou, F. Chu, and C. B. Chu, "A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting,"IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 5, pp. 1182-1194, Sep. 2013.
-
(2013)
IEEE Trans. Syst., Man Cybern., Syst.
, vol.43
, Issue.5
, pp. 1182-1194
-
-
Wu, N.Q.1
Zhou, M.C.2
Chu, F.3
Chu, C.B.4
-
36
-
-
84868259519
-
A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem
-
P. Yan, A. Che, N. Yang, and C. Chu, "A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem," Int. J. Prod. Res., vol. 50, no. 22, pp. 6403-6418, 2012.
-
(2012)
Int. J. Prod. Res.
, vol.50
, Issue.22
, pp. 6403-6418
-
-
Yan, P.1
Che, A.2
Yang, N.3
Chu, C.4
-
37
-
-
84900817063
-
Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication
-
May
-
F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication,"IEEE Trans. Semicond. Manuf., vol. 27, no. 2, pp. 192-203, May 2014.
-
(2014)
IEEE Trans. Semicond. Manuf.
, vol.27
, Issue.2
, pp. 192-203
-
-
Yang, F.J.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
38
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
Apr.
-
J. Yi, S. Ding, and M. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng.
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Zhang, M.3
-
39
-
-
25144432280
-
On-line scheduling of integrated single-wafer processing tools with temporal constraints
-
Aug.
-
H. J. Yoon and D. Y. Lee, "On-line scheduling of integrated single-wafer processing tools with temporal constraints," IEEE Trans. Semicond. Manuf., vol. 18, no. 3, pp. 390-398, Aug. 2005.
-
(2005)
IEEE Trans. Semicond. Manuf.
, vol.18
, Issue.3
, pp. 390-398
-
-
Yoon, H.J.1
Lee, D.Y.2
-
40
-
-
84969626572
-
Modeling and validating e-Commerce business process based on Petri nets
-
Mar.
-
W. Y. Yu, C. G. Yan, Z. J. Ding, C. J. Jiang, and M. C. Zhou, "Modeling and validating e-Commerce business process based on Petri nets," IEEE Trans. Syst., Man, Cybern., Syst., vol. 44, no. 3, pp. 327-341, Mar. 2014.
-
(2014)
IEEE Trans. Syst., Man Cybern., Syst.
, vol.44
, Issue.3
, pp. 327-341
-
-
Yu, W.Y.1
Yan, C.G.2
Ding, Z.J.3
Jiang, C.J.4
Zhou, M.C.5
-
41
-
-
84882673271
-
Risk assessment for enterprise resource planning (ERP) system implementations: A fault tree analysis approach
-
Y. Zeng and M. J. Skibniewski, "Risk assessment for enterprise resource planning (ERP) system implementations: A fault tree analysis approach,"Enterp. Inf. Syst., vol. 7, no. 3, pp. 332-353, 2013.
-
(2013)
Enterp. Inf. Syst.
, vol.7
, Issue.3
, pp. 332-353
-
-
Zeng, Y.1
Skibniewski, M.J.2
-
44
-
-
0026953728
-
Design and implementation of a Petri net based supervisor for a flexible manufacturing system
-
M. C. Zhou, F. DiCesare, and D. Rudolph, "Design and implementation of a Petri net based supervisor for a flexible manufacturing system,"Automatica, vol. 28, no. 6, pp. 1199-1208, 1992.
-
(1992)
Automatica
, vol.28
, Issue.6
, pp. 1199-1208
-
-
Zhou, M.C.1
DiCesare, F.2
Rudolph, D.3
-
45
-
-
0026204001
-
Parallel and sequential mutual exclusions for Petri net modeling for manufacturing systems with shared resources
-
Aug.
-
M. C. Zhou and F. DiCesare, "Parallel and sequential mutual exclusions for Petri net modeling for manufacturing systems with shared resources,"IEEE Trans. Robot. Autom., vol. 7, no. 4, pp. 515-527, Aug. 1991.
-
(1991)
IEEE Trans. Robot. Autom.
, vol.7
, Issue.4
, pp. 515-527
-
-
Zhou, M.C.1
DiCesare, F.2
-
46
-
-
0026882077
-
A hybrid methodology for synthesis of Petri nets for manufacturing systems
-
Jun.
-
M. C. Zhou, F. DiCesare, and A. A. Desrochers, "A hybrid methodology for synthesis of Petri nets for manufacturing systems," IEEE Trans. Robot. Autom., vol. 8, no. 3, pp. 350-361, Jun. 1992.
-
(1992)
IEEE Trans. Robot. Autom.
, vol.8
, Issue.3
, pp. 350-361
-
-
Zhou, M.C.1
DiCesare, F.2
Desrochers, A.A.3
-
47
-
-
0026385802
-
Modeling and performance analysis of a flexible PCB assembly station using Petri nets
-
M. C. Zhou and M. C. Leu, "Modeling and performance analysis of a flexible PCB assembly station using Petri nets," J. Electron. Packag., vol. 113, no. 4, pp. 410-416, 1991.
-
(1991)
J. Electron. Packag.
, vol.113
, Issue.4
, pp. 410-416
-
-
Zhou, M.C.1
Leu, M.C.2
-
48
-
-
15744370437
-
-
New York, NY, USA: Marcel Dekker, Jan.
-
M. C. Zhou and M. P. Fanti, Eds., Deadlock Resolution in Computer-Integrated Systems. New York, NY, USA: Marcel Dekker, Jan. 2005.
-
(2005)
Deadlock Resolution in Computer-Integrated Systems
-
-
Zhou, M.C.1
Fanti, M.P.2
-
49
-
-
0030086204
-
Petri net modeling of buffers in automated manufacturing systems
-
Feb.
-
M. C. Zhou and F. DiCesare, "Petri net modeling of buffers in automated manufacturing systems," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 26, no. 1, pp. 157-164, Feb. 1996.
-
(1996)
IEEE Trans. Syst., Man, Cybern. B, Cybern.
, vol.26
, Issue.1
, pp. 157-164
-
-
Zhou, M.C.1
DiCesare, F.2
-
50
-
-
0032001865
-
Design of industrial automated systems via relay ladder logic programming and Petri nets
-
Feb.
-
M. C. Zhou and E. Twiss, "Design of industrial automated systems via relay ladder logic programming and Petri nets," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 28, no. 1, pp. 137-150, Feb. 1998.
-
(1998)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.28
, Issue.1
, pp. 137-150
-
-
Zhou, M.C.1
Twiss, E.2
-
52
-
-
84878676219
-
ε-constraint and fuzzy logic-based optimization of hazardous material transportation via lane reservation
-
Jun.
-
Z. Zhou, F. Chu, A. Che, and M. C. Zhou, "ε-constraint and fuzzy logic-based optimization of hazardous material transportation via lane reservation,"IEEE Trans. Intell. Transp. Syst., vol. 14, no. 2, pp. 847-857, Jun. 2013.
-
(2013)
IEEE Trans. Intell. Transp. Syst.
, vol.14
, Issue.2
, pp. 847-857
-
-
Zhou, Z.1
Chu, F.2
Che, A.3
Zhou, M.C.4
-
53
-
-
84884354111
-
An analytical approach to customer requirement information processing
-
Z. Zhou, Z. Xiao, Q. Liu, and Q. Ai, "An analytical approach to customer requirement information processing," Enterp. Inf. Syst., vol. 7, no. 4, pp. 543-557, 2013
-
(2013)
Enterp. Inf. Syst.
, vol.7
, Issue.4
, pp. 543-557
-
-
Zhou, Z.1
Xiao, Z.2
Liu, Q.3
Ai, Q.4
-
54
-
-
84867399369
-
An efficient outpatient scheduling approach
-
Oct.
-
H. Zhu, M. Hou, C. Wang, and M. C. Zhou, "An efficient outpatient scheduling approach," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 4, pp. 701-709, Oct. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.4
, pp. 701-709
-
-
Zhu, H.1
Hou, M.2
Wang, C.3
Zhou, M.C.4
-
55
-
-
84857505320
-
Efficient role transfer based on Kuhn-Munkres algorithm
-
Mar.
-
H. Zhu and M. C. Zhou, "Efficient role transfer based on Kuhn-Munkres algorithm," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 42, no. 2, pp. 491-496, Mar. 2012.
-
(2012)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.42
, Issue.2
, pp. 491-496
-
-
Zhu, H.1
Zhou, M.C.2
-
56
-
-
84860161434
-
Group role assignment via a Kuhn-Munkres algorithm-based solution
-
May
-
H. Zhu, M. C. Zhou, and R. Alkins, "Group role assignment via a Kuhn-Munkres algorithm-based solution," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 42, no. 3, pp. 739-750, May 2012.
-
(2012)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.42
, Issue.3
, pp. 739-750
-
-
Zhu, H.1
Zhou, M.C.2
Alkins, R.3
-
57
-
-
84900810194
-
Scheduling single-arm multi-cluster tools with lower bound cycle time via Petri nets
-
Dec.
-
Q. H. Zhu and Y. Qiao, "Scheduling single-arm multi-cluster tools with lower bound cycle time via Petri nets," Int. J. Intell. Control Syst., vol. 18, no. 4, pp. 113-123, Dec. 2012.
-
(2012)
Int. J. Intell. Control Syst.
, vol.18
, Issue.4
, pp. 113-123
-
-
Zhu, Q.H.1
Qiao, Y.2
-
58
-
-
84887980429
-
Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semi-conductor manufacturing
-
Nov.
-
Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semi-conductor manufacturing," IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 578-591, Nov. 2013.
-
(2013)
IEEE Trans. Semicond. Manuf.
, vol.26
, Issue.4
, pp. 578-591
-
-
Zhu, Q.H.1
Wu, N.Q.2
Qiao, Y.3
Zhou, M.C.4
-
59
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
Oct.
-
W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
60
-
-
4344571843
-
Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets
-
Aug.
-
W. M. Zuberek, "Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
-
(2004)
IEEE Trans. Semicond. Manuf.
, vol.17
, Issue.3
, pp. 333-344
-
-
Zuberek, W.M.1
-
61
-
-
0028714917
-
Petri nets and industrial applications: A tutorial
-
Dec.
-
R. Zurawski and M. C. Zhou, "Petri nets and industrial applications: A tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, Dec. 1994.
-
(1994)
IEEE Trans. Ind. Electron.
, vol.41
, Issue.6
, pp. 567-583
-
-
Zurawski, R.1
Zhou, M.C.2
-
62
-
-
84923259118
-
Guest editorial: Special section on Petri nets in manufacturing
-
R. Zurawski and M. C. Zhou, "Guest editorial: Special section on Petri nets in manufacturing," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 565-566, 1994.
-
(1994)
IEEE Trans. Ind. Electron.
, vol.41
, Issue.6
, pp. 565-566
-
-
Zurawski, R.1
Zhou, M.C.2
-
63
-
-
84887855359
-
Functional and Behavioral Modeling of Automated Manufacturing systems
-
New York, NY, USA: CRC Press
-
R. Zurawski and M. C. Zhou, "Functional and behavioral modeling of automated manufacturing systems," in Handbook of Industrial Electronic Engineering, New York, NY, USA: CRC Press, 1996, pp. 669-676.
-
(1996)
Handbook of Industrial Electronic Engineering
, pp. 669-676
-
-
Zurawski, R.1
Zhou, M.C.2
|