메뉴 건너뛰기




Volumn 45, Issue 3, 2015, Pages 472-484

Schedulability and scheduling analysis of dual-arm cluster tools with wafer revisiting and residency time constraints based on a novel schedule

Author keywords

Cluster tools; scheduling; semiconductor manufacturing; wafer revisiting process

Indexed keywords

ATOMIC LAYER DEPOSITION; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE; TOOLS;

EID: 84923257092     PISSN: 21682216     EISSN: 21682232     Source Type: Journal    
DOI: 10.1109/TSMC.2014.2347928     Document Type: Article
Times cited : (57)

References (63)
  • 1
    • 78651098378 scopus 로고    scopus 로고
    • Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis
    • Jan.
    • W. K. V. Chan, J. Yi, and S. Ding, "Optimal scheduling of multicluster tools with constant robot moving times, part I: Two-cluster analysis,"IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 5-16, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 5-16
    • Chan, W.K.V.1    Yi, J.2    Ding, S.3
  • 2
    • 17644374193 scopus 로고    scopus 로고
    • Multi-degree cyclic scheduling of two robots in a no-wait flowshop
    • Apr.
    • A. Che and C. Chu, "Multi-degree cyclic scheduling of two robots in a no-wait flowshop," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 2, pp. 173-183, Apr. 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.2 , pp. 173-183
    • Che, A.1    Chu, C.2
  • 3
    • 34249658388 scopus 로고    scopus 로고
    • Cyclic hoist scheduling in large real-life electroplating lines
    • A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectr., vol. 29, no. 3, pp. 445-470, 2007.
    • (2007) OR Spectr. , vol.29 , Issue.3 , pp. 445-470
    • Che, A.1    Chu, C.2
  • 4
    • 67349222218 scopus 로고    scopus 로고
    • Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
    • A. Che and C. Chu, "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," Eur. J. Oper. Res., vol. 199, no. 1, pp. 77-88, 2009.
    • (2009) Eur. J. Oper. Res. , vol.199 , Issue.1 , pp. 77-88
    • Che, A.1    Chu, C.2
  • 5
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • Feb.
    • H. X. Chen, C. B. Chu, and J.-M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Trans. Robot. Autom., vol. 14, no. 1, pp. 291-318, Feb. 1998.
    • (1998) IEEE Trans. Robot. Autom. , vol.14 , Issue.1 , pp. 291-318
    • Chen, H.X.1    Chu, C.B.2    Proth, J.-M.3
  • 6
    • 33747443542 scopus 로고    scopus 로고
    • Scheduling multi-cluster tools: An integrated event graph and network model approach
    • Aug.
    • S. Ding, J. Yi, and M. Zhang, "Scheduling multi-cluster tools: An integrated event graph and network model approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, pp. 339-351, Aug. 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.3 , pp. 339-351
    • Ding, S.1    Yi, J.2    Zhang, M.3
  • 7
    • 84860664318 scopus 로고    scopus 로고
    • An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems
    • May
    • C. Jung and T.-E. Lee, "An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems," IEEE Trans. Semicond. Manuf., vol. 25, no. 2, pp. 186-199, May 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.2 , pp. 186-199
    • Jung, C.1    Lee, T.-E.2
  • 8
    • 0032646146 scopus 로고    scopus 로고
    • Multiple-part cyclic hoist scheduling using a sieve method
    • Aug.
    • V. Kats, E. Levner, and L. Mayzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Autom., vol. 15, no. 4, pp. 704-713, Aug. 1999.
    • (1999) IEEE Trans. Robot. Autom. , vol.15 , Issue.4 , pp. 704-713
    • Kats, V.1    Levner, E.2    Mayzin, L.3
  • 10
    • 46849094532 scopus 로고    scopus 로고
    • Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net
    • Jul.
    • J.-H. Kim and T.-E. Lee, "Schedulability analysis of timed-constrained cluster tools with bounded time variation by an extended Petri net,"IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 490-503, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.3 , pp. 490-503
    • Kim, J.-H.1    Lee, T.-E.2
  • 11
    • 84871811802 scopus 로고    scopus 로고
    • Scheduling cluster tools with ready time constraints for consecutive small lots
    • Jan.
    • H.-J. Kim, J.-H. Lee, C. Jung, and T.-E. Lee, "Scheduling cluster tools with ready time constraints for consecutive small lots," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 1, pp. 145-159, Jan. 2013.
    • (2013) IEEE Trans. Autom. Sci. Eng. , vol.10 , Issue.1 , pp. 145-159
    • Kim, H.-J.1    Lee, J.-H.2    Jung, C.3    Lee, T.-E.4
  • 12
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of timed-constrained dual-armed cluster tools
    • Aug.
    • J.-H. Kim, T.-E. Lee, H.-Y. Lee, and D.-B. Park, "Scheduling analysis of timed-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.-H.1    Lee, T.-E.2    Lee, H.-Y.3    Park, D.-B.4
  • 13
    • 33646717079 scopus 로고    scopus 로고
    • Scheduling single-arm cluster tools with reentrant wafer flows
    • May
    • H.-Y. Lee and T.-E. Lee, "Scheduling single-arm cluster tools with reentrant wafer flows," IEEE Trans. Semicond. Manuf., vol. 19, no. 2, pp. 226-240, May 2006.
    • (2006) IEEE Trans. Semicond. Manuf. , vol.19 , Issue.2 , pp. 226-240
    • Lee, H.-Y.1    Lee, T.-E.2
  • 15
    • 27644434964 scopus 로고    scopus 로고
    • An extended event graph with negative places and tokens for timed window constraints
    • Oct.
    • T.-E. Lee and S.-H. Park, "An extended event graph with negative places and tokens for timed window constraints," IEEE Trans. Autom. Sci. Eng., vol. 2, no. 4, pp. 319-332, Oct. 2005.
    • (2005) IEEE Trans. Autom. Sci. Eng. , vol.2 , Issue.4 , pp. 319-332
    • Lee, T.-E.1    Park, S.-H.2
  • 16
    • 0038291984 scopus 로고    scopus 로고
    • Systems of multiple cluster toolsconfiguration, reliability, and performance
    • May
    • M.-J. Lopez and S.-C. Wood, "Systems of multiple cluster toolsconfiguration, reliability, and performance," IEEE Trans. Semicond. Manuf., vol. 16, no. 2, pp. 170-178, May 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.2 , pp. 170-178
    • Lopez, M.-J.1    Wood, S.-C.2
  • 18
    • 84864687325 scopus 로고    scopus 로고
    • Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraint and activity time variation
    • Aug.
    • Y. Qiao, N. Q. Wu, and M. C. Zhou, "Petri net modeling and wafer sojourn time analysis of single-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Semicond. Manuf., vol. 25, no. 3, pp. 432-436, Aug. 2012.
    • (2012) IEEE Trans. Semicond. Manuf. , vol.25 , Issue.3 , pp. 432-436
    • Qiao, Y.1    Wu, N.Q.2    Zhou, M.C.3
  • 19
    • 84863456306 scopus 로고    scopus 로고
    • Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation
    • Jul.
    • Y. Qiao, N. Q. Wu, and M. C. Zhou, "Real-time scheduling of single-arm cluster tools subject to residency time constraints and bounded activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 3, pp. 564-577, Jul. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.3 , pp. 564-577
    • Qiao, Y.1    Wu, N.Q.2    Zhou, M.C.3
  • 20
    • 84873384586 scopus 로고    scopus 로고
    • A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting
    • Feb.
    • Y. Qiao, N. Q. Wu, and M. C. Zhou, "A Petri net-based novel scheduling approach and its cycle time analysis for dual-arm cluster tools with wafer revisiting," IEEE Trans. Semicond. Manuf., vol. 26, no. 1, pp. 100-110, Feb. 2013.
    • (2013) IEEE Trans. Semicond. Manuf. , vol.26 , Issue.1 , pp. 100-110
    • Qiao, Y.1    Wu, N.Q.2    Zhou, M.C.3
  • 21
    • 84898440364 scopus 로고    scopus 로고
    • Scheduling of dual-arm cluster tools with wafer revisiting and residency time constraints
    • Feb.
    • Y. Qiao, N. Q. Wu, and M. C. Zhou, "Scheduling of dual-arm cluster tools with wafer revisiting and residency time constraints," IEEE Trans. Ind. Informat., vol. 10, no. 1, pp. 286-300, Feb. 2014.
    • (2014) IEEE Trans. Ind. Informat. , vol.10 , Issue.1 , pp. 286-300
    • Qiao, Y.1    Wu, N.Q.2    Zhou, M.C.3
  • 22
    • 84911144597 scopus 로고    scopus 로고
    • Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times
    • to be published
    • Y. Qiao, N. Q. Wu, Q. H. Zhu, and L. P. Bai, "Cycle time analysis of dual-arm cluster tools for wafer fabrication processes with multiple wafer revisiting times," Comput. Oper. Res., to be published.
    • Comput. Oper. Res.
    • Qiao, Y.1    Wu, N.Q.2    Zhu, Q.H.3    Bai, L.P.4
  • 23
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • Oct.
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints,"IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 609-618, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 24
    • 0035334186 scopus 로고    scopus 로고
    • Modeling and implementing a real-time scheduler for dual-armed cluster tools
    • May
    • Y.-H. Shin, T.-E. Lee, J.-H. Kim, and H.-Y. Lee, "Modeling and implementing a real-time scheduler for dual-armed cluster tools," Comput. Ind., vol. 45, no. 1, pp. 13-27, May 2001.
    • (2001) Comput. Ind. , vol.45 , Issue.1 , pp. 13-27
    • Shin, Y.-H.1    Lee, T.-E.2    Kim, J.-H.3    Lee, H.-Y.4
  • 25
    • 0031276238 scopus 로고    scopus 로고
    • A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots
    • Nov.
    • S. Venkatesh, R. Davenport, P. Foxhoven, and J. Nulman, "A steady state throughput analysis of cluster tools: Dual-blade versus single-blade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, pp. 418-424, Nov. 1997.
    • (1997) IEEE Trans. Semicond. Manuf. , vol.10 , Issue.4 , pp. 418-424
    • Venkatesh, S.1    Davenport, R.2    Foxhoven, P.3    Nulman, J.4
  • 26
    • 43849109024 scopus 로고    scopus 로고
    • A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    • May
    • N. Q. Wu, C. B. Chu, F. Chu, and M. C. Zhou, "A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints," IEEE Trans. Semicond. Manuf., vol. 21, no. 2, pp. 224-237, May 2008.
    • (2008) IEEE Trans. Semicond. Manuf. , vol.21 , Issue.2 , pp. 224-237
    • Wu, N.Q.1    Chu, C.B.2    Chu, F.3    Zhou, M.C.4
  • 28
    • 85027957575 scopus 로고    scopus 로고
    • Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes
    • Jan.
    • N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes," IEEE Trans. Autom. Sci. Eng., vol. 8, no. 1, pp. 42-55, Jan. 2011.
    • (2011) IEEE Trans. Autom. Sci. Eng. , vol.8 , Issue.1 , pp. 42-55
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 29
    • 84887067395 scopus 로고    scopus 로고
    • Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting
    • Jan.
    • N. Q. Wu, F. Chu, C. B. Chu, and M. C. Zhou, "Petri net modeling and cycle time analysis of dual-arm cluster tools with wafer revisiting,"IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 1, pp. 196-207, Jan. 2013.
    • (2013) IEEE Trans. Syst., Man Cybern., Syst. , vol.43 , Issue.1 , pp. 196-207
    • Wu, N.Q.1    Chu, F.2    Chu, C.B.3    Zhou, M.C.4
  • 30
    • 77955321056 scopus 로고    scopus 로고
    • Colored timed Petri nets for modeling and analysis of cluster tools
    • N. Q. Wu and M. C. Zhou, "Colored timed Petri nets for modeling and analysis of cluster tools," Asian J. Control, vol. 12, no. 3, pp. 253-266, 2010.
    • (2010) Asian J. Control , vol.12 , Issue.3 , pp. 253-266
    • Wu, N.Q.1    Zhou, M.C.2
  • 31
    • 77950864273 scopus 로고    scopus 로고
    • A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis
    • Apr.
    • N. Q. Wu and M. C. Zhou, "A closed-form solution for schedulability and optimal scheduling of dual-arm cluster tools with wafer residency time constraint based on steady schedule analysis," IEEE Trans. Autom. Sci. Eng., vol. 7, no. 2, pp. 303-315, Apr. 2010.
    • (2010) IEEE Trans. Autom. Sci. Eng. , vol.7 , Issue.2 , pp. 303-315
    • Wu, N.Q.1    Zhou, M.C.2
  • 32
    • 76849088211 scopus 로고    scopus 로고
    • Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation
    • Feb.
    • N. Q. Wu and M. C. Zhou, "Analysis of wafer sojourn time in dual-arm cluster tools with residency time constraint and activity time variation,"IEEE Trans. Semicond. Manuf., vol. 23, no. 1, pp. 53-64, Feb. 2010.
    • (2010) IEEE Trans. Semicond. Manuf. , vol.23 , Issue.1 , pp. 53-64
    • Wu, N.Q.1    Zhou, M.C.2
  • 33
    • 84855355646 scopus 로고    scopus 로고
    • Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation
    • Jan.
    • N. Q. Wu and M. C. Zhou, "Schedulability analysis and optimal scheduling of dual-arm cluster tools with residency time constraint and activity time variation," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 203-209, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.1 , pp. 203-209
    • Wu, N.Q.1    Zhou, M.C.2
  • 34
    • 84859753478 scopus 로고    scopus 로고
    • Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets
    • Apr.
    • N. Q. Wu and M. C. Zhou, "Modeling, analysis and control of dual-arm cluster tools with residency time constraint and activity time variation based on Petri nets," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 446-454, Apr. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.2 , pp. 446-454
    • Wu, N.Q.1    Zhou, M.C.2
  • 35
    • 84887074610 scopus 로고    scopus 로고
    • A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting
    • Sep.
    • N. Q. Wu, M. C. Zhou, F. Chu, and C. B. Chu, "A Petri-net-based scheduling strategy for dual-arm cluster tools with wafer revisiting,"IEEE Trans. Syst., Man, Cybern., Syst., vol. 43, no. 5, pp. 1182-1194, Sep. 2013.
    • (2013) IEEE Trans. Syst., Man Cybern., Syst. , vol.43 , Issue.5 , pp. 1182-1194
    • Wu, N.Q.1    Zhou, M.C.2    Chu, F.3    Chu, C.B.4
  • 36
    • 84868259519 scopus 로고    scopus 로고
    • A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem
    • P. Yan, A. Che, N. Yang, and C. Chu, "A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem," Int. J. Prod. Res., vol. 50, no. 22, pp. 6403-6418, 2012.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.22 , pp. 6403-6418
    • Yan, P.1    Che, A.2    Yang, N.3    Chu, C.4
  • 37
    • 84900817063 scopus 로고    scopus 로고
    • Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication
    • May
    • F. J. Yang, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication,"IEEE Trans. Semicond. Manuf., vol. 27, no. 2, pp. 192-203, May 2014.
    • (2014) IEEE Trans. Semicond. Manuf. , vol.27 , Issue.2 , pp. 192-203
    • Yang, F.J.1    Wu, N.Q.2    Qiao, Y.3    Zhou, M.C.4
  • 38
    • 41949134365 scopus 로고    scopus 로고
    • Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
    • Apr.
    • J. Yi, S. Ding, and M. Zhang, "Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 2, pp. 321-336, Apr. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng. , vol.5 , Issue.2 , pp. 321-336
    • Yi, J.1    Ding, S.2    Zhang, M.3
  • 39
    • 25144432280 scopus 로고    scopus 로고
    • On-line scheduling of integrated single-wafer processing tools with temporal constraints
    • Aug.
    • H. J. Yoon and D. Y. Lee, "On-line scheduling of integrated single-wafer processing tools with temporal constraints," IEEE Trans. Semicond. Manuf., vol. 18, no. 3, pp. 390-398, Aug. 2005.
    • (2005) IEEE Trans. Semicond. Manuf. , vol.18 , Issue.3 , pp. 390-398
    • Yoon, H.J.1    Lee, D.Y.2
  • 40
    • 84969626572 scopus 로고    scopus 로고
    • Modeling and validating e-Commerce business process based on Petri nets
    • Mar.
    • W. Y. Yu, C. G. Yan, Z. J. Ding, C. J. Jiang, and M. C. Zhou, "Modeling and validating e-Commerce business process based on Petri nets," IEEE Trans. Syst., Man, Cybern., Syst., vol. 44, no. 3, pp. 327-341, Mar. 2014.
    • (2014) IEEE Trans. Syst., Man Cybern., Syst. , vol.44 , Issue.3 , pp. 327-341
    • Yu, W.Y.1    Yan, C.G.2    Ding, Z.J.3    Jiang, C.J.4    Zhou, M.C.5
  • 41
    • 84882673271 scopus 로고    scopus 로고
    • Risk assessment for enterprise resource planning (ERP) system implementations: A fault tree analysis approach
    • Y. Zeng and M. J. Skibniewski, "Risk assessment for enterprise resource planning (ERP) system implementations: A fault tree analysis approach,"Enterp. Inf. Syst., vol. 7, no. 3, pp. 332-353, 2013.
    • (2013) Enterp. Inf. Syst. , vol.7 , Issue.3 , pp. 332-353
    • Zeng, Y.1    Skibniewski, M.J.2
  • 44
    • 0026953728 scopus 로고
    • Design and implementation of a Petri net based supervisor for a flexible manufacturing system
    • M. C. Zhou, F. DiCesare, and D. Rudolph, "Design and implementation of a Petri net based supervisor for a flexible manufacturing system,"Automatica, vol. 28, no. 6, pp. 1199-1208, 1992.
    • (1992) Automatica , vol.28 , Issue.6 , pp. 1199-1208
    • Zhou, M.C.1    DiCesare, F.2    Rudolph, D.3
  • 45
    • 0026204001 scopus 로고
    • Parallel and sequential mutual exclusions for Petri net modeling for manufacturing systems with shared resources
    • Aug.
    • M. C. Zhou and F. DiCesare, "Parallel and sequential mutual exclusions for Petri net modeling for manufacturing systems with shared resources,"IEEE Trans. Robot. Autom., vol. 7, no. 4, pp. 515-527, Aug. 1991.
    • (1991) IEEE Trans. Robot. Autom. , vol.7 , Issue.4 , pp. 515-527
    • Zhou, M.C.1    DiCesare, F.2
  • 46
    • 0026882077 scopus 로고
    • A hybrid methodology for synthesis of Petri nets for manufacturing systems
    • Jun.
    • M. C. Zhou, F. DiCesare, and A. A. Desrochers, "A hybrid methodology for synthesis of Petri nets for manufacturing systems," IEEE Trans. Robot. Autom., vol. 8, no. 3, pp. 350-361, Jun. 1992.
    • (1992) IEEE Trans. Robot. Autom. , vol.8 , Issue.3 , pp. 350-361
    • Zhou, M.C.1    DiCesare, F.2    Desrochers, A.A.3
  • 47
    • 0026385802 scopus 로고
    • Modeling and performance analysis of a flexible PCB assembly station using Petri nets
    • M. C. Zhou and M. C. Leu, "Modeling and performance analysis of a flexible PCB assembly station using Petri nets," J. Electron. Packag., vol. 113, no. 4, pp. 410-416, 1991.
    • (1991) J. Electron. Packag. , vol.113 , Issue.4 , pp. 410-416
    • Zhou, M.C.1    Leu, M.C.2
  • 49
    • 0030086204 scopus 로고    scopus 로고
    • Petri net modeling of buffers in automated manufacturing systems
    • Feb.
    • M. C. Zhou and F. DiCesare, "Petri net modeling of buffers in automated manufacturing systems," IEEE Trans. Syst., Man, Cybern. B, Cybern., vol. 26, no. 1, pp. 157-164, Feb. 1996.
    • (1996) IEEE Trans. Syst., Man, Cybern. B, Cybern. , vol.26 , Issue.1 , pp. 157-164
    • Zhou, M.C.1    DiCesare, F.2
  • 50
    • 0032001865 scopus 로고    scopus 로고
    • Design of industrial automated systems via relay ladder logic programming and Petri nets
    • Feb.
    • M. C. Zhou and E. Twiss, "Design of industrial automated systems via relay ladder logic programming and Petri nets," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev., vol. 28, no. 1, pp. 137-150, Feb. 1998.
    • (1998) IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. , vol.28 , Issue.1 , pp. 137-150
    • Zhou, M.C.1    Twiss, E.2
  • 52
    • 84878676219 scopus 로고    scopus 로고
    • ε-constraint and fuzzy logic-based optimization of hazardous material transportation via lane reservation
    • Jun.
    • Z. Zhou, F. Chu, A. Che, and M. C. Zhou, "ε-constraint and fuzzy logic-based optimization of hazardous material transportation via lane reservation,"IEEE Trans. Intell. Transp. Syst., vol. 14, no. 2, pp. 847-857, Jun. 2013.
    • (2013) IEEE Trans. Intell. Transp. Syst. , vol.14 , Issue.2 , pp. 847-857
    • Zhou, Z.1    Chu, F.2    Che, A.3    Zhou, M.C.4
  • 53
    • 84884354111 scopus 로고    scopus 로고
    • An analytical approach to customer requirement information processing
    • Z. Zhou, Z. Xiao, Q. Liu, and Q. Ai, "An analytical approach to customer requirement information processing," Enterp. Inf. Syst., vol. 7, no. 4, pp. 543-557, 2013
    • (2013) Enterp. Inf. Syst. , vol.7 , Issue.4 , pp. 543-557
    • Zhou, Z.1    Xiao, Z.2    Liu, Q.3    Ai, Q.4
  • 54
    • 84867399369 scopus 로고    scopus 로고
    • An efficient outpatient scheduling approach
    • Oct.
    • H. Zhu, M. Hou, C. Wang, and M. C. Zhou, "An efficient outpatient scheduling approach," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 4, pp. 701-709, Oct. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng. , vol.9 , Issue.4 , pp. 701-709
    • Zhu, H.1    Hou, M.2    Wang, C.3    Zhou, M.C.4
  • 55
    • 84857505320 scopus 로고    scopus 로고
    • Efficient role transfer based on Kuhn-Munkres algorithm
    • Mar.
    • H. Zhu and M. C. Zhou, "Efficient role transfer based on Kuhn-Munkres algorithm," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 42, no. 2, pp. 491-496, Mar. 2012.
    • (2012) IEEE Trans. Syst., Man, Cybern. A, Syst., Humans , vol.42 , Issue.2 , pp. 491-496
    • Zhu, H.1    Zhou, M.C.2
  • 56
    • 84860161434 scopus 로고    scopus 로고
    • Group role assignment via a Kuhn-Munkres algorithm-based solution
    • May
    • H. Zhu, M. C. Zhou, and R. Alkins, "Group role assignment via a Kuhn-Munkres algorithm-based solution," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 42, no. 3, pp. 739-750, May 2012.
    • (2012) IEEE Trans. Syst., Man, Cybern. A, Syst., Humans , vol.42 , Issue.3 , pp. 739-750
    • Zhu, H.1    Zhou, M.C.2    Alkins, R.3
  • 57
    • 84900810194 scopus 로고    scopus 로고
    • Scheduling single-arm multi-cluster tools with lower bound cycle time via Petri nets
    • Dec.
    • Q. H. Zhu and Y. Qiao, "Scheduling single-arm multi-cluster tools with lower bound cycle time via Petri nets," Int. J. Intell. Control Syst., vol. 18, no. 4, pp. 113-123, Dec. 2012.
    • (2012) Int. J. Intell. Control Syst. , vol.18 , Issue.4 , pp. 113-123
    • Zhu, Q.H.1    Qiao, Y.2
  • 58
    • 84887980429 scopus 로고    scopus 로고
    • Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semi-conductor manufacturing
    • Nov.
    • Q. H. Zhu, N. Q. Wu, Y. Qiao, and M. C. Zhou, "Petri net-based optimal one-wafer scheduling of single-arm multi-cluster tools in semi-conductor manufacturing," IEEE Trans. Semicond. Manuf., vol. 26, no. 4, pp. 578-591, Nov. 2013.
    • (2013) IEEE Trans. Semicond. Manuf. , vol.26 , Issue.4 , pp. 578-591
    • Zhu, Q.H.1    Wu, N.Q.2    Qiao, Y.3    Zhou, M.C.4
  • 59
    • 0035485301 scopus 로고    scopus 로고
    • Timed Petri nets in modeling and analysis of cluster tools
    • Oct.
    • W. M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Trans. Robot. Autom., vol. 17, no. 5, pp. 562-575, Oct. 2001.
    • (2001) IEEE Trans. Robot. Autom. , vol.17 , Issue.5 , pp. 562-575
    • Zuberek, W.M.1
  • 60
    • 4344571843 scopus 로고    scopus 로고
    • Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets
    • Aug.
    • W. M. Zuberek, "Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets," IEEE Trans. Semicond. Manuf., vol. 17, no. 3, pp. 333-344, Aug. 2004.
    • (2004) IEEE Trans. Semicond. Manuf. , vol.17 , Issue.3 , pp. 333-344
    • Zuberek, W.M.1
  • 61
    • 0028714917 scopus 로고
    • Petri nets and industrial applications: A tutorial
    • Dec.
    • R. Zurawski and M. C. Zhou, "Petri nets and industrial applications: A tutorial," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 567-583, Dec. 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 567-583
    • Zurawski, R.1    Zhou, M.C.2
  • 62
    • 84923259118 scopus 로고
    • Guest editorial: Special section on Petri nets in manufacturing
    • R. Zurawski and M. C. Zhou, "Guest editorial: Special section on Petri nets in manufacturing," IEEE Trans. Ind. Electron., vol. 41, no. 6, pp. 565-566, 1994.
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 565-566
    • Zurawski, R.1    Zhou, M.C.2
  • 63
    • 84887855359 scopus 로고    scopus 로고
    • Functional and Behavioral Modeling of Automated Manufacturing systems
    • New York, NY, USA: CRC Press
    • R. Zurawski and M. C. Zhou, "Functional and behavioral modeling of automated manufacturing systems," in Handbook of Industrial Electronic Engineering, New York, NY, USA: CRC Press, 1996, pp. 669-676.
    • (1996) Handbook of Industrial Electronic Engineering , pp. 669-676
    • Zurawski, R.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.