-
1
-
-
0028518445
-
A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints
-
R. Armstrong, L. Lei, and S. Ou, "A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints," Eur. J. Oper. Res., vol. 78, pp. 130-140, 1994.
-
(1994)
Eur. J. Oper. Res.
, vol.78
, pp. 130-140
-
-
Armstrong, R.1
Lei, L.2
Ou, S.3
-
2
-
-
0002999514
-
Trends in track system architecture
-
May
-
M. Biché, "Trends in track system architecture," Solid State Technol., pp. 83-86, May 1995.
-
(1995)
Solid State Technol.
, pp. 83-86
-
-
Biché, M.1
-
3
-
-
0035245318
-
Scheduling no-wait production with time windows and flexible processing times
-
Feb.
-
F. Chauvet, J. M. Proth, and Y. Wardi, "Scheduling no-wait production with time windows and flexible processing times," IEEE Trans. Robot. Automat., vol. 17, no. 1, pp. 60-69, Feb. 2001.
-
(2001)
IEEE Trans. Robot. Automat.
, vol.17
, Issue.1
, pp. 60-69
-
-
Chauvet, F.1
Proth, J.M.2
Wardi, Y.3
-
4
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
Feb.
-
A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Automat., vol. 18, no. 1, pp. 69-80, Feb. 2002.
-
(2002)
IEEE Trans. Robot. Automat.
, vol.18
, Issue.1
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
5
-
-
0032000755
-
Cyclic scheduling of a hoist with time window constraints
-
Feb.
-
H. Chen, C. Chu, and J. M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Tran. Robot. Automat., vol. 14, no. 1, pp. 144-152, Feb. 1998.
-
(1998)
IEEE Tran. Robot. Automat.
, vol.14
, Issue.1
, pp. 144-152
-
-
Chen, H.1
Chu, C.2
Proth, J.M.3
-
6
-
-
0026154176
-
Temporal constraint networks
-
R. Dechter, I. Meiri, and J. Pearl, "Temporal constraint networks," Artif. Intell., vol. 49, pp. 61-95, 1991.
-
(1991)
Artif. Intell.
, vol.49
, pp. 61-95
-
-
Dechter, R.1
Meiri, I.2
Pearl, J.3
-
7
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
N. G. Hall and C. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Oper. Res., vol. 44, no. 3, pp. 510-525, 1996.
-
(1996)
Oper. Res.
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
8
-
-
0008912146
-
On a scheduling problem in a robotized analytical system
-
A. Hertz, Y. Mottet, and Y. Rochat, "On a scheduling problem in a robotized analytical system," Discrete Appl Math., vol. 65, pp. 285-318, 1996.
-
(1996)
Discrete Appl Math.
, vol.65
, pp. 285-318
-
-
Hertz, A.1
Mottet, Y.2
Rochat, Y.3
-
9
-
-
0032646146
-
Multiple-part cyclic hoist scheduling using a sieve method
-
Aug.
-
V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Automat., vol. 15, no. 4, pp. 704-713, Aug. 1999.
-
(1999)
IEEE Trans. Robot. Automat.
, vol.15
, Issue.4
, pp. 704-713
-
-
Kats, V.1
Levner, E.2
Meyzin, L.3
-
10
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
Aug.
-
J. H. Kim, T. E. Lee, H. Y. Lee, and D. B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.H.1
Lee, T.E.2
Lee, H.Y.3
Park, D.B.4
-
12
-
-
0016962332
-
Mathematical programming solution for a hoist scheduling problem
-
L. W. Phillips and P. S. Unger, "Mathematical programming solution for a hoist scheduling problem," AIEE Trans., vol. 8, no. 2, pp. 219-225, 1976.
-
(1976)
AIEE Trans.
, vol.8
, Issue.2
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
14
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Oct.
-
S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot, Automat., vol. 17, no. 5, pp. 609-618, Oct., 2001.
-
(2001)
IEEE Trans. Robot, Automat.
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
15
-
-
0036691245
-
Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints
-
Aug.
-
S. Rostami and B. Hamidzadeh, "Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints," IEEE Trans. Semicond. Manuf., vol. 15, no. 3, pp. 341-349, Aug. 2002.
-
(2002)
IEEE Trans. Semicond. Manuf.
, vol.15
, Issue.3
, pp. 341-349
-
-
Rostami, S.1
Hamidzadeh, B.2
-
16
-
-
0031165371
-
Processing disjunction in temporal constraint networks
-
E. Schwalb and R. Dechter, "Processing disjunction in temporal constraint networks," Artif. Intell., vol. 93, pp. 29-61, 1997.
-
(1997)
Artif. Intell.
, vol.93
, pp. 29-61
-
-
Schwalb, E.1
Dechter, R.2
-
17
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
O. W. Shapiro and H. L. W. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, no. 2, pp. 157-167, 1988.
-
(1988)
IIE Trans.
, vol.20
, Issue.2
, pp. 157-167
-
-
Shapiro, O.W.1
Nuttle, H.L.W.2
-
18
-
-
0024088604
-
Misconceptions about real-time computing: A serious problem for next-generation systems
-
I. A. Stankovic, "Misconceptions about real-time computing: A serious problem for next-generation systems," IEEE Trans. Comput., vol. 21, no. 10, pp. 10-19, 1988.
-
(1988)
IEEE Trans. Comput.
, vol.21
, Issue.10
, pp. 10-19
-
-
Stankovic, I.A.1
-
20
-
-
1342287000
-
Deadlock-free scheduling of photolithography equipment in semiconductor fabrication
-
Feb.
-
H. J. Yoon and D. Y. Lee, "Deadlock-free scheduling of photolithography equipment in semiconductor fabrication," IEEE Trans. Semicond. Manuf., vol. 17, no. 1, pp. 42-54, Feb., 2004.
-
(2004)
IEEE Trans. Semicond. Manuf.
, vol.17
, Issue.1
, pp. 42-54
-
-
Yoon, H.J.1
Lee, D.Y.2
-
21
-
-
0036055642
-
Deadlock avoidance in semiconductor track systems
-
Washington, D.C., May 11-15
-
N. Wu and M. C. Zhou, "Deadlock avoidance in semiconductor track systems," in Proc. 2002 IEEE Int. Conf. Robot. Automat., Washington, D.C., May 11-15, 2002, pp. 193-198.
-
(2002)
Proc. 2002 IEEE Int. Conf. Robot. Automat.
, pp. 193-198
-
-
Wu, N.1
Zhou, M.C.2
|