메뉴 건너뛰기




Volumn 18, Issue 3, 2005, Pages 390-398

Online scheduling of integrated single-wafer processing tools with temporal constraints

Author keywords

Cluster tool; Online scheduling; Postprocessing residency constraint; Real time scheduling; Semiconductor manufacturing; Temporal constraint

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; CONSTRAINT THEORY; FORMAL LOGIC; MATHEMATICAL MODELS; POLYNOMIALS; SCHEDULING; SET THEORY; TIME DOMAIN ANALYSIS;

EID: 25144432280     PISSN: 08946507     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSM.2005.852103     Document Type: Article
Times cited : (53)

References (22)
  • 1
    • 0028518445 scopus 로고
    • A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints
    • R. Armstrong, L. Lei, and S. Ou, "A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints," Eur. J. Oper. Res., vol. 78, pp. 130-140, 1994.
    • (1994) Eur. J. Oper. Res. , vol.78 , pp. 130-140
    • Armstrong, R.1    Lei, L.2    Ou, S.3
  • 2
    • 0002999514 scopus 로고
    • Trends in track system architecture
    • May
    • M. Biché, "Trends in track system architecture," Solid State Technol., pp. 83-86, May 1995.
    • (1995) Solid State Technol. , pp. 83-86
    • Biché, M.1
  • 3
    • 0035245318 scopus 로고    scopus 로고
    • Scheduling no-wait production with time windows and flexible processing times
    • Feb.
    • F. Chauvet, J. M. Proth, and Y. Wardi, "Scheduling no-wait production with time windows and flexible processing times," IEEE Trans. Robot. Automat., vol. 17, no. 1, pp. 60-69, Feb. 2001.
    • (2001) IEEE Trans. Robot. Automat. , vol.17 , Issue.1 , pp. 60-69
    • Chauvet, F.1    Proth, J.M.2    Wardi, Y.3
  • 4
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • Feb.
    • A. Che, C. Chu, and F. Chu, "Multicyclic hoist scheduling with constant processing times," IEEE Trans. Robot. Automat., vol. 18, no. 1, pp. 69-80, Feb. 2002.
    • (2002) IEEE Trans. Robot. Automat. , vol.18 , Issue.1 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 5
    • 0032000755 scopus 로고    scopus 로고
    • Cyclic scheduling of a hoist with time window constraints
    • Feb.
    • H. Chen, C. Chu, and J. M. Proth, "Cyclic scheduling of a hoist with time window constraints," IEEE Tran. Robot. Automat., vol. 14, no. 1, pp. 144-152, Feb. 1998.
    • (1998) IEEE Tran. Robot. Automat. , vol.14 , Issue.1 , pp. 144-152
    • Chen, H.1    Chu, C.2    Proth, J.M.3
  • 6
    • 0026154176 scopus 로고
    • Temporal constraint networks
    • R. Dechter, I. Meiri, and J. Pearl, "Temporal constraint networks," Artif. Intell., vol. 49, pp. 61-95, 1991.
    • (1991) Artif. Intell. , vol.49 , pp. 61-95
    • Dechter, R.1    Meiri, I.2    Pearl, J.3
  • 7
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • N. G. Hall and C. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Oper. Res., vol. 44, no. 3, pp. 510-525, 1996.
    • (1996) Oper. Res. , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 8
    • 0008912146 scopus 로고    scopus 로고
    • On a scheduling problem in a robotized analytical system
    • A. Hertz, Y. Mottet, and Y. Rochat, "On a scheduling problem in a robotized analytical system," Discrete Appl Math., vol. 65, pp. 285-318, 1996.
    • (1996) Discrete Appl Math. , vol.65 , pp. 285-318
    • Hertz, A.1    Mottet, Y.2    Rochat, Y.3
  • 9
    • 0032646146 scopus 로고    scopus 로고
    • Multiple-part cyclic hoist scheduling using a sieve method
    • Aug.
    • V. Kats, E. Levner, and L. Meyzin, "Multiple-part cyclic hoist scheduling using a sieve method," IEEE Trans. Robot. Automat., vol. 15, no. 4, pp. 704-713, Aug. 1999.
    • (1999) IEEE Trans. Robot. Automat. , vol.15 , Issue.4 , pp. 704-713
    • Kats, V.1    Levner, E.2    Meyzin, L.3
  • 10
    • 0041384559 scopus 로고    scopus 로고
    • Scheduling analysis of time-constrained dual-armed cluster tools
    • Aug.
    • J. H. Kim, T. E. Lee, H. Y. Lee, and D. B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, pp. 521-534, Aug. 2003.
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 521-534
    • Kim, J.H.1    Lee, T.E.2    Lee, H.Y.3    Park, D.B.4
  • 12
    • 0016962332 scopus 로고
    • Mathematical programming solution for a hoist scheduling problem
    • L. W. Phillips and P. S. Unger, "Mathematical programming solution for a hoist scheduling problem," AIEE Trans., vol. 8, no. 2, pp. 219-225, 1976.
    • (1976) AIEE Trans. , vol.8 , Issue.2 , pp. 219-225
    • Phillips, L.W.1    Unger, P.S.2
  • 14
    • 0035485501 scopus 로고    scopus 로고
    • An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    • Oct.
    • S. Rostami, B. Hamidzadeh, and D. Camporese, "An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints," IEEE Trans. Robot, Automat., vol. 17, no. 5, pp. 609-618, Oct., 2001.
    • (2001) IEEE Trans. Robot, Automat. , vol.17 , Issue.5 , pp. 609-618
    • Rostami, S.1    Hamidzadeh, B.2    Camporese, D.3
  • 15
    • 0036691245 scopus 로고    scopus 로고
    • Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints
    • Aug.
    • S. Rostami and B. Hamidzadeh, "Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints," IEEE Trans. Semicond. Manuf., vol. 15, no. 3, pp. 341-349, Aug. 2002.
    • (2002) IEEE Trans. Semicond. Manuf. , vol.15 , Issue.3 , pp. 341-349
    • Rostami, S.1    Hamidzadeh, B.2
  • 16
    • 0031165371 scopus 로고    scopus 로고
    • Processing disjunction in temporal constraint networks
    • E. Schwalb and R. Dechter, "Processing disjunction in temporal constraint networks," Artif. Intell., vol. 93, pp. 29-61, 1997.
    • (1997) Artif. Intell. , vol.93 , pp. 29-61
    • Schwalb, E.1    Dechter, R.2
  • 17
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • O. W. Shapiro and H. L. W. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, no. 2, pp. 157-167, 1988.
    • (1988) IIE Trans. , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, O.W.1    Nuttle, H.L.W.2
  • 18
    • 0024088604 scopus 로고
    • Misconceptions about real-time computing: A serious problem for next-generation systems
    • I. A. Stankovic, "Misconceptions about real-time computing: A serious problem for next-generation systems," IEEE Trans. Comput., vol. 21, no. 10, pp. 10-19, 1988.
    • (1988) IEEE Trans. Comput. , vol.21 , Issue.10 , pp. 10-19
    • Stankovic, I.A.1
  • 20
    • 1342287000 scopus 로고    scopus 로고
    • Deadlock-free scheduling of photolithography equipment in semiconductor fabrication
    • Feb.
    • H. J. Yoon and D. Y. Lee, "Deadlock-free scheduling of photolithography equipment in semiconductor fabrication," IEEE Trans. Semicond. Manuf., vol. 17, no. 1, pp. 42-54, Feb., 2004.
    • (2004) IEEE Trans. Semicond. Manuf. , vol.17 , Issue.1 , pp. 42-54
    • Yoon, H.J.1    Lee, D.Y.2
  • 21
    • 0036055642 scopus 로고    scopus 로고
    • Deadlock avoidance in semiconductor track systems
    • Washington, D.C., May 11-15
    • N. Wu and M. C. Zhou, "Deadlock avoidance in semiconductor track systems," in Proc. 2002 IEEE Int. Conf. Robot. Automat., Washington, D.C., May 11-15, 2002, pp. 193-198.
    • (2002) Proc. 2002 IEEE Int. Conf. Robot. Automat. , pp. 193-198
    • Wu, N.1    Zhou, M.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.