메뉴 건너뛰기




Volumn 14, Issue 1, 1998, Pages 144-152

Cyclic scheduling of a hoist with time window constraints

Author keywords

Bi valued graph; Branch and bound; Cycletime; Hoist scheduling; Time window constraints

Indexed keywords

ALGORITHMS; COMPUTATIONAL METHODS; CONSTRAINT THEORY; ELECTROPLATING; GRAPH THEORY; LINEAR PROGRAMMING; PRINTED CIRCUIT BOARDS; SCHEDULING;

EID: 0032000755     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/70.660860     Document Type: Article
Times cited : (166)

References (12)
  • 2
    • 0016962332 scopus 로고
    • Mathematical programming solution of a hoist scheduling problem
    • L. W. Phillips and P. S. Unger, "Mathematical programming solution of a hoist scheduling problem," AIIE Trans., vol. 28, no. 2, pp. 219-225, 1976.
    • (1976) AIIE Trans. , vol.28 , Issue.2 , pp. 219-225
    • Phillips, L.W.1    Unger, P.S.2
  • 3
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • G. W. Shapiro and H. L. Nuttle, "Hoist scheduling for a PCB electroplating facility," IIE Trans., vol. 20, no. 2, pp. 157-167, 1988.
    • (1988) IIE Trans. , vol.20 , Issue.2 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.L.2
  • 5
    • 0000402860 scopus 로고
    • The minimun common-cycle algorithm for cyclic scheduling of two material handling hoists with the time window constraints
    • _, "The minimun common-cycle algorithm for cyclic scheduling of two material handling hoists with the time window constraints," Manage. Sci., vol. 37, no. 12, pp. 1629-1639, 1991.
    • (1991) Manage. Sci. , vol.37 , Issue.12 , pp. 1629-1639
  • 9
    • 0030400880 scopus 로고    scopus 로고
    • Single machine scheduling with chain structured precedence constraints and separation time windows
    • Dec.
    • C. Chu and J. M. Proth, "Single machine scheduling with chain structured precedence constraints and separation time windows," IEEE Trans. Robot. Automat., vol. 12, pp. 835-844, Dec. 1996.
    • (1996) IEEE Trans. Robot. Automat. , vol.12 , pp. 835-844
    • Chu, C.1    Proth, J.M.2
  • 10
    • 0003925289 scopus 로고
    • The basic scheduling problem with deadlines
    • P. Chrétienne, "The basic scheduling problem with deadlines," Discrete Appl. Math., vol. 30, pp. 109-123, 1991.
    • (1991) Discrete Appl. Math. , vol.30 , pp. 109-123
    • Chrétienne, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.