-
1
-
-
84937978044
-
Engineer-to-order (ETO) Production Planning and Control: An Empirical Framework for Machinery-Building Companies
-
Adrodegari, F., A., Bacchetti, R., Pinto, F., Pirola, and M., Zanardini. 2015. “Engineer-to-order (ETO) Production Planning and Control: An Empirical Framework for Machinery-Building Companies.” Production Planning & Control 26 (11): 910–932. doi: 10.1080/09537287.2014.1001808
-
(2015)
Production Planning & Control
, vol.26
, Issue.11
, pp. 910-932
-
-
Adrodegari, F.1
Bacchetti, A.2
Pinto, R.3
Pirola, F.4
Zanardini, M.5
-
2
-
-
85062450291
-
Study on Scheduling of the Planning Method Using the Web-Based Visualization System in a Shipbuilding Block Assembly Shop. World Academy of Science, Engineering and Technology
-
Ahn, A. E. K., B. G. N., Wang, and C. S. C., Park. 2010. “Study on Scheduling of the Planning Method Using the Web-Based Visualization System in a Shipbuilding Block Assembly Shop. World Academy of Science, Engineering and Technology.” International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering 4 (9): 821–824.
-
(2010)
International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering
, vol.4
, Issue.9
, pp. 821-824
-
-
Ahn, A.E.K.1
Wang, B.G.N.2
Park, C.S.C.3
-
4
-
-
78650226885
-
A Project Scheduling Approach to Production Planning with Feeding Precedence Relations
-
Alfieri, A., T., Tolio, and M., Urgo. 2011. “A Project Scheduling Approach to Production Planning with Feeding Precedence Relations.” International Journal of Production Research 49 (4): 995–1020. doi: 10.1080/00207541003604844
-
(2011)
International Journal of Production Research
, vol.49
, Issue.4
, pp. 995-1020
-
-
Alfieri, A.1
Tolio, T.2
Urgo, M.3
-
5
-
-
84865351186
-
A Two-Stage Stochastic Programming Project Scheduling Approach to Production Planning
-
Alfieri, A., T., Tolio, and M., Urgo. 2012. “A Two-Stage Stochastic Programming Project Scheduling Approach to Production Planning.” The International Journal of Advanced Manufacturing Technology 62 (1–4): 279–290. doi: 10.1007/s00170-011-3794-4
-
(2012)
The International Journal of Advanced Manufacturing Technology
, vol.62
, Issue.1-4
, pp. 279-290
-
-
Alfieri, A.1
Tolio, T.2
Urgo, M.3
-
6
-
-
27644493989
-
Value Stream Mapping for Make-to-Order Products in a Job Shop Environment
-
San Diego: Ascer - American Society of Civil Engineerings, and
-
Alves, T. D. C., I. D., Tommelein, and G., Ballard. 2005. “Value Stream Mapping for Make-to-Order Products in a Job Shop Environment.” In Construction Research Congress 2005: Broadening Perspectives, 1–10. San Diego: Ascer - American Society of Civil Engineerings.
-
(2005)
Construction Research Congress 2005: Broadening Perspectives
, pp. 1-10
-
-
Alves, T.D.C.1
Tommelein, I.D.2
Ballard, G.3
-
7
-
-
0001195095
-
Competitive Advantage, Customisation and a new Taxonomy for non Make-to-Stock Companies
-
Amaro, G., L., Hendry, and B., Kingsman. 1999. “Competitive Advantage, Customisation and a new Taxonomy for non Make-to-Stock Companies.” International Journal of Operations & Production Management 19 (4): 349–371. doi: 10.1108/01443579910254213
-
(1999)
International Journal of Operations & Production Management
, vol.19
, Issue.4
, pp. 349-371
-
-
Amaro, G.1
Hendry, L.2
Kingsman, B.3
-
8
-
-
55849116349
-
Engineering Design Complexity: an Investigation of Methods and Measures
-
Ameri, F., J. D., Summers, G. M., Mocko, and M., Porter. 2008. “Engineering Design Complexity: an Investigation of Methods and Measures.” Research in Engineering Design 19 (2–3): 161–179. doi: 10.1007/s00163-008-0053-2
-
(2008)
Research in Engineering Design
, vol.19
, Issue.2-3
, pp. 161-179
-
-
Ameri, F.1
Summers, J.D.2
Mocko, G.M.3
Porter, M.4
-
9
-
-
84906099965
-
A Century of Evolution From Harris's Basic lot Size Model: Survey and Research Agenda
-
Andriolo, A., D., Battini, R. W., Grubbström, A., Persona, and F., Sgarbossa. 2014. “A Century of Evolution From Harris's Basic lot Size Model: Survey and Research Agenda.” International Journal of Production Economics 155: 16–38. doi: 10.1016/j.ijpe.2014.01.013
-
(2014)
International Journal of Production Economics
, vol.155
, pp. 16-38
-
-
Andriolo, A.1
Battini, D.2
Grubbström, R.W.3
Persona, A.4
Sgarbossa, F.5
-
10
-
-
0034317755
-
A Component-Based Approach to Support Order Planning in a Distributed Manufacturing Enterprise
-
Azevedo, A. L., and J. P., Sousa. 2000. “A Component-Based Approach to Support Order Planning in a Distributed Manufacturing Enterprise.” Journal of Materials Processing Technology 107 (1–3): 431–438. doi: 10.1016/S0924-0136(00)00680-4
-
(2000)
Journal of Materials Processing Technology
, vol.107
, Issue.1-3
, pp. 431-438
-
-
Azevedo, A.L.1
Sousa, J.P.2
-
11
-
-
84867037593
-
Mixed Model Assembly System with Multiple Secondary Feeder Lines: Layout Design and Balancing Procedure for ATO Environment
-
Azzi, A., D., Battini, M., Faccio, and A., Persona. 2012. “Mixed Model Assembly System with Multiple Secondary Feeder Lines: Layout Design and Balancing Procedure for ATO Environment.” International Journal of Production Research 50 (18): 5132–5151. doi: 10.1080/00207543.2011.653590
-
(2012)
International Journal of Production Research
, vol.50
, Issue.18
, pp. 5132-5151
-
-
Azzi, A.1
Battini, D.2
Faccio, M.3
Persona, A.4
-
12
-
-
84989209076
-
A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard
-
Back, M. G., D. K., Lee, J. G., Shin, and J. H., Woo. 2016. “A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard.” International Journal of Naval Architecture and Ocean Engineering 8 (5): 496–510. doi: 10.1016/j.ijnaoe.2016.05.005
-
(2016)
International Journal of Naval Architecture and Ocean Engineering
, vol.8
, Issue.5
, pp. 496-510
-
-
Back, M.G.1
Lee, D.K.2
Shin, J.G.3
Woo, J.H.4
-
13
-
-
85062443441
-
-
Big size products assembly system design: a literature review and future research agenda. Proceedings Twentieth International Working Seminar on Production Economics, Innsbruck, Austria, February 19–23, 2, 29–41
-
Battini, D., M., Calzavara, S., Finco, A., Persona, and F., Sgarbossa. 2018. Big size products assembly system design: a literature review and future research agenda." In Proceedings Twentieth International Working Seminar on Production Economics, Innsbruck, Austria, February 19–23, 2, 29–41.
-
(2018)
-
-
Battini, D.1
Calzavara, M.2
Finco, S.3
Persona, A.4
Sgarbossa, F.5
-
14
-
-
84959152312
-
Ergonomics in Assembly Line Balancing Based on Energy Expenditure: a Multi-Objective Model
-
Battini, D., X., Delorme, A., Dolgui, A., Persona, and F., Sgarbossa. 2016. “Ergonomics in Assembly Line Balancing Based on Energy Expenditure: a Multi-Objective Model.” International Journal of Production Research 54 (3): 824–845. doi: 10.1080/00207543.2015.1074299
-
(2016)
International Journal of Production Research
, vol.54
, Issue.3
, pp. 824-845
-
-
Battini, D.1
Delorme, X.2
Dolgui, A.3
Persona, A.4
Sgarbossa, F.5
-
15
-
-
84921984956
-
Part-feeding with Supermarket in Assembly Systems: Transportation Mode Selection Model and Multi-Scenario Analysis
-
Battini, D., M., Gamberi, A., Persona, and F., Sgarbossa. 2015. “Part-feeding with Supermarket in Assembly Systems: Transportation Mode Selection Model and Multi-Scenario Analysis.” Assembly Automation 35 (1): 149–159. doi: 10.1108/AA-06-2014-053
-
(2015)
Assembly Automation
, vol.35
, Issue.1
, pp. 149-159
-
-
Battini, D.1
Gamberi, M.2
Persona, A.3
Sgarbossa, F.4
-
16
-
-
84899128125
-
Lean Manufacturing in the Valve pre-Assembly Area of a Bottling Lines Production Plant: An Italian Case Study
-
Rabat, Morocco: IEEE, and
-
Bertolini, M., and G., Romagnoli. 2013. “Lean Manufacturing in the Valve pre-Assembly Area of a Bottling Lines Production Plant: An Italian Case Study.” In Industrial Engineering and Systems Management (IESM), Proceedings of 2013 International Conference, 1–8. Rabat, Morocco: IEEE.
-
(2013)
Industrial Engineering and Systems Management (IESM), Proceedings of 2013 International Conference
, pp. 1-8
-
-
Bertolini, M.1
Romagnoli, G.2
-
17
-
-
85015926230
-
2MTO, a new Mapping Tool to Achieve Lean Benefits in High-Variety low-Volume job Shops
-
Bertolini, M., G., Romagnoli, and F., Zammori. 2017. “2MTO, a new Mapping Tool to Achieve Lean Benefits in High-Variety low-Volume job Shops.” Production Planning & Control 28 (5): 444–458. doi: 10.1080/09537287.2017.1302615
-
(2017)
Production Planning & Control
, vol.28
, Issue.5
, pp. 444-458
-
-
Bertolini, M.1
Romagnoli, G.2
Zammori, F.3
-
19
-
-
84956947883
-
Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy
-
Birkie, S. E., and P., Trucco. 2016. “Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy.” Production Planning & Control 27 (5): 345–359. doi: 10.1080/09537287.2015.1127446
-
(2016)
Production Planning & Control
, vol.27
, Issue.5
, pp. 345-359
-
-
Birkie, S.E.1
Trucco, P.2
-
20
-
-
84872000996
-
-
Model-based production for engineered-to-order joinery products. World Conference on Timber Engineering: 15–19 July, 697–701. New Zealand Timber Design Society
-
Björngrim, N., L., Laitila, S., Forsman, and P., Bomark. 2012. Model-based production for engineered-to-order joinery products." In World Conference on Timber Engineering: 15–19 July, 697–701. New Zealand Timber Design Society.
-
(2012)
-
-
Björngrim, N.1
Laitila, L.2
Forsman, S.3
Bomark, P.4
-
22
-
-
84870798260
-
Cooperation of Suppliers and Clients with Companies in the Agricultural Machinery Industry: Some Evidence From Brazil
-
Borsato, M., and A., de Araújo Carvalho. 2010. “Cooperation of Suppliers and Clients with Companies in the Agricultural Machinery Industry: Some Evidence From Brazil.” International Journal of Technological Learning, Innovation and Development 3 (4): 330–346. doi: 10.1504/IJTLID.2010.039163
-
(2010)
International Journal of Technological Learning, Innovation and Development
, vol.3
, Issue.4
, pp. 330-346
-
-
Borsato, M.1
de Araújo Carvalho, A.2
-
23
-
-
84904464337
-
How Virtualization, Decentralization and Network Building Change the Manufacturing Landscape: An Industry 4.0 Perspective
-
Brettel, M., N., Friederichsen, M., Keller, and M., Rosenberg. 2014. “How Virtualization, Decentralization and Network Building Change the Manufacturing Landscape: An Industry 4.0 Perspective.” International Journal of Mechanical, Industrial Science and Engineering 8 (1): 37–44.
-
(2014)
International Journal of Mechanical, Industrial Science and Engineering
, vol.8
, Issue.1
, pp. 37-44
-
-
Brettel, M.1
Friederichsen, N.2
Keller, M.3
Rosenberg, M.4
-
24
-
-
77953684240
-
Resource-constrained Multi-Project Scheduling: Priority Rule Performance Revisited
-
Browning, T. R., and A. A., Yassine. 2010. “Resource-constrained Multi-Project Scheduling: Priority Rule Performance Revisited.” International Journal of Production Economics 126 (2): 212–228. doi: 10.1016/j.ijpe.2010.03.009
-
(2010)
International Journal of Production Economics
, vol.126
, Issue.2
, pp. 212-228
-
-
Browning, T.R.1
Yassine, A.A.2
-
25
-
-
8644280372
-
Integrated Model for Supplier Selection and Negotiation in a Make-to-Order Environment
-
Cakravastia, A., and K., Takahashi. 2004. “Integrated Model for Supplier Selection and Negotiation in a Make-to-Order Environment.” International Journal of Production Research 42 (21): 4457–4474. doi: 10.1080/00207540410001727622
-
(2004)
International Journal of Production Research
, vol.42
, Issue.21
, pp. 4457-4474
-
-
Cakravastia, A.1
Takahashi, K.2
-
26
-
-
41549093092
-
Operational Flexibility Quantification in a Make-to-Order Assembly System
-
Calvo, R., R., Domingo, and M. A., Sebastián. 2007. “Operational Flexibility Quantification in a Make-to-Order Assembly System.” International Journal of Flexible Manufacturing Systems 19 (3): 247–263. doi: 10.1007/s10696-008-9037-9
-
(2007)
International Journal of Flexible Manufacturing Systems
, vol.19
, Issue.3
, pp. 247-263
-
-
Calvo, R.1
Domingo, R.2
Sebastián, M.A.3
-
27
-
-
0029387797
-
‘Engineer to Order’companies: How to Integrate Manufacturing and Innovative Processes
-
Caron, F., and A., Fiore. 1995. “‘Engineer to Order’companies: How to Integrate Manufacturing and Innovative Processes.” International Journal of Project Management 13 (5): 313–319. doi: 10.1016/0263-7863(95)00023-J
-
(1995)
International Journal of Project Management
, vol.13
, Issue.5
, pp. 313-319
-
-
Caron, F.1
Fiore, A.2
-
28
-
-
84937399331
-
Tactical Capacity Planning in a Real-World ETO Industry Case: An Action Research
-
Carvalho, A. N., F., Oliveira, and L. F., Scavarda. 2015. “Tactical Capacity Planning in a Real-World ETO Industry Case: An Action Research.” International Journal of Production Economics 167: 187–203. doi: 10.1016/j.ijpe.2015.05.032
-
(2015)
International Journal of Production Economics
, vol.167
, pp. 187-203
-
-
Carvalho, A.N.1
Oliveira, F.2
Scavarda, L.F.3
-
29
-
-
77955442671
-
The Construction of Production Improvement Model for Aerospace Manufacturing Suppliers
-
Trans Tech Publications, and
-
Chang, H. M., C. K., Huang, and C. C., Torng. 2010. “The Construction of Production Improvement Model for Aerospace Manufacturing Suppliers.” In Key Engineering Materials, 443, 748–753. Trans Tech Publications.
-
(2010)
Key Engineering Materials
, vol.443
, pp. 748-753
-
-
Chang, H.M.1
Huang, C.K.2
Torng, C.C.3
-
30
-
-
73649085463
-
Using Rule Based Design in Engineer to Order Industry: An SME Case Study
-
Chavali, S. R., C., Sen, G. M., Mocko, and J. D., Summers. 2008. “Using Rule Based Design in Engineer to Order Industry: An SME Case Study.” Computer-Aided Design and Applications 5 (1–4): 178–193. doi: 10.3722/cadaps.2008.178-193
-
(2008)
Computer-Aided Design and Applications
, vol.5
, Issue.1-4
, pp. 178-193
-
-
Chavali, S.R.1
Sen, C.2
Mocko, G.M.3
Summers, J.D.4
-
31
-
-
64049105121
-
Concurrent Engineer-to-Order Operation in the Manufacturing Engineering Contracting Industries
-
Chen, C. S., 2006. “Concurrent Engineer-to-Order Operation in the Manufacturing Engineering Contracting Industries.” International Journal of Industrial and Systems Engineering 1 (1–2): 37–58. doi: 10.1504/IJISE.2006.009049
-
(2006)
International Journal of Industrial and Systems Engineering
, vol.1
, Issue.1-2
, pp. 37-58
-
-
Chen, C.S.1
-
32
-
-
23344432043
-
A Simulation-Based Process Model for Managing Complex Design Projects
-
Cho, S. H., and S. D., Eppinger. 2005. “A Simulation-Based Process Model for Managing Complex Design Projects.” IEEE Transactions on Engineering Management 52 (3): 316–328. doi: 10.1109/TEM.2005.850722
-
(2005)
IEEE Transactions on Engineering Management
, vol.52
, Issue.3
, pp. 316-328
-
-
Cho, S.H.1
Eppinger, S.D.2
-
33
-
-
0034263053
-
Integrated Engineering Environments for Large Complex Products
-
Coates, G., I., Ritchey, A. H., Duffy, W., Hills, and R. I., Whitfield. 2000. “Integrated Engineering Environments for Large Complex Products.” Concurrent Engineering 8 (3): 171–182. doi: 10.1177/1063293X0000800302
-
(2000)
Concurrent Engineering
, vol.8
, Issue.3
, pp. 171-182
-
-
Coates, G.1
Ritchey, I.2
Duffy, A.H.3
Hills, W.4
Whitfield, R.I.5
-
34
-
-
0032040841
-
Optimizing the Number of Stations in Assembly Lines Under Learning for Limited Production
-
Cohen, Y., and M., Ezey Dar-El. 1998. “Optimizing the Number of Stations in Assembly Lines Under Learning for Limited Production.” Production Planning & Control 9 (3): 230–240. doi: 10.1080/095372898234208
-
(1998)
Production Planning & Control
, vol.9
, Issue.3
, pp. 230-240
-
-
Cohen, Y.1
Ezey Dar-El, M.2
-
35
-
-
33644502870
-
-
January,Economics modelling for systems engineering aircraft. AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences (7371
-
Curran, R., J., Early, M., Price, S., Castagne, P., Mawhinney, J., Butterfield, and S., Raghunathan. 2005, January. "Economics modelling for systems engineering in aircraft." In AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences (7371).
-
(2005)
-
-
Curran, R.1
Early, J.2
Price, M.3
Castagne, S.4
Mawhinney, P.5
Butterfield, J.6
Raghunathan, S.7
-
36
-
-
66449123062
-
Special Orders
-
Cutler, T. R., 2009. “Special Orders.” Industrial Engineer 41 (5): 36–38.
-
(2009)
Industrial Engineer
, vol.41
, Issue.5
, pp. 36-38
-
-
Cutler, T.R.1
-
37
-
-
46149093978
-
Stochastic Shipyard Simulation with SIMYARD
-
Monterey: IEEE, and
-
Dain, O., M., Ginsberg, E., Keenan, J., Pyle, T., Smith, A., Stoneman, and I., Pardoe. 2006. “Stochastic Shipyard Simulation with SIMYARD.” In Simulation Conference, 2006. WSC 06. Proceedings of the Winter, 1770–1778. Monterey: IEEE.
-
(2006)
Simulation Conference, 2006. WSC 06. Proceedings of the Winter
, pp. 1770-1778
-
-
Dain, O.1
Ginsberg, M.2
Keenan, E.3
Pyle, J.4
Smith, T.5
Stoneman, A.6
Pardoe, I.7
-
38
-
-
43049104581
-
Investigating Factors Affecting ERP Selection in Made-to-Order SME Sector
-
Deep, A., P., Guttridge, S., Dani, and N., Burns. 2008. “Investigating Factors Affecting ERP Selection in Made-to-Order SME Sector.” Journal of Manufacturing Technology Management 19 (4): 430–446. doi: 10.1108/17410380810869905
-
(2008)
Journal of Manufacturing Technology Management
, vol.19
, Issue.4
, pp. 430-446
-
-
Deep, A.1
Guttridge, P.2
Dani, S.3
Burns, N.4
-
40
-
-
30744451443
-
Assembly Line Balancing and Group Working: A Heuristic Procedure for Workers’ Groups Operating on the Same Product and Workstation
-
Dimitriadis, S. G., 2006. “Assembly Line Balancing and Group Working: A Heuristic Procedure for Workers’ Groups Operating on the Same Product and Workstation.” Computers & Operations Research 33 (9): 2757–2774. doi: 10.1016/j.cor.2005.02.027
-
(2006)
Computers & Operations Research
, vol.33
, Issue.9
, pp. 2757-2774
-
-
Dimitriadis, S.G.1
-
41
-
-
73249144350
-
Innovative Ship Block Assembly Production Control Using a Flexible Curved Block Job Shop
-
Dong, F., H., Parvin, M. P., Van Oyen, and D. J., Singer. 2009. “Innovative Ship Block Assembly Production Control Using a Flexible Curved Block Job Shop.” Journal of Ship Production 25 (4): 206–213.
-
(2009)
Journal of Ship Production
, vol.25
, Issue.4
, pp. 206-213
-
-
Dong, F.1
Parvin, H.2
Van Oyen, M.P.3
Singer, D.J.4
-
43
-
-
0032672455
-
Risk Analysis for Large Engineering Projects: Modeling Cost Uncertainty for Ship Production Activities
-
Duffey, M. R., and J. R., Van Dorp. 1999. “Risk Analysis for Large Engineering Projects: Modeling Cost Uncertainty for Ship Production Activities.” Journal of Engineering Valuation and Cost Analysis 2 (4): 285–301.
-
(1999)
Journal of Engineering Valuation and Cost Analysis
, vol.2
, Issue.4
, pp. 285-301
-
-
Duffey, M.R.1
Van Dorp, J.R.2
-
44
-
-
33644599725
-
Consequences of Competitive Bidding in Project-Based Production
-
Elfving, J. A., I. D., Tommelein, and G., Ballard. 2005. “Consequences of Competitive Bidding in Project-Based Production.” Journal of Purchasing and Supply Management 11 (4): 173–181. doi: 10.1016/j.pursup.2005.12.001
-
(2005)
Journal of Purchasing and Supply Management
, vol.11
, Issue.4
, pp. 173-181
-
-
Elfving, J.A.1
Tommelein, I.D.2
Ballard, G.3
-
45
-
-
84899876997
-
Lean Project Planning in Shipbuilding
-
Emblemsvåg, J., 2014. “Lean Project Planning in Shipbuilding.” Journal of Ship Production and Design 30 (2): 79–88. doi: 10.5957/JSPD.30.2.130054
-
(2014)
Journal of Ship Production and Design
, vol.30
, Issue.2
, pp. 79-88
-
-
Emblemsvåg, J.1
-
46
-
-
74549208061
-
Shipyard Production Cost Structure Optimisation Model Related to Product Type
-
Fafandjel, N., A., Zamarin, and M., Hadjina. 2010. “Shipyard Production Cost Structure Optimisation Model Related to Product Type.” International Journal of Production Research 48 (5): 1479–1491. doi: 10.1080/00207540802609665
-
(2010)
International Journal of Production Research
, vol.48
, Issue.5
, pp. 1479-1491
-
-
Fafandjel, N.1
Zamarin, A.2
Hadjina, M.3
-
47
-
-
38049151116
-
Shipyard Space Allocation and Scheduling
-
Finke, D. A., C. B., Ligetti, M. T., Traband, and A., Roy. 2007. “Shipyard Space Allocation and Scheduling.” Journal of Ship Production 23 (4): 197–201.
-
(2007)
Journal of Ship Production
, vol.23
, Issue.4
, pp. 197-201
-
-
Finke, D.A.1
Ligetti, C.B.2
Traband, M.T.3
Roy, A.4
-
48
-
-
84973121850
-
Challenges of System Integration in the Engineer-to-Order Business
-
Yokohama: IEEE, and
-
Foehr, M., M., Gepp, and J., Vollmar. 2015. “Challenges of System Integration in the Engineer-to-Order Business.” In Industrial Electronics Society, IECON 2015-41st Annual Conference of the IEEE, 000073–000079. Yokohama: IEEE.
-
(2015)
Industrial Electronics Society, IECON 2015-41st Annual Conference of the IEEE
, pp. 000073-000079
-
-
Foehr, M.1
Gepp, M.2
Vollmar, J.3
-
49
-
-
84867087470
-
Need for Innovation in Supplying Engineer-to-Order Joinery Products to Construction: A Case Study in Sweden
-
Forsman, S., N., Björngrim, A., Bystedt, L., Laitila, P., Bomark, and M., Öhman. 2012. “Need for Innovation in Supplying Engineer-to-Order Joinery Products to Construction: A Case Study in Sweden.” Construction Innovation 12 (4): 464–491. doi: 10.1108/14714171211272225
-
(2012)
Construction Innovation
, vol.12
, Issue.4
, pp. 464-491
-
-
Forsman, S.1
Björngrim, N.2
Bystedt, A.3
Laitila, L.4
Bomark, P.5
Öhman, M.6
-
51
-
-
77955418542
-
Integrated Multi-Agent-Based Supply Chain Management
-
Linz: IEEE, and
-
Frey, D., P. O., Woelk, T., Stockheim, and R., Zimmermann. 2003. “Integrated Multi-Agent-Based Supply Chain Management.” In Enabling Technologies: Infrastructure for Collaborative Enterprises, 2003. WET ICE 2003. Proceedings. Twelfth IEEE International Workshops, 24–29. Linz: IEEE.
-
(2003)
Enabling Technologies: Infrastructure for Collaborative Enterprises, 2003. WET ICE 2003. Proceedings. Twelfth IEEE International Workshops
, pp. 24-29
-
-
Frey, D.1
Woelk, P.O.2
Stockheim, T.3
Zimmermann, R.4
-
52
-
-
85086612341
-
Application of Design for Manufacture and Assembly Methodologies to Complex Aerospace Products
-
Las Vegas: AIAA, and,. In
-
Gauthier, B., P., Dewhurst, and D., Japikse. 2000. “Application of Design for Manufacture and Assembly Methodologies to Complex Aerospace Products.” In 36th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit, 3404. Las Vegas: AIAA.
-
(2000)
36th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit
, pp. 3404
-
-
Gauthier, B.1
Dewhurst, P.2
Japikse, D.3
-
53
-
-
5444275078
-
Globally Distributed Product Development Using a new Project Management Framework
-
Ghosh, P. P., and J. C., Varghese. 2004. “Globally Distributed Product Development Using a new Project Management Framework.” International Journal of Project Management 22 (8): 669–678. doi: 10.1016/j.ijproman.2004.05.008
-
(2004)
International Journal of Project Management
, vol.22
, Issue.8
, pp. 669-678
-
-
Ghosh, P.P.1
Varghese, J.C.2
-
54
-
-
85027960179
-
The Application of Quick Response Manufacturing Practices in Brazil, Europe, and the USA: An Exploratory Study
-
Godinho Filho, M., A. G., Marchesini, J., Riezebos, N., Vandaele, and G. M. D., Ganga. 2017. “The Application of Quick Response Manufacturing Practices in Brazil, Europe, and the USA: An Exploratory Study.” International Journal of Production Economics 193: 437–448. doi: 10.1016/j.ijpe.2017.08.006
-
(2017)
International Journal of Production Economics
, vol.193
, pp. 437-448
-
-
Godinho Filho, M.1
Marchesini, A.G.2
Riezebos, J.3
Vandaele, N.4
Ganga, G.M.D.5
-
55
-
-
70350568663
-
Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda
-
Gosling, J., and M. M., Naim. 2009. “Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–754. doi: 10.1016/j.ijpe.2009.07.002
-
(2009)
International Journal of Production Economics
, vol.122
, Issue.2
, pp. 741-754
-
-
Gosling, J.1
Naim, M.M.2
-
56
-
-
84872733124
-
Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains
-
Gosling, J., M., Naim, and D., Towill. 2013. “Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains.” Journal of Construction Engineering and Management 139 (1): 102–110. doi: 10.1061/(ASCE)CO.1943-7862.0000574
-
(2013)
Journal of Construction Engineering and Management
, vol.139
, Issue.1
, pp. 102-110
-
-
Gosling, J.1
Naim, M.2
Towill, D.3
-
57
-
-
44849113415
-
Development of a Template Design Support System
-
Las Vegas: American Society of Mechanical Engineers, and
-
Goto, N., T., Koga, S., Okamura, and K., Aoyama. 2007. “Development of a Template Design Support System.” In ASME, 2007. International Design Engineering Technical Conferences and Computers and Information in Engineering Conference, 537–546. Las Vegas: American Society of Mechanical Engineers.
-
(2007)
ASME, 2007. International Design Engineering Technical Conferences and Computers and Information in Engineering Conference
, pp. 537-546
-
-
Goto, N.1
Koga, T.2
Okamura, S.3
Aoyama, K.4
-
58
-
-
84900309792
-
Defining job Complexity for the Engineer to Order Environment
-
San Juan: ISERC, and
-
Grabenstetter, D. H., and J. M., Usher. 2013a. “Defining job Complexity for the Engineer to Order Environment.” In IIE Annual Conference and Expo, 2404–2413. San Juan: ISERC.
-
(2013)
IIE Annual Conference and Expo
, pp. 2404-2413
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
59
-
-
84885849174
-
Determining job Complexity in an Engineer to Order Environment for due Date Estimation Using a Proposed Framework
-
Grabenstetter, D. H., and J. M., Usher. 2013b. “Determining job Complexity in an Engineer to Order Environment for due Date Estimation Using a Proposed Framework.” International Journal of Production Research 51 (19): 5728–5740. doi: 10.1080/00207543.2013.787169
-
(2013)
International Journal of Production Research
, vol.51
, Issue.19
, pp. 5728-5740
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
60
-
-
84908201074
-
Developing due Dates in an Engineer-to-Order Engineering Environment
-
Grabenstetter, D. H., and J. M., Usher. 2014. “Developing due Dates in an Engineer-to-Order Engineering Environment.” International Journal of Production Research 52 (21): 6349–6361. doi: 10.1080/00207543.2014.940072
-
(2014)
International Journal of Production Research
, vol.52
, Issue.21
, pp. 6349-6361
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
61
-
-
84977111282
-
Sequencing Jobs in an Engineer-to-Order Engineering Environment
-
Grabenstetter, D. H., and J. M., Usher. 2015. “Sequencing Jobs in an Engineer-to-Order Engineering Environment.” Production & Manufacturing Research 3 (1): 201–217. doi: 10.1080/21693277.2015.1035461
-
(2015)
Production & Manufacturing Research
, vol.3
, Issue.1
, pp. 201-217
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
62
-
-
70350449071
-
Adaptable Design: Concepts, Methods, and Applications. Proceedings of the Institution of Mechanical Engineers
-
Gu, P., D., Xue, and A. Y. C., Nee. 2009. “Adaptable Design: Concepts, Methods, and Applications. Proceedings of the Institution of Mechanical Engineers.” Part B: Journal of Engineering Manufacture 223 (11): 1367–1387.
-
(2009)
Part B: Journal of Engineering Manufacture
, vol.223
, Issue.11
, pp. 1367-1387
-
-
Gu, P.1
Xue, D.2
Nee, A.Y.C.3
-
63
-
-
84929027178
-
An Integrated Engineering Change Management Process Model for a Project-Based Manufacturing
-
Han, J., S. H., Lee, and P., Nyamsuren. 2015. “An Integrated Engineering Change Management Process Model for a Project-Based Manufacturing.” International Journal of Computer Integrated Manufacturing 28 (7): 745–752. doi: 10.1080/0951192X.2014.924342
-
(2015)
International Journal of Computer Integrated Manufacturing
, vol.28
, Issue.7
, pp. 745-752
-
-
Han, J.1
Lee, S.H.2
Nyamsuren, P.3
-
64
-
-
84882988994
-
Application of Pull Concept-Based Lean Production System in the Ship Building Industry
-
Hassan, K., and H., Kajiwara. 2013. “Application of Pull Concept-Based Lean Production System in the Ship Building Industry.” Journal of Ship Production and Design 29 (3): 105–116. doi: 10.5957/JSPD.29.3.120021
-
(2013)
Journal of Ship Production and Design
, vol.29
, Issue.3
, pp. 105-116
-
-
Hassan, K.1
Kajiwara, H.2
-
65
-
-
0035307357
-
Due Date Setting with Supply Constraints in Systems Using MRP
-
Hegedus, M. G., and W. J., Hopp. 2001. “Due Date Setting with Supply Constraints in Systems Using MRP.” Computers & Industrial Engineering 39 (3–4): 293–305. doi: 10.1016/S0360-8352(01)00007-9
-
(2001)
Computers & Industrial Engineering
, vol.39
, Issue.3-4
, pp. 293-305
-
-
Hegedus, M.G.1
Hopp, W.J.2
-
66
-
-
0035919859
-
Mixed Model Assembly Alternatives for Low-Volume Manufacturing: The Case of the Aerospace Industry
-
Heike, G., M., Ramulu, E., Sorenson, P., Shanahan, and K., Moinzadeh. 2001. “Mixed Model Assembly Alternatives for Low-Volume Manufacturing: The Case of the Aerospace Industry.” International Journal of Production Economics 72 (2): 103–120. doi: 10.1016/S0925-5273(00)00089-X
-
(2001)
International Journal of Production Economics
, vol.72
, Issue.2
, pp. 103-120
-
-
Heike, G.1
Ramulu, M.2
Sorenson, E.3
Shanahan, P.4
Moinzadeh, K.5
-
67
-
-
0031632563
-
The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies
-
Hendry, L. C., B. G., Kingsman, and P., Cheung. 1998. “The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies.” Journal of Operations Management 16 (1): 63–75. doi: 10.1016/S0272-6963(97)00011-9
-
(1998)
Journal of Operations Management
, vol.16
, Issue.1
, pp. 63-75
-
-
Hendry, L.C.1
Kingsman, B.G.2
Cheung, P.3
-
68
-
-
38749152402
-
Investigating Implementation Issues for Workload Control (WLC): A Comparative Case Study Analysis
-
Hendry, L., M., Land, M., Stevenson, and G., Gaalman. 2008. “Investigating Implementation Issues for Workload Control (WLC): A Comparative Case Study Analysis.” International Journal of Production Economics 112 (1): 452–469. doi: 10.1016/j.ijpe.2007.05.012
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.1
, pp. 452-469
-
-
Hendry, L.1
Land, M.2
Stevenson, M.3
Gaalman, G.4
-
69
-
-
0034672925
-
Computer-aided Production Management Issues in the Engineer-to-Order Production of Complex Capital Goods Explored Using a Simulation Approach
-
Hicks, C., and P. M., Braiden. 2000. “Computer-aided Production Management Issues in the Engineer-to-Order Production of Complex Capital Goods Explored Using a Simulation Approach.” International Journal of Production Research 38 (18): 4783–4810. doi: 10.1080/00207540010001019
-
(2000)
International Journal of Production Research
, vol.38
, Issue.18
, pp. 4783-4810
-
-
Hicks, C.1
Braiden, P.M.2
-
70
-
-
67549121045
-
Product Life Cycle Management in Engineer-to-Order Industries
-
Hicks, C., and T., McGovern. 2009. “Product Life Cycle Management in Engineer-to-Order Industries.” International Journal of Technology Management 48 (2): 153–167. doi: 10.1504/IJTM.2009.024913
-
(2009)
International Journal of Technology Management
, vol.48
, Issue.2
, pp. 153-167
-
-
Hicks, C.1
McGovern, T.2
-
71
-
-
0033878455
-
Supply Chain Management: A Strategic Issue in Engineer to Order Manufacturing
-
Hicks, C., T., McGovern, and C. F., Earl. 2000. “Supply Chain Management: A Strategic Issue in Engineer to Order Manufacturing.” International Journal of Production Economics 65 (2): 179–190. doi: 10.1016/S0925-5273(99)00026-2
-
(2000)
International Journal of Production Economics
, vol.65
, Issue.2
, pp. 179-190
-
-
Hicks, C.1
McGovern, T.2
Earl, C.F.3
-
72
-
-
67549084647
-
Applying Different Control Approaches for Resources with High and low Utilisation: a Case Study of the Production of Complex Products with Stochastic Processing Times
-
Hicks, C., and P., Pongcharoen. 2009. “Applying Different Control Approaches for Resources with High and low Utilisation: a Case Study of the Production of Complex Products with Stochastic Processing Times.” International Journal of Technology Management 48 (2): 202–218. doi: 10.1504/IJTM.2009.024916
-
(2009)
International Journal of Technology Management
, vol.48
, Issue.2
, pp. 202-218
-
-
Hicks, C.1
Pongcharoen, P.2
-
74
-
-
58049198132
-
Engineer-to-order Approach to High Speed Bucket Elevator Design in a Small Enterprise
-
Jaskulski, A., 2008. “Engineer-to-order Approach to High Speed Bucket Elevator Design in a Small Enterprise.” Applied Engineering in Agriculture 24 (5): 545–557. doi: 10.13031/2013.25266
-
(2008)
Applied Engineering in Agriculture
, vol.24
, Issue.5
, pp. 545-557
-
-
Jaskulski, A.1
-
75
-
-
84992179865
-
Toward Efficient Merchant Shipbuilding Based on the Lean Production Methodology
-
Jiang, G., D., Feng, and W., Zhu. 2016. “Toward Efficient Merchant Shipbuilding Based on the Lean Production Methodology.” Journal of Ship Production and Design 32 (4): 245–257. doi: 10.5957/JSPD.32.4.150042
-
(2016)
Journal of Ship Production and Design
, vol.32
, Issue.4
, pp. 245-257
-
-
Jiang, G.1
Feng, D.2
Zhu, W.3
-
76
-
-
84925339631
-
Multiagent Based Open Source for Supply Chain Management Using JADE
-
Chennai: IEEE, and
-
John, R., and S., Balakrishnan. 2014. “Multiagent Based Open Source for Supply Chain Management Using JADE.” In Information Communication and Embedded Systems (ICICES), 2014 International Conference, 1–6. Chennai: IEEE.
-
(2014)
Information Communication and Embedded Systems (ICICES), 2014 International Conference
, pp. 1-6
-
-
John, R.1
Balakrishnan, S.2
-
77
-
-
84906258194
-
Supply Chain Configuration in Low Volume, High Customized Production Environment: Can Pre-Project Planning Stabilize Your Supply Chain?
-
Minneapolis: IEEE
-
Junge, G. H., 2014. “Supply Chain Configuration in Low Volume, High Customized Production Environment: Can Pre-Project Planning Stabilize Your Supply Chain?” In Collaboration Technologies and Systems (CTS), 2014 International Conference, 657–660. Minneapolis: IEEE.
-
(2014)
Collaboration Technologies and Systems (CTS), 2014 International Conference
, pp. 657-660
-
-
Junge, G.H.1
-
78
-
-
84900033308
-
-
Total process simulation shipbuilding: Simulation aided hull assembly planning 10th Int. Workshop on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, HMS 2008, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2008, 49–54
-
Kaarsemaker, J., and U., Nienhuis. 2008. Total process simulation in shipbuilding: Simulation aided hull assembly planning 10th Int. Workshop on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, HMS 2008, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2008, 49–54. https://www.scopus.com/inward/record.uri?eid = 2-s2.0-.
-
(2008)
-
-
Kaarsemaker, J.1
Nienhuis, U.2
-
79
-
-
84883778746
-
Active Discrete Event Simulation Algorithm Using Probability Distribution of Shipbuilding Process
-
Suwon: IEEE, and
-
Kang, S. K., H., Jung, I. H., Im, K. Y., Chung, and J. H., Lee. 2013. “Active Discrete Event Simulation Algorithm Using Probability Distribution of Shipbuilding Process.” In Information Science and Applications (ICISA), 2013 International Conference, 1–3. Suwon: IEEE.
-
(2013)
Information Science and Applications (ICISA), 2013 International Conference
, pp. 1-3
-
-
Kang, S.K.1
Jung, H.2
Im, I.H.3
Chung, K.Y.4
Lee, J.H.5
-
80
-
-
84883715110
-
Initial Plan of Shipbuilding Capacity Based on the Stochastic Discrete Event Simulation
-
Anchorage: International Society of Offshore and Polar Engineers, and
-
Kim, K., J., Lee, and H., Hwang. 2013. “Initial Plan of Shipbuilding Capacity Based on the Stochastic Discrete Event Simulation.” In The Twenty-Third International Offshore and Polar Engineering Conference, 1–8. Anchorage: International Society of Offshore and Polar Engineers.
-
(2013)
The Twenty-Third International Offshore and Polar Engineering Conference
, pp. 1-8
-
-
Kim, K.1
Lee, J.2
Hwang, H.3
-
81
-
-
85009862742
-
Responding to Customer Enquiries in Make-to-Order Companies: Problems and Solutions
-
Kingsman, B., L., Hendry, A., Mercer, and A. D., Souza. 1996. “Responding to Customer Enquiries in Make-to-Order Companies: Problems and Solutions.” Production 6 (2): 195–207. doi: 10.1590/S0103-65131996000200004
-
(1996)
Production
, vol.6
, Issue.2
, pp. 195-207
-
-
Kingsman, B.1
Hendry, L.2
Mercer, A.3
Souza, A.D.4
-
82
-
-
0027628217
-
Integrating Marketing and Production Planning in Make-to-Order Companies
-
Kingsman, B., L., Worden, L., Hendry, A., Mercer, and E., Wilson. 1993. “Integrating Marketing and Production Planning in Make-to-Order Companies.” International Journal of Production Economics 30–31: 53–66. doi: 10.1016/0925-5273(93)90081-U
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 53-66
-
-
Kingsman, B.1
Worden, L.2
Hendry, L.3
Mercer, A.4
Wilson, E.5
-
83
-
-
84952041517
-
Implementing Lean in Engineer-to-Order Industry: a Case Study
-
Cham: Springer, and
-
Kjersem, K., L. L., Halse, P., Kiekebos, and J., Emblemsvåg. 2015. “Implementing Lean in Engineer-to-Order Industry: a Case Study.” In IFIP International Conference on Advances in Production Management Systems, 248–255. Cham: Springer.
-
(2015)
IFIP International Conference on Advances in Production Management Systems
, pp. 248-255
-
-
Kjersem, K.1
Halse, L.L.2
Kiekebos, P.3
Emblemsvåg, J.4
-
84
-
-
0036672601
-
Lean Production in the Japanese Shipbuilding Industry?
-
Koenig, P. C., H., Narita, and K., Baba. 2002. “Lean Production in the Japanese Shipbuilding Industry?” Journal of Ship Production 18 (3): 167–174.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.3
, pp. 167-174
-
-
Koenig, P.C.1
Narita, H.2
Baba, K.3
-
85
-
-
0034516883
-
Integration of Assembly and Fabrication for Make-to-Order Production
-
Kolisch, R., 2000. “Integration of Assembly and Fabrication for Make-to-Order Production.” International Journal of Production Economics 68 (3): 287–306. doi: 10.1016/S0925-5273(99)00011-0
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.3
, pp. 287-306
-
-
Kolisch, R.1
-
86
-
-
0002984011
-
Coordinating Marketing and Manufacturing in ETO Companies
-
Konijnendijk, P. A., 1994. “Coordinating Marketing and Manufacturing in ETO Companies.” International Journal of Production Economics 37 (1): 19–26. doi: 10.1016/0925-5273(94)90004-3
-
(1994)
International Journal of Production Economics
, vol.37
, Issue.1
, pp. 19-26
-
-
Konijnendijk, P.A.1
-
87
-
-
19944400423
-
Responding to Schedule Changes in Build-to-Order Supply Chains
-
Krajewski, L., J. C., Wei, and L. L., Tang. 2005. “Responding to Schedule Changes in Build-to-Order Supply Chains.” Journal of Operations Management 23 (5): 452–469. doi: 10.1016/j.jom.2004.10.006
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 452-469
-
-
Krajewski, L.1
Wei, J.C.2
Tang, L.L.3
-
88
-
-
84962034432
-
Utilizing Product Configuration Systems for Supporting the Critical Parts of the Engineering Processes
-
Kristjánsdóttir, K., S., Shafiee, and L., Hvam. 2015. “Utilizing Product Configuration Systems for Supporting the Critical Parts of the Engineering Processes.” In IEEM 8: 1777–1781.
-
(2015)
In IEEM
, vol.8
, pp. 1777-1781
-
-
Kristjánsdóttir, K.1
Shafiee, S.2
Hvam, L.3
-
89
-
-
85034046176
-
How to Identify Possible Applications of Product Configuration Systems in Engineer-to-Order Companies
-
Kristjansdottir, K., S., Shafiee, and L., Hvam. 2017. “How to Identify Possible Applications of Product Configuration Systems in Engineer-to-Order Companies.” International Journal of Industrial Engineering and Management 8 (3): 157–165.
-
(2017)
International Journal of Industrial Engineering and Management
, vol.8
, Issue.3
, pp. 157-165
-
-
Kristjansdottir, K.1
Shafiee, S.2
Hvam, L.3
-
90
-
-
79955162429
-
Production Planning for a Supply Chain in a Low-Volume and Make-to-Order Manufacturing Environment
-
Küttner, R., 2009. “Production Planning for a Supply Chain in a Low-Volume and Make-to-Order Manufacturing Environment.” Estonian Journal of Engineering 15 (1): 48–61. doi: 10.3176/eng.2009.1.05
-
(2009)
Estonian Journal of Engineering
, vol.15
, Issue.1
, pp. 48-61
-
-
Küttner, R.1
-
91
-
-
79960964668
-
Multistage Optimisation Strategy For Solving Production Planning Problems
-
Küttner, R., and J., Majak. 2009. “Multistage Optimisation Strategy For Solving Production Planning Problems.” IFAC Proceedings Volumes 42 (2): 332–337. doi: 10.3182/20090506-3-SF-4003.00061
-
(2009)
IFAC Proceedings Volumes
, vol.42
, Issue.2
, pp. 332-337
-
-
Küttner, R.1
Majak, J.2
-
92
-
-
70349649481
-
Production Planning and Control in SMEs: Time for Change
-
Land, M. J., and G. J., Gaalman. 2009. “Production Planning and Control in SMEs: Time for Change.” Production Planning and Control 20 (7): 548–558. doi: 10.1080/09537280903034230
-
(2009)
Production Planning and Control
, vol.20
, Issue.7
, pp. 548-558
-
-
Land, M.J.1
Gaalman, G.J.2
-
95
-
-
84897623145
-
Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards
-
Lee, D. K., Y., Kim, I. H., Hwang, D. K., Oh, and J. G., Shin. 2014. “Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards.” The International Journal of Advanced Manufacturing Technology 71 (1–4): 621–633. doi: 10.1007/s00170-013-5498-4
-
(2014)
The International Journal of Advanced Manufacturing Technology
, vol.71
, Issue.1-4
, pp. 621-633
-
-
Lee, D.K.1
Kim, Y.2
Hwang, I.H.3
Oh, D.K.4
Shin, J.G.5
-
96
-
-
38049144587
-
A Statistical Analysis of Engineering Project Risks in the Korean Shipbuilding Industry
-
Lee, E., J. G., Shin, and Y., Park. 2007. “A Statistical Analysis of Engineering Project Risks in the Korean Shipbuilding Industry.” Journal of Ship Production 23 (4): 223–230.
-
(2007)
Journal of Ship Production
, vol.23
, Issue.4
, pp. 223-230
-
-
Lee, E.1
Shin, J.G.2
Park, Y.3
-
97
-
-
85028586160
-
Implementation of Hybrid Kanban-CONWIP System: a Case Study
-
Leonardo, D. G., B., Sereno, D. S. A. D., Silva, M., Sampaio, A. A., Massote, and J. C., Simões. 2017. “Implementation of Hybrid Kanban-CONWIP System: a Case Study.” Journal of Manufacturing Technology Management 28 (6): 714–736. doi: 10.1108/JMTM-03-2016-0043
-
(2017)
Journal of Manufacturing Technology Management
, vol.28
, Issue.6
, pp. 714-736
-
-
Leonardo, D.G.1
Sereno, B.2
Silva, D.S.A.D.3
Sampaio, M.4
Massote, A.A.5
Simões, J.C.6
-
98
-
-
84939256936
-
A two-Stage Model of Adaptable Product Platform for Engineering-to-Order Configuration Design
-
Levandowski, C. E., J. R., Jiao, and H., Johannesson. 2015. “A two-Stage Model of Adaptable Product Platform for Engineering-to-Order Configuration Design.” Journal of Engineering Design 26 (7–9): 220–235. doi: 10.1080/09544828.2015.1021305
-
(2015)
Journal of Engineering Design
, vol.26
, Issue.7-9
, pp. 220-235
-
-
Levandowski, C.E.1
Jiao, J.R.2
Johannesson, H.3
-
99
-
-
84907381772
-
Set-based Development Using an Integrated Product and Manufacturing System Platform
-
Levandowski, C., M. T., Michaelis, and H., Johannesson. 2014. “Set-based Development Using an Integrated Product and Manufacturing System Platform.” Concurrent Engineering 22 (3): 234–252. doi: 10.1177/1063293X14537654
-
(2014)
Concurrent Engineering
, vol.22
, Issue.3
, pp. 234-252
-
-
Levandowski, C.1
Michaelis, M.T.2
Johannesson, H.3
-
100
-
-
65249188702
-
Performance Evaluation in Shipbuilding Based on Earned Value Theory
-
Li, R., Liu, Y.-J., Zhang, F., (2009) Performance Evaluation in Shipbuilding Based on Earned Value Theory. Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University, 30 (3), pp. 244–249.
-
(2009)
Harbin Gongcheng Daxue Xuebao/Journal of Harbin Engineering University
, vol.30
, Issue.3
, pp. 244-249
-
-
Li, R.1
Liu, Y.-J.2
Zhang, F.3
-
101
-
-
0036671757
-
What is Lean Ship Construction and Repair?
-
Liker, J. K., and T., Lamb. 2002. “What is Lean Ship Construction and Repair?” Journal of Ship Production 18 (3): 121–142.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.3
, pp. 121-142
-
-
Liker, J.K.1
Lamb, T.2
-
102
-
-
0347999551
-
Integrated Planning and Scheduling in the Engineer-to-Order Sector
-
Little, D., R., Rollins, M., Peck, and J. K., Porter. 2000. “Integrated Planning and Scheduling in the Engineer-to-Order Sector.” International Journal of Computer Integrated Manufacturing 13 (6): 545–554. doi: 10.1080/09511920050195977
-
(2000)
International Journal of Computer Integrated Manufacturing
, vol.13
, Issue.6
, pp. 545-554
-
-
Little, D.1
Rollins, R.2
Peck, M.3
Porter, J.K.4
-
103
-
-
80052147949
-
Aggregate Production Planning for Shipbuilding with Variation-Inventory Trade-Offs
-
Liu, Z., D. K. H., Chua, and K. W., Yeoh. 2011. “Aggregate Production Planning for Shipbuilding with Variation-Inventory Trade-Offs.” International Journal of Production Research 49 (20): 6249–6272. doi: 10.1080/00207543.2010.527388
-
(2011)
International Journal of Production Research
, vol.49
, Issue.20
, pp. 6249-6272
-
-
Liu, Z.1
Chua, D.K.H.2
Yeoh, K.W.3
-
104
-
-
33749424158
-
The Relationship Between Proximate Supply and Build-to-Order Capability
-
Lyons, A., A., Coronado, and Z., Michaelides. 2006. “The Relationship Between Proximate Supply and Build-to-Order Capability.” Industrial Management & Data Systems 106 (8): 1095–1111. doi: 10.1108/02635570610710773
-
(2006)
Industrial Management & Data Systems
, vol.106
, Issue.8
, pp. 1095-1111
-
-
Lyons, A.1
Coronado, A.2
Michaelides, Z.3
-
105
-
-
84982801357
-
A Review of two-Sided Assembly Line Balancing Problem
-
Make, M. R. A., M. F. F. A., Rashid, and M. M., Razali. 2017. “A Review of two-Sided Assembly Line Balancing Problem.” The International Journal of Advanced Manufacturing Technology 89 (5–8): 1743–1763. doi: 10.1007/s00170-016-9158-3
-
(2017)
The International Journal of Advanced Manufacturing Technology
, vol.89
, Issue.5-8
, pp. 1743-1763
-
-
Make, M.R.A.1
Rashid, M.F.F.A.2
Razali, M.M.3
-
106
-
-
84878214850
-
The Main Problems in the Product Development Process by Large-Sized Companies of the Brazilian Agricultural Machines and Implements Sector
-
London: Springer, and
-
Mano, A. P., J. M. S., Simões, L. S., Lima, J. C., de Toledo, and S. L., da Silva. 2007. “The Main Problems in the Product Development Process by Large-Sized Companies of the Brazilian Agricultural Machines and Implements Sector.” In Complex Systems Concurrent Engineering, 749–755. London: Springer.
-
(2007)
Complex Systems Concurrent Engineering
, pp. 749-755
-
-
Mano, A.P.1
Simões, J.M.S.2
Lima, L.S.3
de Toledo, J.C.4
da Silva, S.L.5
-
107
-
-
84953319524
-
Makespan Estimation of a Production Process Affected by Uncertainty: Application on MTO Production of NC Machine Tools
-
Manzini, M., and M., Urgo. 2015. “Makespan Estimation of a Production Process Affected by Uncertainty: Application on MTO Production of NC Machine Tools.” Journal of Manufacturing Systems 37 (P1): 1–16. doi: 10.1016/j.jmsy.2015.10.001
-
(2015)
Journal of Manufacturing Systems
, vol.37
, Issue.P1
, pp. 1-16
-
-
Manzini, M.1
Urgo, M.2
-
108
-
-
85034807417
-
A Risk Based Approach to Support the Supplying of Components in an MTO Assembly Process
-
Manzini, M., and M., Urgo. 2018. “A Risk Based Approach to Support the Supplying of Components in an MTO Assembly Process.” Journal of Manufacturing Systems 46: 67–78. doi: 10.1016/j.jmsy.2017.11.006
-
(2018)
Journal of Manufacturing Systems
, vol.46
, pp. 67-78
-
-
Manzini, M.1
Urgo, M.2
-
109
-
-
0042343670
-
Project Scheduling Approach to Production Planning
-
Márkus, A., J., Váncza, T., Kis, and A., Kovács. 2003. “Project Scheduling Approach to Production Planning.” CIRP Annals-Manufacturing Technology 52 (1): 359–362. doi: 10.1016/S0007-8506(07)60601-5
-
(2003)
CIRP Annals-Manufacturing Technology
, vol.52
, Issue.1
, pp. 359-362
-
-
Márkus, A.1
Váncza, J.2
Kis, T.3
Kovács, A.4
-
110
-
-
85029811244
-
-
Improving product configurability ETO companies. DS 87-3 Proceedings of the 21st International Conference on Engineering Design (ICED 17) 3: Product, Services and Systems Design, Vancouver, Canada, 21–25 August
-
Markworth Johnsen, S. H., K., Kristjansdottir, and L., Hvam. 2017. Improving product configurability in ETO companies. In DS 87-3 Proceedings of the 21st International Conference on Engineering Design (ICED 17) Vol. 3: Product, Services and Systems Design, Vancouver, Canada, 21–25 August.
-
(2017)
-
-
Markworth Johnsen, S.H.1
Kristjansdottir, K.2
Hvam, L.3
-
111
-
-
85031825706
-
Workforce Management in Manual Assembly Lines of Large Products: a Case Study
-
Martignago, M., O., Battaïa, and D., Battini. 2017. “Workforce Management in Manual Assembly Lines of Large Products: a Case Study.” IFAC-PapersOnLine 50: 6906–6911. doi: 10.1016/j.ifacol.2017.08.1215
-
(2017)
IFAC-PapersOnLine
, vol.50
, pp. 6906-6911
-
-
Martignago, M.1
Battaïa, O.2
Battini, D.3
-
112
-
-
0031189509
-
On Performance Modeling of Project-Oriented Production
-
Martinez, E. C., D., Duje, and G. A., Perez. 1997. “On Performance Modeling of Project-Oriented Production.” Computers & Industrial Engineering 32 (3): 509–527. doi: 10.1016/S0360-8352(97)00005-3
-
(1997)
Computers & Industrial Engineering
, vol.32
, Issue.3
, pp. 509-527
-
-
Martinez, E.C.1
Duje, D.2
Perez, G.A.3
-
114
-
-
68549083851
-
Design of Lean Manufacturing Support Systems in Make-to-Order Production
-
Trans Tech Publications
-
Matt, D. T., 2009. “Design of Lean Manufacturing Support Systems in Make-to-Order Production.” Key Engineering Materials 410–411: 151–158. Trans Tech Publications.
-
(2009)
Key Engineering Materials
, vol.410-411
, pp. 151-158
-
-
Matt, D.T.1
-
115
-
-
84939802796
-
On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO)
-
Matt, D. T., P., Dallasega, and E., Rauch. 2015. “On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO).” Procedia CIRP 33: 197–202. doi: 10.1016/j.procir.2015.06.036
-
(2015)
Procedia CIRP
, vol.33
, pp. 197-202
-
-
Matt, D.T.1
Dallasega, P.2
Rauch, E.3
-
116
-
-
84964620719
-
Business and Information Management Architectures for Delivering Product Lifecycle Management (PLM) in Engineer To Order (ETO) Products
-
Bremen: RINA Conference Proceedings, and,. In
-
McKendry, D. A., R. I., Whitfield, and A. H. B., Duffy. 2015. “Business and Information Management Architectures for Delivering Product Lifecycle Management (PLM) in Engineer To Order (ETO) Products.” In International Conference in Compuer Applications for Shipbuilding. Bremen: RINA Conference Proceedings.
-
(2015)
International Conference in Compuer Applications for Shipbuilding
-
-
McKendry, D.A.1
Whitfield, R.I.2
Duffy, A.H.B.3
-
117
-
-
85028408177
-
-
August,Key Findings to Support the Development of a Framework for the Implementation of Product Lifecycle Management Engineer to Order Products. Advances Manufacturing Technology XXXI: Proceedings of the 15th International Conference on Manufacturing Research, Incorporating the 32nd National Conference on Manufacturing Research, September 5–7, 2017, University of Greenwich, UK, 6, 464. IOS Press
-
McKendry, D. A., R. I., Whitfield, and A. H. B., Duffy. 2017, August. Key Findings to Support the Development of a Framework for the Implementation of Product Lifecycle Management in Engineer to Order Products. In Advances in Manufacturing Technology XXXI: Proceedings of the 15th International Conference on Manufacturing Research, Incorporating the 32nd National Conference on Manufacturing Research, September 5–7, 2017, University of Greenwich, UK, Vol. 6, 464. IOS Press.
-
(2017)
-
-
McKendry, D.A.1
Whitfield, R.I.2
Duffy, A.H.B.3
-
118
-
-
84872119006
-
The Optimal Organization Structure Design Problem in Make-to-Order Enterprises
-
Mena, J. A., 2012. “The Optimal Organization Structure Design Problem in Make-to-Order Enterprises.” International Journal of Industrial Engineering 19 (4): 181–192.
-
(2012)
International Journal of Industrial Engineering
, vol.19
, Issue.4
, pp. 181-192
-
-
Mena, J.A.1
-
119
-
-
0035501151
-
Understanding and Managing Risks in Large Engineering Projects
-
Miller, R., and D., Lessard. 2001. “Understanding and Managing Risks in Large Engineering Projects.” International Journal of Project Management 19 (8): 437–443. doi: 10.1016/S0263-7863(01)00045-X
-
(2001)
International Journal of Project Management
, vol.19
, Issue.8
, pp. 437-443
-
-
Miller, R.1
Lessard, D.2
-
120
-
-
84903849841
-
An Integrated Method of Hierarchical Planning and “Pull-way” Production Control for Lean Shipbuilding
-
Hong Kong: IEEE, and, December
-
Mingdi, Z., and S., Houfang. 2012, December. “An Integrated Method of Hierarchical Planning and “Pull-way” Production Control for Lean Shipbuilding.” In Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference, 2150–2154. Hong Kong: IEEE.
-
(2012)
Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference
, pp. 2150-2154
-
-
Mingdi, Z.1
Houfang, S.2
-
121
-
-
34547546183
-
Virtual Enterprise Brokerage: a Structure-Driven Strategy to Achieve Build to Order Supply Chains
-
Molina, A., M., Velandia, and N., Galeano. 2007. “Virtual Enterprise Brokerage: a Structure-Driven Strategy to Achieve Build to Order Supply Chains.” International Journal of Production Research 45 (17): 3853–3880. doi: 10.1080/00207540600818161
-
(2007)
International Journal of Production Research
, vol.45
, Issue.17
, pp. 3853-3880
-
-
Molina, A.1
Velandia, M.2
Galeano, N.3
-
122
-
-
85043361743
-
Towards Facades as Make-To-Order Products–the Role of Knowledge-Based-Engineering to Support Design
-
Montali, J., M., Overend, P. M., Pelken, and S., Michele. 2017. “Towards Facades as Make-To-Order Products–the Role of Knowledge-Based-Engineering to Support Design.” Journal of Facade Design and Engineering 5 (2): 101–112.
-
(2017)
Journal of Facade Design and Engineering
, vol.5
, Issue.2
, pp. 101-112
-
-
Montali, J.1
Overend, M.2
Pelken, P.M.3
Michele, S.4
-
123
-
-
24344485381
-
Factors Affecting Ship Design and Construction Lead Time and Cost
-
Moyst, H., and B., Das. 2005. “Factors Affecting Ship Design and Construction Lead Time and Cost.” Journal of Ship Production 21 (3): 186–194.
-
(2005)
Journal of Ship Production
, vol.21
, Issue.3
, pp. 186-194
-
-
Moyst, H.1
Das, B.2
-
124
-
-
84884989073
-
Reconfigurable Handling Systems as an Enabler for Large Components in Mass Customized Production
-
Müller, R., M., Esser, and M., Vette. 2013. “Reconfigurable Handling Systems as an Enabler for Large Components in Mass Customized Production.” Journal of Intelligent Manufacturing 24 (5): 977–990. doi: 10.1007/s10845-012-0624-y
-
(2013)
Journal of Intelligent Manufacturing
, vol.24
, Issue.5
, pp. 977-990
-
-
Müller, R.1
Esser, M.2
Vette, M.3
-
125
-
-
0026106979
-
Project Risk Assessment Using the Analytic Hierarchy Process
-
Mustafa, M. A., and J. F., Al-Bahar. 1991. “Project Risk Assessment Using the Analytic Hierarchy Process.” IEEE Transactions on Engineering Management 38 (1): 46–52. doi: 10.1109/17.65759
-
(1991)
IEEE Transactions on Engineering Management
, vol.38
, Issue.1
, pp. 46-52
-
-
Mustafa, M.A.1
Al-Bahar, J.F.2
-
126
-
-
84901719363
-
Research on Complex Product WBS Process Simulation and Prediction
-
Nan, R., H., Yan-Xin, and H., Bing-Jie. 2013. “Research on Complex Product WBS Process Simulation and Prediction.” Information Technology Journal 12 (16): 3880–3884. doi: 10.3923/itj.2013.3880.3884
-
(2013)
Information Technology Journal
, vol.12
, Issue.16
, pp. 3880-3884
-
-
Nan, R.1
Yan-Xin, H.2
Bing-Jie, H.3
-
127
-
-
68949219559
-
Worker Allocation in Make-to-Order Assembly Cells
-
Niemi, E., 2009. “Worker Allocation in Make-to-Order Assembly Cells.” Robotics and Computer-Integrated Manufacturing 25 (6): 932–936. doi: 10.1016/j.rcim.2009.04.008
-
(2009)
Robotics and Computer-Integrated Manufacturing
, vol.25
, Issue.6
, pp. 932-936
-
-
Niemi, E.1
-
128
-
-
34249652389
-
An Ontology-Based Approach to Support Decision-Making for the Design of ETO (Engineer-To-Order) Products
-
Pandit, A., and Y., Zhu. 2007. “An Ontology-Based Approach to Support Decision-Making for the Design of ETO (Engineer-To-Order) Products.” Automation in Construction 16 (6): 759–770. doi: 10.1016/j.autcon.2007.02.003
-
(2007)
Automation in Construction
, vol.16
, Issue.6
, pp. 759-770
-
-
Pandit, A.1
Zhu, Y.2
-
129
-
-
0033736797
-
A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System Under due Date Constraints
-
Park, M. W., and Y. D., Kim. 2000. “A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System Under due Date Constraints.” European Journal of Operational Research 123 (3): 504–518. doi: 10.1016/S0377-2217(99)00108-3
-
(2000)
European Journal of Operational Research
, vol.123
, Issue.3
, pp. 504-518
-
-
Park, M.W.1
Kim, Y.D.2
-
130
-
-
33947672314
-
Assembly Block Storage Location Assignment at a Shipyard: a Case of Hyundai Heavy Industries
-
Park, C., J., Seo, J., Kim, S., Lee, T. H., Baek, and S. K., Min. 2007. “Assembly Block Storage Location Assignment at a Shipyard: a Case of Hyundai Heavy Industries.” Production Planning and Control 18 (3): 180–189. doi: 10.1080/09537280601009039
-
(2007)
Production Planning and Control
, vol.18
, Issue.3
, pp. 180-189
-
-
Park, C.1
Seo, J.2
Kim, J.3
Lee, S.4
Baek, T.H.5
Min, S.K.6
-
131
-
-
9444251028
-
An Integrated Reference Model for Production Planning and Control in SMEs
-
Persona, A., A., Regattieri, and P., Romano. 2004. “An Integrated Reference Model for Production Planning and Control in SMEs.” Journal of Manufacturing Technology Management 15 (7): 626–640. doi: 10.1108/17410380410555871
-
(2004)
Journal of Manufacturing Technology Management
, vol.15
, Issue.7
, pp. 626-640
-
-
Persona, A.1
Regattieri, A.2
Romano, P.3
-
133
-
-
0037063279
-
Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products
-
Pongcharoen, P., C., Hicks, P. M., Braiden, and D. J., Stewardson. 2002. “Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products.” International Journal of Production Economics 78 (3): 311–322. doi: 10.1016/S0925-5273(02)00104-4
-
(2002)
International Journal of Production Economics
, vol.78
, Issue.3
, pp. 311-322
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
Stewardson, D.J.4
-
135
-
-
84904460379
-
A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers
-
Powell, D., J. O., Strandhagen, I., Tommelein, G., Ballard, and M., Rossi. 2014. “A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers.” Procedia CIRP 17: 571–576. doi: 10.1016/j.procir.2014.01.137
-
(2014)
Procedia CIRP
, vol.17
, pp. 571-576
-
-
Powell, D.1
Strandhagen, J.O.2
Tommelein, I.3
Ballard, G.4
Rossi, M.5
-
136
-
-
0041467637
-
Resource-constrained Shop-Level Scheduling in a Shipyard
-
Prasad, V. R., M., Graul, P., Benjamin, P. D., Cahill, and R., Mayer. 2003. “Resource-constrained Shop-Level Scheduling in a Shipyard.” Journal of Ship Production 19 (2): 65–75.
-
(2003)
Journal of Ship Production
, vol.19
, Issue.2
, pp. 65-75
-
-
Prasad, V.R.1
Graul, M.2
Benjamin, P.3
Cahill, P.D.4
Mayer, R.5
-
137
-
-
84970714737
-
Working top-Down: Cost Estimating Before Development Begins. Proceedings of the Institution of Mechanical Engineers
-
Pugh, P. G., 1992. “Working top-Down: Cost Estimating Before Development Begins. Proceedings of the Institution of Mechanical Engineers.” Part G: Journal of Aerospace Engineering 206 (2): 143–151.
-
(1992)
Part G: Journal of Aerospace Engineering
, vol.206
, Issue.2
, pp. 143-151
-
-
Pugh, P.G.1
-
138
-
-
85029824711
-
Transforming ETO Businesses with Enhanced PLM Capabilities
-
Pulkkinen, A., S. P., Leino, and J., Papinniemi. 2017. “Transforming ETO Businesses with Enhanced PLM Capabilities.” Procedia Manufacturing 11: 1642–1650. doi: 10.1016/j.promfg.2017.07.315
-
(2017)
Procedia Manufacturing
, vol.11
, pp. 1642-1650
-
-
Pulkkinen, A.1
Leino, S.P.2
Papinniemi, J.3
-
139
-
-
84960155448
-
Multi-objective Mixed Integer Programming Approach for Facility Layout Design by Considering Closeness Ratings, Material Handling, and Re-Layout Cost
-
Purnomo, M. R. A., and Y. S., Wiwoho. 2016. “Multi-objective Mixed Integer Programming Approach for Facility Layout Design by Considering Closeness Ratings, Material Handling, and Re-Layout Cost.” IOP Conference Series: Materials Science and Engineering, Vol. 105, no. 1, 012045 105 (1): 012045. doi: 10.1088/1757-899X/105/1/012045
-
(2016)
IOP Conference Series: Materials Science and Engineering, Vol. 105, no. 1, 012045
, vol.105
, Issue.1
, pp. 012045
-
-
Purnomo, M.R.A.1
Wiwoho, Y.S.2
-
140
-
-
84937953710
-
Facility Layout Design On The Agricultural Machinery Industry
-
Honkg Kong: IMECS, and,. In
-
Putri, N.T., P., Fithri, and M., Taufik. 2015. “Facility Layout Design On The Agricultural Machinery Industry.” In Proceedings of the International MultiConference of Engineers and Computer Scientists (Vol. 2). Honkg Kong: IMECS.
-
(2015)
Proceedings of the International MultiConference of Engineers and Computer Scientists (Vol. 2)
-
-
Putri, N.T.1
Fithri, P.2
Taufik, M.3
-
141
-
-
84986059467
-
The Need for a New Product Development Framework for Engineer-to-Order Products
-
Rahman Abdul Rahim, A., and M., Shariff Nabi Baksh. 2003. “The Need for a New Product Development Framework for Engineer-to-Order Products.” European Journal of Innovation Management 6 (3): 182–196. doi: 10.1108/14601060310486253
-
(2003)
European Journal of Innovation Management
, vol.6
, Issue.3
, pp. 182-196
-
-
Rahman Abdul Rahim, A.1
Shariff Nabi Baksh, M.2
-
142
-
-
0032715081
-
Tools and Techniques for Decomposing and Managing Complex Design Projects
-
Rogers, J. L., 1999. “Tools and Techniques for Decomposing and Managing Complex Design Projects.” Journal of Aircraft 36 (1): 266–274. doi: 10.2514/2.2434
-
(1999)
Journal of Aircraft
, vol.36
, Issue.1
, pp. 266-274
-
-
Rogers, J.L.1
-
143
-
-
18844387410
-
Integer Programming Approach to Production Scheduling for Make-to-Order Manufacturing
-
Sawik, T., 2005. “Integer Programming Approach to Production Scheduling for Make-to-Order Manufacturing.” Mathematical and Computer Modelling 41 (1): 99–118. doi: 10.1016/j.mcm.2003.10.053
-
(2005)
Mathematical and Computer Modelling
, vol.41
, Issue.1
, pp. 99-118
-
-
Sawik, T.1
-
144
-
-
30844458381
-
Hierarchical Approach to Production Scheduling in Make-to-Order Assembly
-
Sawik, T., 2006. “Hierarchical Approach to Production Scheduling in Make-to-Order Assembly.” International Journal of Production Research 44 (4): 801–830. doi: 10.1080/00207540500340969
-
(2006)
International Journal of Production Research
, vol.44
, Issue.4
, pp. 801-830
-
-
Sawik, T.1
-
145
-
-
84954468605
-
How to Analyze and Quantify Similarities Between Configured Engineer-to-Order Products by Comparing the Highlighted Features Utilizing the Configuration System Abilities
-
Vienna: University of Helsinki, and
-
Shafiee, S., L., Hvam, and K., Kristjansdottir. 2015. “How to Analyze and Quantify Similarities Between Configured Engineer-to-Order Products by Comparing the Highlighted Features Utilizing the Configuration System Abilities.” In 17th International Configuration Workshop, 139–145. Vienna: University of Helsinki.
-
(2015)
17th International Configuration Workshop
, pp. 139-145
-
-
Shafiee, S.1
Hvam, L.2
Kristjansdottir, K.3
-
146
-
-
85034013934
-
Automatic Identification of Similarities Across Products to Improve the Configuration Process in ETO Companies
-
Shafiee, S., K., Kristjansdottir, and L., Hvam. 2017. “Automatic Identification of Similarities Across Products to Improve the Configuration Process in ETO Companies.” International Journal of Industrial Engineering and Management 8 (3): 167–176.
-
(2017)
International Journal of Industrial Engineering and Management
, vol.8
, Issue.3
, pp. 167-176
-
-
Shafiee, S.1
Kristjansdottir, K.2
Hvam, L.3
-
147
-
-
84866075196
-
A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects
-
Sharon, A., and D., Dori. 2012. “A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects.” IFAC Proceedings Volumes 45 (6): 1083–1088. doi: 10.3182/20120523-3-RO-2023.00255
-
(2012)
IFAC Proceedings Volumes
, vol.45
, Issue.6
, pp. 1083-1088
-
-
Sharon, A.1
Dori, D.2
-
148
-
-
85038936122
-
-
July,Design of an Integrated Production Planning System Framework Based on Simulation Using a Production Information Model. The 27th International Ocean and Polar Engineering Conference. International Society of Offshore and Polar Engineers
-
Shen, H., S., Nam, S., Ju, S., Sung, J. G., Shin, and J. H., Nam. 2017, July. Design of an Integrated Production Planning System Framework Based on Simulation Using a Production Information Model. In The 27th International Ocean and Polar Engineering Conference. International Society of Offshore and Polar Engineers.
-
(2017)
-
-
Shen, H.1
Nam, S.2
Ju, S.3
Sung, S.4
Shin, J.G.5
Nam, J.H.6
-
149
-
-
0031371730
-
Productivity Improvements for a Small “Made-to-Order” Manufacturing Environment
-
Shing Ong, N., 1997. “Productivity Improvements for a Small “Made-to-Order” Manufacturing Environment.” Industrial Management & Data Systems 97 (7): 251–258. doi: 10.1108/02635579710191662
-
(1997)
Industrial Management & Data Systems
, vol.97
, Issue.7
, pp. 251-258
-
-
Shing Ong, N.1
-
150
-
-
84906924240
-
Designing an Engineer-to-Order Performance Measurement System: a Case Study
-
September,Berlin, Heidelberg: Springer, and
-
Sjøbakk, B., and O., Bakås. 2014, September. “Designing an Engineer-to-Order Performance Measurement System: a Case Study.” In IFIP International Conference on Advances in Production Management Systems, 473–480. Berlin, Heidelberg: Springer.
-
(2014)
IFIP International Conference on Advances in Production Management Systems
, pp. 473-480
-
-
Sjøbakk, B.1
Bakås, O.2
-
151
-
-
84938945527
-
Designing a Performance Measurement System to Support Materials Management in Engineer-to-Order: a Case Study
-
Sjøbakk, B., O., Bakås, O., Bondarenko, and T., Kamran. 2015. “Designing a Performance Measurement System to Support Materials Management in Engineer-to-Order: a Case Study.” Advances in Manufacturing 3 (2): 111–122. doi: 10.1007/s40436-015-0109-2
-
(2015)
Advances in Manufacturing
, vol.3
, Issue.2
, pp. 111-122
-
-
Sjøbakk, B.1
Bakås, O.2
Bondarenko, O.3
Kamran, T.4
-
152
-
-
84921867550
-
A Performance Measurement System to Support Materials Management in Engineer-to-Order Companies
-
Trans Tech Publications, and
-
Sjøbakk, B., O., Bondarenko, and T., Kamran. 2014. “A Performance Measurement System to Support Materials Management in Engineer-to-Order Companies.” Advanced Materials Research 1039: 569–576.). Trans Tech Publications.
-
(2014)
Advanced Materials Research
, vol.1039
, pp. 569-576
-
-
Sjøbakk, B.1
Bondarenko, O.2
Kamran, T.3
-
153
-
-
70349642237
-
A Lean Production Control System for High-Variety/low-Volume Environments: a Case Study Implementation
-
Slomp, J., J. A., Bokhorst, and R., Germs. 2009. “A Lean Production Control System for High-Variety/low-Volume Environments: a Case Study Implementation.” Production Planning and Control 20 (7): 586–595. doi: 10.1080/09537280903086164
-
(2009)
Production Planning and Control
, vol.20
, Issue.7
, pp. 586-595
-
-
Slomp, J.1
Bokhorst, J.A.2
Germs, R.3
-
154
-
-
84859973608
-
Workload Control Dynamics in Practice
-
Soepenberg, G. D., M. J., Land, and G. J., Gaalman. 2012. “Workload Control Dynamics in Practice.” International Journal of Production Research 50 (2): 443–460. doi: 10.1080/00207543.2010.539277
-
(2012)
International Journal of Production Research
, vol.50
, Issue.2
, pp. 443-460
-
-
Soepenberg, G.D.1
Land, M.J.2
Gaalman, G.J.3
-
155
-
-
0035872175
-
Setting Planned job Release Times in Stochastic Assembly Systems with Resource Constraints
-
Song, D., C., Hicks, and C. F., Earl. 2001. “Setting Planned job Release Times in Stochastic Assembly Systems with Resource Constraints.” International Journal of Production Research 39 (6): 1289–1301. doi: 10.1080/00207540010022377
-
(2001)
International Journal of Production Research
, vol.39
, Issue.6
, pp. 1289-1301
-
-
Song, D.1
Hicks, C.2
Earl, C.F.3
-
156
-
-
0037061532
-
Product due Date Assignment for Complex Assemblies
-
Song, D. P., C., Hicks, and C. F., Earl. 2002. “Product due Date Assignment for Complex Assemblies.” International Journal of Production Economics 76 (3): 243–256. doi: 10.1016/S0925-5273(01)00170-0
-
(2002)
International Journal of Production Economics
, vol.76
, Issue.3
, pp. 243-256
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
157
-
-
79960706061
-
Planned Lead-Times Design in Stochastic Multistage Assembly Systems
-
Song, D. P., C., Hicks, and C. F., Earl. 2005. “Planned Lead-Times Design in Stochastic Multistage Assembly Systems.” IFAC Proceedings Volumes 38 (1): 189–194. doi: 10.3182/20050703-6-CZ-1902.01515
-
(2005)
IFAC Proceedings Volumes
, vol.38
, Issue.1
, pp. 189-194
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
158
-
-
33749553327
-
An Ordinal Optimization Based Evolution Strategy to Schedule Complex Make-to-Order Products
-
Song, D. P., C., Hicks, and C. F., Earl. 2006. “An Ordinal Optimization Based Evolution Strategy to Schedule Complex Make-to-Order Products.” International Journal of Production Research 44 (22): 4877–4895. doi: 10.1080/00207540600620922
-
(2006)
International Journal of Production Research
, vol.44
, Issue.22
, pp. 4877-4895
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
159
-
-
77955692246
-
System Development and Applications of a Shipyard Layout Design Framework
-
Song, Y. J., D. K., Lee, J. H., Woo, and J. G., Shin. 2010. “System Development and Applications of a Shipyard Layout Design Framework.” Journal of Ship Production and Design 26 (2): 144–154.
-
(2010)
Journal of Ship Production and Design
, vol.26
, Issue.2
, pp. 144-154
-
-
Song, Y.J.1
Lee, D.K.2
Woo, J.H.3
Shin, J.G.4
-
160
-
-
84863012341
-
Research on a Simulation-Based Ship Production Support System for Middle-Sized Shipbuilding Companies
-
Song, Y. J., J. H., Woo, and J. G., Shin. 2009. “Research on a Simulation-Based Ship Production Support System for Middle-Sized Shipbuilding Companies.” International Journal of Naval Architecture and Ocean Engineering 1 (2): 70–77. doi: 10.2478/IJNAOE-2013-0009
-
(2009)
International Journal of Naval Architecture and Ocean Engineering
, vol.1
, Issue.2
, pp. 70-77
-
-
Song, Y.J.1
Woo, J.H.2
Shin, J.G.3
-
161
-
-
67651229046
-
Procedure for Reducing the Risk of Delayed Deliveries in Make-to-Order Production
-
Stefansson, H., P., Jensson, and N., Shah. 2009. “Procedure for Reducing the Risk of Delayed Deliveries in Make-to-Order Production.” Production Planning and Control 20 (4): 332–342. doi: 10.1080/09537280902843698
-
(2009)
Production Planning and Control
, vol.20
, Issue.4
, pp. 332-342
-
-
Stefansson, H.1
Jensson, P.2
Shah, N.3
-
162
-
-
84874671639
-
Development and Applications of Simulation Tools for one-of-a-Kind Production Processes
-
Berlin: IEEE, and
-
Steinhauer, D., and M., Soyka. 2012. “Development and Applications of Simulation Tools for one-of-a-Kind Production Processes.” In Simulation Conference (WSC). Proceedings of the, 2012. Winter, 1–11. Berlin: IEEE.
-
(2012)
Simulation Conference (WSC). Proceedings of the, 2012. Winter
, pp. 1-11
-
-
Steinhauer, D.1
Soyka, M.2
-
163
-
-
33748750890
-
Aggregate Load-Oriented Workload Control: A Review and a re-Classification of a key Approach
-
Stevenson, M., and L. C., Hendry. 2006. “Aggregate Load-Oriented Workload Control: A Review and a re-Classification of a key Approach.” International Journal of Production Economics 104 (2): 676–693. doi: 10.1016/j.ijpe.2005.05.022
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.2
, pp. 676-693
-
-
Stevenson, M.1
Hendry, L.C.2
-
164
-
-
27744563510
-
A Review of Production Planning and Control: the Applicability of key Concepts to the Make-to-Order Industry
-
Stevenson, M., L. C., Hendry, and B. G., Kingsman. 2005. “A Review of Production Planning and Control: the Applicability of key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898. doi: 10.1080/0020754042000298520
-
(2005)
International Journal of Production Research
, vol.43
, Issue.5
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
165
-
-
0024765069
-
The Use of Computers in Establishing a Company-Wide Perspective Toward Advanced Ship Production
-
Stewart, E. W., 1989. “The Use of Computers in Establishing a Company-Wide Perspective Toward Advanced Ship Production.” Journal of Ship Production 5 (4).
-
(1989)
Journal of Ship Production
, vol.5
, Issue.4
-
-
Stewart, E.W.1
-
166
-
-
0033097214
-
Improving Flow to Achieve Lean Manufacturing in Shipbuilding
-
Storch, R. L., and S., Lim. 1999. “Improving Flow to Achieve Lean Manufacturing in Shipbuilding.” Production Planning & Control 10 (2): 127–137. doi: 10.1080/095372899233280
-
(1999)
Production Planning & Control
, vol.10
, Issue.2
, pp. 127-137
-
-
Storch, R.L.1
Lim, S.2
-
167
-
-
0038250770
-
Strategies for Enhancing Twoagility of Make-to-Order Manufacturing Systems
-
Subash Babu, A., 1999. “Strategies for Enhancing Twoagility of Make-to-Order Manufacturing Systems.” International Journal of Agile Management Systems 1 (1): 23–29. doi: 10.1108/14654659910266682
-
(1999)
International Journal of Agile Management Systems
, vol.1
, Issue.1
, pp. 23-29
-
-
Subash Babu, A.1
-
168
-
-
77955240739
-
Mechanical Engineering Design Complexity Metrics: Size, Coupling, and Solvability
-
Summers, J. D., and J. J., Shah. 2010. “Mechanical Engineering Design Complexity Metrics: Size, Coupling, and Solvability.” Journal of Mechanical Design 132 (2): 021004–021015. doi: 10.1115/1.4000759
-
(2010)
Journal of Mechanical Design
, vol.132
, Issue.2
, pp. 021004-021015
-
-
Summers, J.D.1
Shah, J.J.2
-
169
-
-
0019565498
-
An Aggregate Production Planning for a Heavy Manufacturing Industry
-
Tang, J. C., P., Adulbhan, and T., Zubair. 1981. “An Aggregate Production Planning for a Heavy Manufacturing Industry.” European Journal of Operational Research 7 (1): 22–29. doi: 10.1016/0377-2217(81)90046-1
-
(1981)
European Journal of Operational Research
, vol.7
, Issue.1
, pp. 22-29
-
-
Tang, J.C.1
Adulbhan, P.2
Zubair, T.3
-
170
-
-
84856893341
-
Order Management in the Customization-Responsiveness Squeeze
-
Tenhiälä, A., and M., Ketokivi. 2012. “Order Management in the Customization-Responsiveness Squeeze.” Decision Sciences 43 (1): 173–206. doi: 10.1111/j.1540-5915.2011.00342.x
-
(2012)
Decision Sciences
, vol.43
, Issue.1
, pp. 173-206
-
-
Tenhiälä, A.1
Ketokivi, M.2
-
171
-
-
85030594714
-
Project Scheduling System for Planning Make-to-Order Production
-
Andersin H.E., Niemi E., Hirvonen V., (eds), Otaniemi: ICAM, and,. edited by
-
Toivonen, V., E., Niemi, and K., Ikkala. 2005. “Project Scheduling System for Planning Make-to-Order Production.” In Proceedings of the International Conference on Agility, 27–28 July, edited by H. E., Andersin, E., Niemi, and V., Hirvonen. Otaniemi: ICAM.
-
(2005)
Proceedings of the International Conference on Agility, 27–28 July
-
-
Toivonen, V.1
Niemi, E.2
Ikkala, K.3
-
172
-
-
70349124674
-
-
January,Production and material requirements planning Manufacturing-to-Order environments: an application to machining centers production. (411–417). American Society of Mechanical Engineers
-
Tolio, T., M., Urgo, and A., Alfieri. 2008, January. “Production and material requirements planning in Manufacturing-to-Order environments: an application to machining centers production.” In ASME, 9th Biennial Conference on Engineering Systems Design and Analysis (411–417). American Society of Mechanical Engineers.
-
(2008)
In ASME, 9th Biennial Conference on Engineering Systems Design and Analysis
-
-
Tolio, T.1
Urgo, M.2
Alfieri, A.3
-
173
-
-
84952037281
-
A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning
-
September,Cham: Springer, and
-
Vaagen, H., and M., Kaut. 2015, September. “A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning.” In IFIP International Conference on Advances in Production Management Systems, 167–174. Cham: Springer.
-
(2015)
IFIP International Conference on Advances in Production Management Systems
, pp. 167-174
-
-
Vaagen, H.1
Kaut, M.2
-
174
-
-
67649118794
-
Applicability of the Capability Maturity Model for Engineer-to-Order Firms
-
Veldman, J., and W., Klingenberg. 2009. “Applicability of the Capability Maturity Model for Engineer-to-Order Firms.” International Journal of Technology Management 48 (2): 219–239. doi: 10.1504/IJTM.2009.024917
-
(2009)
International Journal of Technology Management
, vol.48
, Issue.2
, pp. 219-239
-
-
Veldman, J.1
Klingenberg, W.2
-
175
-
-
85017409652
-
Utilising the Internet of Things for the Management of Through-Life Engineering Services on Marine Auxiliaries
-
von Stietencron, M., C. C., Røstad, B., Henriksen, and K. D., Thoben. 2017. “Utilising the Internet of Things for the Management of Through-Life Engineering Services on Marine Auxiliaries.” Procedia CIRP 59: 233–239. doi: 10.1016/j.procir.2016.09.003
-
(2017)
Procedia CIRP
, vol.59
, pp. 233-239
-
-
von Stietencron, M.1
Røstad, C.C.2
Henriksen, B.3
Thoben, K.D.4
-
176
-
-
0032138424
-
A Fuzzy due-Date Bargainer for the Make-to-Order Manufacturing Systems. IEEE Transactions on Systems, Man, and Cybernetics
-
Wang, D., S. C., Fang, and T. J., Hodgson. 1998. “A Fuzzy due-Date Bargainer for the Make-to-Order Manufacturing Systems. IEEE Transactions on Systems, Man, and Cybernetics.” Part C (Applications and Reviews 28 (3): 492–497.
-
(1998)
Part C (Applications and Reviews
, vol.28
, Issue.3
, pp. 492-497
-
-
Wang, D.1
Fang, S.C.2
Hodgson, T.J.3
-
177
-
-
84870596784
-
Research of WBS Construction Technology for Large Aircraft Based on Artificial Neural Network
-
Taiyuan: ADME, and
-
Wang, K. F., G. R., Yan, and W., Wang. 2012. “Research of WBS Construction Technology for Large Aircraft Based on Artificial Neural Network.” In Applied Mechanics and Materials. Vol. 220, 812–818. Taiyuan: ADME.
-
(2012)
Applied Mechanics and Materials
, vol.220
, pp. 812-818
-
-
Wang, K.F.1
Yan, G.R.2
Wang, W.3
-
178
-
-
0029357179
-
A Classified Bibliography of Recent Research Relating to Project Risk Management
-
Williams, T., 1995. “A Classified Bibliography of Recent Research Relating to Project Risk Management.” European Journal of Operational Research 85 (1): 18–38. doi: 10.1016/0377-2217(93)E0363-3
-
(1995)
European Journal of Operational Research
, vol.85
, Issue.1
, pp. 18-38
-
-
Williams, T.1
-
179
-
-
0032653583
-
The Need for new Paradigms for Complex Projects
-
Williams, T. M., 1999. “The Need for new Paradigms for Complex Projects.” International Journal of Project Management 17 (5): 269–273. doi: 10.1016/S0263-7863(98)00047-7
-
(1999)
International Journal of Project Management
, vol.17
, Issue.5
, pp. 269-273
-
-
Williams, T.M.1
-
180
-
-
84897620971
-
Systematisation of Ship Production Management and Case Study for Ship Block Assembly Factory
-
Woo, J. H., and Y. J., Song. 2014. “Systematisation of Ship Production Management and Case Study for Ship Block Assembly Factory.” International Journal of Computer Integrated Manufacturing 27 (4): 333–347. doi: 10.1080/0951192X.2013.800237
-
(2014)
International Journal of Computer Integrated Manufacturing
, vol.27
, Issue.4
, pp. 333-347
-
-
Woo, J.H.1
Song, Y.J.2
-
181
-
-
0026854373
-
Production Management Systems for one-of-a-Kind Products
-
Wortmann, J. C., 1992. “Production Management Systems for one-of-a-Kind Products.” Computers in Industry 19 (1): 79–88. doi: 10.1016/0166-3615(92)90008-B
-
(1992)
Computers in Industry
, vol.19
, Issue.1
, pp. 79-88
-
-
Wortmann, J.C.1
-
182
-
-
84856354513
-
Optimal Adaptable Design for Creating the Changeable Product Based on Changeable Requirements Considering the Whole Product Life-Cycle
-
Xue, D., G., Hua, V., Mehrad, and P., Gu. 2012. “Optimal Adaptable Design for Creating the Changeable Product Based on Changeable Requirements Considering the Whole Product Life-Cycle.” Journal of Manufacturing Systems 31 (1): 59–68. doi: 10.1016/j.jmsy.2011.04.003
-
(2012)
Journal of Manufacturing Systems
, vol.31
, Issue.1
, pp. 59-68
-
-
Xue, D.1
Hua, G.2
Mehrad, V.3
Gu, P.4
-
183
-
-
84867817884
-
The Simulation of the Ship Production Design Process Based on Hierarchical Timed Petri Net
-
Trans Tech Publications, and
-
Yan, R., P., Jiang, W. J., Li, J., Yan, and L., Wen. 2012. “The Simulation of the Ship Production Design Process Based on Hierarchical Timed Petri Net.” Advanced Materials Research 544: 170–175. Trans Tech Publications.
-
(2012)
Advanced Materials Research
, vol.544
, pp. 170-175
-
-
Yan, R.1
Jiang, P.2
Li, W.J.3
Yan, J.4
Wen, L.5
-
184
-
-
77949489584
-
A Genetic Approach to two-Phase Optimization of Dynamic Supply Chain Scheduling
-
Yimer, A. D., and K., Demirli. 2010. “A Genetic Approach to two-Phase Optimization of Dynamic Supply Chain Scheduling.” Computers & Industrial Engineering 58 (3): 411–422. doi: 10.1016/j.cie.2009.01.010
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.3
, pp. 411-422
-
-
Yimer, A.D.1
Demirli, K.2
-
185
-
-
37749044158
-
Research on the Production Logistics System of Shipbuilding Enterprise Based on MRP and TOC
-
Chengdu: ASCE, and
-
Yue, W., C., Wang, Q., Zhang, and H., Fan. 2007. “Research on the Production Logistics System of Shipbuilding Enterprise Based on MRP and TOC.” In International Conference on Transportation Engineering, 2536–2541. Chengdu: ASCE.
-
(2007)
International Conference on Transportation Engineering
, pp. 2536-2541
-
-
Yue, W.1
Wang, C.2
Zhang, Q.3
Fan, H.4
-
187
-
-
84908204809
-
Product Configuration: a Review of the State-of-the-art and Future Research
-
Zhang, L. L., 2014. “Product Configuration: a Review of the State-of-the-art and Future Research.” International Journal of Production Research 52 (21): 6381–6398. doi: 10.1080/00207543.2014.942012
-
(2014)
International Journal of Production Research
, vol.52
, Issue.21
, pp. 6381-6398
-
-
Zhang, L.L.1
-
188
-
-
40949157946
-
October. A Grey Measurement of Product Complexity
-
Montreal: IEEE, and
-
Zhang, Z., and Q., Luo. 2007. “October. A Grey Measurement of Product Complexity.” In Systems, Man and Cybernetics, ISIC. IEEE International Conference, 2176–2180. Montreal: IEEE.
-
(2007)
Systems, Man and Cybernetics, ISIC. IEEE International Conference
, pp. 2176-2180
-
-
Zhang, Z.1
Luo, Q.2
-
189
-
-
84903313967
-
Robust Adaptable Design Considering Changes of Requirements and Parameters During Product Operation Stage
-
Zhang, J., D., Xue, and P., Gu. 2014. “Robust Adaptable Design Considering Changes of Requirements and Parameters During Product Operation Stage.” The International Journal of Advanced Manufacturing Technology 72 (1–4): 387–401. doi: 10.1007/s00170-014-5658-1
-
(2014)
The International Journal of Advanced Manufacturing Technology
, vol.72
, Issue.1-4
, pp. 387-401
-
-
Zhang, J.1
Xue, D.2
Gu, P.3
-
190
-
-
84929134108
-
Adaptable Design of Open Architecture Products with Robust Performance
-
Zhang, J., D., Xue, and P., Gu. 2015. “Adaptable Design of Open Architecture Products with Robust Performance.” Journal of Engineering Design 26 (1–3): 1–23. doi: 10.1080/09544828.2015.1012055
-
(2015)
Journal of Engineering Design
, vol.26
, Issue.1-3
, pp. 1-23
-
-
Zhang, J.1
Xue, D.2
Gu, P.3
-
191
-
-
84963649712
-
A System Framework for OKP Product Planning in a Cloud-Based Design Environment
-
Zheng, P., Y., Lu, X., Xu, and S. Q., Xie. 2017. “A System Framework for OKP Product Planning in a Cloud-Based Design Environment.” Robotics and Computer-Integrated Manufacturing 45: 73–85. doi: 10.1016/j.rcim.2016.04.001
-
(2017)
Robotics and Computer-Integrated Manufacturing
, vol.45
, pp. 73-85
-
-
Zheng, P.1
Lu, Y.2
Xu, X.3
Xie, S.Q.4
-
192
-
-
85019001563
-
Personalized Product Configuration Framework in an Adaptable Open Architecture Product Platform
-
Zheng, P., X., Xu, S., Yu, and C., Liu. 2017. “Personalized Product Configuration Framework in an Adaptable Open Architecture Product Platform.” Journal of Manufacturing Systems 43: 422–435. doi: 10.1016/j.jmsy.2017.03.010
-
(2017)
Journal of Manufacturing Systems
, vol.43
, pp. 422-435
-
-
Zheng, P.1
Xu, X.2
Yu, S.3
Liu, C.4
-
193
-
-
84940490504
-
Simulation of Low-Volume Mixed Model Assembly Lines: Modeling Aspects and Case Study
-
Savannah: IEEE Press, and
-
Ziarnetzky, T., L., Mönch, and A., Biele. 2014. “Simulation of Low-Volume Mixed Model Assembly Lines: Modeling Aspects and Case Study.” In Proceedings of the 2014 Winter Simulation Conference, 2101–2112. Savannah: IEEE Press.
-
(2014)
Proceedings of the 2014 Winter Simulation Conference
, pp. 2101-2112
-
-
Ziarnetzky, T.1
Mönch, L.2
Biele, A.3
-
194
-
-
39649122099
-
Due Date (DD) Quotation and Capacity Planning in Make-to-Order Companies: Results From an Empirical Analysis
-
Zorzini, M., D., Corti, and A., Pozzetti. 2008. “Due Date (DD) Quotation and Capacity Planning in Make-to-Order Companies: Results From an Empirical Analysis.” International Journal of Production Economics 112 (2): 919–933. doi: 10.1016/j.ijpe.2007.08.005
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.2
, pp. 919-933
-
-
Zorzini, M.1
Corti, D.2
Pozzetti, A.3
|