Volumn 57, Issue 15-16, 2019, Pages 5362-5385

Big size highly customised product manufacturing systems: a literature review and future research agenda

Author keywords

big size product; customised products; engineering to order; make to order; manufacturing systems; project management

Indexed keywords

ERGONOMICS; FINANCIAL DATA PROCESSING; INDUSTRIAL RESEARCH; INVESTMENTS; MANUFACTURE; PLANNING; PRODUCT DESIGN; PRODUCTION CONTROL;

EID: 85062444641     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2019.1582819     Document Type: Review
Times cited : (73)

References (194)
  • 1
    • 84937978044 scopus 로고    scopus 로고
    • Engineer-to-order (ETO) Production Planning and Control: An Empirical Framework for Machinery-Building Companies
    • Adrodegari, F., A., Bacchetti, R., Pinto, F., Pirola, and M., Zanardini. 2015. “Engineer-to-order (ETO) Production Planning and Control: An Empirical Framework for Machinery-Building Companies.” Production Planning & Control 26 (11): 910–932. doi: 10.1080/09537287.2014.1001808
    • (2015) Production Planning & Control , vol.26 , Issue.11 , pp. 910-932
    • Adrodegari, F.1    Bacchetti, A.2    Pinto, R.3    Pirola, F.4    Zanardini, M.5
  • 2
    • 85062450291 scopus 로고    scopus 로고
    • Study on Scheduling of the Planning Method Using the Web-Based Visualization System in a Shipbuilding Block Assembly Shop. World Academy of Science, Engineering and Technology
    • Ahn, A. E. K., B. G. N., Wang, and C. S. C., Park. 2010. “Study on Scheduling of the Planning Method Using the Web-Based Visualization System in a Shipbuilding Block Assembly Shop. World Academy of Science, Engineering and Technology.” International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering 4 (9): 821–824.
    • (2010) International Journal of Mechanical, Aerospace, Industrial, Mechatronic and Manufacturing Engineering , vol.4 , Issue.9 , pp. 821-824
    • Ahn, A.E.K.1    Wang, B.G.N.2    Park, C.S.C.3
  • 4
    • 78650226885 scopus 로고    scopus 로고
    • A Project Scheduling Approach to Production Planning with Feeding Precedence Relations
    • Alfieri, A., T., Tolio, and M., Urgo. 2011. “A Project Scheduling Approach to Production Planning with Feeding Precedence Relations.” International Journal of Production Research 49 (4): 995–1020. doi: 10.1080/00207541003604844
    • (2011) International Journal of Production Research , vol.49 , Issue.4 , pp. 995-1020
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 5
    • 84865351186 scopus 로고    scopus 로고
    • A Two-Stage Stochastic Programming Project Scheduling Approach to Production Planning
    • Alfieri, A., T., Tolio, and M., Urgo. 2012. “A Two-Stage Stochastic Programming Project Scheduling Approach to Production Planning.” The International Journal of Advanced Manufacturing Technology 62 (1–4): 279–290. doi: 10.1007/s00170-011-3794-4
    • (2012) The International Journal of Advanced Manufacturing Technology , vol.62 , Issue.1-4 , pp. 279-290
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 6
    • 27644493989 scopus 로고    scopus 로고
    • Value Stream Mapping for Make-to-Order Products in a Job Shop Environment
    • San Diego: Ascer - American Society of Civil Engineerings, and
    • Alves, T. D. C., I. D., Tommelein, and G., Ballard. 2005. “Value Stream Mapping for Make-to-Order Products in a Job Shop Environment.” In Construction Research Congress 2005: Broadening Perspectives, 1–10. San Diego: Ascer - American Society of Civil Engineerings.
    • (2005) Construction Research Congress 2005: Broadening Perspectives , pp. 1-10
    • Alves, T.D.C.1    Tommelein, I.D.2    Ballard, G.3
  • 7
    • 0001195095 scopus 로고    scopus 로고
    • Competitive Advantage, Customisation and a new Taxonomy for non Make-to-Stock Companies
    • Amaro, G., L., Hendry, and B., Kingsman. 1999. “Competitive Advantage, Customisation and a new Taxonomy for non Make-to-Stock Companies.” International Journal of Operations & Production Management 19 (4): 349–371. doi: 10.1108/01443579910254213
    • (1999) International Journal of Operations & Production Management , vol.19 , Issue.4 , pp. 349-371
    • Amaro, G.1    Hendry, L.2    Kingsman, B.3
  • 8
    • 55849116349 scopus 로고    scopus 로고
    • Engineering Design Complexity: an Investigation of Methods and Measures
    • Ameri, F., J. D., Summers, G. M., Mocko, and M., Porter. 2008. “Engineering Design Complexity: an Investigation of Methods and Measures.” Research in Engineering Design 19 (2–3): 161–179. doi: 10.1007/s00163-008-0053-2
    • (2008) Research in Engineering Design , vol.19 , Issue.2-3 , pp. 161-179
    • Ameri, F.1    Summers, J.D.2    Mocko, G.M.3    Porter, M.4
  • 10
    • 0034317755 scopus 로고    scopus 로고
    • A Component-Based Approach to Support Order Planning in a Distributed Manufacturing Enterprise
    • Azevedo, A. L., and J. P., Sousa. 2000. “A Component-Based Approach to Support Order Planning in a Distributed Manufacturing Enterprise.” Journal of Materials Processing Technology 107 (1–3): 431–438. doi: 10.1016/S0924-0136(00)00680-4
    • (2000) Journal of Materials Processing Technology , vol.107 , Issue.1-3 , pp. 431-438
    • Azevedo, A.L.1    Sousa, J.P.2
  • 11
    • 84867037593 scopus 로고    scopus 로고
    • Mixed Model Assembly System with Multiple Secondary Feeder Lines: Layout Design and Balancing Procedure for ATO Environment
    • Azzi, A., D., Battini, M., Faccio, and A., Persona. 2012. “Mixed Model Assembly System with Multiple Secondary Feeder Lines: Layout Design and Balancing Procedure for ATO Environment.” International Journal of Production Research 50 (18): 5132–5151. doi: 10.1080/00207543.2011.653590
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 5132-5151
    • Azzi, A.1    Battini, D.2    Faccio, M.3    Persona, A.4
  • 12
    • 84989209076 scopus 로고    scopus 로고
    • A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard
    • Back, M. G., D. K., Lee, J. G., Shin, and J. H., Woo. 2016. “A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard.” International Journal of Naval Architecture and Ocean Engineering 8 (5): 496–510. doi: 10.1016/j.ijnaoe.2016.05.005
    • (2016) International Journal of Naval Architecture and Ocean Engineering , vol.8 , Issue.5 , pp. 496-510
    • Back, M.G.1    Lee, D.K.2    Shin, J.G.3    Woo, J.H.4
  • 13
    • 85062443441 scopus 로고    scopus 로고
    • Big size products assembly system design: a literature review and future research agenda. Proceedings Twentieth International Working Seminar on Production Economics, Innsbruck, Austria, February 19–23, 2, 29–41
    • Battini, D., M., Calzavara, S., Finco, A., Persona, and F., Sgarbossa. 2018. Big size products assembly system design: a literature review and future research agenda." In Proceedings Twentieth International Working Seminar on Production Economics, Innsbruck, Austria, February 19–23, 2, 29–41.
    • (2018)
    • Battini, D.1    Calzavara, M.2    Finco, S.3    Persona, A.4    Sgarbossa, F.5
  • 14
    • 84959152312 scopus 로고    scopus 로고
    • Ergonomics in Assembly Line Balancing Based on Energy Expenditure: a Multi-Objective Model
    • Battini, D., X., Delorme, A., Dolgui, A., Persona, and F., Sgarbossa. 2016. “Ergonomics in Assembly Line Balancing Based on Energy Expenditure: a Multi-Objective Model.” International Journal of Production Research 54 (3): 824–845. doi: 10.1080/00207543.2015.1074299
    • (2016) International Journal of Production Research , vol.54 , Issue.3 , pp. 824-845
    • Battini, D.1    Delorme, X.2    Dolgui, A.3    Persona, A.4    Sgarbossa, F.5
  • 15
    • 84921984956 scopus 로고    scopus 로고
    • Part-feeding with Supermarket in Assembly Systems: Transportation Mode Selection Model and Multi-Scenario Analysis
    • Battini, D., M., Gamberi, A., Persona, and F., Sgarbossa. 2015. “Part-feeding with Supermarket in Assembly Systems: Transportation Mode Selection Model and Multi-Scenario Analysis.” Assembly Automation 35 (1): 149–159. doi: 10.1108/AA-06-2014-053
    • (2015) Assembly Automation , vol.35 , Issue.1 , pp. 149-159
    • Battini, D.1    Gamberi, M.2    Persona, A.3    Sgarbossa, F.4
  • 17
    • 85015926230 scopus 로고    scopus 로고
    • 2MTO, a new Mapping Tool to Achieve Lean Benefits in High-Variety low-Volume job Shops
    • Bertolini, M., G., Romagnoli, and F., Zammori. 2017. “2MTO, a new Mapping Tool to Achieve Lean Benefits in High-Variety low-Volume job Shops.” Production Planning & Control 28 (5): 444–458. doi: 10.1080/09537287.2017.1302615
    • (2017) Production Planning & Control , vol.28 , Issue.5 , pp. 444-458
    • Bertolini, M.1    Romagnoli, G.2    Zammori, F.3
  • 19
    • 84956947883 scopus 로고    scopus 로고
    • Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy
    • Birkie, S. E., and P., Trucco. 2016. “Understanding Dynamism and Complexity Factors in Engineer-to-Order and Their Influence on Lean Implementation Strategy.” Production Planning & Control 27 (5): 345–359. doi: 10.1080/09537287.2015.1127446
    • (2016) Production Planning & Control , vol.27 , Issue.5 , pp. 345-359
    • Birkie, S.E.1    Trucco, P.2
  • 20
    • 84872000996 scopus 로고    scopus 로고
    • Model-based production for engineered-to-order joinery products. World Conference on Timber Engineering: 15–19 July, 697–701. New Zealand Timber Design Society
    • Björngrim, N., L., Laitila, S., Forsman, and P., Bomark. 2012. Model-based production for engineered-to-order joinery products." In World Conference on Timber Engineering: 15–19 July, 697–701. New Zealand Timber Design Society.
    • (2012)
    • Björngrim, N.1    Laitila, L.2    Forsman, S.3    Bomark, P.4
  • 22
    • 84870798260 scopus 로고    scopus 로고
    • Cooperation of Suppliers and Clients with Companies in the Agricultural Machinery Industry: Some Evidence From Brazil
    • Borsato, M., and A., de Araújo Carvalho. 2010. “Cooperation of Suppliers and Clients with Companies in the Agricultural Machinery Industry: Some Evidence From Brazil.” International Journal of Technological Learning, Innovation and Development 3 (4): 330–346. doi: 10.1504/IJTLID.2010.039163
    • (2010) International Journal of Technological Learning, Innovation and Development , vol.3 , Issue.4 , pp. 330-346
    • Borsato, M.1    de Araújo Carvalho, A.2
  • 24
    • 77953684240 scopus 로고    scopus 로고
    • Resource-constrained Multi-Project Scheduling: Priority Rule Performance Revisited
    • Browning, T. R., and A. A., Yassine. 2010. “Resource-constrained Multi-Project Scheduling: Priority Rule Performance Revisited.” International Journal of Production Economics 126 (2): 212–228. doi: 10.1016/j.ijpe.2010.03.009
    • (2010) International Journal of Production Economics , vol.126 , Issue.2 , pp. 212-228
    • Browning, T.R.1    Yassine, A.A.2
  • 25
    • 8644280372 scopus 로고    scopus 로고
    • Integrated Model for Supplier Selection and Negotiation in a Make-to-Order Environment
    • Cakravastia, A., and K., Takahashi. 2004. “Integrated Model for Supplier Selection and Negotiation in a Make-to-Order Environment.” International Journal of Production Research 42 (21): 4457–4474. doi: 10.1080/00207540410001727622
    • (2004) International Journal of Production Research , vol.42 , Issue.21 , pp. 4457-4474
    • Cakravastia, A.1    Takahashi, K.2
  • 26
    • 41549093092 scopus 로고    scopus 로고
    • Operational Flexibility Quantification in a Make-to-Order Assembly System
    • Calvo, R., R., Domingo, and M. A., Sebastián. 2007. “Operational Flexibility Quantification in a Make-to-Order Assembly System.” International Journal of Flexible Manufacturing Systems 19 (3): 247–263. doi: 10.1007/s10696-008-9037-9
    • (2007) International Journal of Flexible Manufacturing Systems , vol.19 , Issue.3 , pp. 247-263
    • Calvo, R.1    Domingo, R.2    Sebastián, M.A.3
  • 27
    • 0029387797 scopus 로고
    • ‘Engineer to Order’companies: How to Integrate Manufacturing and Innovative Processes
    • Caron, F., and A., Fiore. 1995. “‘Engineer to Order’companies: How to Integrate Manufacturing and Innovative Processes.” International Journal of Project Management 13 (5): 313–319. doi: 10.1016/0263-7863(95)00023-J
    • (1995) International Journal of Project Management , vol.13 , Issue.5 , pp. 313-319
    • Caron, F.1    Fiore, A.2
  • 28
    • 84937399331 scopus 로고    scopus 로고
    • Tactical Capacity Planning in a Real-World ETO Industry Case: An Action Research
    • Carvalho, A. N., F., Oliveira, and L. F., Scavarda. 2015. “Tactical Capacity Planning in a Real-World ETO Industry Case: An Action Research.” International Journal of Production Economics 167: 187–203. doi: 10.1016/j.ijpe.2015.05.032
    • (2015) International Journal of Production Economics , vol.167 , pp. 187-203
    • Carvalho, A.N.1    Oliveira, F.2    Scavarda, L.F.3
  • 29
    • 77955442671 scopus 로고    scopus 로고
    • The Construction of Production Improvement Model for Aerospace Manufacturing Suppliers
    • Trans Tech Publications, and
    • Chang, H. M., C. K., Huang, and C. C., Torng. 2010. “The Construction of Production Improvement Model for Aerospace Manufacturing Suppliers.” In Key Engineering Materials, 443, 748–753. Trans Tech Publications.
    • (2010) Key Engineering Materials , vol.443 , pp. 748-753
    • Chang, H.M.1    Huang, C.K.2    Torng, C.C.3
  • 30
    • 73649085463 scopus 로고    scopus 로고
    • Using Rule Based Design in Engineer to Order Industry: An SME Case Study
    • Chavali, S. R., C., Sen, G. M., Mocko, and J. D., Summers. 2008. “Using Rule Based Design in Engineer to Order Industry: An SME Case Study.” Computer-Aided Design and Applications 5 (1–4): 178–193. doi: 10.3722/cadaps.2008.178-193
    • (2008) Computer-Aided Design and Applications , vol.5 , Issue.1-4 , pp. 178-193
    • Chavali, S.R.1    Sen, C.2    Mocko, G.M.3    Summers, J.D.4
  • 31
    • 64049105121 scopus 로고    scopus 로고
    • Concurrent Engineer-to-Order Operation in the Manufacturing Engineering Contracting Industries
    • Chen, C. S., 2006. “Concurrent Engineer-to-Order Operation in the Manufacturing Engineering Contracting Industries.” International Journal of Industrial and Systems Engineering 1 (1–2): 37–58. doi: 10.1504/IJISE.2006.009049
    • (2006) International Journal of Industrial and Systems Engineering , vol.1 , Issue.1-2 , pp. 37-58
    • Chen, C.S.1
  • 32
    • 23344432043 scopus 로고    scopus 로고
    • A Simulation-Based Process Model for Managing Complex Design Projects
    • Cho, S. H., and S. D., Eppinger. 2005. “A Simulation-Based Process Model for Managing Complex Design Projects.” IEEE Transactions on Engineering Management 52 (3): 316–328. doi: 10.1109/TEM.2005.850722
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.3 , pp. 316-328
    • Cho, S.H.1    Eppinger, S.D.2
  • 33
    • 0034263053 scopus 로고    scopus 로고
    • Integrated Engineering Environments for Large Complex Products
    • Coates, G., I., Ritchey, A. H., Duffy, W., Hills, and R. I., Whitfield. 2000. “Integrated Engineering Environments for Large Complex Products.” Concurrent Engineering 8 (3): 171–182. doi: 10.1177/1063293X0000800302
    • (2000) Concurrent Engineering , vol.8 , Issue.3 , pp. 171-182
    • Coates, G.1    Ritchey, I.2    Duffy, A.H.3    Hills, W.4    Whitfield, R.I.5
  • 34
    • 0032040841 scopus 로고    scopus 로고
    • Optimizing the Number of Stations in Assembly Lines Under Learning for Limited Production
    • Cohen, Y., and M., Ezey Dar-El. 1998. “Optimizing the Number of Stations in Assembly Lines Under Learning for Limited Production.” Production Planning & Control 9 (3): 230–240. doi: 10.1080/095372898234208
    • (1998) Production Planning & Control , vol.9 , Issue.3 , pp. 230-240
    • Cohen, Y.1    Ezey Dar-El, M.2
  • 35
    • 33644502870 scopus 로고    scopus 로고
    • January,Economics modelling for systems engineering aircraft. AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences (7371
    • Curran, R., J., Early, M., Price, S., Castagne, P., Mawhinney, J., Butterfield, and S., Raghunathan. 2005, January. "Economics modelling for systems engineering in aircraft." In AIAA 5th ATIO and16th Lighter-Than-Air Sys Tech. and Balloon Systems Conferences (7371).
    • (2005)
    • Curran, R.1    Early, J.2    Price, M.3    Castagne, S.4    Mawhinney, P.5    Butterfield, J.6    Raghunathan, S.7
  • 36
    • 66449123062 scopus 로고    scopus 로고
    • Special Orders
    • Cutler, T. R., 2009. “Special Orders.” Industrial Engineer 41 (5): 36–38.
    • (2009) Industrial Engineer , vol.41 , Issue.5 , pp. 36-38
    • Cutler, T.R.1
  • 38
    • 43049104581 scopus 로고    scopus 로고
    • Investigating Factors Affecting ERP Selection in Made-to-Order SME Sector
    • Deep, A., P., Guttridge, S., Dani, and N., Burns. 2008. “Investigating Factors Affecting ERP Selection in Made-to-Order SME Sector.” Journal of Manufacturing Technology Management 19 (4): 430–446. doi: 10.1108/17410380810869905
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.4 , pp. 430-446
    • Deep, A.1    Guttridge, P.2    Dani, S.3    Burns, N.4
  • 40
    • 30744451443 scopus 로고    scopus 로고
    • Assembly Line Balancing and Group Working: A Heuristic Procedure for Workers’ Groups Operating on the Same Product and Workstation
    • Dimitriadis, S. G., 2006. “Assembly Line Balancing and Group Working: A Heuristic Procedure for Workers’ Groups Operating on the Same Product and Workstation.” Computers & Operations Research 33 (9): 2757–2774. doi: 10.1016/j.cor.2005.02.027
    • (2006) Computers & Operations Research , vol.33 , Issue.9 , pp. 2757-2774
    • Dimitriadis, S.G.1
  • 41
    • 73249144350 scopus 로고    scopus 로고
    • Innovative Ship Block Assembly Production Control Using a Flexible Curved Block Job Shop
    • Dong, F., H., Parvin, M. P., Van Oyen, and D. J., Singer. 2009. “Innovative Ship Block Assembly Production Control Using a Flexible Curved Block Job Shop.” Journal of Ship Production 25 (4): 206–213.
    • (2009) Journal of Ship Production , vol.25 , Issue.4 , pp. 206-213
    • Dong, F.1    Parvin, H.2    Van Oyen, M.P.3    Singer, D.J.4
  • 43
    • 0032672455 scopus 로고    scopus 로고
    • Risk Analysis for Large Engineering Projects: Modeling Cost Uncertainty for Ship Production Activities
    • Duffey, M. R., and J. R., Van Dorp. 1999. “Risk Analysis for Large Engineering Projects: Modeling Cost Uncertainty for Ship Production Activities.” Journal of Engineering Valuation and Cost Analysis 2 (4): 285–301.
    • (1999) Journal of Engineering Valuation and Cost Analysis , vol.2 , Issue.4 , pp. 285-301
    • Duffey, M.R.1    Van Dorp, J.R.2
  • 44
    • 33644599725 scopus 로고    scopus 로고
    • Consequences of Competitive Bidding in Project-Based Production
    • Elfving, J. A., I. D., Tommelein, and G., Ballard. 2005. “Consequences of Competitive Bidding in Project-Based Production.” Journal of Purchasing and Supply Management 11 (4): 173–181. doi: 10.1016/j.pursup.2005.12.001
    • (2005) Journal of Purchasing and Supply Management , vol.11 , Issue.4 , pp. 173-181
    • Elfving, J.A.1    Tommelein, I.D.2    Ballard, G.3
  • 45
    • 84899876997 scopus 로고    scopus 로고
    • Lean Project Planning in Shipbuilding
    • Emblemsvåg, J., 2014. “Lean Project Planning in Shipbuilding.” Journal of Ship Production and Design 30 (2): 79–88. doi: 10.5957/JSPD.30.2.130054
    • (2014) Journal of Ship Production and Design , vol.30 , Issue.2 , pp. 79-88
    • Emblemsvåg, J.1
  • 46
    • 74549208061 scopus 로고    scopus 로고
    • Shipyard Production Cost Structure Optimisation Model Related to Product Type
    • Fafandjel, N., A., Zamarin, and M., Hadjina. 2010. “Shipyard Production Cost Structure Optimisation Model Related to Product Type.” International Journal of Production Research 48 (5): 1479–1491. doi: 10.1080/00207540802609665
    • (2010) International Journal of Production Research , vol.48 , Issue.5 , pp. 1479-1491
    • Fafandjel, N.1    Zamarin, A.2    Hadjina, M.3
  • 49
    • 84867087470 scopus 로고    scopus 로고
    • Need for Innovation in Supplying Engineer-to-Order Joinery Products to Construction: A Case Study in Sweden
    • Forsman, S., N., Björngrim, A., Bystedt, L., Laitila, P., Bomark, and M., Öhman. 2012. “Need for Innovation in Supplying Engineer-to-Order Joinery Products to Construction: A Case Study in Sweden.” Construction Innovation 12 (4): 464–491. doi: 10.1108/14714171211272225
    • (2012) Construction Innovation , vol.12 , Issue.4 , pp. 464-491
    • Forsman, S.1    Björngrim, N.2    Bystedt, A.3    Laitila, L.4    Bomark, P.5    Öhman, M.6
  • 52
    • 85086612341 scopus 로고    scopus 로고
    • Application of Design for Manufacture and Assembly Methodologies to Complex Aerospace Products
    • Las Vegas: AIAA, and,. In
    • Gauthier, B., P., Dewhurst, and D., Japikse. 2000. “Application of Design for Manufacture and Assembly Methodologies to Complex Aerospace Products.” In 36th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit, 3404. Las Vegas: AIAA.
    • (2000) 36th AIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit , pp. 3404
    • Gauthier, B.1    Dewhurst, P.2    Japikse, D.3
  • 53
    • 5444275078 scopus 로고    scopus 로고
    • Globally Distributed Product Development Using a new Project Management Framework
    • Ghosh, P. P., and J. C., Varghese. 2004. “Globally Distributed Product Development Using a new Project Management Framework.” International Journal of Project Management 22 (8): 669–678. doi: 10.1016/j.ijproman.2004.05.008
    • (2004) International Journal of Project Management , vol.22 , Issue.8 , pp. 669-678
    • Ghosh, P.P.1    Varghese, J.C.2
  • 54
    • 85027960179 scopus 로고    scopus 로고
    • The Application of Quick Response Manufacturing Practices in Brazil, Europe, and the USA: An Exploratory Study
    • Godinho Filho, M., A. G., Marchesini, J., Riezebos, N., Vandaele, and G. M. D., Ganga. 2017. “The Application of Quick Response Manufacturing Practices in Brazil, Europe, and the USA: An Exploratory Study.” International Journal of Production Economics 193: 437–448. doi: 10.1016/j.ijpe.2017.08.006
    • (2017) International Journal of Production Economics , vol.193 , pp. 437-448
    • Godinho Filho, M.1    Marchesini, A.G.2    Riezebos, J.3    Vandaele, N.4    Ganga, G.M.D.5
  • 55
    • 70350568663 scopus 로고    scopus 로고
    • Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda
    • Gosling, J., and M. M., Naim. 2009. “Engineer-to-order Supply Chain Management: A Literature Review and Research Agenda.” International Journal of Production Economics 122 (2): 741–754. doi: 10.1016/j.ijpe.2009.07.002
    • (2009) International Journal of Production Economics , vol.122 , Issue.2 , pp. 741-754
    • Gosling, J.1    Naim, M.M.2
  • 56
    • 84872733124 scopus 로고    scopus 로고
    • Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains
    • Gosling, J., M., Naim, and D., Towill. 2013. “Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains.” Journal of Construction Engineering and Management 139 (1): 102–110. doi: 10.1061/(ASCE)CO.1943-7862.0000574
    • (2013) Journal of Construction Engineering and Management , vol.139 , Issue.1 , pp. 102-110
    • Gosling, J.1    Naim, M.2    Towill, D.3
  • 58
    • 84900309792 scopus 로고    scopus 로고
    • Defining job Complexity for the Engineer to Order Environment
    • San Juan: ISERC, and
    • Grabenstetter, D. H., and J. M., Usher. 2013a. “Defining job Complexity for the Engineer to Order Environment.” In IIE Annual Conference and Expo, 2404–2413. San Juan: ISERC.
    • (2013) IIE Annual Conference and Expo , pp. 2404-2413
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 59
    • 84885849174 scopus 로고    scopus 로고
    • Determining job Complexity in an Engineer to Order Environment for due Date Estimation Using a Proposed Framework
    • Grabenstetter, D. H., and J. M., Usher. 2013b. “Determining job Complexity in an Engineer to Order Environment for due Date Estimation Using a Proposed Framework.” International Journal of Production Research 51 (19): 5728–5740. doi: 10.1080/00207543.2013.787169
    • (2013) International Journal of Production Research , vol.51 , Issue.19 , pp. 5728-5740
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 60
    • 84908201074 scopus 로고    scopus 로고
    • Developing due Dates in an Engineer-to-Order Engineering Environment
    • Grabenstetter, D. H., and J. M., Usher. 2014. “Developing due Dates in an Engineer-to-Order Engineering Environment.” International Journal of Production Research 52 (21): 6349–6361. doi: 10.1080/00207543.2014.940072
    • (2014) International Journal of Production Research , vol.52 , Issue.21 , pp. 6349-6361
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 61
    • 84977111282 scopus 로고    scopus 로고
    • Sequencing Jobs in an Engineer-to-Order Engineering Environment
    • Grabenstetter, D. H., and J. M., Usher. 2015. “Sequencing Jobs in an Engineer-to-Order Engineering Environment.” Production & Manufacturing Research 3 (1): 201–217. doi: 10.1080/21693277.2015.1035461
    • (2015) Production & Manufacturing Research , vol.3 , Issue.1 , pp. 201-217
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 62
    • 70350449071 scopus 로고    scopus 로고
    • Adaptable Design: Concepts, Methods, and Applications. Proceedings of the Institution of Mechanical Engineers
    • Gu, P., D., Xue, and A. Y. C., Nee. 2009. “Adaptable Design: Concepts, Methods, and Applications. Proceedings of the Institution of Mechanical Engineers.” Part B: Journal of Engineering Manufacture 223 (11): 1367–1387.
    • (2009) Part B: Journal of Engineering Manufacture , vol.223 , Issue.11 , pp. 1367-1387
    • Gu, P.1    Xue, D.2    Nee, A.Y.C.3
  • 63
    • 84929027178 scopus 로고    scopus 로고
    • An Integrated Engineering Change Management Process Model for a Project-Based Manufacturing
    • Han, J., S. H., Lee, and P., Nyamsuren. 2015. “An Integrated Engineering Change Management Process Model for a Project-Based Manufacturing.” International Journal of Computer Integrated Manufacturing 28 (7): 745–752. doi: 10.1080/0951192X.2014.924342
    • (2015) International Journal of Computer Integrated Manufacturing , vol.28 , Issue.7 , pp. 745-752
    • Han, J.1    Lee, S.H.2    Nyamsuren, P.3
  • 64
    • 84882988994 scopus 로고    scopus 로고
    • Application of Pull Concept-Based Lean Production System in the Ship Building Industry
    • Hassan, K., and H., Kajiwara. 2013. “Application of Pull Concept-Based Lean Production System in the Ship Building Industry.” Journal of Ship Production and Design 29 (3): 105–116. doi: 10.5957/JSPD.29.3.120021
    • (2013) Journal of Ship Production and Design , vol.29 , Issue.3 , pp. 105-116
    • Hassan, K.1    Kajiwara, H.2
  • 65
    • 0035307357 scopus 로고    scopus 로고
    • Due Date Setting with Supply Constraints in Systems Using MRP
    • Hegedus, M. G., and W. J., Hopp. 2001. “Due Date Setting with Supply Constraints in Systems Using MRP.” Computers & Industrial Engineering 39 (3–4): 293–305. doi: 10.1016/S0360-8352(01)00007-9
    • (2001) Computers & Industrial Engineering , vol.39 , Issue.3-4 , pp. 293-305
    • Hegedus, M.G.1    Hopp, W.J.2
  • 66
    • 0035919859 scopus 로고    scopus 로고
    • Mixed Model Assembly Alternatives for Low-Volume Manufacturing: The Case of the Aerospace Industry
    • Heike, G., M., Ramulu, E., Sorenson, P., Shanahan, and K., Moinzadeh. 2001. “Mixed Model Assembly Alternatives for Low-Volume Manufacturing: The Case of the Aerospace Industry.” International Journal of Production Economics 72 (2): 103–120. doi: 10.1016/S0925-5273(00)00089-X
    • (2001) International Journal of Production Economics , vol.72 , Issue.2 , pp. 103-120
    • Heike, G.1    Ramulu, M.2    Sorenson, E.3    Shanahan, P.4    Moinzadeh, K.5
  • 67
    • 0031632563 scopus 로고    scopus 로고
    • The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies
    • Hendry, L. C., B. G., Kingsman, and P., Cheung. 1998. “The Effect of Workload Control (WLC) on Performance in Make-to-Order Companies.” Journal of Operations Management 16 (1): 63–75. doi: 10.1016/S0272-6963(97)00011-9
    • (1998) Journal of Operations Management , vol.16 , Issue.1 , pp. 63-75
    • Hendry, L.C.1    Kingsman, B.G.2    Cheung, P.3
  • 68
    • 38749152402 scopus 로고    scopus 로고
    • Investigating Implementation Issues for Workload Control (WLC): A Comparative Case Study Analysis
    • Hendry, L., M., Land, M., Stevenson, and G., Gaalman. 2008. “Investigating Implementation Issues for Workload Control (WLC): A Comparative Case Study Analysis.” International Journal of Production Economics 112 (1): 452–469. doi: 10.1016/j.ijpe.2007.05.012
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.1    Land, M.2    Stevenson, M.3    Gaalman, G.4
  • 69
    • 0034672925 scopus 로고    scopus 로고
    • Computer-aided Production Management Issues in the Engineer-to-Order Production of Complex Capital Goods Explored Using a Simulation Approach
    • Hicks, C., and P. M., Braiden. 2000. “Computer-aided Production Management Issues in the Engineer-to-Order Production of Complex Capital Goods Explored Using a Simulation Approach.” International Journal of Production Research 38 (18): 4783–4810. doi: 10.1080/00207540010001019
    • (2000) International Journal of Production Research , vol.38 , Issue.18 , pp. 4783-4810
    • Hicks, C.1    Braiden, P.M.2
  • 70
    • 67549121045 scopus 로고    scopus 로고
    • Product Life Cycle Management in Engineer-to-Order Industries
    • Hicks, C., and T., McGovern. 2009. “Product Life Cycle Management in Engineer-to-Order Industries.” International Journal of Technology Management 48 (2): 153–167. doi: 10.1504/IJTM.2009.024913
    • (2009) International Journal of Technology Management , vol.48 , Issue.2 , pp. 153-167
    • Hicks, C.1    McGovern, T.2
  • 71
    • 0033878455 scopus 로고    scopus 로고
    • Supply Chain Management: A Strategic Issue in Engineer to Order Manufacturing
    • Hicks, C., T., McGovern, and C. F., Earl. 2000. “Supply Chain Management: A Strategic Issue in Engineer to Order Manufacturing.” International Journal of Production Economics 65 (2): 179–190. doi: 10.1016/S0925-5273(99)00026-2
    • (2000) International Journal of Production Economics , vol.65 , Issue.2 , pp. 179-190
    • Hicks, C.1    McGovern, T.2    Earl, C.F.3
  • 72
    • 67549084647 scopus 로고    scopus 로고
    • Applying Different Control Approaches for Resources with High and low Utilisation: a Case Study of the Production of Complex Products with Stochastic Processing Times
    • Hicks, C., and P., Pongcharoen. 2009. “Applying Different Control Approaches for Resources with High and low Utilisation: a Case Study of the Production of Complex Products with Stochastic Processing Times.” International Journal of Technology Management 48 (2): 202–218. doi: 10.1504/IJTM.2009.024916
    • (2009) International Journal of Technology Management , vol.48 , Issue.2 , pp. 202-218
    • Hicks, C.1    Pongcharoen, P.2
  • 74
    • 58049198132 scopus 로고    scopus 로고
    • Engineer-to-order Approach to High Speed Bucket Elevator Design in a Small Enterprise
    • Jaskulski, A., 2008. “Engineer-to-order Approach to High Speed Bucket Elevator Design in a Small Enterprise.” Applied Engineering in Agriculture 24 (5): 545–557. doi: 10.13031/2013.25266
    • (2008) Applied Engineering in Agriculture , vol.24 , Issue.5 , pp. 545-557
    • Jaskulski, A.1
  • 75
    • 84992179865 scopus 로고    scopus 로고
    • Toward Efficient Merchant Shipbuilding Based on the Lean Production Methodology
    • Jiang, G., D., Feng, and W., Zhu. 2016. “Toward Efficient Merchant Shipbuilding Based on the Lean Production Methodology.” Journal of Ship Production and Design 32 (4): 245–257. doi: 10.5957/JSPD.32.4.150042
    • (2016) Journal of Ship Production and Design , vol.32 , Issue.4 , pp. 245-257
    • Jiang, G.1    Feng, D.2    Zhu, W.3
  • 77
    • 84906258194 scopus 로고    scopus 로고
    • Supply Chain Configuration in Low Volume, High Customized Production Environment: Can Pre-Project Planning Stabilize Your Supply Chain?
    • Minneapolis: IEEE
    • Junge, G. H., 2014. “Supply Chain Configuration in Low Volume, High Customized Production Environment: Can Pre-Project Planning Stabilize Your Supply Chain?” In Collaboration Technologies and Systems (CTS), 2014 International Conference, 657–660. Minneapolis: IEEE.
    • (2014) Collaboration Technologies and Systems (CTS), 2014 International Conference , pp. 657-660
    • Junge, G.H.1
  • 78
    • 84900033308 scopus 로고    scopus 로고
    • Total process simulation shipbuilding: Simulation aided hull assembly planning 10th Int. Workshop on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, HMS 2008, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2008, 49–54
    • Kaarsemaker, J., and U., Nienhuis. 2008. Total process simulation in shipbuilding: Simulation aided hull assembly planning 10th Int. Workshop on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, HMS 2008, Held at the International Mediterranean and Latin American Modeling Multiconference, I3M 2008, 49–54. https://www.scopus.com/inward/record.uri?eid = 2-s2.0-.
    • (2008)
    • Kaarsemaker, J.1    Nienhuis, U.2
  • 80
    • 84883715110 scopus 로고    scopus 로고
    • Initial Plan of Shipbuilding Capacity Based on the Stochastic Discrete Event Simulation
    • Anchorage: International Society of Offshore and Polar Engineers, and
    • Kim, K., J., Lee, and H., Hwang. 2013. “Initial Plan of Shipbuilding Capacity Based on the Stochastic Discrete Event Simulation.” In The Twenty-Third International Offshore and Polar Engineering Conference, 1–8. Anchorage: International Society of Offshore and Polar Engineers.
    • (2013) The Twenty-Third International Offshore and Polar Engineering Conference , pp. 1-8
    • Kim, K.1    Lee, J.2    Hwang, H.3
  • 81
    • 85009862742 scopus 로고    scopus 로고
    • Responding to Customer Enquiries in Make-to-Order Companies: Problems and Solutions
    • Kingsman, B., L., Hendry, A., Mercer, and A. D., Souza. 1996. “Responding to Customer Enquiries in Make-to-Order Companies: Problems and Solutions.” Production 6 (2): 195–207. doi: 10.1590/S0103-65131996000200004
    • (1996) Production , vol.6 , Issue.2 , pp. 195-207
    • Kingsman, B.1    Hendry, L.2    Mercer, A.3    Souza, A.D.4
  • 84
    • 0036672601 scopus 로고    scopus 로고
    • Lean Production in the Japanese Shipbuilding Industry?
    • Koenig, P. C., H., Narita, and K., Baba. 2002. “Lean Production in the Japanese Shipbuilding Industry?” Journal of Ship Production 18 (3): 167–174.
    • (2002) Journal of Ship Production , vol.18 , Issue.3 , pp. 167-174
    • Koenig, P.C.1    Narita, H.2    Baba, K.3
  • 85
    • 0034516883 scopus 로고    scopus 로고
    • Integration of Assembly and Fabrication for Make-to-Order Production
    • Kolisch, R., 2000. “Integration of Assembly and Fabrication for Make-to-Order Production.” International Journal of Production Economics 68 (3): 287–306. doi: 10.1016/S0925-5273(99)00011-0
    • (2000) International Journal of Production Economics , vol.68 , Issue.3 , pp. 287-306
    • Kolisch, R.1
  • 86
    • 0002984011 scopus 로고
    • Coordinating Marketing and Manufacturing in ETO Companies
    • Konijnendijk, P. A., 1994. “Coordinating Marketing and Manufacturing in ETO Companies.” International Journal of Production Economics 37 (1): 19–26. doi: 10.1016/0925-5273(94)90004-3
    • (1994) International Journal of Production Economics , vol.37 , Issue.1 , pp. 19-26
    • Konijnendijk, P.A.1
  • 87
    • 19944400423 scopus 로고    scopus 로고
    • Responding to Schedule Changes in Build-to-Order Supply Chains
    • Krajewski, L., J. C., Wei, and L. L., Tang. 2005. “Responding to Schedule Changes in Build-to-Order Supply Chains.” Journal of Operations Management 23 (5): 452–469. doi: 10.1016/j.jom.2004.10.006
    • (2005) Journal of Operations Management , vol.23 , Issue.5 , pp. 452-469
    • Krajewski, L.1    Wei, J.C.2    Tang, L.L.3
  • 88
    • 84962034432 scopus 로고    scopus 로고
    • Utilizing Product Configuration Systems for Supporting the Critical Parts of the Engineering Processes
    • Kristjánsdóttir, K., S., Shafiee, and L., Hvam. 2015. “Utilizing Product Configuration Systems for Supporting the Critical Parts of the Engineering Processes.” In IEEM 8: 1777–1781.
    • (2015) In IEEM , vol.8 , pp. 1777-1781
    • Kristjánsdóttir, K.1    Shafiee, S.2    Hvam, L.3
  • 90
    • 79955162429 scopus 로고    scopus 로고
    • Production Planning for a Supply Chain in a Low-Volume and Make-to-Order Manufacturing Environment
    • Küttner, R., 2009. “Production Planning for a Supply Chain in a Low-Volume and Make-to-Order Manufacturing Environment.” Estonian Journal of Engineering 15 (1): 48–61. doi: 10.3176/eng.2009.1.05
    • (2009) Estonian Journal of Engineering , vol.15 , Issue.1 , pp. 48-61
    • Küttner, R.1
  • 91
    • 79960964668 scopus 로고    scopus 로고
    • Multistage Optimisation Strategy For Solving Production Planning Problems
    • Küttner, R., and J., Majak. 2009. “Multistage Optimisation Strategy For Solving Production Planning Problems.” IFAC Proceedings Volumes 42 (2): 332–337. doi: 10.3182/20090506-3-SF-4003.00061
    • (2009) IFAC Proceedings Volumes , vol.42 , Issue.2 , pp. 332-337
    • Küttner, R.1    Majak, J.2
  • 92
    • 70349649481 scopus 로고    scopus 로고
    • Production Planning and Control in SMEs: Time for Change
    • Land, M. J., and G. J., Gaalman. 2009. “Production Planning and Control in SMEs: Time for Change.” Production Planning and Control 20 (7): 548–558. doi: 10.1080/09537280903034230
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 548-558
    • Land, M.J.1    Gaalman, G.J.2
  • 95
    • 84897623145 scopus 로고    scopus 로고
    • Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards
    • Lee, D. K., Y., Kim, I. H., Hwang, D. K., Oh, and J. G., Shin. 2014. “Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards.” The International Journal of Advanced Manufacturing Technology 71 (1–4): 621–633. doi: 10.1007/s00170-013-5498-4
    • (2014) The International Journal of Advanced Manufacturing Technology , vol.71 , Issue.1-4 , pp. 621-633
    • Lee, D.K.1    Kim, Y.2    Hwang, I.H.3    Oh, D.K.4    Shin, J.G.5
  • 96
    • 38049144587 scopus 로고    scopus 로고
    • A Statistical Analysis of Engineering Project Risks in the Korean Shipbuilding Industry
    • Lee, E., J. G., Shin, and Y., Park. 2007. “A Statistical Analysis of Engineering Project Risks in the Korean Shipbuilding Industry.” Journal of Ship Production 23 (4): 223–230.
    • (2007) Journal of Ship Production , vol.23 , Issue.4 , pp. 223-230
    • Lee, E.1    Shin, J.G.2    Park, Y.3
  • 98
    • 84939256936 scopus 로고    scopus 로고
    • A two-Stage Model of Adaptable Product Platform for Engineering-to-Order Configuration Design
    • Levandowski, C. E., J. R., Jiao, and H., Johannesson. 2015. “A two-Stage Model of Adaptable Product Platform for Engineering-to-Order Configuration Design.” Journal of Engineering Design 26 (7–9): 220–235. doi: 10.1080/09544828.2015.1021305
    • (2015) Journal of Engineering Design , vol.26 , Issue.7-9 , pp. 220-235
    • Levandowski, C.E.1    Jiao, J.R.2    Johannesson, H.3
  • 99
    • 84907381772 scopus 로고    scopus 로고
    • Set-based Development Using an Integrated Product and Manufacturing System Platform
    • Levandowski, C., M. T., Michaelis, and H., Johannesson. 2014. “Set-based Development Using an Integrated Product and Manufacturing System Platform.” Concurrent Engineering 22 (3): 234–252. doi: 10.1177/1063293X14537654
    • (2014) Concurrent Engineering , vol.22 , Issue.3 , pp. 234-252
    • Levandowski, C.1    Michaelis, M.T.2    Johannesson, H.3
  • 101
    • 0036671757 scopus 로고    scopus 로고
    • What is Lean Ship Construction and Repair?
    • Liker, J. K., and T., Lamb. 2002. “What is Lean Ship Construction and Repair?” Journal of Ship Production 18 (3): 121–142.
    • (2002) Journal of Ship Production , vol.18 , Issue.3 , pp. 121-142
    • Liker, J.K.1    Lamb, T.2
  • 103
    • 80052147949 scopus 로고    scopus 로고
    • Aggregate Production Planning for Shipbuilding with Variation-Inventory Trade-Offs
    • Liu, Z., D. K. H., Chua, and K. W., Yeoh. 2011. “Aggregate Production Planning for Shipbuilding with Variation-Inventory Trade-Offs.” International Journal of Production Research 49 (20): 6249–6272. doi: 10.1080/00207543.2010.527388
    • (2011) International Journal of Production Research , vol.49 , Issue.20 , pp. 6249-6272
    • Liu, Z.1    Chua, D.K.H.2    Yeoh, K.W.3
  • 104
    • 33749424158 scopus 로고    scopus 로고
    • The Relationship Between Proximate Supply and Build-to-Order Capability
    • Lyons, A., A., Coronado, and Z., Michaelides. 2006. “The Relationship Between Proximate Supply and Build-to-Order Capability.” Industrial Management & Data Systems 106 (8): 1095–1111. doi: 10.1108/02635570610710773
    • (2006) Industrial Management & Data Systems , vol.106 , Issue.8 , pp. 1095-1111
    • Lyons, A.1    Coronado, A.2    Michaelides, Z.3
  • 106
    • 84878214850 scopus 로고    scopus 로고
    • The Main Problems in the Product Development Process by Large-Sized Companies of the Brazilian Agricultural Machines and Implements Sector
    • London: Springer, and
    • Mano, A. P., J. M. S., Simões, L. S., Lima, J. C., de Toledo, and S. L., da Silva. 2007. “The Main Problems in the Product Development Process by Large-Sized Companies of the Brazilian Agricultural Machines and Implements Sector.” In Complex Systems Concurrent Engineering, 749–755. London: Springer.
    • (2007) Complex Systems Concurrent Engineering , pp. 749-755
    • Mano, A.P.1    Simões, J.M.S.2    Lima, L.S.3    de Toledo, J.C.4    da Silva, S.L.5
  • 107
    • 84953319524 scopus 로고    scopus 로고
    • Makespan Estimation of a Production Process Affected by Uncertainty: Application on MTO Production of NC Machine Tools
    • Manzini, M., and M., Urgo. 2015. “Makespan Estimation of a Production Process Affected by Uncertainty: Application on MTO Production of NC Machine Tools.” Journal of Manufacturing Systems 37 (P1): 1–16. doi: 10.1016/j.jmsy.2015.10.001
    • (2015) Journal of Manufacturing Systems , vol.37 , Issue.P1 , pp. 1-16
    • Manzini, M.1    Urgo, M.2
  • 108
    • 85034807417 scopus 로고    scopus 로고
    • A Risk Based Approach to Support the Supplying of Components in an MTO Assembly Process
    • Manzini, M., and M., Urgo. 2018. “A Risk Based Approach to Support the Supplying of Components in an MTO Assembly Process.” Journal of Manufacturing Systems 46: 67–78. doi: 10.1016/j.jmsy.2017.11.006
    • (2018) Journal of Manufacturing Systems , vol.46 , pp. 67-78
    • Manzini, M.1    Urgo, M.2
  • 109
    • 0042343670 scopus 로고    scopus 로고
    • Project Scheduling Approach to Production Planning
    • Márkus, A., J., Váncza, T., Kis, and A., Kovács. 2003. “Project Scheduling Approach to Production Planning.” CIRP Annals-Manufacturing Technology 52 (1): 359–362. doi: 10.1016/S0007-8506(07)60601-5
    • (2003) CIRP Annals-Manufacturing Technology , vol.52 , Issue.1 , pp. 359-362
    • Márkus, A.1    Váncza, J.2    Kis, T.3    Kovács, A.4
  • 110
    • 85029811244 scopus 로고    scopus 로고
    • Improving product configurability ETO companies. DS 87-3 Proceedings of the 21st International Conference on Engineering Design (ICED 17) 3: Product, Services and Systems Design, Vancouver, Canada, 21–25 August
    • Markworth Johnsen, S. H., K., Kristjansdottir, and L., Hvam. 2017. Improving product configurability in ETO companies. In DS 87-3 Proceedings of the 21st International Conference on Engineering Design (ICED 17) Vol. 3: Product, Services and Systems Design, Vancouver, Canada, 21–25 August.
    • (2017)
    • Markworth Johnsen, S.H.1    Kristjansdottir, K.2    Hvam, L.3
  • 111
    • 85031825706 scopus 로고    scopus 로고
    • Workforce Management in Manual Assembly Lines of Large Products: a Case Study
    • Martignago, M., O., Battaïa, and D., Battini. 2017. “Workforce Management in Manual Assembly Lines of Large Products: a Case Study.” IFAC-PapersOnLine 50: 6906–6911. doi: 10.1016/j.ifacol.2017.08.1215
    • (2017) IFAC-PapersOnLine , vol.50 , pp. 6906-6911
    • Martignago, M.1    Battaïa, O.2    Battini, D.3
  • 112
    • 0031189509 scopus 로고    scopus 로고
    • On Performance Modeling of Project-Oriented Production
    • Martinez, E. C., D., Duje, and G. A., Perez. 1997. “On Performance Modeling of Project-Oriented Production.” Computers & Industrial Engineering 32 (3): 509–527. doi: 10.1016/S0360-8352(97)00005-3
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.3 , pp. 509-527
    • Martinez, E.C.1    Duje, D.2    Perez, G.A.3
  • 114
    • 68549083851 scopus 로고    scopus 로고
    • Design of Lean Manufacturing Support Systems in Make-to-Order Production
    • Trans Tech Publications
    • Matt, D. T., 2009. “Design of Lean Manufacturing Support Systems in Make-to-Order Production.” Key Engineering Materials 410–411: 151–158. Trans Tech Publications.
    • (2009) Key Engineering Materials , vol.410-411 , pp. 151-158
    • Matt, D.T.1
  • 115
    • 84939802796 scopus 로고    scopus 로고
    • On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO)
    • Matt, D. T., P., Dallasega, and E., Rauch. 2015. “On-site Oriented Capacity Regulation for Fabrication Shops in Engineer-to-Order Companies (ETO).” Procedia CIRP 33: 197–202. doi: 10.1016/j.procir.2015.06.036
    • (2015) Procedia CIRP , vol.33 , pp. 197-202
    • Matt, D.T.1    Dallasega, P.2    Rauch, E.3
  • 116
    • 84964620719 scopus 로고    scopus 로고
    • Business and Information Management Architectures for Delivering Product Lifecycle Management (PLM) in Engineer To Order (ETO) Products
    • Bremen: RINA Conference Proceedings, and,. In
    • McKendry, D. A., R. I., Whitfield, and A. H. B., Duffy. 2015. “Business and Information Management Architectures for Delivering Product Lifecycle Management (PLM) in Engineer To Order (ETO) Products.” In International Conference in Compuer Applications for Shipbuilding. Bremen: RINA Conference Proceedings.
    • (2015) International Conference in Compuer Applications for Shipbuilding
    • McKendry, D.A.1    Whitfield, R.I.2    Duffy, A.H.B.3
  • 117
    • 85028408177 scopus 로고    scopus 로고
    • August,Key Findings to Support the Development of a Framework for the Implementation of Product Lifecycle Management Engineer to Order Products. Advances Manufacturing Technology XXXI: Proceedings of the 15th International Conference on Manufacturing Research, Incorporating the 32nd National Conference on Manufacturing Research, September 5–7, 2017, University of Greenwich, UK, 6, 464. IOS Press
    • McKendry, D. A., R. I., Whitfield, and A. H. B., Duffy. 2017, August. Key Findings to Support the Development of a Framework for the Implementation of Product Lifecycle Management in Engineer to Order Products. In Advances in Manufacturing Technology XXXI: Proceedings of the 15th International Conference on Manufacturing Research, Incorporating the 32nd National Conference on Manufacturing Research, September 5–7, 2017, University of Greenwich, UK, Vol. 6, 464. IOS Press.
    • (2017)
    • McKendry, D.A.1    Whitfield, R.I.2    Duffy, A.H.B.3
  • 118
    • 84872119006 scopus 로고    scopus 로고
    • The Optimal Organization Structure Design Problem in Make-to-Order Enterprises
    • Mena, J. A., 2012. “The Optimal Organization Structure Design Problem in Make-to-Order Enterprises.” International Journal of Industrial Engineering 19 (4): 181–192.
    • (2012) International Journal of Industrial Engineering , vol.19 , Issue.4 , pp. 181-192
    • Mena, J.A.1
  • 119
    • 0035501151 scopus 로고    scopus 로고
    • Understanding and Managing Risks in Large Engineering Projects
    • Miller, R., and D., Lessard. 2001. “Understanding and Managing Risks in Large Engineering Projects.” International Journal of Project Management 19 (8): 437–443. doi: 10.1016/S0263-7863(01)00045-X
    • (2001) International Journal of Project Management , vol.19 , Issue.8 , pp. 437-443
    • Miller, R.1    Lessard, D.2
  • 120
    • 84903849841 scopus 로고    scopus 로고
    • An Integrated Method of Hierarchical Planning and “Pull-way” Production Control for Lean Shipbuilding
    • Hong Kong: IEEE, and, December
    • Mingdi, Z., and S., Houfang. 2012, December. “An Integrated Method of Hierarchical Planning and “Pull-way” Production Control for Lean Shipbuilding.” In Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference, 2150–2154. Hong Kong: IEEE.
    • (2012) Industrial Engineering and Engineering Management (IEEM), 2012 IEEE International Conference , pp. 2150-2154
    • Mingdi, Z.1    Houfang, S.2
  • 121
    • 34547546183 scopus 로고    scopus 로고
    • Virtual Enterprise Brokerage: a Structure-Driven Strategy to Achieve Build to Order Supply Chains
    • Molina, A., M., Velandia, and N., Galeano. 2007. “Virtual Enterprise Brokerage: a Structure-Driven Strategy to Achieve Build to Order Supply Chains.” International Journal of Production Research 45 (17): 3853–3880. doi: 10.1080/00207540600818161
    • (2007) International Journal of Production Research , vol.45 , Issue.17 , pp. 3853-3880
    • Molina, A.1    Velandia, M.2    Galeano, N.3
  • 122
    • 85043361743 scopus 로고    scopus 로고
    • Towards Facades as Make-To-Order Products–the Role of Knowledge-Based-Engineering to Support Design
    • Montali, J., M., Overend, P. M., Pelken, and S., Michele. 2017. “Towards Facades as Make-To-Order Products–the Role of Knowledge-Based-Engineering to Support Design.” Journal of Facade Design and Engineering 5 (2): 101–112.
    • (2017) Journal of Facade Design and Engineering , vol.5 , Issue.2 , pp. 101-112
    • Montali, J.1    Overend, M.2    Pelken, P.M.3    Michele, S.4
  • 123
    • 24344485381 scopus 로고    scopus 로고
    • Factors Affecting Ship Design and Construction Lead Time and Cost
    • Moyst, H., and B., Das. 2005. “Factors Affecting Ship Design and Construction Lead Time and Cost.” Journal of Ship Production 21 (3): 186–194.
    • (2005) Journal of Ship Production , vol.21 , Issue.3 , pp. 186-194
    • Moyst, H.1    Das, B.2
  • 124
    • 84884989073 scopus 로고    scopus 로고
    • Reconfigurable Handling Systems as an Enabler for Large Components in Mass Customized Production
    • Müller, R., M., Esser, and M., Vette. 2013. “Reconfigurable Handling Systems as an Enabler for Large Components in Mass Customized Production.” Journal of Intelligent Manufacturing 24 (5): 977–990. doi: 10.1007/s10845-012-0624-y
    • (2013) Journal of Intelligent Manufacturing , vol.24 , Issue.5 , pp. 977-990
    • Müller, R.1    Esser, M.2    Vette, M.3
  • 125
    • 0026106979 scopus 로고
    • Project Risk Assessment Using the Analytic Hierarchy Process
    • Mustafa, M. A., and J. F., Al-Bahar. 1991. “Project Risk Assessment Using the Analytic Hierarchy Process.” IEEE Transactions on Engineering Management 38 (1): 46–52. doi: 10.1109/17.65759
    • (1991) IEEE Transactions on Engineering Management , vol.38 , Issue.1 , pp. 46-52
    • Mustafa, M.A.1    Al-Bahar, J.F.2
  • 126
    • 84901719363 scopus 로고    scopus 로고
    • Research on Complex Product WBS Process Simulation and Prediction
    • Nan, R., H., Yan-Xin, and H., Bing-Jie. 2013. “Research on Complex Product WBS Process Simulation and Prediction.” Information Technology Journal 12 (16): 3880–3884. doi: 10.3923/itj.2013.3880.3884
    • (2013) Information Technology Journal , vol.12 , Issue.16 , pp. 3880-3884
    • Nan, R.1    Yan-Xin, H.2    Bing-Jie, H.3
  • 127
    • 68949219559 scopus 로고    scopus 로고
    • Worker Allocation in Make-to-Order Assembly Cells
    • Niemi, E., 2009. “Worker Allocation in Make-to-Order Assembly Cells.” Robotics and Computer-Integrated Manufacturing 25 (6): 932–936. doi: 10.1016/j.rcim.2009.04.008
    • (2009) Robotics and Computer-Integrated Manufacturing , vol.25 , Issue.6 , pp. 932-936
    • Niemi, E.1
  • 128
    • 34249652389 scopus 로고    scopus 로고
    • An Ontology-Based Approach to Support Decision-Making for the Design of ETO (Engineer-To-Order) Products
    • Pandit, A., and Y., Zhu. 2007. “An Ontology-Based Approach to Support Decision-Making for the Design of ETO (Engineer-To-Order) Products.” Automation in Construction 16 (6): 759–770. doi: 10.1016/j.autcon.2007.02.003
    • (2007) Automation in Construction , vol.16 , Issue.6 , pp. 759-770
    • Pandit, A.1    Zhu, Y.2
  • 129
    • 0033736797 scopus 로고    scopus 로고
    • A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System Under due Date Constraints
    • Park, M. W., and Y. D., Kim. 2000. “A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System Under due Date Constraints.” European Journal of Operational Research 123 (3): 504–518. doi: 10.1016/S0377-2217(99)00108-3
    • (2000) European Journal of Operational Research , vol.123 , Issue.3 , pp. 504-518
    • Park, M.W.1    Kim, Y.D.2
  • 130
    • 33947672314 scopus 로고    scopus 로고
    • Assembly Block Storage Location Assignment at a Shipyard: a Case of Hyundai Heavy Industries
    • Park, C., J., Seo, J., Kim, S., Lee, T. H., Baek, and S. K., Min. 2007. “Assembly Block Storage Location Assignment at a Shipyard: a Case of Hyundai Heavy Industries.” Production Planning and Control 18 (3): 180–189. doi: 10.1080/09537280601009039
    • (2007) Production Planning and Control , vol.18 , Issue.3 , pp. 180-189
    • Park, C.1    Seo, J.2    Kim, J.3    Lee, S.4    Baek, T.H.5    Min, S.K.6
  • 131
    • 9444251028 scopus 로고    scopus 로고
    • An Integrated Reference Model for Production Planning and Control in SMEs
    • Persona, A., A., Regattieri, and P., Romano. 2004. “An Integrated Reference Model for Production Planning and Control in SMEs.” Journal of Manufacturing Technology Management 15 (7): 626–640. doi: 10.1108/17410380410555871
    • (2004) Journal of Manufacturing Technology Management , vol.15 , Issue.7 , pp. 626-640
    • Persona, A.1    Regattieri, A.2    Romano, P.3
  • 133
    • 0037063279 scopus 로고    scopus 로고
    • Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products
    • Pongcharoen, P., C., Hicks, P. M., Braiden, and D. J., Stewardson. 2002. “Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products.” International Journal of Production Economics 78 (3): 311–322. doi: 10.1016/S0925-5273(02)00104-4
    • (2002) International Journal of Production Economics , vol.78 , Issue.3 , pp. 311-322
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3    Stewardson, D.J.4
  • 134
    • 84859397505 scopus 로고    scopus 로고
    • A Lean-Based ORR System for non-Repetitive Manufacturing
    • Portioli-Staudacher, A., and M., Tantardini. 2012. “A Lean-Based ORR System for non-Repetitive Manufacturing.” International Journal of Production Research 50 (12): 3257–3273. doi: 10.1080/00207543.2011.564664
    • (2012) International Journal of Production Research , vol.50 , Issue.12 , pp. 3257-3273
    • Portioli-Staudacher, A.1    Tantardini, M.2
  • 135
    • 84904460379 scopus 로고    scopus 로고
    • A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers
    • Powell, D., J. O., Strandhagen, I., Tommelein, G., Ballard, and M., Rossi. 2014. “A New Set of Principles for Pursuing the Lean Ideal in Engineer-to-Order Manufacturers.” Procedia CIRP 17: 571–576. doi: 10.1016/j.procir.2014.01.137
    • (2014) Procedia CIRP , vol.17 , pp. 571-576
    • Powell, D.1    Strandhagen, J.O.2    Tommelein, I.3    Ballard, G.4    Rossi, M.5
  • 137
    • 84970714737 scopus 로고
    • Working top-Down: Cost Estimating Before Development Begins. Proceedings of the Institution of Mechanical Engineers
    • Pugh, P. G., 1992. “Working top-Down: Cost Estimating Before Development Begins. Proceedings of the Institution of Mechanical Engineers.” Part G: Journal of Aerospace Engineering 206 (2): 143–151.
    • (1992) Part G: Journal of Aerospace Engineering , vol.206 , Issue.2 , pp. 143-151
    • Pugh, P.G.1
  • 138
    • 85029824711 scopus 로고    scopus 로고
    • Transforming ETO Businesses with Enhanced PLM Capabilities
    • Pulkkinen, A., S. P., Leino, and J., Papinniemi. 2017. “Transforming ETO Businesses with Enhanced PLM Capabilities.” Procedia Manufacturing 11: 1642–1650. doi: 10.1016/j.promfg.2017.07.315
    • (2017) Procedia Manufacturing , vol.11 , pp. 1642-1650
    • Pulkkinen, A.1    Leino, S.P.2    Papinniemi, J.3
  • 139
    • 84960155448 scopus 로고    scopus 로고
    • Multi-objective Mixed Integer Programming Approach for Facility Layout Design by Considering Closeness Ratings, Material Handling, and Re-Layout Cost
    • Purnomo, M. R. A., and Y. S., Wiwoho. 2016. “Multi-objective Mixed Integer Programming Approach for Facility Layout Design by Considering Closeness Ratings, Material Handling, and Re-Layout Cost.” IOP Conference Series: Materials Science and Engineering, Vol. 105, no. 1, 012045 105 (1): 012045. doi: 10.1088/1757-899X/105/1/012045
    • (2016) IOP Conference Series: Materials Science and Engineering, Vol. 105, no. 1, 012045 , vol.105 , Issue.1 , pp. 012045
    • Purnomo, M.R.A.1    Wiwoho, Y.S.2
  • 141
    • 84986059467 scopus 로고    scopus 로고
    • The Need for a New Product Development Framework for Engineer-to-Order Products
    • Rahman Abdul Rahim, A., and M., Shariff Nabi Baksh. 2003. “The Need for a New Product Development Framework for Engineer-to-Order Products.” European Journal of Innovation Management 6 (3): 182–196. doi: 10.1108/14601060310486253
    • (2003) European Journal of Innovation Management , vol.6 , Issue.3 , pp. 182-196
    • Rahman Abdul Rahim, A.1    Shariff Nabi Baksh, M.2
  • 142
    • 0032715081 scopus 로고    scopus 로고
    • Tools and Techniques for Decomposing and Managing Complex Design Projects
    • Rogers, J. L., 1999. “Tools and Techniques for Decomposing and Managing Complex Design Projects.” Journal of Aircraft 36 (1): 266–274. doi: 10.2514/2.2434
    • (1999) Journal of Aircraft , vol.36 , Issue.1 , pp. 266-274
    • Rogers, J.L.1
  • 143
    • 18844387410 scopus 로고    scopus 로고
    • Integer Programming Approach to Production Scheduling for Make-to-Order Manufacturing
    • Sawik, T., 2005. “Integer Programming Approach to Production Scheduling for Make-to-Order Manufacturing.” Mathematical and Computer Modelling 41 (1): 99–118. doi: 10.1016/j.mcm.2003.10.053
    • (2005) Mathematical and Computer Modelling , vol.41 , Issue.1 , pp. 99-118
    • Sawik, T.1
  • 144
    • 30844458381 scopus 로고    scopus 로고
    • Hierarchical Approach to Production Scheduling in Make-to-Order Assembly
    • Sawik, T., 2006. “Hierarchical Approach to Production Scheduling in Make-to-Order Assembly.” International Journal of Production Research 44 (4): 801–830. doi: 10.1080/00207540500340969
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 801-830
    • Sawik, T.1
  • 145
    • 84954468605 scopus 로고    scopus 로고
    • How to Analyze and Quantify Similarities Between Configured Engineer-to-Order Products by Comparing the Highlighted Features Utilizing the Configuration System Abilities
    • Vienna: University of Helsinki, and
    • Shafiee, S., L., Hvam, and K., Kristjansdottir. 2015. “How to Analyze and Quantify Similarities Between Configured Engineer-to-Order Products by Comparing the Highlighted Features Utilizing the Configuration System Abilities.” In 17th International Configuration Workshop, 139–145. Vienna: University of Helsinki.
    • (2015) 17th International Configuration Workshop , pp. 139-145
    • Shafiee, S.1    Hvam, L.2    Kristjansdottir, K.3
  • 146
    • 85034013934 scopus 로고    scopus 로고
    • Automatic Identification of Similarities Across Products to Improve the Configuration Process in ETO Companies
    • Shafiee, S., K., Kristjansdottir, and L., Hvam. 2017. “Automatic Identification of Similarities Across Products to Improve the Configuration Process in ETO Companies.” International Journal of Industrial Engineering and Management 8 (3): 167–176.
    • (2017) International Journal of Industrial Engineering and Management , vol.8 , Issue.3 , pp. 167-176
    • Shafiee, S.1    Kristjansdottir, K.2    Hvam, L.3
  • 147
    • 84866075196 scopus 로고    scopus 로고
    • A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects
    • Sharon, A., and D., Dori. 2012. “A Model-Based Approach for Planning Work Breakdown Structures of Complex Systems Projects.” IFAC Proceedings Volumes 45 (6): 1083–1088. doi: 10.3182/20120523-3-RO-2023.00255
    • (2012) IFAC Proceedings Volumes , vol.45 , Issue.6 , pp. 1083-1088
    • Sharon, A.1    Dori, D.2
  • 148
    • 85038936122 scopus 로고    scopus 로고
    • July,Design of an Integrated Production Planning System Framework Based on Simulation Using a Production Information Model. The 27th International Ocean and Polar Engineering Conference. International Society of Offshore and Polar Engineers
    • Shen, H., S., Nam, S., Ju, S., Sung, J. G., Shin, and J. H., Nam. 2017, July. Design of an Integrated Production Planning System Framework Based on Simulation Using a Production Information Model. In The 27th International Ocean and Polar Engineering Conference. International Society of Offshore and Polar Engineers.
    • (2017)
    • Shen, H.1    Nam, S.2    Ju, S.3    Sung, S.4    Shin, J.G.5    Nam, J.H.6
  • 149
    • 0031371730 scopus 로고    scopus 로고
    • Productivity Improvements for a Small “Made-to-Order” Manufacturing Environment
    • Shing Ong, N., 1997. “Productivity Improvements for a Small “Made-to-Order” Manufacturing Environment.” Industrial Management & Data Systems 97 (7): 251–258. doi: 10.1108/02635579710191662
    • (1997) Industrial Management & Data Systems , vol.97 , Issue.7 , pp. 251-258
    • Shing Ong, N.1
  • 150
    • 84906924240 scopus 로고    scopus 로고
    • Designing an Engineer-to-Order Performance Measurement System: a Case Study
    • September,Berlin, Heidelberg: Springer, and
    • Sjøbakk, B., and O., Bakås. 2014, September. “Designing an Engineer-to-Order Performance Measurement System: a Case Study.” In IFIP International Conference on Advances in Production Management Systems, 473–480. Berlin, Heidelberg: Springer.
    • (2014) IFIP International Conference on Advances in Production Management Systems , pp. 473-480
    • Sjøbakk, B.1    Bakås, O.2
  • 151
    • 84938945527 scopus 로고    scopus 로고
    • Designing a Performance Measurement System to Support Materials Management in Engineer-to-Order: a Case Study
    • Sjøbakk, B., O., Bakås, O., Bondarenko, and T., Kamran. 2015. “Designing a Performance Measurement System to Support Materials Management in Engineer-to-Order: a Case Study.” Advances in Manufacturing 3 (2): 111–122. doi: 10.1007/s40436-015-0109-2
    • (2015) Advances in Manufacturing , vol.3 , Issue.2 , pp. 111-122
    • Sjøbakk, B.1    Bakås, O.2    Bondarenko, O.3    Kamran, T.4
  • 152
    • 84921867550 scopus 로고    scopus 로고
    • A Performance Measurement System to Support Materials Management in Engineer-to-Order Companies
    • Trans Tech Publications, and
    • Sjøbakk, B., O., Bondarenko, and T., Kamran. 2014. “A Performance Measurement System to Support Materials Management in Engineer-to-Order Companies.” Advanced Materials Research 1039: 569–576.). Trans Tech Publications.
    • (2014) Advanced Materials Research , vol.1039 , pp. 569-576
    • Sjøbakk, B.1    Bondarenko, O.2    Kamran, T.3
  • 153
    • 70349642237 scopus 로고    scopus 로고
    • A Lean Production Control System for High-Variety/low-Volume Environments: a Case Study Implementation
    • Slomp, J., J. A., Bokhorst, and R., Germs. 2009. “A Lean Production Control System for High-Variety/low-Volume Environments: a Case Study Implementation.” Production Planning and Control 20 (7): 586–595. doi: 10.1080/09537280903086164
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 586-595
    • Slomp, J.1    Bokhorst, J.A.2    Germs, R.3
  • 155
    • 0035872175 scopus 로고    scopus 로고
    • Setting Planned job Release Times in Stochastic Assembly Systems with Resource Constraints
    • Song, D., C., Hicks, and C. F., Earl. 2001. “Setting Planned job Release Times in Stochastic Assembly Systems with Resource Constraints.” International Journal of Production Research 39 (6): 1289–1301. doi: 10.1080/00207540010022377
    • (2001) International Journal of Production Research , vol.39 , Issue.6 , pp. 1289-1301
    • Song, D.1    Hicks, C.2    Earl, C.F.3
  • 156
    • 0037061532 scopus 로고    scopus 로고
    • Product due Date Assignment for Complex Assemblies
    • Song, D. P., C., Hicks, and C. F., Earl. 2002. “Product due Date Assignment for Complex Assemblies.” International Journal of Production Economics 76 (3): 243–256. doi: 10.1016/S0925-5273(01)00170-0
    • (2002) International Journal of Production Economics , vol.76 , Issue.3 , pp. 243-256
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 157
    • 79960706061 scopus 로고    scopus 로고
    • Planned Lead-Times Design in Stochastic Multistage Assembly Systems
    • Song, D. P., C., Hicks, and C. F., Earl. 2005. “Planned Lead-Times Design in Stochastic Multistage Assembly Systems.” IFAC Proceedings Volumes 38 (1): 189–194. doi: 10.3182/20050703-6-CZ-1902.01515
    • (2005) IFAC Proceedings Volumes , vol.38 , Issue.1 , pp. 189-194
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 158
    • 33749553327 scopus 로고    scopus 로고
    • An Ordinal Optimization Based Evolution Strategy to Schedule Complex Make-to-Order Products
    • Song, D. P., C., Hicks, and C. F., Earl. 2006. “An Ordinal Optimization Based Evolution Strategy to Schedule Complex Make-to-Order Products.” International Journal of Production Research 44 (22): 4877–4895. doi: 10.1080/00207540600620922
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4877-4895
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 159
    • 77955692246 scopus 로고    scopus 로고
    • System Development and Applications of a Shipyard Layout Design Framework
    • Song, Y. J., D. K., Lee, J. H., Woo, and J. G., Shin. 2010. “System Development and Applications of a Shipyard Layout Design Framework.” Journal of Ship Production and Design 26 (2): 144–154.
    • (2010) Journal of Ship Production and Design , vol.26 , Issue.2 , pp. 144-154
    • Song, Y.J.1    Lee, D.K.2    Woo, J.H.3    Shin, J.G.4
  • 160
    • 84863012341 scopus 로고    scopus 로고
    • Research on a Simulation-Based Ship Production Support System for Middle-Sized Shipbuilding Companies
    • Song, Y. J., J. H., Woo, and J. G., Shin. 2009. “Research on a Simulation-Based Ship Production Support System for Middle-Sized Shipbuilding Companies.” International Journal of Naval Architecture and Ocean Engineering 1 (2): 70–77. doi: 10.2478/IJNAOE-2013-0009
    • (2009) International Journal of Naval Architecture and Ocean Engineering , vol.1 , Issue.2 , pp. 70-77
    • Song, Y.J.1    Woo, J.H.2    Shin, J.G.3
  • 161
    • 67651229046 scopus 로고    scopus 로고
    • Procedure for Reducing the Risk of Delayed Deliveries in Make-to-Order Production
    • Stefansson, H., P., Jensson, and N., Shah. 2009. “Procedure for Reducing the Risk of Delayed Deliveries in Make-to-Order Production.” Production Planning and Control 20 (4): 332–342. doi: 10.1080/09537280902843698
    • (2009) Production Planning and Control , vol.20 , Issue.4 , pp. 332-342
    • Stefansson, H.1    Jensson, P.2    Shah, N.3
  • 162
    • 84874671639 scopus 로고    scopus 로고
    • Development and Applications of Simulation Tools for one-of-a-Kind Production Processes
    • Berlin: IEEE, and
    • Steinhauer, D., and M., Soyka. 2012. “Development and Applications of Simulation Tools for one-of-a-Kind Production Processes.” In Simulation Conference (WSC). Proceedings of the, 2012. Winter, 1–11. Berlin: IEEE.
    • (2012) Simulation Conference (WSC). Proceedings of the, 2012. Winter , pp. 1-11
    • Steinhauer, D.1    Soyka, M.2
  • 163
    • 33748750890 scopus 로고    scopus 로고
    • Aggregate Load-Oriented Workload Control: A Review and a re-Classification of a key Approach
    • Stevenson, M., and L. C., Hendry. 2006. “Aggregate Load-Oriented Workload Control: A Review and a re-Classification of a key Approach.” International Journal of Production Economics 104 (2): 676–693. doi: 10.1016/j.ijpe.2005.05.022
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 676-693
    • Stevenson, M.1    Hendry, L.C.2
  • 164
    • 27744563510 scopus 로고    scopus 로고
    • A Review of Production Planning and Control: the Applicability of key Concepts to the Make-to-Order Industry
    • Stevenson, M., L. C., Hendry, and B. G., Kingsman. 2005. “A Review of Production Planning and Control: the Applicability of key Concepts to the Make-to-Order Industry.” International Journal of Production Research 43 (5): 869–898. doi: 10.1080/0020754042000298520
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 165
    • 0024765069 scopus 로고
    • The Use of Computers in Establishing a Company-Wide Perspective Toward Advanced Ship Production
    • Stewart, E. W., 1989. “The Use of Computers in Establishing a Company-Wide Perspective Toward Advanced Ship Production.” Journal of Ship Production 5 (4).
    • (1989) Journal of Ship Production , vol.5 , Issue.4
    • Stewart, E.W.1
  • 166
    • 0033097214 scopus 로고    scopus 로고
    • Improving Flow to Achieve Lean Manufacturing in Shipbuilding
    • Storch, R. L., and S., Lim. 1999. “Improving Flow to Achieve Lean Manufacturing in Shipbuilding.” Production Planning & Control 10 (2): 127–137. doi: 10.1080/095372899233280
    • (1999) Production Planning & Control , vol.10 , Issue.2 , pp. 127-137
    • Storch, R.L.1    Lim, S.2
  • 167
    • 0038250770 scopus 로고    scopus 로고
    • Strategies for Enhancing Twoagility of Make-to-Order Manufacturing Systems
    • Subash Babu, A., 1999. “Strategies for Enhancing Twoagility of Make-to-Order Manufacturing Systems.” International Journal of Agile Management Systems 1 (1): 23–29. doi: 10.1108/14654659910266682
    • (1999) International Journal of Agile Management Systems , vol.1 , Issue.1 , pp. 23-29
    • Subash Babu, A.1
  • 168
    • 77955240739 scopus 로고    scopus 로고
    • Mechanical Engineering Design Complexity Metrics: Size, Coupling, and Solvability
    • Summers, J. D., and J. J., Shah. 2010. “Mechanical Engineering Design Complexity Metrics: Size, Coupling, and Solvability.” Journal of Mechanical Design 132 (2): 021004–021015. doi: 10.1115/1.4000759
    • (2010) Journal of Mechanical Design , vol.132 , Issue.2 , pp. 021004-021015
    • Summers, J.D.1    Shah, J.J.2
  • 169
    • 0019565498 scopus 로고
    • An Aggregate Production Planning for a Heavy Manufacturing Industry
    • Tang, J. C., P., Adulbhan, and T., Zubair. 1981. “An Aggregate Production Planning for a Heavy Manufacturing Industry.” European Journal of Operational Research 7 (1): 22–29. doi: 10.1016/0377-2217(81)90046-1
    • (1981) European Journal of Operational Research , vol.7 , Issue.1 , pp. 22-29
    • Tang, J.C.1    Adulbhan, P.2    Zubair, T.3
  • 170
    • 84856893341 scopus 로고    scopus 로고
    • Order Management in the Customization-Responsiveness Squeeze
    • Tenhiälä, A., and M., Ketokivi. 2012. “Order Management in the Customization-Responsiveness Squeeze.” Decision Sciences 43 (1): 173–206. doi: 10.1111/j.1540-5915.2011.00342.x
    • (2012) Decision Sciences , vol.43 , Issue.1 , pp. 173-206
    • Tenhiälä, A.1    Ketokivi, M.2
  • 171
    • 85030594714 scopus 로고    scopus 로고
    • Project Scheduling System for Planning Make-to-Order Production
    • Andersin H.E., Niemi E., Hirvonen V., (eds), Otaniemi: ICAM, and,. edited by
    • Toivonen, V., E., Niemi, and K., Ikkala. 2005. “Project Scheduling System for Planning Make-to-Order Production.” In Proceedings of the International Conference on Agility, 27–28 July, edited by H. E., Andersin, E., Niemi, and V., Hirvonen. Otaniemi: ICAM.
    • (2005) Proceedings of the International Conference on Agility, 27–28 July
    • Toivonen, V.1    Niemi, E.2    Ikkala, K.3
  • 172
    • 70349124674 scopus 로고    scopus 로고
    • January,Production and material requirements planning Manufacturing-to-Order environments: an application to machining centers production. (411–417). American Society of Mechanical Engineers
    • Tolio, T., M., Urgo, and A., Alfieri. 2008, January. “Production and material requirements planning in Manufacturing-to-Order environments: an application to machining centers production.” In ASME, 9th Biennial Conference on Engineering Systems Design and Analysis (411–417). American Society of Mechanical Engineers.
    • (2008) In ASME, 9th Biennial Conference on Engineering Systems Design and Analysis
    • Tolio, T.1    Urgo, M.2    Alfieri, A.3
  • 173
    • 84952037281 scopus 로고    scopus 로고
    • A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning
    • September,Cham: Springer, and
    • Vaagen, H., and M., Kaut. 2015, September. “A Mockup Stochastic Program to Study the Impact of Design Uncertainty on ETO Shipbuilding Planning.” In IFIP International Conference on Advances in Production Management Systems, 167–174. Cham: Springer.
    • (2015) IFIP International Conference on Advances in Production Management Systems , pp. 167-174
    • Vaagen, H.1    Kaut, M.2
  • 174
    • 67649118794 scopus 로고    scopus 로고
    • Applicability of the Capability Maturity Model for Engineer-to-Order Firms
    • Veldman, J., and W., Klingenberg. 2009. “Applicability of the Capability Maturity Model for Engineer-to-Order Firms.” International Journal of Technology Management 48 (2): 219–239. doi: 10.1504/IJTM.2009.024917
    • (2009) International Journal of Technology Management , vol.48 , Issue.2 , pp. 219-239
    • Veldman, J.1    Klingenberg, W.2
  • 175
    • 85017409652 scopus 로고    scopus 로고
    • Utilising the Internet of Things for the Management of Through-Life Engineering Services on Marine Auxiliaries
    • von Stietencron, M., C. C., Røstad, B., Henriksen, and K. D., Thoben. 2017. “Utilising the Internet of Things for the Management of Through-Life Engineering Services on Marine Auxiliaries.” Procedia CIRP 59: 233–239. doi: 10.1016/j.procir.2016.09.003
    • (2017) Procedia CIRP , vol.59 , pp. 233-239
    • von Stietencron, M.1    Røstad, C.C.2    Henriksen, B.3    Thoben, K.D.4
  • 176
    • 0032138424 scopus 로고    scopus 로고
    • A Fuzzy due-Date Bargainer for the Make-to-Order Manufacturing Systems. IEEE Transactions on Systems, Man, and Cybernetics
    • Wang, D., S. C., Fang, and T. J., Hodgson. 1998. “A Fuzzy due-Date Bargainer for the Make-to-Order Manufacturing Systems. IEEE Transactions on Systems, Man, and Cybernetics.” Part C (Applications and Reviews 28 (3): 492–497.
    • (1998) Part C (Applications and Reviews , vol.28 , Issue.3 , pp. 492-497
    • Wang, D.1    Fang, S.C.2    Hodgson, T.J.3
  • 177
    • 84870596784 scopus 로고    scopus 로고
    • Research of WBS Construction Technology for Large Aircraft Based on Artificial Neural Network
    • Taiyuan: ADME, and
    • Wang, K. F., G. R., Yan, and W., Wang. 2012. “Research of WBS Construction Technology for Large Aircraft Based on Artificial Neural Network.” In Applied Mechanics and Materials. Vol. 220, 812–818. Taiyuan: ADME.
    • (2012) Applied Mechanics and Materials , vol.220 , pp. 812-818
    • Wang, K.F.1    Yan, G.R.2    Wang, W.3
  • 178
    • 0029357179 scopus 로고
    • A Classified Bibliography of Recent Research Relating to Project Risk Management
    • Williams, T., 1995. “A Classified Bibliography of Recent Research Relating to Project Risk Management.” European Journal of Operational Research 85 (1): 18–38. doi: 10.1016/0377-2217(93)E0363-3
    • (1995) European Journal of Operational Research , vol.85 , Issue.1 , pp. 18-38
    • Williams, T.1
  • 179
    • 0032653583 scopus 로고    scopus 로고
    • The Need for new Paradigms for Complex Projects
    • Williams, T. M., 1999. “The Need for new Paradigms for Complex Projects.” International Journal of Project Management 17 (5): 269–273. doi: 10.1016/S0263-7863(98)00047-7
    • (1999) International Journal of Project Management , vol.17 , Issue.5 , pp. 269-273
    • Williams, T.M.1
  • 180
    • 84897620971 scopus 로고    scopus 로고
    • Systematisation of Ship Production Management and Case Study for Ship Block Assembly Factory
    • Woo, J. H., and Y. J., Song. 2014. “Systematisation of Ship Production Management and Case Study for Ship Block Assembly Factory.” International Journal of Computer Integrated Manufacturing 27 (4): 333–347. doi: 10.1080/0951192X.2013.800237
    • (2014) International Journal of Computer Integrated Manufacturing , vol.27 , Issue.4 , pp. 333-347
    • Woo, J.H.1    Song, Y.J.2
  • 181
    • 0026854373 scopus 로고
    • Production Management Systems for one-of-a-Kind Products
    • Wortmann, J. C., 1992. “Production Management Systems for one-of-a-Kind Products.” Computers in Industry 19 (1): 79–88. doi: 10.1016/0166-3615(92)90008-B
    • (1992) Computers in Industry , vol.19 , Issue.1 , pp. 79-88
    • Wortmann, J.C.1
  • 182
    • 84856354513 scopus 로고    scopus 로고
    • Optimal Adaptable Design for Creating the Changeable Product Based on Changeable Requirements Considering the Whole Product Life-Cycle
    • Xue, D., G., Hua, V., Mehrad, and P., Gu. 2012. “Optimal Adaptable Design for Creating the Changeable Product Based on Changeable Requirements Considering the Whole Product Life-Cycle.” Journal of Manufacturing Systems 31 (1): 59–68. doi: 10.1016/j.jmsy.2011.04.003
    • (2012) Journal of Manufacturing Systems , vol.31 , Issue.1 , pp. 59-68
    • Xue, D.1    Hua, G.2    Mehrad, V.3    Gu, P.4
  • 183
    • 84867817884 scopus 로고    scopus 로고
    • The Simulation of the Ship Production Design Process Based on Hierarchical Timed Petri Net
    • Trans Tech Publications, and
    • Yan, R., P., Jiang, W. J., Li, J., Yan, and L., Wen. 2012. “The Simulation of the Ship Production Design Process Based on Hierarchical Timed Petri Net.” Advanced Materials Research 544: 170–175. Trans Tech Publications.
    • (2012) Advanced Materials Research , vol.544 , pp. 170-175
    • Yan, R.1    Jiang, P.2    Li, W.J.3    Yan, J.4    Wen, L.5
  • 184
    • 77949489584 scopus 로고    scopus 로고
    • A Genetic Approach to two-Phase Optimization of Dynamic Supply Chain Scheduling
    • Yimer, A. D., and K., Demirli. 2010. “A Genetic Approach to two-Phase Optimization of Dynamic Supply Chain Scheduling.” Computers & Industrial Engineering 58 (3): 411–422. doi: 10.1016/j.cie.2009.01.010
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.3 , pp. 411-422
    • Yimer, A.D.1    Demirli, K.2
  • 185
    • 37749044158 scopus 로고    scopus 로고
    • Research on the Production Logistics System of Shipbuilding Enterprise Based on MRP and TOC
    • Chengdu: ASCE, and
    • Yue, W., C., Wang, Q., Zhang, and H., Fan. 2007. “Research on the Production Logistics System of Shipbuilding Enterprise Based on MRP and TOC.” In International Conference on Transportation Engineering, 2536–2541. Chengdu: ASCE.
    • (2007) International Conference on Transportation Engineering , pp. 2536-2541
    • Yue, W.1    Wang, C.2    Zhang, Q.3    Fan, H.4
  • 186
    • 79952966869 scopus 로고    scopus 로고
    • ERP System Implementation in Make-to-Order SMEs: An Exploratory Case Study
    • Kauai: IEEE, and
    • Zach, O., and D. H., Olsen. 2011. “ERP System Implementation in Make-to-Order SMEs: An Exploratory Case Study.” In System Sciences HICSS. 44th Hawaii International Conference, 1–10. Kauai: IEEE.
    • (2011) System Sciences HICSS. 44th Hawaii International Conference , pp. 1-10
    • Zach, O.1    Olsen, D.H.2
  • 187
    • 84908204809 scopus 로고    scopus 로고
    • Product Configuration: a Review of the State-of-the-art and Future Research
    • Zhang, L. L., 2014. “Product Configuration: a Review of the State-of-the-art and Future Research.” International Journal of Production Research 52 (21): 6381–6398. doi: 10.1080/00207543.2014.942012
    • (2014) International Journal of Production Research , vol.52 , Issue.21 , pp. 6381-6398
    • Zhang, L.L.1
  • 189
    • 84903313967 scopus 로고    scopus 로고
    • Robust Adaptable Design Considering Changes of Requirements and Parameters During Product Operation Stage
    • Zhang, J., D., Xue, and P., Gu. 2014. “Robust Adaptable Design Considering Changes of Requirements and Parameters During Product Operation Stage.” The International Journal of Advanced Manufacturing Technology 72 (1–4): 387–401. doi: 10.1007/s00170-014-5658-1
    • (2014) The International Journal of Advanced Manufacturing Technology , vol.72 , Issue.1-4 , pp. 387-401
    • Zhang, J.1    Xue, D.2    Gu, P.3
  • 190
    • 84929134108 scopus 로고    scopus 로고
    • Adaptable Design of Open Architecture Products with Robust Performance
    • Zhang, J., D., Xue, and P., Gu. 2015. “Adaptable Design of Open Architecture Products with Robust Performance.” Journal of Engineering Design 26 (1–3): 1–23. doi: 10.1080/09544828.2015.1012055
    • (2015) Journal of Engineering Design , vol.26 , Issue.1-3 , pp. 1-23
    • Zhang, J.1    Xue, D.2    Gu, P.3
  • 191
    • 84963649712 scopus 로고    scopus 로고
    • A System Framework for OKP Product Planning in a Cloud-Based Design Environment
    • Zheng, P., Y., Lu, X., Xu, and S. Q., Xie. 2017. “A System Framework for OKP Product Planning in a Cloud-Based Design Environment.” Robotics and Computer-Integrated Manufacturing 45: 73–85. doi: 10.1016/j.rcim.2016.04.001
    • (2017) Robotics and Computer-Integrated Manufacturing , vol.45 , pp. 73-85
    • Zheng, P.1    Lu, Y.2    Xu, X.3    Xie, S.Q.4
  • 192
    • 85019001563 scopus 로고    scopus 로고
    • Personalized Product Configuration Framework in an Adaptable Open Architecture Product Platform
    • Zheng, P., X., Xu, S., Yu, and C., Liu. 2017. “Personalized Product Configuration Framework in an Adaptable Open Architecture Product Platform.” Journal of Manufacturing Systems 43: 422–435. doi: 10.1016/j.jmsy.2017.03.010
    • (2017) Journal of Manufacturing Systems , vol.43 , pp. 422-435
    • Zheng, P.1    Xu, X.2    Yu, S.3    Liu, C.4
  • 193
    • 84940490504 scopus 로고    scopus 로고
    • Simulation of Low-Volume Mixed Model Assembly Lines: Modeling Aspects and Case Study
    • Savannah: IEEE Press, and
    • Ziarnetzky, T., L., Mönch, and A., Biele. 2014. “Simulation of Low-Volume Mixed Model Assembly Lines: Modeling Aspects and Case Study.” In Proceedings of the 2014 Winter Simulation Conference, 2101–2112. Savannah: IEEE Press.
    • (2014) Proceedings of the 2014 Winter Simulation Conference , pp. 2101-2112
    • Ziarnetzky, T.1    Mönch, L.2    Biele, A.3
  • 194
    • 39649122099 scopus 로고    scopus 로고
    • Due Date (DD) Quotation and Capacity Planning in Make-to-Order Companies: Results From an Empirical Analysis
    • Zorzini, M., D., Corti, and A., Pozzetti. 2008. “Due Date (DD) Quotation and Capacity Planning in Make-to-Order Companies: Results From an Empirical Analysis.” International Journal of Production Economics 112 (2): 919–933. doi: 10.1016/j.ijpe.2007.08.005
    • (2008) International Journal of Production Economics , vol.112 , Issue.2 , pp. 919-933
    • Zorzini, M.1    Corti, D.2    Pozzetti, A.3