2
-
-
84989726438
-
Supply management in assembly systems
-
Chu, C., J. M., Proth and X. Xie (1993). Supply management in assembly systems, Naval Research Logistics, 40, 933-949.
-
(1993)
Naval Research Logistics
, vol.40
, pp. 933-949
-
-
Chu, C.1
Proth, J.M.2
Xie, X.3
-
3
-
-
0033888813
-
Optimal start times under stochastic activity durations
-
Elmaghraby, S. E., A. A. Ferreira. and L. V. Tavares (2000). Optimal start times under stochastic activity durations, International Journal of Production Economics, 64, 153-164.
-
(2000)
International Journal of Production Economics
, vol.64
, pp. 153-164
-
-
Elmaghraby, S.E.1
Ferreira, A.A.2
Tavares, L.V.3
-
6
-
-
0028423190
-
Optimal lead-times planning in a serial production system
-
Gong, L. G., T. Kok and J. Ding (1994). Optimal lead-times planning in a serial production system, Management Science, 40(5), 629-632.
-
(1994)
Management Science
, vol.40
, Issue.5
, pp. 629-632
-
-
Gong, L.G.1
Kok, T.2
Ding, J.3
-
7
-
-
0032650511
-
Optimal material release times in stochastic production environments
-
Hasan, C. N. and M. L. Spearman (1999). Optimal material release times in stochastic production environments. International Journal of Production Research, 37(6), 1201-1216.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.6
, pp. 1201-1216
-
-
Hasan, C.N.1
Spearman, M.L.2
-
8
-
-
0027562596
-
Setting safety lead-times for purchased components in assembly systems
-
Hopp, W. J. and M. L. Spearman (1993). Setting safety lead-times for purchased components in assembly systems, IIE Transactions, 25(2), 2- 11.
-
(1993)
IIE Transactions
, vol.25
, Issue.2
, pp. 2-11
-
-
Hopp, W.J.1
Spearman, M.L.2
-
11
-
-
77950506731
-
Manufacturing lead times, order release and capacity loading
-
Graves, S. C. A. H. G. Rinnooy Kan and P. H. Zipkin (Ed)), Elsevier, New York
-
Karmarkar, U. S. (1993). Manufacturing lead times, order release and capacity loading. In: Logistics of Production and Inventory, (Graves, S. C., A. H. G. Rinnooy Kan and P. H. Zipkin (Ed)), 287-329. Elsevier, New York.
-
(1993)
Logistics of Production and Inventory
, pp. 287-329
-
-
Karmarkar, U.S.1
-
12
-
-
26444479778
-
Optimisation by simulated annealing
-
Kirkpatrick, S., C. D. Gelatt and M. P. Vecchi (1983). Optimisation by simulated annealing, Science, 220(4598), 671-680.
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
14
-
-
0031123532
-
Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system
-
Molinder, A. (1997). Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, 35(4), 983-994.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.4
, pp. 983-994
-
-
Molinder, A.1
-
16
-
-
0029392207
-
Setting safety lead-times for purchased components in assembly systems: A general solution procedure
-
Shore, H. (1995). Setting safety lead-times for purchased components in assembly systems: a general solution procedure, IIE Transactions, 27(5), 634-637.
-
(1995)
IIE Transactions
, vol.27
, Issue.5
, pp. 634-637
-
-
Shore, H.1
-
17
-
-
0035872175
-
Setting planned job release times in stochastic assembly systems with resource constraints
-
Song, D. P., C. Hicks and C. F. Earl (2001). Setting planned job release times in stochastic assembly systems with resource constraints, International Journal of Production Research, 39(6), 1289- 1301.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.6
, pp. 1289-1301
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
18
-
-
84989412809
-
Material requirements planning under uncertainty
-
Whybark, D. C. and J. G. Williams (1976). Material requirements planning under uncertainty, Decision Sciences, 7, 595-606.
-
(1976)
Decision Sciences
, vol.7
, pp. 595-606
-
-
Whybark, D.C.1
Williams, J.G.2
-
19
-
-
0023558979
-
Stochastic lead-times in two-level assembly systems
-
Yano, C. A. (1987a). Stochastic lead-times in two-level assembly systems, IIE Transactions. 19(4), 371-378.
-
(1987)
IIE Transactions
, vol.19
, Issue.4
, pp. 371-378
-
-
Yano, C.A.1
-
20
-
-
0023207074
-
Setting planned lead-times in serial production systems with tardiness costs
-
Yano, C. A. (1987b). Setting planned lead-times in serial production systems with tardiness costs, Management Science, 33(1), 95-106.
-
(1987)
Management Science
, vol.33
, Issue.1
, pp. 95-106
-
-
Yano, C.A.1
|