Volumn 38, Issue 1, 2005, Pages 189-194

Planned lead-times design in stochastic multistage assembly systems

Author keywords

Assembly; Lead time; Manufacturing; Optimisation; Perturbation analysis; Simulated annealing; Stochastic

Indexed keywords

ASSEMBLY; COSTS; CUSTOMER SATISFACTION; MANUFACTURE; SIMULATED ANNEALING;

EID: 79960706061     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (20)
  • 2
    • 84989726438 scopus 로고
    • Supply management in assembly systems
    • Chu, C., J. M., Proth and X. Xie (1993). Supply management in assembly systems, Naval Research Logistics, 40, 933-949.
    • (1993) Naval Research Logistics , vol.40 , pp. 933-949
    • Chu, C.1    Proth, J.M.2    Xie, X.3
  • 6
    • 0028423190 scopus 로고
    • Optimal lead-times planning in a serial production system
    • Gong, L. G., T. Kok and J. Ding (1994). Optimal lead-times planning in a serial production system, Management Science, 40(5), 629-632.
    • (1994) Management Science , vol.40 , Issue.5 , pp. 629-632
    • Gong, L.G.1    Kok, T.2    Ding, J.3
  • 7
    • 0032650511 scopus 로고    scopus 로고
    • Optimal material release times in stochastic production environments
    • Hasan, C. N. and M. L. Spearman (1999). Optimal material release times in stochastic production environments. International Journal of Production Research, 37(6), 1201-1216.
    • (1999) International Journal of Production Research , vol.37 , Issue.6 , pp. 1201-1216
    • Hasan, C.N.1    Spearman, M.L.2
  • 8
    • 0027562596 scopus 로고
    • Setting safety lead-times for purchased components in assembly systems
    • Hopp, W. J. and M. L. Spearman (1993). Setting safety lead-times for purchased components in assembly systems, IIE Transactions, 25(2), 2- 11.
    • (1993) IIE Transactions , vol.25 , Issue.2 , pp. 2-11
    • Hopp, W.J.1    Spearman, M.L.2
  • 11
    • 77950506731 scopus 로고
    • Manufacturing lead times, order release and capacity loading
    • Graves, S. C. A. H. G. Rinnooy Kan and P. H. Zipkin (Ed)), Elsevier, New York
    • Karmarkar, U. S. (1993). Manufacturing lead times, order release and capacity loading. In: Logistics of Production and Inventory, (Graves, S. C., A. H. G. Rinnooy Kan and P. H. Zipkin (Ed)), 287-329. Elsevier, New York.
    • (1993) Logistics of Production and Inventory , pp. 287-329
    • Karmarkar, U.S.1
  • 12
    • 26444479778 scopus 로고
    • Optimisation by simulated annealing
    • Kirkpatrick, S., C. D. Gelatt and M. P. Vecchi (1983). Optimisation by simulated annealing, Science, 220(4598), 671-680.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 14
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A. (1997). Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system, International Journal of Production Research, 35(4), 983-994.
    • (1997) International Journal of Production Research , vol.35 , Issue.4 , pp. 983-994
    • Molinder, A.1
  • 16
    • 0029392207 scopus 로고
    • Setting safety lead-times for purchased components in assembly systems: A general solution procedure
    • Shore, H. (1995). Setting safety lead-times for purchased components in assembly systems: a general solution procedure, IIE Transactions, 27(5), 634-637.
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 634-637
    • Shore, H.1
  • 17
    • 0035872175 scopus 로고    scopus 로고
    • Setting planned job release times in stochastic assembly systems with resource constraints
    • Song, D. P., C. Hicks and C. F. Earl (2001). Setting planned job release times in stochastic assembly systems with resource constraints, International Journal of Production Research, 39(6), 1289- 1301.
    • (2001) International Journal of Production Research , vol.39 , Issue.6 , pp. 1289-1301
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 18
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D. C. and J. G. Williams (1976). Material requirements planning under uncertainty, Decision Sciences, 7, 595-606.
    • (1976) Decision Sciences , vol.7 , pp. 595-606
    • Whybark, D.C.1    Williams, J.G.2
  • 19
    • 0023558979 scopus 로고
    • Stochastic lead-times in two-level assembly systems
    • Yano, C. A. (1987a). Stochastic lead-times in two-level assembly systems, IIE Transactions. 19(4), 371-378.
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 371-378
    • Yano, C.A.1
  • 20
    • 0023207074 scopus 로고
    • Setting planned lead-times in serial production systems with tardiness costs
    • Yano, C. A. (1987b). Setting planned lead-times in serial production systems with tardiness costs, Management Science, 33(1), 95-106.
    • (1987) Management Science , vol.33 , Issue.1 , pp. 95-106
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.