-
1
-
-
84989209076
-
A study for production simulation model generation system based on data model at a shipyard
-
Back, MG, Lee, DK, Shin, JG, and Woo, JH (2016). "A Study for Production Simulation Model Generation System Based on Data Model at a Shipyard, " Inter J Nav Archit Oc Engng, 8(5), 495-510.
-
(2016)
Inter J Nav Archit Oc Engng
, vol.8
, Issue.5
, pp. 495-510
-
-
Back, M.G.1
Lee, D.K.2
Shin, J.G.3
Woo, J.H.4
-
2
-
-
84877988129
-
Discrete event production simulation and optimization of ship block erection process
-
Berlin, COMPIT
-
Caprace, JD, Trevisani Da Silva, C, Rigo, P, Martins Pires, FC (2011). "Discrete Event Production Simulation and Optimization of Ship Block Erection Process, " Proc 10th Int Conf on Computer Applications and Information Technology in the Maritime Industries, Berlin, COMPIT, 271-282.
-
(2011)
Proc 10th Int Conf on Computer Applications and Information Technology in the Maritime Industries
, vol.271-282
-
-
Caprace, J.D.1
Trevisani Da Silva, C.2
Rigo, P.3
Martins Pires, F.C.4
-
3
-
-
0031641788
-
An integrated process planning and scheduling system for block assembly in shipbuilding
-
Cho, KK, Oh, JS, Ryu, KR, & Choi, HR (1998). "An Integrated Process Planning and Scheduling System for Block Assembly in Shipbuilding, " CIRP Annals-Manufacturing Technology, 47(1), 419-422.
-
(1998)
CIRP Annals-Manufacturing Technology
, vol.47
, Issue.1
, pp. 419-422
-
-
Cho, K.K.1
Oh, J.S.2
Ryu, K.R.3
Choi, H.R.4
-
4
-
-
0347946656
-
A generic shipyard computer model: A tool for design for production
-
Chung, H, Lamb, T, Shin, JG (2000). "A Generic Shipyard Computer Model: A Tool for Design for Production, " J Ship Prod, 16(3), 160-172.
-
(2000)
J Ship Prod
, vol.16
, Issue.3
, pp. 160-172
-
-
Chung, H.1
Lamb, T.2
Shin, J.G.3
-
5
-
-
0003964033
-
-
Massachusetts Institute of Technology, Cambridge
-
Deming, WE (1986). Out of the Crisis, Massachusetts Institute of Technology, Cambridge.
-
(1986)
Out of the Crisis
-
-
Deming, W.E.1
-
6
-
-
85030378173
-
Towards a generic product-oriented work breakdown structure for shipbuilding
-
New Orleans, Louisiana
-
Koenig, PC, MacDonald, P, Lamb, T, and Dougherty, J (1997). "Towards a Generic Product-Oriented Work Breakdown Structure for Shipbuilding, " Ship Production Symposium, The Society of Naval Architects and Marine Engineers, New Orleans, Louisiana.
-
(1997)
Ship Production Symposium, the Society of Naval Architects and Marine Engineers
-
-
Koenig, P.C.1
MacDonald, P.2
Lamb, T.3
Dougherty, J.4
-
7
-
-
84897623145
-
Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards
-
Lee, DK, Kim, YM, Hwang, IH, Oh, DK, Shin, JG (2014a). "Study on a Process-Centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards, " Int J Adv Manuf Technol, 71(1), 621-633.
-
(2014)
Int J Adv Manuf Technol
, vol.71
, Issue.1
, pp. 621-633
-
-
Lee, D.K.1
Kim, Y.M.2
Hwang, I.H.3
Oh, D.K.4
Shin, J.G.5
-
8
-
-
84899785132
-
Simulation-based work plan verification in shipyards
-
Lee, DK, Shin, JG, Kim, YM, Jeong, YK (2014b). "Simulation-Based Work Plan Verification in Shipyards, " J Ship Prod Des, 30(2), 49-57.
-
(2014)
J Ship Prod des
, vol.30
, Issue.2
, pp. 49-57
-
-
Lee, D.K.1
Shin, J.G.2
Kim, Y.M.3
Jeong, Y.K.4
-
9
-
-
85038889678
-
DAS intelligent scheduling systems for shipbuilding
-
Lee, JK, Lee, KJ, Hong, JS, Kim, W, Kim, EY, Choi, SY, Kim, HD, Yang, OR, Choi, HR (1995). "DAS Intelligent Scheduling Systems for Shipbuilding, " AI Mag, 14(1), 41-58.
-
(1995)
AI Mag
, vol.14
, Issue.1
, pp. 41-58
-
-
Lee, J.K.1
Lee, K.J.2
Hong, J.S.3
Kim, W.4
Kim, E.Y.5
Choi, S.Y.6
Kim, H.D.7
Yang, O.R.8
Choi, H.R.9
-
10
-
-
85038927590
-
The designing of production planning module for advanced planning system with respect to supply chain of the shipbuilding industry
-
Nam, SH, Ju, SH, Ryu, CH, Shin, JG (2016). "The Designing of Production Planning Module for Advanced Planning System with Respect to Supply Chain of the Shipbuilding Industry, " Korean Journal of Computational Design and Engineering, 21(3), 353-362.
-
(2016)
Korean Journal of Computational Design and Engineering
, vol.21
, Issue.3
, pp. 353-362
-
-
Nam, S.H.1
Ju, S.H.2
Ryu, C.H.3
Shin, J.G.4
-
12
-
-
84986059467
-
The need for a new product development framework for engineer-to-order products
-
Rahman Abdul Rahim, A, and Shariff Nabi Baksh, M, (2003). "The Need for a New Product Development Framework for Engineer-to-Order Products, " Eur J Innovat Manag, 6(3), 182-196.
-
(2003)
Eur J Innovat Manag
, vol.6
, Issue.3
, pp. 182-196
-
-
Rahman Abdul Rahim, A.1
Shariff Nabi Baksh, M.2
-
13
-
-
3843071984
-
A modeling and simulation of production process in subassembly lines at a shipyard
-
Shin, JG, Lee, KK, Woo, JH, Kim, WD, Lee, JH, Kim, SH, Park, JY, Yim, HJ (2004). "A Modeling and Simulation of Production Process in Subassembly Lines at a Shipyard, " J Ship Prod, 20(2), 79-83.
-
(2004)
J Ship Prod
, vol.20
, Issue.2
, pp. 79-83
-
-
Shin, J.G.1
Lee, K.K.2
Woo, J.H.3
Kim, W.D.4
Lee, J.H.5
Kim, S.H.6
Park, J.Y.7
Yim, H.J.8
-
14
-
-
84863012341
-
Research on a simulation-based ship production support system for middle-sized shipbuilding companies
-
Song, YJ, Woo, JH, Shin, JG (2009). "Research on a Simulation-Based Ship Production Support System for Middle-Sized Shipbuilding Companies, " Inter J Nav Archit Oc Engng, 1(2), 70-77.
-
(2009)
Inter J Nav Archit Oc Engng
, vol.1
, Issue.2
, pp. 70-77
-
-
Song, Y.J.1
Woo, J.H.2
Shin, J.G.3
-
15
-
-
84874671639
-
Development and applications of simulation tools for one-of-A-kind production processes
-
Berlin, WSC, IEEE
-
Steinhauer, D, Soyka, M (2012). "Development and Applications of Simulation Tools for One-of-a-Kind Production Processes, " Proceedings of the 2012 Winter Simulation Conference, Berlin, WSC, 1-11, IEEE.
-
(2012)
Proceedings of the 2012 Winter Simulation Conference
, pp. 1-11
-
-
Steinhauer, D.1
Soyka, M.2
-
16
-
-
47049104662
-
-
Ph.D. Dissertation, Seoul National University. Seoul, Korea
-
Woo, JH (2005). Modeling and Simulation of Shop System of Shipbuilding by Integration of the Product, Process, Resource and Schedule Information, Ph.D. Dissertation, Seoul National University. Seoul, Korea.
-
(2005)
Modeling and Simulation of Shop System of Shipbuilding by Integration of the Product, Process, Resource and Schedule Information
-
-
Woo, J.H.1
-
17
-
-
33748711826
-
Shipbuilding erection network optimization: A tsp method
-
Varghese, R, Yoon DY (2006) "Shipbuilding Erection Network Optimization: A TSP Method, " J Ship Prod, 22(3), 139-146.
-
(2006)
J Ship Prod
, vol.22
, Issue.3
, pp. 139-146
-
-
Varghese, R.1
Yoon, D.Y.2
|