메뉴 건너뛰기




Volumn 50, Issue 1, 2017, Pages 6906-6911

Workforce management in manual assembly lines of large products: a case study

Author keywords

Assembly line; Balancing; Integer linear programming; Large products; Optimization

Indexed keywords

ASSEMBLY MACHINES; BALANCING; CUSTOMER SATISFACTION; INTEGER PROGRAMMING; OPTIMIZATION;

EID: 85031825706     PISSN: None     EISSN: 24058963     Source Type: Conference Proceeding    
DOI: 10.1016/j.ifacol.2017.08.1215     Document Type: Conference Paper
Times cited : (24)

References (18)
  • 1
    • 84964034018 scopus 로고    scopus 로고
    • Priority-based heuristics for the multi-skill resource constrained project scheduling problem
    • Almeida, B.F., Correia, I., Saldanha-da Gama, F., Priority-based heuristics for the multi-skill resource constrained project scheduling problem. Expert Systems With Applications 57 (2016), 91–103.
    • (2016) Expert Systems With Applications , vol.57 , pp. 91-103
    • Almeida, B.F.1    Correia, I.2    Saldanha-da Gama, F.3
  • 3
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaïa, O., Dolgui, A., A taxonomy of line balancing problems and their solution approaches. International Journal of Production Economics 142:2 (2013), 259–277.
    • (2013) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 4
    • 67349130287 scopus 로고    scopus 로고
    • Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure
    • Becker, C., Scholl, A., Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure. European Journal of Operational Research 199 (2009), 359–374.
    • (2009) European Journal of Operational Research , vol.199 , pp. 359-374
    • Becker, C.1    Scholl, A.2
  • 5
    • 84883446228 scopus 로고    scopus 로고
    • A robustness information and visualization model for time and space assembly line balancing under uncertain demand
    • Chica, M., Cordón, Ó., Damas, S., Bautista, J., A robustness information and visualization model for time and space assembly line balancing under uncertain demand. International Journal of Production Economics 145 (2013), 761–772.
    • (2013) International Journal of Production Economics , vol.145 , pp. 761-772
    • Chica, M.1    Cordón, Ó.2    Damas, S.3    Bautista, J.4
  • 6
    • 40649088035 scopus 로고    scopus 로고
    • Balancing assembly line with skilled and unskilled workers
    • Corominas, A., Pastor, R., Plans, J., Balancing assembly line with skilled and unskilled workers. Omega 36 (2008), 1126–1132.
    • (2008) Omega , vol.36 , pp. 1126-1132
    • Corominas, A.1    Pastor, R.2    Plans, J.3
  • 8
    • 84876104666 scopus 로고    scopus 로고
    • Assembly line balancing under uncertainty: Robust optimization models and exact solution method
    • Hazır, Ö., Dolgui, A., Assembly line balancing under uncertainty: Robust optimization models and exact solution method. Computers & Industrial Engineering 65:2 (2013), 61–267.
    • (2013) Computers & Industrial Engineering , vol.65 , Issue.2 , pp. 61-267
    • Hazır, Ö.1    Dolgui, A.2
  • 9
    • 1242309349 scopus 로고    scopus 로고
    • Benefits of skill chaining in serial production lines with cross-trained workers
    • Hopp, W.J., Tekin, E., Van Oyen, M.P., Benefits of skill chaining in serial production lines with cross-trained workers. Management Science 50:1 (2004), 83–98.
    • (2004) Management Science , vol.50 , Issue.1 , pp. 83-98
    • Hopp, W.J.1    Tekin, E.2    Van Oyen, M.P.3
  • 13
    • 67349093890 scopus 로고    scopus 로고
    • Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm
    • Li, H., Womer, K., Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm. Journal of Scheduling, 12(3), 2008, 281.
    • (2008) Journal of Scheduling , vol.12 , Issue.3 , pp. 281
    • Li, H.1    Womer, K.2
  • 15
    • 26844450637 scopus 로고    scopus 로고
    • Optimal dynamic assignment of a flexible worker on an open production line with specialists
    • Sennotta, L.I., Van Oyen, M.P., Iravani, S.M., Optimal dynamic assignment of a flexible worker on an open production line with specialists. European Journal of Operational Research 170 (2006), 541–566.
    • (2006) European Journal of Operational Research , vol.170 , pp. 541-566
    • Sennotta, L.I.1    Van Oyen, M.P.2    Iravani, S.M.3
  • 17
    • 84911989311 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines with adjacent task duplication
    • Yang, C., Gao, J., Li, J., Balancing mixed-model assembly lines with adjacent task duplication. International Journal of Production Research 52:24 (2014), 7454–7471.
    • (2014) International Journal of Production Research , vol.52 , Issue.24 , pp. 7454-7471
    • Yang, C.1    Gao, J.2    Li, J.3
  • 18
    • 85027930517 scopus 로고    scopus 로고
    • A new algorithm and multi-response taguchi method to solve line balancing problem in an automotive industry
    • Yazgan, H.R., Beypinar, I., Boran, S., Ocak, C., A new algorithm and multi-response taguchi method to solve line balancing problem in an automotive industry. International Journal of Advanced Manufacturing Technology 1:57 (2011), 379–392.
    • (2011) International Journal of Advanced Manufacturing Technology , vol.1 , Issue.57 , pp. 379-392
    • Yazgan, H.R.1    Beypinar, I.2    Boran, S.3    Ocak, C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.