메뉴 건너뛰기




Volumn 46, Issue , 2018, Pages 67-78

A risk based approach to support the supplying of components in a MTO assembly process

Author keywords

Inventory; Make to order; Material supplying; Risk

Indexed keywords

CRITICALITY (NUCLEAR FISSION); MACHINE TOOLS; RISKS;

EID: 85034807417     PISSN: 02786125     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jmsy.2017.11.006     Document Type: Article
Times cited : (3)

References (32)
  • 1
    • 84862300001 scopus 로고    scopus 로고
    • A project scheduling approach to production and material requirement planning in manufacturing-to-order environments
    • Alfieri, A., Tolio, T., Urgo, M., A project scheduling approach to production and material requirement planning in manufacturing-to-order environments. J Intell Manuf 23 (2012), 575–585.
    • (2012) J Intell Manuf , vol.23 , pp. 575-585
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 2
    • 84865351186 scopus 로고    scopus 로고
    • A two-stage stochastic programming project scheduling approach to production planning
    • Alfieri, A., Tolio, T., Urgo, M., A two-stage stochastic programming project scheduling approach to production planning. Int J Adv Manuf Technol 62 (2012), 279–290.
    • (2012) Int J Adv Manuf Technol , vol.62 , pp. 279-290
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 3
    • 84944521098 scopus 로고    scopus 로고
    • Project scheduling for aggregate production scheduling in make-to-order environments
    • C. Schwindt J. Zimmermann Springer International Publishing Ch. 56
    • Alfieri, A., Urgo, M., Project scheduling for aggregate production scheduling in make-to-order environments. Schwindt, C., Zimmermann, J., (eds.) Handbook on project management and scheduling, vol. 2, 2015, Springer International Publishing, 1249–1266 Ch. 56.
    • (2015) Handbook on project management and scheduling, vol. 2 , pp. 1249-1266
    • Alfieri, A.1    Urgo, M.2
  • 4
    • 0004047288 scopus 로고
    • Planning and control systems: a framework for analysis
    • Harvard University
    • Anthony, R.N., Planning and control systems: a framework for analysis. 1965, Harvard University.
    • (1965)
    • Anthony, R.N.1
  • 6
    • 84992390030 scopus 로고    scopus 로고
    • Including material exposure and part attributes in the manual assembly line balancing problem
    • Bortolini, M., Faccio, M., Gamberi, M., Pilati, F., Including material exposure and part attributes in the manual assembly line balancing problem. IFAC-PapersOnLine 49:12 (2016), 926–931.
    • (2016) IFAC-PapersOnLine , vol.49 , Issue.12 , pp. 926-931
    • Bortolini, M.1    Faccio, M.2    Gamberi, M.3    Pilati, F.4
  • 8
    • 84937399331 scopus 로고    scopus 로고
    • Tactical capacity planning in a real-world ETO industry case: an action research
    • Carvalho, A.N., Oliveira, F., Scavarda, L.F., Tactical capacity planning in a real-world ETO industry case: an action research. Int J Prod Econ 167 (2015), 187–203.
    • (2015) Int J Prod Econ , vol.167 , pp. 187-203
    • Carvalho, A.N.1    Oliveira, F.2    Scavarda, L.F.3
  • 9
    • 0012814054 scopus 로고    scopus 로고
    • Project scheduling: a research handbook
    • Springer
    • Demeulemeester, E.L., Herroelen, W.S., Project scheduling: a research handbook. 2002, Springer.
    • (2002)
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 10
    • 0003709365 scopus 로고
    • Activity networks – project planning and control by networks models
    • John Wiley and Sons
    • Elmaghraby, S.E., Activity networks – project planning and control by networks models. 1977, John Wiley and Sons.
    • (1977)
    • Elmaghraby, S.E.1
  • 11
    • 84928304811 scopus 로고    scopus 로고
    • Packaging strategy definition for sales kits within an assembly system
    • Faccio, M., Gamberi, M., Pilati, F., Bortolini, M., Packaging strategy definition for sales kits within an assembly system. Int J Prod Res 53:11 (2015), 3288–3305.
    • (2015) Int J Prod Res , vol.53 , Issue.11 , pp. 3288-3305
    • Faccio, M.1    Gamberi, M.2    Pilati, F.3    Bortolini, M.4
  • 12
    • 84937967985 scopus 로고    scopus 로고
    • A structured procedure for materials planning during production transfer
    • Fredriksson, A., Wänström, C., Johansson, M.I., Medbo, L., A structured procedure for materials planning during production transfer. Prod Plan Control 26:9 (2015), 738–752.
    • (2015) Prod Plan Control , vol.26 , Issue.9 , pp. 738-752
    • Fredriksson, A.1    Wänström, C.2    Johansson, M.I.3    Medbo, L.4
  • 13
    • 84994189406 scopus 로고    scopus 로고
    • Aspects influencing man-hour efficiency of kit preparation for mixed-model assembly
    • Hanson, R., Medbo, L., Aspects influencing man-hour efficiency of kit preparation for mixed-model assembly. Proc CIRP 44 (2016), 353–358.
    • (2016) Proc CIRP , vol.44 , pp. 353-358
    • Hanson, R.1    Medbo, L.2
  • 14
    • 0036681925 scopus 로고    scopus 로고
    • A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints
    • Harris, B., Lewis, F., Cook, D.J., A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints. J Intell Manuf 13:4 (2002), 239–252.
    • (2002) J Intell Manuf , vol.13 , Issue.4 , pp. 239-252
    • Harris, B.1    Lewis, F.2    Cook, D.J.3
  • 16
    • 0003849209 scopus 로고    scopus 로고
    • Factory physics: foundations of manufacturing management
    • McGraw-Hill Irwin
    • Hopp, W.J., Spearman, M.L., Factory physics: foundations of manufacturing management. 2000, McGraw-Hill, Irwin.
    • (2000)
    • Hopp, W.J.1    Spearman, M.L.2
  • 17
    • 84864776870 scopus 로고    scopus 로고
    • Lead time estimation in MRP/ERP for make-to-order manufacturing systems
    • Ioannou, G., Dimitriou, S., Lead time estimation in MRP/ERP for make-to-order manufacturing systems. Int J Prod Econ 2:139 (2012), 551–563.
    • (2012) Int J Prod Econ , vol.2 , Issue.139 , pp. 551-563
    • Ioannou, G.1    Dimitriou, S.2
  • 18
    • 70350572739 scopus 로고    scopus 로고
    • Trade-off between capacity invested and inventory needed
    • Jodlbauer, H., Altendorfer, K., Trade-off between capacity invested and inventory needed. Eur J Op Res 1:203 (2010), 118–133.
    • (2010) Eur J Op Res , vol.1 , Issue.203 , pp. 118-133
    • Jodlbauer, H.1    Altendorfer, K.2
  • 19
    • 70350572739 scopus 로고    scopus 로고
    • Trade-off between capacity invested and inventory needed
    • Jodlbauer, H., Altendorfer, K., Trade-off between capacity invested and inventory needed. Eur J Op Res 203:1 (2010), 118–133.
    • (2010) Eur J Op Res , vol.203 , Issue.1 , pp. 118-133
    • Jodlbauer, H.1    Altendorfer, K.2
  • 20
    • 0003657590 scopus 로고
    • The art of computer programming, vol. 2
    • Addison-Wesley
    • Knuth, D.E., The art of computer programming, vol. 2. 1989, Addison-Wesley.
    • (1989)
    • Knuth, D.E.1
  • 21
    • 0003558735 scopus 로고
    • Combinatorial optimization: network and matroids
    • Rinehart and Winston Holt
    • Lawler, E.L., Combinatorial optimization: network and matroids. 1976, Rinehart and Winston, Holt.
    • (1976)
    • Lawler, E.L.1
  • 22
    • 84859971638 scopus 로고    scopus 로고
    • Incap – applying short-term flexibility to control inventories
    • Lödding, H., Lohmann, S., Incap – applying short-term flexibility to control inventories. Int J Prod Res 50:3 (2011), 909–919.
    • (2011) Int J Prod Res , vol.50 , Issue.3 , pp. 909-919
    • Lödding, H.1    Lohmann, S.2
  • 24
    • 0003107787 scopus 로고
    • Distribution of the time through a direct, acyclic network
    • Martin, J.J., Distribution of the time through a direct, acyclic network. J Op Res 13:1 (1965), 46–66.
    • (1965) J Op Res , vol.13 , Issue.1 , pp. 46-66
    • Martin, J.J.1
  • 25
    • 2842577299 scopus 로고    scopus 로고
    • A capacitated hierarchical approach to make-to-order production
    • Neumann, K., Schwindt, C., A capacitated hierarchical approach to make-to-order production. Eur J Autom, 1998.
    • (1998) Eur J Autom
    • Neumann, K.1    Schwindt, C.2
  • 26
    • 84929297631 scopus 로고    scopus 로고
    • A risk management-based evaluation of inventory allocations for make-to-order production
    • Radke, A.M., Tolio, T., Tseng, M.M., Urgo, M., A risk management-based evaluation of inventory allocations for make-to-order production. CIRP Ann – Manuf Technol 1:62 (2013), 459–462.
    • (2013) CIRP Ann – Manuf Technol , vol.1 , Issue.62 , pp. 459-462
    • Radke, A.M.1    Tolio, T.2    Tseng, M.M.3    Urgo, M.4
  • 27
    • 84861623898 scopus 로고    scopus 로고
    • A risk management-based approach for inventory planning of engineering-to-order production
    • Radke, A.M., Tseng, M.M., A risk management-based approach for inventory planning of engineering-to-order production. CIRP Ann – Manuf Technol 61 (2012), 387–390.
    • (2012) CIRP Ann – Manuf Technol , vol.61 , pp. 387-390
    • Radke, A.M.1    Tseng, M.M.2
  • 28
    • 0003445519 scopus 로고    scopus 로고
    • Stochastic orders and their applications
    • Springer
    • Shaked, M., Shanthikumar, J.G., Stochastic orders and their applications. 2007, Springer.
    • (2007)
    • Shaked, M.1    Shanthikumar, J.G.2
  • 29
    • 34249878484 scopus 로고    scopus 로고
    • Towards a normative model for inventory cost management in a generalized ABC classification system
    • Stanford, R.E., Martin, W., Towards a normative model for inventory cost management in a generalized ABC classification system. J Op Res Soc 7:58 (2007), 922–928.
    • (2007) J Op Res Soc , vol.7 , Issue.58 , pp. 922-928
    • Stanford, R.E.1    Martin, W.2
  • 30
    • 79957652035 scopus 로고    scopus 로고
    • Robust production control against propagation of disruptions
    • Tolio, T., Urgo, M., Váncza, J., Robust production control against propagation of disruptions. CIRP Ann – Manuf Technol 1:60 (2011), 489–492.
    • (2011) CIRP Ann – Manuf Technol , vol.1 , Issue.60 , pp. 489-492
    • Tolio, T.1    Urgo, M.2    Váncza, J.3
  • 31
    • 46849083916 scopus 로고    scopus 로고
    • A multiple objective particle swarm optimization approach for inventory classification
    • Tsai, C.-Y., Yeh, S.-W., A multiple objective particle swarm optimization approach for inventory classification. Int J Prod Econ 2:114 (2008), 656–666.
    • (2008) Int J Prod Econ , vol.2 , Issue.114 , pp. 656-666
    • Tsai, C.-Y.1    Yeh, S.-W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.