메뉴 건너뛰기




Volumn , Issue , 2012, Pages 2150-2154

An integrated method of hierarchical planning and 'pull-way' production control for lean shipbuilding

Author keywords

Lean manufacturing; production control; receding horizon plan; shipbuilding

Indexed keywords

AGILE MANUFACTURING SYSTEMS; INDUSTRIAL ENGINEERING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; SHIPBUILDING; SHIPYARDS;

EID: 84903849841     PISSN: 21573611     EISSN: 2157362X     Source Type: Conference Proceeding    
DOI: 10.1109/IEEM.2012.6838127     Document Type: Conference Paper
Times cited : (1)

References (21)
  • 1
    • 84884745383 scopus 로고    scopus 로고
    • Lean production and management (part three): The progression of world manufacturing
    • Luo Zhenbi, Me Ruhu, Luo Jie, et. Lean Production and Management (Part three): The Progression of world manufacturing, World Manufacturing Engineering & Market , vol 5, pp. 90-97, 2007
    • (2007) World Manufacturing Engineering & Market , vol.5 , pp. 90-97
    • Zhenbi, L.1    Ruhu, M.2    Jie, L.3
  • 2
    • 84885871476 scopus 로고    scopus 로고
    • Lean shipbuilding-study of japanese shipbuilding system
    • Zhang Minghua, Huang Sheng, Lean Shipbuilding-Study of Japanese Shipbuilding System, Ship Engineering, Vol 27, pp. 62-66, 2005
    • (2005) Ship Engineering , vol.27 , pp. 62-66
    • Minghua, Z.1    Sheng, H.2
  • 3
    • 4644333148 scopus 로고    scopus 로고
    • Beijing, China Financial & Economic Publishing House
    • Jeffrey K. Liker, The Toyota Way, Beijing, China Financial & Economic Publishing House, 2004
    • (2004) The Toyota Way
    • Liker, J.K.1
  • 4
    • 84885840011 scopus 로고    scopus 로고
    • Dynamic enterprise resource optimization model based on rolling planning
    • Lan Boxiong, Jiang Nan, Dynamic Enterprise Resource Optimization Model Based on Rolling Planning, Operations Research and Management Science, vol 19, pp. 136-143, 2010
    • (2010) Operations Research and Management Science , vol.19 , pp. 136-143
    • Boxiong, L.1    Nan, J.2
  • 5
    • 84884780899 scopus 로고    scopus 로고
    • Rolling-horizon algorithm for scheduling under time-dependent Utility pricing and availability
    • Pedro M. Castro, Iiro Harjunkoski, Ignacio E. Grossmannc
    • S. Pierucci, G. Buzzi Ferraris, Rolling-Horizon Algorithm for Scheduling under Time-Dependent Utility Pricing and Availability, Pedro M. Castro, Iiro Harjunkoski, Ignacio E. Grossmannc , 20th European Symposium on Computer Aided Process Engineering, vol 28, pp. 1171-1176, 2008
    • (2008) 20th European Symposium on Computer Aided Process Engineering , vol.28 , pp. 1171-1176
    • Pierucci, S.1    Buzzi Ferraris, G.2
  • 6
    • 77949551610 scopus 로고    scopus 로고
    • Efficient rolling horizon algorithms for resourcesconstrained scheduling problems with buffers
    • Shao Hao , Chen Hunping , Sun Guangzhong, et. , Efficient rolling horizon algorithms for resourcesconstrained scheduling problems with buffers, Systems Engineering, Theory, Practice, vol 30, pp. 119-125, 2010
    • (2010) Systems Engineering, Theory, Practice , vol.30 , pp. 119-125
    • Hao, S.1    Hunping, C.2    Guangzhong, S.3
  • 8
    • 84885847485 scopus 로고    scopus 로고
    • Job selection method of job rolling scheduling based on rough-Neural Network
    • Jan
    • Liu Yi, Gao Qi, Job Selection Method of Job Rolling Scheduling Based on Rough-Neural Network, Modular Machine Tool and Automatic Manufacturing Technique, pp. 104-107, Jan. 2010
    • (2010) Modular Machine Tool and Automatic Manufacturing Technique , pp. 104-107
    • Yi, L.1    Qi, G.2
  • 11
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman M. and Zazanis,M. , Push and pull production systems: Issues and comparisons, Operations Research, vol 40, pp. 521-532, 1992.
    • (1992) Operations Research , vol.40 , pp. 521-532
    • Spearman, M.1    Zazanis, M.2
  • 13
    • 10744220621 scopus 로고    scopus 로고
    • The CONWIP production control system: Review and research issues
    • JOSE M. FRAMINAN, PEDRO L. GONZALEZ , RAFAEL RUIZ-USANO , The CONWIP production control system: review and research issues,Production Planning & Control, vol 4, pp. 255-265, 2003
    • (2003) Production Planning & Control , vol.4 , pp. 255-265
    • Framinan, J.M.1    Gonzalez, P.L.2    Ruiz-Usano, R.3
  • 14
    • 0000996514 scopus 로고
    • Customer service in pull production systems
    • Spearman, M. , Customer service in pull production systems, Operations Research, vol 40, pp. 948-958, 1992.
    • (1992) Operations Research , vol.40 , pp. 948-958
    • Spearman, M.1
  • 16
    • 38049086229 scopus 로고    scopus 로고
    • Performance evaluation of a multi-product system under CONWIP control
    • KUMAR SATYAM and ANANTH KRISHNAMURTHY, Performance evaluation of a multi-product system under CONWIP control, IIE Transactions, vol 40, pp. 252-264,2008
    • (2008) IIE Transactions , vol.40 , pp. 252-264
    • Satyam, K.1    Krishnamurthy, A.2
  • 17
    • 84885852798 scopus 로고    scopus 로고
    • CONWIP release method in multireentrant production lines
    • Luo Ming, Gu Hanyu, CONWIP Release Method in Multireentrant Production Lines, Computer Simulation, ,vol 23, pp. 232-235, 2006
    • (2006) Computer Simulation , vol.23 , pp. 232-235
    • Ming, L.1    Hanyu, G.2
  • 18
    • 0343878239 scopus 로고    scopus 로고
    • The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability
    • Brüggemann, Wolfgang Jahnke, Hermann,The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability, European Journal of Operational Research, vol 124, pp. 511-528, 2000
    • (2000) European Journal of Operational Research , vol.124 , pp. 511-528
    • Wolfgang, B.1    Hermann, J.2
  • 19
    • 0142240460 scopus 로고    scopus 로고
    • Beyond kanban: Creating and analyzing lean shop floor control policies
    • Dartmouth College, The Amos Tuck School, Hanover, New Hampshire reference
    • Bonvik, A. M. , and Gerhwin, S. B. , Beyond Kanban: Creating and analyzing lean shop floor control policies, Manufacturing and Service Operations Management Conference Proceedings, Dartmouth College, The Amos Tuck School, Hanover, New Hampshire 03755, 1996 (reference)
    • (1996) Manufacturing and Service Operations Management Conference Proceedings , pp. 03755
    • Bonvik, A.M.1    Gerhwin, S.B.2
  • 21
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • Izak Duenyas , Wallace J. Hopp, Quoting customer lead times, Management Science,vol 41, pp. 43-57, 1995
    • (1995) Management Science , vol.41 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.