-
1
-
-
84884745383
-
Lean production and management (part three): The progression of world manufacturing
-
Luo Zhenbi, Me Ruhu, Luo Jie, et. Lean Production and Management (Part three): The Progression of world manufacturing, World Manufacturing Engineering & Market , vol 5, pp. 90-97, 2007
-
(2007)
World Manufacturing Engineering & Market
, vol.5
, pp. 90-97
-
-
Zhenbi, L.1
Ruhu, M.2
Jie, L.3
-
2
-
-
84885871476
-
Lean shipbuilding-study of japanese shipbuilding system
-
Zhang Minghua, Huang Sheng, Lean Shipbuilding-Study of Japanese Shipbuilding System, Ship Engineering, Vol 27, pp. 62-66, 2005
-
(2005)
Ship Engineering
, vol.27
, pp. 62-66
-
-
Minghua, Z.1
Sheng, H.2
-
3
-
-
4644333148
-
-
Beijing, China Financial & Economic Publishing House
-
Jeffrey K. Liker, The Toyota Way, Beijing, China Financial & Economic Publishing House, 2004
-
(2004)
The Toyota Way
-
-
Liker, J.K.1
-
4
-
-
84885840011
-
Dynamic enterprise resource optimization model based on rolling planning
-
Lan Boxiong, Jiang Nan, Dynamic Enterprise Resource Optimization Model Based on Rolling Planning, Operations Research and Management Science, vol 19, pp. 136-143, 2010
-
(2010)
Operations Research and Management Science
, vol.19
, pp. 136-143
-
-
Boxiong, L.1
Nan, J.2
-
5
-
-
84884780899
-
Rolling-horizon algorithm for scheduling under time-dependent Utility pricing and availability
-
Pedro M. Castro, Iiro Harjunkoski, Ignacio E. Grossmannc
-
S. Pierucci, G. Buzzi Ferraris, Rolling-Horizon Algorithm for Scheduling under Time-Dependent Utility Pricing and Availability, Pedro M. Castro, Iiro Harjunkoski, Ignacio E. Grossmannc , 20th European Symposium on Computer Aided Process Engineering, vol 28, pp. 1171-1176, 2008
-
(2008)
20th European Symposium on Computer Aided Process Engineering
, vol.28
, pp. 1171-1176
-
-
Pierucci, S.1
Buzzi Ferraris, G.2
-
6
-
-
77949551610
-
Efficient rolling horizon algorithms for resourcesconstrained scheduling problems with buffers
-
Shao Hao , Chen Hunping , Sun Guangzhong, et. , Efficient rolling horizon algorithms for resourcesconstrained scheduling problems with buffers, Systems Engineering, Theory, Practice, vol 30, pp. 119-125, 2010
-
(2010)
Systems Engineering, Theory, Practice
, vol.30
, pp. 119-125
-
-
Hao, S.1
Hunping, C.2
Guangzhong, S.3
-
7
-
-
18744399279
-
Rolling time horizon job shop scheduling strategy in dynamic Environment
-
Pan Quanke, Zhu Jianying, Rolling time horizon Job Shop Scheduling Strategy in Dynamic Environment, Journal of Nanjing University of Aeronautics and Astronautics, vol 37, pp. 262-268, 2005
-
(2005)
Journal of Nanjing University of Aeronautics and Astronautics
, vol.37
, pp. 262-268
-
-
Quanke, P.1
Jianying, Z.2
-
8
-
-
84885847485
-
Job selection method of job rolling scheduling based on rough-Neural Network
-
Jan
-
Liu Yi, Gao Qi, Job Selection Method of Job Rolling Scheduling Based on Rough-Neural Network, Modular Machine Tool and Automatic Manufacturing Technique, pp. 104-107, Jan. 2010
-
(2010)
Modular Machine Tool and Automatic Manufacturing Technique
, pp. 104-107
-
-
Yi, L.1
Qi, G.2
-
9
-
-
0025430443
-
CONWIP: A pull alternative to Kanban
-
Spearman, M. L. , Woodruff, D. L. , Hopp, W. J. , CONWIP: A pull alternative to Kanban, International Journal of Production Research, vol 23, pp. 879-894, 1996
-
(1996)
International Journal of Production Research
, vol.23
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
11
-
-
0026859945
-
Push and pull production systems: Issues and comparisons
-
Spearman M. and Zazanis,M. , Push and pull production systems: Issues and comparisons, Operations Research, vol 40, pp. 521-532, 1992.
-
(1992)
Operations Research
, vol.40
, pp. 521-532
-
-
Spearman, M.1
Zazanis, M.2
-
13
-
-
10744220621
-
The CONWIP production control system: Review and research issues
-
JOSE M. FRAMINAN, PEDRO L. GONZALEZ , RAFAEL RUIZ-USANO , The CONWIP production control system: review and research issues,Production Planning & Control, vol 4, pp. 255-265, 2003
-
(2003)
Production Planning & Control
, vol.4
, pp. 255-265
-
-
Framinan, J.M.1
Gonzalez, P.L.2
Ruiz-Usano, R.3
-
14
-
-
0000996514
-
Customer service in pull production systems
-
Spearman, M. , Customer service in pull production systems, Operations Research, vol 40, pp. 948-958, 1992.
-
(1992)
Operations Research
, vol.40
, pp. 948-958
-
-
Spearman, M.1
-
15
-
-
0031095866
-
A comparison of production-line control mechanisms
-
Bonvik, A. M. , Couch, C. E. , and Gershwin, S. B. , A comparison of production-line control mechanisms, International Journal of Production Research, vol 35, pp. 789-804, 1997
-
(1997)
International Journal of Production Research
, vol.35
, pp. 789-804
-
-
Bonvik, A.M.1
Couch, C.E.2
Gershwin, S.B.3
-
16
-
-
38049086229
-
Performance evaluation of a multi-product system under CONWIP control
-
KUMAR SATYAM and ANANTH KRISHNAMURTHY, Performance evaluation of a multi-product system under CONWIP control, IIE Transactions, vol 40, pp. 252-264,2008
-
(2008)
IIE Transactions
, vol.40
, pp. 252-264
-
-
Satyam, K.1
Krishnamurthy, A.2
-
17
-
-
84885852798
-
CONWIP release method in multireentrant production lines
-
Luo Ming, Gu Hanyu, CONWIP Release Method in Multireentrant Production Lines, Computer Simulation, ,vol 23, pp. 232-235, 2006
-
(2006)
Computer Simulation
, vol.23
, pp. 232-235
-
-
Ming, L.1
Hanyu, G.2
-
18
-
-
0343878239
-
The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability
-
Brüggemann, Wolfgang Jahnke, Hermann,The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability, European Journal of Operational Research, vol 124, pp. 511-528, 2000
-
(2000)
European Journal of Operational Research
, vol.124
, pp. 511-528
-
-
Wolfgang, B.1
Hermann, J.2
-
19
-
-
0142240460
-
Beyond kanban: Creating and analyzing lean shop floor control policies
-
Dartmouth College, The Amos Tuck School, Hanover, New Hampshire reference
-
Bonvik, A. M. , and Gerhwin, S. B. , Beyond Kanban: Creating and analyzing lean shop floor control policies, Manufacturing and Service Operations Management Conference Proceedings, Dartmouth College, The Amos Tuck School, Hanover, New Hampshire 03755, 1996 (reference)
-
(1996)
Manufacturing and Service Operations Management Conference Proceedings
, pp. 03755
-
-
Bonvik, A.M.1
Gerhwin, S.B.2
-
20
-
-
0034672912
-
Input control and dispatching rules in a dynamic CONWIP flow-shop
-
Framinan, J. M. , Ruiz-Usano, R. , Leisten, R. , Input control and dispatching rules in a dynamic CONWIP flow-shop, International Journal of Production Research, ,vol 38, pp. 4589-4598, 2000
-
(2000)
International Journal of Production Research
, vol.38
, pp. 4589-4598
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
21
-
-
0002987480
-
Quoting customer lead times
-
Izak Duenyas , Wallace J. Hopp, Quoting customer lead times, Management Science,vol 41, pp. 43-57, 1995
-
(1995)
Management Science
, vol.41
, pp. 43-57
-
-
Duenyas, I.1
Hopp, W.J.2
|