-
2
-
-
84904471875
-
Design of the building execution process in SME construction networks
-
Thompson MK, editor Worcester, MA: DCEE
-
Dallasega P, Matt DT, Krause D. Design of the Building Execution Process in SME Construction Networks. In: Thompson MK, editor. Proceedings of the 2nd International Workshop on Design in Civil and Environmental Engineering. Worcester, MA: DCEE 2013; 2013, p. 7-15.
-
(2013)
Proceedings of the 2nd International Workshop on Design in Civil and Environmental Engineering
, vol.2013
, pp. 7-15
-
-
Dallasega, P.1
Matt, D.T.2
Krause, D.3
-
3
-
-
84904471446
-
SMART reconfigurability approach in manufacture of steel and Façade constructions
-
Zäh MF editor Cham: Springer International Publishing
-
Matt DT, Rauch E. SMART Reconfigurability Approach in Manufacture of Steel and Façade Constructions. In: Zäh MF, editor. Enabling Manufacturing Competitiveness and Economic Sustainability. Cham: Springer International Publishing; 2014, p. 9-34.
-
(2014)
Enabling Manufacturing Competitiveness and Economic Sustainability
, pp. 9-34
-
-
Matt, D.T.1
Rauch, E.2
-
4
-
-
84931067162
-
Implementing lean in engineer-to-order manufacturing: Experiences from a ETO manufacturer
-
Modrák V, Semančo P, editors Hershey, PA: IGI Global
-
Matt DT, Rauch E. Implementing Lean in Engineer-to-Order Manufacturing: Experiences from a ETO Manufacturer. In: Modrák V, Semančo P, editors. Handbook of Research on Design and Management of Lean Production Systems. Hershey, PA: IGI Global; 2014, p. 148-172.
-
(2014)
Handbook of Research on Design and Management of Lean Production Systems
, pp. 148-172
-
-
Matt, D.T.1
Rauch, E.2
-
5
-
-
84886785323
-
Adaptation of the value stream optimization approach to collaborative company networks in the construction industry
-
Teti R, editor Naples: Procedia CIRP
-
Matt DT, Krause D, Rauch R. Adaptation of the Value Stream Optimization approach to collaborative company networks in the construction industry. In: Teti R, editor. Proceedings 8th CIRP Conference on Intelligent Computation in Manufacturing Engineering. Naples: Procedia CIRP 12; 2013, p. 402-407.
-
(2013)
Proceedings 8th CIRP Conference on Intelligent Computation in Manufacturing Engineering
, vol.12
, pp. 402-407
-
-
Matt, D.T.1
Krause, D.2
Rauch, R.3
-
6
-
-
84856669155
-
Development of an integrated façade system to improve the high-rise building process
-
Taipei Taiwan July 15-17
-
Friblik F, Tommelein ID, Mueller E, Falk JH. Development of an integrated façade system to improve the high-rise building process. Proceedings of the 17th Annual Conference of the International Group for Lean Construction (IGLC 17), Taipei, Taiwan, July 15-17, 2009, pp. 359-370.
-
(2009)
Proceedings of the 17th Annual Conference of the International Group for Lean Construction (IGLC 17)
, pp. 359-370
-
-
Friblik, F.1
Tommelein, I.D.2
Mueller, E.3
Falk, J.H.4
-
7
-
-
75349089288
-
-
Birkhäuser, Basel, Switzerland
-
Eisele J, Kloft E. High-Rise Manual-typology and design, construction and technology. Birkhäuser, Basel, Switzerland, 2003.
-
(2003)
High-Rise Manual-typology and Design, Construction and Technology
-
-
Eisele, J.1
Kloft, E.2
-
10
-
-
84856737237
-
-
Spon Press
-
Kenley, R.; Seppänen, O.: Location-Based Management for Construction, Planning, Scheduling and Control, Spon Press, 2010, pp. 123.
-
(2010)
Location-Based Management for Construction, Planning, Scheduling and Control
, pp. 123
-
-
Kenley, R.1
Seppänen, O.2
-
12
-
-
84939786613
-
Process flow improvement proposal using lean manufacturing philosophy and simulation techniques on a modular home manufacturer
-
Velarde GJ, Saloni DE, van Dyk H, Giunta M. Process flow improvement proposal using lean manufacturing philosophy and simulation techniques on a modular home manufacturer. Lean Construction Journal 2009, 17:1-77-93
-
(2009)
Lean Construction Journal
, vol.17
, pp. 177-193
-
-
Velarde, G.J.1
Saloni, D.E.2
Van Dyk, H.3
Giunta, M.4
|