메뉴 건너뛰기




Volumn 52, Issue 21, 2014, Pages 6349-6361

Developing due dates in an engineer-to-order engineering environment

Author keywords

due dates; Engineer to order; job complexity

Indexed keywords

COMPETITION; DIGITAL STORAGE; MANUFACTURE; PRODUCT DESIGN;

EID: 84908201074     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.940072     Document Type: Article
Times cited : (36)

References (40)
  • 1
    • 84864753972 scopus 로고
    • A gasp simulation study of job shop scheduling
    • Ashour, S., and, S. D. Vaswani. 1972. " A Gasp Simulation Study of Job Shop Scheduling." Simulation 18 (1): 1-10
    • (1972) Simulation , vol.18 , Issue.1 , pp. 1-10
    • Ashour, S.1    Vaswani, S.D.2
  • 2
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker, K. R. 1984. " Sequencing Rules and Due Date Assignments in a Job Shop." Management Science 30 (9): 1093-1104
    • (1984) Management Science , vol.30 , Issue.9 , pp. 1093-1104
    • Baker, K.R.1
  • 3
    • 0019582153 scopus 로고
    • A comparison of due date selection rules
    • Baker, K. R., and, J. V. M. Bertrand. 1981. " A Comparison of Due Date Selection Rules." AIIE Transactions 13: 123-131
    • (1981) AIIE Transactions , vol.13 , pp. 123-131
    • Baker, K.R.1    Bertrand, J.V.M.2
  • 5
    • 0023436606 scopus 로고
    • Algorithm for the con due-date determination and sequencing problem
    • Cheng, T. C. E. 1987. " Algorithm for the Con Due-date Determination and Sequencing Problem." Computers & Operations Research 14 (6): 537-542
    • (1987) Computers & Operations Research , vol.14 , Issue.6 , pp. 537-542
    • Cheng, T.C.E.1
  • 6
    • 0026398365 scopus 로고
    • Optimal constant due date determination and sequencing of n jobs on a single machine
    • Cheng, T. C. E. 1991. " Optimal Constant Due Date Determination and Sequencing of N Jobs on a Single Machine." International Journal of Production Economics 22: 259-261
    • (1991) International Journal of Production Economics , vol.22 , pp. 259-261
    • Cheng, T.C.E.1
  • 7
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T. C. E., and, M. C. Gupta. 1989. " Survey of Scheduling Research Involving Due Date Determination Decisions." European Journal of Operational Research 38: 156-166
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 8
    • 84908206482 scopus 로고    scopus 로고
    • Are You Eto? the Increasing Importance of Custom (Engineer-to-order) Manufacturers
    • Cutler, T. R. 2005. " Are You Eto? The Increasing Importance of Custom (Engineer-to-order) Manufacturers." InMFG 1-3.
    • (2005) InMFG , pp. 1-3
    • Cutler, T.R.1
  • 10
    • 0001131108 scopus 로고
    • Single facility due date setting with multiple customer classes
    • Duenyas, I. 1995. " Single Facility Due Date Setting with Multiple Customer Classes." Management Science 41 (4): 608-619
    • (1995) Management Science , vol.41 , Issue.4 , pp. 608-619
    • Duenyas, I.1
  • 11
    • 0002987480 scopus 로고
    • Quoting customer lead times
    • Duenyas, I., and, W. J. Hopp. 1995. " Quoting Customer Lead Times." Management Science 41 (1): 43-57
    • (1995) Management Science , vol.41 , Issue.1 , pp. 43-57
    • Duenyas, I.1    Hopp, W.J.2
  • 12
    • 49149099182 scopus 로고    scopus 로고
    • Delivery date and capacity management in a decentralized internal market
    • Erkoc, M., D. Wu, and, H. Gurnani. 2008. " Delivery Date and Capacity Management in a Decentralized Internal Market." Naval Research Logistics 55: 390-405
    • (2008) Naval Research Logistics , vol.55 , pp. 390-405
    • Erkoc, M.1    Wu, D.2    Gurnani, H.3
  • 13
    • 0036507457 scopus 로고    scopus 로고
    • Due date assignment and scheduling: Slk, twk and other due date assignment models
    • Gordon, V. S., J. M. Proth, and, C. Chu. 2002. " Due Date Assignment and Scheduling: Slk, TWK and Other Due Date Assignment Models." Production Planning and Control 13 (2): 117-132
    • (2002) Production Planning and Control , vol.13 , Issue.2 , pp. 117-132
    • Gordon, V.S.1    Proth, J.M.2    Chu, C.3
  • 15
    • 84885849174 scopus 로고    scopus 로고
    • Determining job complexity in an engineer to order environment for due date estimation using a proposed framework
    • Grabenstetter, D. H., and, J. M. Usher. 2013. " Determining Job Complexity in an Engineer to Order Environment for Due Date Estimation Using a Proposed Framework." International Journal of Production Research 51 (19): 5728-5740
    • (2013) International Journal of Production Research , vol.51 , Issue.19 , pp. 5728-5740
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 16
    • 0034672925 scopus 로고    scopus 로고
    • Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
    • Hicks, C., and, P. M. Braiden. 2000. " Computer-aided Production Management Issues in the Engineer-to-order Production of Complex Capital Goods Explored Using a Simulation Approach." International Journal of Production Research 38 (18): 4783-4810
    • (2000) International Journal of Production Research , vol.38 , Issue.18 , pp. 4783-4810
    • Hicks, C.1    Braiden, P.M.2
  • 18
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W. J., and, M. L. Sturgis. 2001a. " Quoting Manufacturing Due Dates Subject to a Service Level Constraint." IIE Transactions 32: 771-784.
    • (2001) IIE Transactions , vol.32 , pp. 771-784
    • Hopp, W.J.1    Sturgis, M.L.2
  • 20
    • 0012298197 scopus 로고
    • Priority dispatching with operation due dates in a job shop
    • Kanet, J. J., and, J. C. Hayya. 1982. " Priority Dispatching with Operation Due Dates in a Job Shop." Journal of Operations Management 2 (3): 167-175
    • (1982) Journal of Operations Management , vol.2 , Issue.3 , pp. 167-175
    • Kanet, J.J.1    Hayya, J.C.2
  • 21
    • 68649085140 scopus 로고    scopus 로고
    • Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times
    • Kim, J. G., and, D. H. Lee. 2009. " Algorithms for Common Due-date Assignment and Sequencing on a Single Machine with Sequence-dependent Setup Times." Journal of the Operational Research Society 60: 1264-1272
    • (2009) Journal of the Operational Research Society , vol.60 , pp. 1264-1272
    • Kim, J.G.1    Lee, D.H.2
  • 25
    • 0025890745 scopus 로고
    • Performance of lot dispatching and scheduling algorithms through discrete event simulation
    • Tempe, AZ
    • Oneil, P. 1991. " Performance of Lot Dispatching and Scheduling Algorithms Through Discrete Event Simulation." IEEE/SEMI International Semiconductor Manufacturing Science Symposium 21-24, Tempe, AZ.
    • (1991) IEEE/SEMI International Semiconductor Manufacturing Science Symposium , pp. 21-24
    • Oneil, P.1
  • 26
    • 34249652389 scopus 로고    scopus 로고
    • An ontology-based approach to support decision-making for the design of eto (engineer to order) products
    • Pandit, A., and, Y. Zhu. 2009. " An Ontology-based Approach to Support Decision-making for the Design of Eto (Engineer to Order) Products." Automation in Construction 16: 759-770.
    • (2009) Automation in Construction , vol.16 , pp. 759-770
    • Pandit, A.1    Zhu, Y.2
  • 27
    • 0020103079 scopus 로고
    • Common due date assignment to minimize total penalty for the one machine scheduling problem
    • Panwalker, S. S., M. L. Smith, and, A. Seidmann. 1982. " Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem." Operations Research 30: 391-399
    • (1982) Operations Research , vol.30 , pp. 391-399
    • Panwalker, S.S.1    Smith, M.L.2    Seidmann, A.3
  • 28
    • 0023326988 scopus 로고
    • A generalized model of due date assignment by linear programming
    • Quaddus, M. A. 1987. " A Generalized Model of Due Date Assignment by Linear Programming." Journal of the Operational Research Society 38 (4): 53-59.
    • (1987) Journal of the Operational Research Society , vol.38 , Issue.4 , pp. 53-59
    • Quaddus, M.A.1
  • 29
    • 0021468849 scopus 로고
    • A framework for the study of due date management in job shops
    • Ragatz, G. L., and, V. A. Mabert. 1984. " A Framework for the Study of Due Date Management in Job Shops." International Journal of Production Research 22 (4): 685-695
    • (1984) International Journal of Production Research , vol.22 , Issue.4 , pp. 685-695
    • Ragatz, G.L.1    Mabert, V.A.2
  • 31
    • 61449114951 scopus 로고    scopus 로고
    • Optimal due date assignment and resource allocation to minimize the weighted number of tardy jobs on a single machine
    • Shabtay, D., and, G. Steiner. 2007. " Optimal Due Date Assignment and Resource Allocation to Minimize the Weighted Number of Tardy Jobs on a Single Machine." Manufacturing and Service Operations Management 9 (3): 332-350
    • (2007) Manufacturing and Service Operations Management , vol.9 , Issue.3 , pp. 332-350
    • Shabtay, D.1    Steiner, G.2
  • 34
    • 33749553327 scopus 로고    scopus 로고
    • An ordinal optimization based evolution strategy to schedule complex make to order products
    • Song, D. P., C. Hicks, and, C. F. Earl. 2006. " An Ordinal Optimization Based Evolution Strategy to Schedule Complex Make to Order Products." International Journal of Production Research 44 (22): 4877-4895
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4877-4895
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 35
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • Stevenson, M., L. C. Hendry, and, B. G. Kingsman. 2005. " A Review of Production Planning and Control: The Applicability of Key Concepts to the Make-to-order Industry." International Journal of Production Research 43 (5): 869-898
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 36
    • 84882449229 scopus 로고    scopus 로고
    • Towards an integrated workload control (wlc) concept: The performance of due date setting rules in job shops with contingent orders
    • Thürer, M., M. Stevenson, C. Silva, and, M. Land. 2013. " Towards an Integrated Workload Control (Wlc) Concept: The Performance of Due Date Setting Rules in Job Shops with Contingent Orders." International Journal of Production Research 51 (15): 4502-4516
    • (2013) International Journal of Production Research , vol.51 , Issue.15 , pp. 4502-4516
    • Thürer, M.1    Stevenson, M.2    Silva, C.3    Land, M.4
  • 38
    • 0018454859 scopus 로고
    • A simulation study of predictable due dates
    • Weeks, J. K. 1979. " A Simulation Study of Predictable Due Dates." Management Science 25 (4): 363-373
    • (1979) Management Science , vol.25 , Issue.4 , pp. 363-373
    • Weeks, J.K.1
  • 39
    • 0017478424 scopus 로고
    • A methodology for assigning minimum cost due-dates
    • Weeks, J. K., and, J. S. Fryer. 1977. " A Methodology for Assigning Minimum Cost Due-dates." Management Science 23 (8): 872-881
    • (1977) Management Science , vol.23 , Issue.8 , pp. 872-881
    • Weeks, J.K.1    Fryer, J.S.2
  • 40
    • 39649122099 scopus 로고    scopus 로고
    • Due date (dd) quotation and capacity planning in make-to-order companies: Results from an empirical analysis
    • Zorzini, M., D. Corti, and, A. Pozzetti. 2008. " Due Date (dd) Quotation and Capacity Planning in Make-to-order Companies: Results from an Empirical Analysis." International Journal of Production Economics 112: 919-933
    • (2008) International Journal of Production Economics , vol.112 , pp. 919-933
    • Zorzini, M.1    Corti, D.2    Pozzetti, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.