메뉴 건너뛰기




Volumn 6, Issue 3, 2003, Pages 182-196

The need for a new product development framework for engineer-to-order products

Author keywords

Manufacturing systems; New products

Indexed keywords


EID: 84986059467     PISSN: 14601060     EISSN: None     Source Type: Journal    
DOI: 10.1108/14601060310486253     Document Type: Article
Times cited : (57)

References (34)
  • 1
    • 0025724184 scopus 로고
    • On the design process for customized products and demands upon technical information system
    • Agerman, E. (1991), “On the design process for customized products and demands upon technical information system”, Annals of the CIRP, Vol. 40 No. 1, pp. 161-4.
    • (1991) Annals of the CIRP , vol.40 , pp. 161-164
    • Agerman, E.1
  • 3
  • 6
    • 0031210412 scopus 로고    scopus 로고
    • Concurrent engineering and the underlying structure of the design problem
    • Funk, J.L. (1997), “Concurrent engineering and the underlying structure of the design problem”, IEEE Transactions on Engineering Management, Vol. 44 No. 3, pp. 305-15.
    • (1997) IEEE Transactions on Engineering Management , vol.44 , pp. 305-315
    • Funk, J.L.1
  • 7
    • 0028543214 scopus 로고
    • Effects of concurrent engineering on make-to-order products
    • Handfield, R.B. (1994), “Effects of concurrent engineering on make-to-order products”, IEEE Transactions on Engineering Management, Vol. 41 No. 4, pp. 384-93.
    • (1994) IEEE Transactions on Engineering Management , vol.41 , pp. 384-393
    • Handfield, R.B.1
  • 9
    • 33744901230 scopus 로고
    • Designer's thinking pattern in the basic layout design procedure of machine tools – validity evaluation of thinking block
    • Ito, Y., Shinno, H. and Nakanishi, S. (1989), “Designer's thinking pattern in the basic layout design procedure of machine tools – validity evaluation of thinking block”, Annals of the CIRP, Vol. 38 No. 1, pp. 141-4.
    • (1989) Annals of the CIRP , vol.38 , pp. 141-144
    • Ito, Y.1    Shinno, H.2    Nakanishi, S.3
  • 10
    • 84992972117 scopus 로고    scopus 로고
    • Implementation of success factors in new product development – the missing links?
    • Jensen, B. and Harmsen H. (2001), “Implementation of success factors in new product development – the missing links?”, European Journal of Innovation Management, Vol. 4 No. 1, pp. 37-52.
    • (2001) European Journal of Innovation Management , vol.4 , pp. 37-52
    • Jensen, B.1    Harmsen, H.2
  • 14
  • 15
    • 0035155607 scopus 로고    scopus 로고
    • “Manufacturing and supplier roles in product development”
    • Maffin, D. and Braiden, P. (2001), “Manufacturing and supplier roles in product development”, International Journal of Production Economics, Vol. 69, pp. 205-13.
    • (2001) International Journal of Production Economics , vol.69 , pp. 205-213
    • Maffin, D.1    Braiden, P.2
  • 19
    • 0027929727 scopus 로고
    • Engineering, a dialogue between science and society
    • Peters, J. and Leuven, K.U. (1994), “Engineering, a dialogue between science and society”, Annals of the CIRP, Vol. 43 No. 1, pp. 401-4.
    • (1994) Annals of the CIRP , vol.43 , pp. 401-404
    • Peters, J.1    Leuven, K.U.2
  • 20
    • 0032658519 scopus 로고    scopus 로고
    • Manufacturing classifications: relationships with production control systems
    • Porter, K., Little, D., Peck, M. and Rollins, R. (1999), “Manufacturing classifications: relationships with production control systems”, Integrated Manufacturing Systems, Vol. 10 No. 4, pp. 189-98.
    • (1999) Integrated Manufacturing Systems , vol.10 , pp. 189-198
    • Porter, K.1    Little, D.2    Peck, M.3    Rollins, R.4
  • 21
    • 11544358954 scopus 로고    scopus 로고
    • A concurrent workflow management process for integrated product development
    • Prasad, B. and Fujun, W. (1998), “A concurrent workflow management process for integrated product development”, Journal of Engineering Design, Vol. 9 No. 2, pp. 121-36.
    • (1998) Journal of Engineering Design , vol.9 , pp. 121-136
    • Prasad, B.1    Fujun, W.2
  • 22
    • 0003737701 scopus 로고
    • Addison-Wesley, Wokingham.
    • Pugh, S. (1991), Total Design, Addison-Wesley, Wokingham.
    • (1991) Total Design
    • Pugh, S.1
  • 23
    • 3543086756 scopus 로고
    • Shared computer-integrated manufacturing for various types of production environment
    • Samadhi, T.M.A.A. and Hoang, K. (1995), “Shared computer-integrated manufacturing for various types of production environment”, International Journal of Operations & Production Management, Vol. 15 No. 5, pp. 95-108.
    • (1995) International Journal of Operations & Production Management , vol.15 , pp. 95-108
    • Samadhi, T.M.A.A.1    Hoang, K.2
  • 24
    • 0031381833 scopus 로고    scopus 로고
    • Development and manufacture of dies for car body production
    • Siegert, K., Altan, T. and Nakagawa, T. (1997), “Development and manufacture of dies for car body production”, Annals of the CIRP, Vol. 46 No. 2, pp. 535-43.
    • (1997) Annals of the CIRP , vol.46 , pp. 535-543
    • Siegert, K.1    Altan, T.2    Nakagawa, T.3
  • 25
    • 0026995660 scopus 로고
    • Concurrent engineering
    • Sohlenius, G. (1992), “Concurrent engineering”, Annals of the CIRP, Vol. 41 No. 2, pp. 645-55.
    • (1992) Annals of the CIRP , vol.41 , pp. 645-655
    • Sohlenius, G.1
  • 28
    • 0000461601 scopus 로고
    • Development of personal CAD/CAM for mold manufacture based on solid modeling technique
    • Takeuchi, Y., Sakamoto, M., Abe, Y. and Orita, R. (1989), “Development of personal CAD/CAM for mold manufacture based on solid modeling technique”, Annals of the CIRP, Vol. 38 No. 1, pp. 429-32.
    • (1989) Annals of the CIRP , vol.38 , pp. 429-432
    • Takeuchi, Y.1    Sakamoto, M.2    Abe, Y.3    Orita, R.4
  • 31
    • 0026982333 scopus 로고
    • Manufacturing interfaces
    • van Houten, F.J.A.M. (1992), “Manufacturing interfaces”, Annals of the CIRP, Vol. 41 No. 2, pp. 699-710.
    • (1992) Annals of the CIRP , vol.41 , pp. 699-710
    • van Houten, F.J.A.M.1
  • 32
    • 0030167813 scopus 로고    scopus 로고
    • Concurrent engineering infrastructure: tools, technologies and methods in British industry
    • June
    • Veness, P.J., Chidolue, G. and Medhat, S.S. (1996), “Concurrent engineering infrastructure: tools, technologies and methods in British industry”, Engineering Management Journal, June, pp. 141-7.
    • (1996) Engineering Management Journal , pp. 141-147
    • Veness, P.J.1    Chidolue, G.2    Medhat, S.S.3
  • 33
    • 0029746913 scopus 로고    scopus 로고
    • Integrated design for low volume, large, complex products
    • Wallace, G. and Sackett, P. (1996), “Integrated design for low volume, large, complex products”, Integrated Manufacturing Systems, Vol. 7 No. 3, pp. 5-16.
    • (1996) Integrated Manufacturing Systems , vol.7 , pp. 5-16
    • Wallace, G.1    Sackett, P.2
  • 34
    • 0032664383 scopus 로고    scopus 로고
    • Strategies and application of rapid product and process development in Daimler-Benz AG
    • Wiedemann, B. and Jantzen, H.-A. (1999), “Strategies and application of rapid product and process development in Daimler-Benz AG”, Computers in Industry, Vol. 39, pp. 11-25.
    • (1999) Computers in Industry , vol.39 , pp. 11-25
    • Wiedemann, B.1    Jantzen, H.-A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.