메뉴 건너뛰기




Volumn , Issue , 2005, Pages 13-22

Value stream mapping for make-to-order products in a job shop environment

Author keywords

HVAC sheet metal fittings; Job shop; Lean Construction; Lean Production; Make to order; Value Stream Mapping

Indexed keywords

JOB SHOP ENVIRONMENT; SHEET METAL DUCTS; STREAM MAPPING; VALUE STEAM MAPPING (VSM);

EID: 27644493989     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (18)

References (16)
  • 9
    • 0004253213 scopus 로고    scopus 로고
    • McGraw-Hill International Editions, Boston (First Edition 1996)
    • Hopp, W.J. and Spearman, M.L. (2000) Factory Physics. Second Edition. McGraw-Hill International Editions, Boston, 698 pp. (First Edition 1996)
    • (2000) Factory Physics. Second Edition
    • Hopp, W.J.1    Spearman, M.L.2
  • 16
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling to pipe-spool installation: Simulation of a lean construction technique
    • ASCE
    • Tommelein, I.D. (1998) "Pull-driven Scheduling to Pipe-Spool Installation: Simulation of a Lean Construction Technique", ASCE, Journal of Construction Engineering and Management, 124(4), 279-288
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.