-
2
-
-
27644572400
-
Buffering and batching practices in the HVAC industry
-
22-24 July, Virginia Tech, held in Blacksburg, VA, USA
-
Alves, T.C.L. and Tommelein, I.D. (2003) "Buffering and Batching Practices in the HVAC Industry." Proc. Eleventh Conference of the International Group for Lean Construction (IGLC 11), 22-24 July, Virginia Tech, held in Blacksburg, VA, USA, 369-381
-
(2003)
Proc. Eleventh Conference of the International Group for Lean Construction (IGLC 11)
, pp. 369-381
-
-
Alves, T.C.L.1
Tommelein, I.D.2
-
6
-
-
27644494359
-
-
Ph.D. Dissertation, Constr. Engrg. and Mgmt. Program, U.C. Berkeley, Berkeley, CA
-
Elfving, J.A. (2003) Exploration of Opportunities to Reduce Lead Times for Engineered-To-Ordered Products. Ph.D. Dissertation, Constr. Engrg. and Mgmt. Program, U.C. Berkeley, Berkeley, CA. 322 pp.
-
(2003)
Exploration of Opportunities to Reduce Lead Times for Engineered-to-ordered Products
-
-
Elfving, J.A.1
-
7
-
-
27644530741
-
Value stream macro mapping - A case study of aluminum windows for construction supply chain
-
3-5 August, held in Helsingor, Denmark
-
Fontanini, P.S. and Picchi, F.A. (2004) "Value Stream Macro Mapping - A Case Study of Aluminum Windows for Construction Supply Chain." Proc. Twelfth Conference of the International Group for Lean Construction (IGLC 12), 3-5 August, held in Helsingor, Denmark, 576-587.
-
(2004)
Proc. Twelfth Conference of the International Group for Lean Construction (IGLC 12)
, pp. 576-587
-
-
Fontanini, P.S.1
Picchi, F.A.2
-
8
-
-
3242724531
-
Materials and information flows for HVAC ductwork fabrication and site installation
-
17-19 July, held in Brighton, UK
-
Holzemer, M., Tommelein, I.D. and Lin, S.L. (2000). "Materials and Information Flows for HVAC Ductwork Fabrication and Site Installation." Proc. Eighth Annual Conference of the International Group for Lean Construction (IGLC-8), 17-19 July, held in Brighton, UK.
-
(2000)
Proc. Eighth Annual Conference of the International Group for Lean Construction (IGLC-8)
-
-
Holzemer, M.1
Tommelein, I.D.2
Lin, S.L.3
-
11
-
-
27644434543
-
The challenge: The impetus for change to lean project delivery
-
22-24 July, Virginia Tech, held in Blacksburg, VA, USA
-
Mastroianni, R. and Abdelhamid, T. (2003) The challenge: the Impetus for Change to Lean Project Delivery. Proc. Eleventh Conference of the International Group for Lean Construction (IGLC 11), 22-24 July, Virginia Tech, held in Blacksburg, VA, USA, 610-621
-
(2003)
Proc. Eleventh Conference of the International Group for Lean Construction (IGLC 11)
, pp. 610-621
-
-
Mastroianni, R.1
Abdelhamid, T.2
-
13
-
-
0004046182
-
-
June 2001, The Lean Enterprise Institute, Brookline, Massachusetts, USA
-
Rother, M. and Harris, R. (2001) Creating Continuous Flow: an action guide for managers, engineers, and production associates, Version 1.0, June 2001, The Lean Enterprise Institute, Brookline, Massachusetts, USA, 104 pp
-
(2001)
Creating Continuous Flow: An Action Guide for Managers, Engineers, and Production Associates, Version 1.0
-
-
Rother, M.1
Harris, R.2
-
14
-
-
0003931681
-
-
The Lean Enterprise Institute, Brookline, Massachusetts, USA
-
Rother, M. and Shook, J. (1998) Learning to see: value stream mapping to create value and eliminate muda, Version 1.1, The Lean Enterprise Institute, Brookline, Massachusetts, USA, 96 pp.
-
(1998)
Learning to See: Value Stream Mapping to Create Value and Eliminate Muda, Version 1.1
-
-
Rother, M.1
Shook, J.2
-
16
-
-
0000012732
-
Pull-driven scheduling to pipe-spool installation: Simulation of a lean construction technique
-
ASCE
-
Tommelein, I.D. (1998) "Pull-driven Scheduling to Pipe-Spool Installation: Simulation of a Lean Construction Technique", ASCE, Journal of Construction Engineering and Management, 124(4), 279-288
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
|